Jordan Hydroelectric Limited Partnership; Flannagan Hydro, LLC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests, 21723-21724 [2021-08521]
Download as PDF
Federal Register / Vol. 86, No. 77 / Friday, April 23, 2021 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
authorization again to allow time to
continue working through landowner/
agency issues and obtain the
outstanding environmental permit to
abandon the North Lake Pagie/Bay
Junop-Bay Round pipeline. Texas Gas
states that the Project’s environmental
findings remain valid as no agency has
made any change, nor has any change
occurred to the Project, that would
affect the environment to an extent not
already considered by the June 26
Order, by the Project’s Environmental
Assessment issued on June 13, 2018, or
by the confirmed biological opinions of
environmental agencies. Thus, Texas
Gas believes it can come to agreeable
terms for abandonment with the
relevant landowner/agency parties and
therefore asserts that ‘good cause’ exists
to grant an extension of time, until June
26, 2023
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on Transco’s request for an
extension of time may do so. No reply
comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).2
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,3 the Commission will aim to
issue an order acting on the request
within 45 days.4 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.5 The Commission will not
consider arguments that re-litigate the
issuance of the Order, including
whether the Commission properly
found the project to be in the public
convenience and necessity and whether
the Commission’s environmental
analysis for the certificate complied
2 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC 61,144, at P 39 (2020).
3 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2020).
4 Algonquin Gas Transmission, LLC, 170 FERC
61,144, at P 40 (2020).
5 Id. P 40.
VerDate Sep<11>2014
18:15 Apr 22, 2021
Jkt 253001
with the National Environmental Policy
Act.6 At the time a pipeline requests an
extension of time, orders on certificates
of public convenience and necessity are
final and the Commission will not relitigate their issuance.7 The OEP
Director, or his or her designee, will act
on those extension requests that are
uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning COVID–19,
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission. To mail
via USPS, use the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Time on May 10, 2021.
Dated: April 19, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–08519 Filed 4–22–21; 8:45 am]
BILLING CODE 6717–01–P
6 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
7 Algonquin Gas Transmission, LLC, 170 FERC
61,144, at P 40 (2020).
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
21723
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12740–010]
Jordan Hydroelectric Limited
Partnership; Flannagan Hydro, LLC;
Notice of Application for Transfer of
License and Soliciting Comments,
Motions To Intervene, and Protests
On March 12, 2021, and
supplemented on April 12, 2021, Jordan
Hydroelectric Limited Partnership
(transferor) and Flannagan Hydro, LLC
(transferee) filed jointly an application
for the transfer of license of the
Flannagan Hydroelectric Project No.
12740. The proposed project would be
located at the U.S. Army Corps of
Engineers’ (Corps) John W. Flannagan
Dam and Reservoir on the Pound River,
near the Town of Clintwood, in
Dickenson County, Virginia.
The applicants seek Commission
approval to transfer the license for the
Flannagan Hydroelectric Project from
the transferor to the transferee.
Applicants Contact: For transferor and
transferee: Mr. James Price, President of
General Partner, Jordan Hydroelectric
Limited Partnership and President of
Flannagan Hydro, LLC, P.O. Box 903,
Gatlinburg, TN 37738, Email:
jabboprice@bellsouth.net and Mr.
Joshua E. Adrian, Thompson Coburn
LLP, 1909 K Street NW, Suite 600,
Washington, District of Columbia 20006,
Phone: (202) 585–6922, Email: jadrian@
thompsoncoburn.com.
FERC Contact: Anumzziatta
Purchiaroni, (202) 502–6191,
anumzziatta.purchiaroni@ferc.gov.
Deadline for filing comments, motions
to intervene, and protests: 30 days from
the date that the Commission issues this
notice. The Commission strongly
encourages electronic filing. Please file
comments, motions to intervene, and
protests using the Commission’s eFiling
system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
In lieu of electronic filing, you may
submit a paper copy. Submissions sent
via U.S. Postal Service must be
addressed to, Kimberly D. Bose,
Secretary, Federal Energy Regulatory
E:\FR\FM\23APN1.SGM
23APN1
21724
Federal Register / Vol. 86, No. 77 / Friday, April 23, 2021 / Notices
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to, Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–12740–010. Comments
emailed to Commission staff are not
considered part of the Commission
record.
Dated: April 19, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–08521 Filed 4–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–2360–008;
ER12–2037–013; ER12–2314–009;
ER15–2129–006; ER15–2130–006;
ER15–2131–006; ER17–2258–004.
Applicants: Great Western Wind
Energy, LLC, Milo Wind Project, LLC,
Rock Falls Wind Farm LLC, Roosevelt
Wind Project, LLC, Slate Creek Wind
Project, LLC, Spearville 3, LLC,
Spinning Spur Wind LLC.
Description: Notice of Change in
Status of Great Western Wind Energy,
LLC, et al.
Filed Date: 4/16/21.
Accession Number: 20210416–5383.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER20–2671–001;
ER21–425–001; ER21–848–001.
Applicants: Water Strider Solar, LLC,
Copper Mountain Solar 5, LLC, Battle
Mountain SP, LLC.
Description: Notice of Non-Material
Change in Status of Water Strider Solar,
LLC, et al.
Filed Date: 4/16/21.
Accession Number: 20210419–5133.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1707–000.
