Jordan Hydroelectric Limited Partnership; Flannagan Hydro, LLC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests, 21723-21724 [2021-08521]

Download as PDF Federal Register / Vol. 86, No. 77 / Friday, April 23, 2021 / Notices khammond on DSKJM1Z7X2PROD with NOTICES authorization again to allow time to continue working through landowner/ agency issues and obtain the outstanding environmental permit to abandon the North Lake Pagie/Bay Junop-Bay Round pipeline. Texas Gas states that the Project’s environmental findings remain valid as no agency has made any change, nor has any change occurred to the Project, that would affect the environment to an extent not already considered by the June 26 Order, by the Project’s Environmental Assessment issued on June 13, 2018, or by the confirmed biological opinions of environmental agencies. Thus, Texas Gas believes it can come to agreeable terms for abandonment with the relevant landowner/agency parties and therefore asserts that ‘good cause’ exists to grant an extension of time, until June 26, 2023 This notice establishes a 15-calendar day intervention and comment period deadline. Any person wishing to comment on Transco’s request for an extension of time may do so. No reply comments or answers will be considered. If you wish to obtain legal status by becoming a party to the proceedings for this request, you should, on or before the comment date stated below, file a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10).2 As a matter of practice, the Commission itself generally acts on requests for extensions of time to complete construction for Natural Gas Act facilities when such requests are contested before order issuance. For those extension requests that are contested,3 the Commission will aim to issue an order acting on the request within 45 days.4 The Commission will address all arguments relating to whether the applicant has demonstrated there is good cause to grant the extension.5 The Commission will not consider arguments that re-litigate the issuance of the Order, including whether the Commission properly found the project to be in the public convenience and necessity and whether the Commission’s environmental analysis for the certificate complied 2 Only motions to intervene from entities that were party to the underlying proceeding will be accepted. Algonquin Gas Transmission, LLC, 170 FERC 61,144, at P 39 (2020). 3 Contested proceedings are those where an intervenor disputes any material issue of the filing. 18 CFR 385.2201(c)(1) (2020). 4 Algonquin Gas Transmission, LLC, 170 FERC 61,144, at P 40 (2020). 5 Id. P 40. VerDate Sep<11>2014 18:15 Apr 22, 2021 Jkt 253001 with the National Environmental Policy Act.6 At the time a pipeline requests an extension of time, orders on certificates of public convenience and necessity are final and the Commission will not relitigate their issuance.7 The OEP Director, or his or her designee, will act on those extension requests that are uncontested. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning COVID–19, issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFile’’ link at https://www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5:00 p.m. Eastern Time on May 10, 2021. Dated: April 19, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–08519 Filed 4–22–21; 8:45 am] BILLING CODE 6717–01–P 6 Similarly, the Commission will not re-litigate the issuance of an NGA section 3 authorization, including whether a proposed project is not inconsistent with the public interest and whether the Commission’s environmental analysis for the permit order complied with NEPA. 7 Algonquin Gas Transmission, LLC, 170 FERC 61,144, at P 40 (2020). PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 21723 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12740–010] Jordan Hydroelectric Limited Partnership; Flannagan Hydro, LLC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests On March 12, 2021, and supplemented on April 12, 2021, Jordan Hydroelectric Limited Partnership (transferor) and Flannagan Hydro, LLC (transferee) filed jointly an application for the transfer of license of the Flannagan Hydroelectric Project No. 12740. The proposed project would be located at the U.S. Army Corps of Engineers’ (Corps) John W. Flannagan Dam and Reservoir on the Pound River, near the Town of Clintwood, in Dickenson County, Virginia. The applicants seek Commission approval to transfer the license for the Flannagan Hydroelectric Project from the transferor to the transferee. Applicants Contact: For transferor and transferee: Mr. James Price, President of General Partner, Jordan Hydroelectric Limited Partnership and President of Flannagan Hydro, LLC, P.O. Box 903, Gatlinburg, TN 37738, Email: jabboprice@bellsouth.net and Mr. Joshua E. Adrian, Thompson Coburn LLP, 1909 K Street NW, Suite 600, Washington, District of Columbia 20006, Phone: (202) 585–6922, Email: jadrian@ thompsoncoburn.com. FERC Contact: Anumzziatta Purchiaroni, (202) 502–6191, anumzziatta.purchiaroni@ferc.gov. Deadline for filing comments, motions to intervene, and protests: 30 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via U.S. Postal Service must be addressed to, Kimberly D. Bose, Secretary, Federal Energy Regulatory E:\FR\FM\23APN1.SGM 23APN1 21724 Federal Register / Vol. 86, No. 77 / Friday, April 23, 2021 / Notices Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to, Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–12740–010. Comments emailed to Commission staff are not considered part of the Commission record. Dated: April 19, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–08521 Filed 4–22–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission khammond on DSKJM1Z7X2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–2360–008; ER12–2037–013; ER12–2314–009; ER15–2129–006; ER15–2130–006; ER15–2131–006; ER17–2258–004. Applicants: Great Western Wind Energy, LLC, Milo Wind Project, LLC, Rock Falls Wind Farm LLC, Roosevelt Wind Project, LLC, Slate Creek Wind Project, LLC, Spearville 3, LLC, Spinning Spur Wind LLC. Description: Notice of Change in Status of Great Western Wind Energy, LLC, et al. Filed Date: 4/16/21. Accession Number: 20210416–5383. Comments Due: 5 p.m. ET 5/7/21. Docket Numbers: ER20–2671–001; ER21–425–001; ER21–848–001. Applicants: Water Strider Solar, LLC, Copper Mountain Solar 5, LLC, Battle Mountain SP, LLC. Description: Notice of Non-Material Change in Status of Water Strider Solar, LLC, et al. Filed Date: 4/16/21. Accession Number: 20210419–5133. Comments Due: 5 p.m. ET 5/7/21. Docket Numbers: ER21–1707–000. Applicants: The Potomac Edison Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Potomac submits Interconnection Agreement, SA No. 4452 with ODEC to be effective 6/16/2021. Filed Date: 4/16/21. Accession Number: 20210416–5349. Comments Due: 5 p.m. ET 5/7/21. Docket Numbers: ER21–1708–000. Applicants: PJM Interconnection, L.L.C. VerDate Sep<11>2014 18:15 Apr 22, 2021 Jkt 253001 Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 6009; Queue No. AF2–168 to be effective 3/18/2021. Filed Date: 4/19/21. Accession Number: 20210419–5007. Comments Due: 5 p.m. ET 5/10/21. Docket Numbers: ER21–1709–000. Applicants: ISO New England Inc., Vermont Transco LLC. Description: Compliance filing: Vermont Transco LLC; Supplemental Order No. 864 Compliance Filing to be effective 1/1/2020. Filed Date: 4/19/21. Accession Number: 20210419–5039. Comments Due: 5 p.m. ET 5/10/21. Docket Numbers: ER21–1710–000. Applicants: New York Transco, LLC, New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: 205 EPCA among Transco, Holcim and NYISO SA No. 2617 to be effective 4/ 2/2021. Filed Date: 4/19/21. Accession Number: 20210419–5088. Comments Due: 5 p.m. ET 5/10/21. Docket Numbers: ER21–1711–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: OATT Formula Rate—Schedule 10 Loss Factor for June 2021 to be effective 6/ 1/2021. Filed Date: 4/19/21. Accession Number: 20210419–5095. Comments Due: 5 p.m. ET 5/10/21. Docket Numbers: ER21–1712–000. Applicants: Indiana Michigan Power Company, AEP Indiana Michigan Transmission Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: AEP submits Harber Facilities Agreement re: SA No. 1262 to be effective 6/19/2021. Filed Date: 4/19/21. Accession Number: 20210419–5121. Comments Due: 5 p.m. ET 5/10/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 19, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–08523 Filed 4–22–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784–106] Topsham Hydro Partners Limited Partnership; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 4784–106. c. Date filed: August 31, 2020. d. Applicant: Topsham Hydro Partners Limited Partnership. e. Name of Project: Pejepscot Hydroelectric Project. f. Location: On the Androscoggin River in Sagadahoc, Cumberland, and Androscoggin Counties in the village of Pejepscot and the town of Topsham, Maine. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Tom Uncher, Vice President, Topsham Hydro Partners Limited Partnership, 339B Big Bay Rd, Queensbury, NY 12804, Telephone: 1–518–743–2018, Thomas.Uncher@ brookfieldrenewable.com. i. FERC Contact: Ryan Hansen, Telephone (202) 502–8074, and email ryan.hansen@ferc.gov. j. Deadline for filing motions to intervene and protests, comments, recommendations, preliminary terms and conditions, and preliminary prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, recommendations, preliminary terms and conditions, and preliminary E:\FR\FM\23APN1.SGM 23APN1

