McCallum Enterprises I Limited; Partnership and Shelton Canal Company; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 23717 [2021-09340]
Download as PDF
Federal Register / Vol. 86, No. 84 / Tuesday, May 4, 2021 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff, Volume No.
11; Amendment to be effective
6/27/2021.
Filed Date: 4/27/21.
Accession Number: 20210427–5205.
Comments Due: 5 p.m. ET 5/18/21.
Docket Numbers: ER21–1776–000.
Applicants: Emmons-Logan Wind
Interconnection, LLC.
Description: Tariff Cancellation:
Emmons-Logan Interconnection Notice
of Cancellation of TSA to be effective
4/28/2021.
Filed Date: 4/27/21.
Accession Number: 20210427–5213.
Comments Due: 5 p.m. ET 5/18/21.
Docket Numbers: ER21–1777–000.
Applicants: Lanyard Power Holdings,
LLC.
Description: § 205(d) Rate Filing:
Reactive Service Rate Schedule Filing
for Deactivation of Chalk Point Units to
be effective 6/1/2021.
Filed Date: 4/27/21.
Accession Number: 20210427–5227.
Comments Due: 5 p.m. ET 5/18/21.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES21–40–000.
Applicants: MidAmerican Energy
Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities for
MidAmerican Energy Company.
Filed Date: 4/27/21.
Accession Number: 20210427–5241.
Comments Due: 5 p.m. ET 5/18/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
17:13 May 03, 2021
Jkt 253001
Dated: April 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–09343 Filed 5–3–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6066–038]
McCallum Enterprises I Limited;
Partnership and Shelton Canal
Company; Notice of Intent To File
License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 6066–038.
c. Date Filed: February 26, 2021.
d. Submitted By: McCallum
Enterprises I Limited Partnership and
Shelton Canal Company (McCallum and
Shelton).
e. Name of Project: Derby Dam
Hydroelectric Project.
f. Location: On the Housatonic River
in Fairfield and New Haven Counties,
Connecticut. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and
5.5 of the Commission’s regulations.
h. Potential Applicant Contact: Joseph
W. Szarmach, Jr., McCallum Enterprises
I Limited Partnership and Shelton Canal
Company, 2874 Main St., Stratford, CT
06614; (203) 386–1745; email at
MELPHydro@gmail.com.
i. FERC Contact: Michael Watts at
(202) 502–6123; or email at
michael.watts@ferc.gov.
j. McCallum Enterprises filed its
request to use the Traditional Licensing
Process on February 26, 2021, and
provided public notice of the request on
February 26, 2021. In a letter dated
April 27, 2021, the Director of the
Division of Hydropower Licensing
approved McCallum’s and Shelton’s
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
part 402; and NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
23717
Act and implementing regulations at 50
CFR 600.920. We are also initiating
consultation with the Connecticut State
Historic Preservation Officer, as
required by section 106 of the National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
McCallum and Shelton as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. On February 26, 2021, McCallum
and Shelton filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD may be viewed
and/or printed on the Commission’s
website (https://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued on March 13, 2020. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 6066.
Pursuant to 18 CFR 16.8, 16.9, and
16.10, each application for a new
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by February 28,
2024.
p. Register online at https://
ferconline.ferc.gov/FERCOnline.aspx to
be notified via email of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
Dated: April 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–09340 Filed 5–3–21; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\04MYN1.SGM
04MYN1
Agencies
[Federal Register Volume 86, Number 84 (Tuesday, May 4, 2021)]
[Notices]
[Page 23717]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-09340]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6066-038]
McCallum Enterprises I Limited; Partnership and Shelton Canal
Company; Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approving Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 6066-038.
c. Date Filed: February 26, 2021.
d. Submitted By: McCallum Enterprises I Limited Partnership and
Shelton Canal Company (McCallum and Shelton).
e. Name of Project: Derby Dam Hydroelectric Project.
f. Location: On the Housatonic River in Fairfield and New Haven
Counties, Connecticut. No federal lands are occupied by the project
works or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission's
regulations.
h. Potential Applicant Contact: Joseph W. Szarmach, Jr., McCallum
Enterprises I Limited Partnership and Shelton Canal Company, 2874 Main
St., Stratford, CT 06614; (203) 386-1745; email at [email protected].
i. FERC Contact: Michael Watts at (202) 502-6123; or email at
[email protected].
j. McCallum Enterprises filed its request to use the Traditional
Licensing Process on February 26, 2021, and provided public notice of
the request on February 26, 2021. In a letter dated April 27, 2021, the
Director of the Division of Hydropower Licensing approved McCallum's
and Shelton's request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7
of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the Connecticut State Historic Preservation Officer,
as required by section 106 of the National Historic Preservation Act,
and the implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating McCallum and Shelton as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act; and consultation pursuant to section 106 of the
National Historic Preservation Act.
m. On February 26, 2021, McCallum and Shelton filed a Pre-
Application Document (PAD; including a proposed process plan and
schedule) with the Commission, pursuant to 18 CFR 5.6 of the
Commission's regulations.
n. A copy of the PAD may be viewed and/or printed on the
Commission's website (https://www.ferc.gov), using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field to access the document. At this time, the
Commission has suspended access to the Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued on March 13, 2020. For
assistance, contact FERC Online Support at [email protected],
(866) 208-3676 (toll free), or (202) 502-8659 (TTY).
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 6066. Pursuant to 18 CFR
16.8, 16.9, and 16.10, each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by February 28,
2024.
p. Register online at https://ferconline.ferc.gov/FERCOnline.aspx
to be notified via email of new filings and issuances related to this
or other pending projects. For assistance, contact FERC Online Support.
Dated: April 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-09340 Filed 5-3-21; 8:45 am]
BILLING CODE 6717-01-P