Applicants: The Potomac Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Potomac submits Interconnection
Agreement, SA No. 4452 with ODEC to
be effective 6/16/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5349.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1708–000.
Applicants: PJM Interconnection,
L.L.C.
VerDate Sep<11>2014
18:15 Apr 22, 2021
Jkt 253001
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
6009; Queue No. AF2–168 to be
effective 3/18/2021.
Filed Date: 4/19/21.
Accession Number: 20210419–5007.
Comments Due: 5 p.m. ET 5/10/21.
Docket Numbers: ER21–1709–000.
Applicants: ISO New England Inc.,
Vermont Transco LLC.
Description: Compliance filing:
Vermont Transco LLC; Supplemental
Order No. 864 Compliance Filing to be
effective 1/1/2020.
Filed Date: 4/19/21.
Accession Number: 20210419–5039.
Comments Due: 5 p.m. ET 5/10/21.
Docket Numbers: ER21–1710–000.
Applicants: New York Transco, LLC,
New York Independent System
Operator, Inc.
Description: § 205(d) Rate Filing: 205
EPCA among Transco, Holcim and
NYISO SA No. 2617 to be effective 4/
2/2021.
Filed Date: 4/19/21.
Accession Number: 20210419–5088.
Comments Due: 5 p.m. ET 5/10/21.
Docket Numbers: ER21–1711–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
OATT Formula Rate—Schedule 10 Loss
Factor for June 2021 to be effective 6/
1/2021.
Filed Date: 4/19/21.
Accession Number: 20210419–5095.
Comments Due: 5 p.m. ET 5/10/21.
Docket Numbers: ER21–1712–000.
Applicants: Indiana Michigan Power
Company, AEP Indiana Michigan
Transmission Company, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing: AEP
submits Harber Facilities Agreement re:
SA No. 1262 to be effective 6/19/2021.
Filed Date: 4/19/21.
Accession Number: 20210419–5121.
Comments Due: 5 p.m. ET 5/10/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 19, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–08523 Filed 4–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4784–106]
Topsham Hydro Partners Limited
Partnership; Notice of Application
Accepted for Filing, Soliciting Motions
To Intervene and Protests, Ready for
Environmental Analysis, and Soliciting
Comments, Recommendations,
Preliminary Terms and Conditions, and
Preliminary Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 4784–106.
c. Date filed: August 31, 2020.
d. Applicant: Topsham Hydro
Partners Limited Partnership.
e. Name of Project: Pejepscot
Hydroelectric Project.
f. Location: On the Androscoggin
River in Sagadahoc, Cumberland, and
Androscoggin Counties in the village of
Pejepscot and the town of Topsham,
Maine. The project does not affect
federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Tom
Uncher, Vice President, Topsham Hydro
Partners Limited Partnership, 339B Big
Bay Rd, Queensbury, NY 12804,
Telephone: 1–518–743–2018,
Thomas.Uncher@
brookfieldrenewable.com.
i. FERC Contact: Ryan Hansen,
Telephone (202) 502–8074, and email
ryan.hansen@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
prescriptions: 60 days from the issuance
date of this notice; reply comments are
due 105 days from the issuance date of
this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
E:\FR\FM\23APN1.SGM
23APN1
Agencies
[Federal Register Volume 86, Number 77 (Friday, April 23, 2021)]
[Notices]
[Pages 21723-21724]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-08521]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12740-010]
Jordan Hydroelectric Limited Partnership; Flannagan Hydro, LLC;
Notice of Application for Transfer of License and Soliciting Comments,
Motions To Intervene, and Protests
On March 12, 2021, and supplemented on April 12, 2021, Jordan
Hydroelectric Limited Partnership (transferor) and Flannagan Hydro, LLC
(transferee) filed jointly an application for the transfer of license
of the Flannagan Hydroelectric Project No. 12740. The proposed project
would be located at the U.S. Army Corps of Engineers' (Corps) John W.
Flannagan Dam and Reservoir on the Pound River, near the Town of
Clintwood, in Dickenson County, Virginia.
The applicants seek Commission approval to transfer the license for
the Flannagan Hydroelectric Project from the transferor to the
transferee.
Applicants Contact: For transferor and transferee: Mr. James Price,
President of General Partner, Jordan Hydroelectric Limited Partnership
and President of Flannagan Hydro, LLC, P.O. Box 903, Gatlinburg, TN
37738, Email: [email protected] and Mr. Joshua E. Adrian,
Thompson Coburn LLP, 1909 K Street NW, Suite 600, Washington, District
of Columbia 20006, Phone: (202) 585-6922, Email:
[email protected].
FERC Contact: Anumzziatta Purchiaroni, (202) 502-6191,
[email protected].
Deadline for filing comments, motions to intervene, and protests:
30 days from the date that the Commission issues this notice. The
Commission strongly encourages electronic filing. Please file comments,
motions to intervene, and protests using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY).
In lieu of electronic filing, you may submit a paper copy.
Submissions sent via U.S. Postal Service must be addressed to, Kimberly
D. Bose, Secretary, Federal Energy Regulatory
[[Page 21724]]
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to, Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include docket number P-12740-010. Comments emailed to Commission staff
are not considered part of the Commission record.
Dated: April 19, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-08521 Filed 4-22-21; 8:45 am]