Combined Notice of Filings #1, 21315-21316 [2021-08382]
Download as PDF
Federal Register / Vol. 86, No. 76 / Thursday, April 22, 2021 / Notices
21315
19 Emailed
comments dated 4/13/2021 from James Hatchett.
comments dated 4/13/2021 from Lasha Wells.
comments dated 4/13/2021 from Les Roberts.
22 Emailed comments dated 4/13/2021 from Robert Rutkowski.
23 Emailed comments dated 4/15/2021 from Shanyn Viars.
24 Emailed comments dated 4/15/2021 from Kern Aughinbaugh.
25 Emailed comments dated 4/15/2021 from Suzanne Haws.
26 Emailed comments dated 4/15/2021 from Elizabeth Flees.
27 Emailed comments dated 4/15/2021 from Stefan Warner.
28 Emailed comments dated 4/15/2021 from Jenna Randall.
29 Comptroller Scott Stringer, U.S. Senators James Sanders, Jessica Ramos, Joseph P. Addabbo, Jr., Julia Salazar, Andrew Gounardes, Brian
Kavanagh, Brad Hoylman, Alessandra Biaggi, Jabari Brisport, Assemblymembers Stacey Pheffer-Amato, Brian Barnwell, Zohran Mamdani, Robert Carroll, William Colton, Emily Gallagher, Jo Anne Simon, Phara Souffrant Forrest, Harvey Epstein, Marcela Mitanyes, Queens Borough President Donovan Richards, Councilmembers Costa Constantinides, Brad Lander, Carlina Rivera, Rockaways District Leader Lew Simon, and Jeanette Garramone.
20 Emailed
21 Emailed
Dated: April 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–08388 Filed 4–21–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–127–000.
Applicants: Samson Solar Energy III
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Samson Solar
Energy III LLC.
Filed Date: 4/16/21.
Accession Number: 20210416–5102.
Comments Due: 5 p.m. ET 5/7/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–801–012.
Applicants: Constellation Power
Source Generation, LLC.
Description: Compliance filing:
Settlement Compliance Filing to be
effective 10/20/2019.
Filed Date: 4/16/21.
Accession Number: 20210416–5174.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER20–2452–002.
Applicants: Hamilton Liberty LLC.
Description: Compliance filing:
Supplement to Informational Filing &
Requests for Waiver & Expedited Action
to be effective 7/18/2020.
Filed Date: 4/16/21.
Accession Number: 20210416–5104.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER20–2453–003.
Applicants: Hamilton Patriot LLC.
Description: Compliance filing:
Supplement to Informational Filing &
Requests for Waiver & Expedited Action
to be effective 7/18/2020.
Filed Date: 4/16/21.
VerDate Sep<11>2014
19:20 Apr 21, 2021
Jkt 253001
Accession Number: 20210416–5108.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–254–003.
Applicants: Harmony Florida Solar,
LLC.
Description: Compliance filing:
Harmony Florida Solar, LLC
Compliance Filing to be effective 12/29/
2020.
Filed Date: 4/16/21.
Accession Number: 20210416–5149.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–502–002.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
Compliance Demand Curve Reset to be
effective 4/9/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5181.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1691–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–04–16_SA 3476 ATC-Grant
County Solar 1st Rev GIA (J947) to be
effective 4/2/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5017.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1692–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 6028; Queue
No. AF2–378 to be effective 3/29/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5039.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1693–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 6029; Queue
No. AG1–140 to be effective 4/5/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5065.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1694–000.
Applicants: ISO New England Inc.,
Green Mountain Power Corporation.
Description: Compliance filing: Green
Mountain Power; Supplement to Order
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
No. 864 Compliance Filing to be
effective 1/1/2020.
Filed Date: 4/16/21.
Accession Number: 20210416–5090.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1696–000.
Applicants: Bluestone Farm Solar,
LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 5/1/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5093.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1697–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 6030; Queue
No. AG1–145 to be effective 4/5/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5105.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1698–000.
Applicants: New York State Electric &
Gas Corporation, New York
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
NYSEG 205 filing of EPA between
NYSEG andBluestone Wind SA No.
2616 to be effective 4/16/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5117.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1699–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
LGIA Luz Solar Partners LTD., IX, LP
Kramer Junction 9 SA No. 264 to be
effective 4/18/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5134.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1700–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Americus Solar (Americus Solar II)
LGIA Amendment Filing to be effective
3/10/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5190.
Comments Due: 5 p.m. ET 5/7/21.
E:\FR\FM\22APN1.SGM
22APN1
21316
Federal Register / Vol. 86, No. 76 / Thursday, April 22, 2021 / Notices
Docket Numbers: ER21–1701–000.
Applicants: Alabama Power
Company.
Description: Initial rate filing:
Cooperative Energy Morrow CC Affected
System Upgrade Agreement Filing to be
effective 3/31/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5192.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1702–000.
Applicants: ISO New England Inc.,
Central Maine Power Company.
Description: Compliance filing:
Central Maine Power; Order No. 864
Supplemental Compliance Filing to be
effective 1/1/2020.
Filed Date: 4/16/21.
Accession Number: 20210416–5199.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1703–000.
Applicants: Georgia Power Company.
Description: Initial rate filing:
Cooperative Energy Morrow CC Affected
System Upgrade Agreement Filing to be
effective 3/31/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5210.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1704–000.
Applicants: Mississippi Power
Company.