Agencies

[Federal Register Volume 86, Number 77 (Friday, April 23, 2021)]
[Notices]
[Pages 21723-21724]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-08521]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12740-010]


Jordan Hydroelectric Limited Partnership; Flannagan Hydro, LLC; 
Notice of Application for Transfer of License and Soliciting Comments, 
Motions To Intervene, and Protests

    On March 12, 2021, and supplemented on April 12, 2021, Jordan 
Hydroelectric Limited Partnership (transferor) and Flannagan Hydro, LLC 
(transferee) filed jointly an application for the transfer of license 
of the Flannagan Hydroelectric Project No. 12740. The proposed project 
would be located at the U.S. Army Corps of Engineers' (Corps) John W. 
Flannagan Dam and Reservoir on the Pound River, near the Town of 
Clintwood, in Dickenson County, Virginia.
    The applicants seek Commission approval to transfer the license for 
the Flannagan Hydroelectric Project from the transferor to the 
transferee.
    Applicants Contact: For transferor and transferee: Mr. James Price, 
President of General Partner, Jordan Hydroelectric Limited Partnership 
and President of Flannagan Hydro, LLC, P.O. Box 903, Gatlinburg, TN 
37738, Email: [email protected] and Mr. Joshua E. Adrian, 
Thompson Coburn LLP, 1909 K Street NW, Suite 600, Washington, District 
of Columbia 20006, Phone: (202) 585-6922, Email: 
[email protected].
    FERC Contact: Anumzziatta Purchiaroni, (202) 502-6191, 
[email protected].
    Deadline for filing comments, motions to intervene, and protests: 
30 days from the date that the Commission issues this notice. The 
Commission strongly encourages electronic filing. Please file comments, 
motions to intervene, and protests using the Commission's eFiling 
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY).
    In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via U.S. Postal Service must be addressed to, Kimberly 
D. Bose, Secretary, Federal Energy Regulatory

[[Page 21724]]

Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to, Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852. The first page of any filing should 
include docket number P-12740-010. Comments emailed to Commission staff 
are not considered part of the Commission record.

    Dated: April 19, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-08521 Filed 4-22-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.