Description: Initial rate filing:
Cooperative Energy Morrow CC Affected
System Upgrade Agreement Filing to be
effective 3/31/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5211.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1705–000.
Applicants: Avista Corporation.
Description: § 205(d) Rate Filing:
Avista Corp LTF PTP Agreement T–
1179 to be effective 5/1/2021.
Filed Date: 4/16/21.
Accession Number: 20210416–5238.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21–1706–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.,
Southwest Power Pool, Inc.
Description: Compliance filing: TriState Generation and Transmission
Assoc., Inc. Order 864 Compliance
Filing to be effective 1/27/2020.
Filed Date: 4/16/21.
Accession Number: 20210416–5285.
Comments Due: 5 p.m. ET 5/7/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
VerDate Sep<11>2014
19:20 Apr 21, 2021
Jkt 253001
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–08382 Filed 4–21–21; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–10022–40–Region 5]
Clean Air Act Operating Permit
Program; Petition for Objection to
State Operating Permit for AK Steel
Dearborn Works, Wayne County,
Michigan
Environmental Protection
Agency (EPA).
ACTION: Notice of final order on petition
for objection to a Clean Air Act title V
operating permit.
AGENCY:
The Environmental Protection
Agency (EPA) Administrator signed an
Order dated January 15, 2021, denying
a Petition dated September 27, 2017
from the Sierra Club, the South
Dearborn Environmental Improvement
Association, and the Great Lakes
Environmental Law Center (the
Petitioners). The Petition requested that
EPA object to a Clean Air Act (CAA)
title V operating permit issued by the
Michigan Department of Environment,
Great Lakes and Energy (EGLE), to AK
Steel Dearborn Works (AK Steel),
located in Wayne County, Michigan.
ADDRESSES: The final order, the Petition,
and other supporting information are
available for public inspection during
normal business hours at the following
address: U.S. Environmental Protection
Agency, Region 5, Air and Radiation
Division, 77 West Jackson Boulevard,
Chicago, Illinois 60604. This facility is
open from 8:30 a.m. to 4:30 p.m.,
Monday through Friday, excluding
Federal holidays and facility closures
due to COVID–19. We recommend that
you telephone Susan Kraj,
Environmental Engineer, at (312) 353–
2654 before visiting the Region 5 office.
Additionally, the final Order and
SUMMARY:
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
Petition are available electronically at:
https://www.epa.gov/title-v-operatingpermits/title-v-petition-database.
FOR FURTHER INFORMATION CONTACT:
Susan Kraj, Environmental Engineer,
Air Permits Section, Air Programs
Branch (AR–18J), Environmental
Protection Agency, Region 5, 77 West
Jackson Boulevard, Chicago, Illinois
60604, (312) 353–2654, kraj.susan@
epa.gov.
SUPPLEMENTARY INFORMATION: The CAA
affords EPA a 45-day period to review
and object to, as appropriate, operating
permits proposed by state permitting
authorities under title V of the CAA.
Section 505(b)(2) of the CAA authorizes
any person to petition the EPA
Administrator to object to a title V
operating permit within 60 days after
the expiration of EPA’s 45-day review
period if EPA has not objected on its
own initiative. Petitions must be based
only on objections to the permit that
were raised with reasonable specificity
during the public comment period
provided by the state, unless the
petitioner demonstrates that it was
impracticable to raise these issues
during the comment period or unless
the grounds for the issues arose after
this period.
EPA received the September 27, 2016
Petition from the Petitioners requesting
that EPA object to the issuance of
operating permit no. MI–ROP–
A8640.2016a issued by Michigan EGLE
to AK Steel. The Petition alleged: (1)
The incorporation of a construction
permit into the operating permit was
unlawful because the it allowed
emissions increases without applying
current standards, that is, EGLE
evaluated the Sulphur Dioxide
regulations as they existed in 2007
rather than applying the regulations in
effect at the time the construction
permit was issued in 2014; (2) that any
future operation or rebuild of the B Blast
Furnace (which is not operational due
to catastrophic failure) should require a
new construction permit and that the
title V permit cannot authorize the
operation of this Blast Furnace; and, (3)
that EGLE was required to address
environmental justice concerns in the
permit.
On January 15, 2021, the EPA
Administrator issued an Order denying
the Petition. The order explains the
basis for EPA’s decision.
Sections 307(b) and 505(b)(2) of the
CAA provide that a petitioner may
request judicial review of those portions
of an order that deny issues in a
petition. Any petition for review of the
Administrator’s January 15, 2021 Order
shall be filed in the United States Court
E:\FR\FM\22APN1.SGM
22APN1
Agencies
[Federal Register Volume 86, Number 76 (Thursday, April 22, 2021)]
[Notices]
[Pages 21315-21316]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-08382]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG21-127-000.
Applicants: Samson Solar Energy III LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Samson Solar Energy III LLC.
Filed Date: 4/16/21.
Accession Number: 20210416-5102.
Comments Due: 5 p.m. ET 5/7/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-801-012.
Applicants: Constellation Power Source Generation, LLC.
Description: Compliance filing: Settlement Compliance Filing to be
effective 10/20/2019.
Filed Date: 4/16/21.
Accession Number: 20210416-5174.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER20-2452-002.
Applicants: Hamilton Liberty LLC.
Description: Compliance filing: Supplement to Informational Filing
& Requests for Waiver & Expedited Action to be effective 7/18/2020.
Filed Date: 4/16/21.
Accession Number: 20210416-5104.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER20-2453-003.
Applicants: Hamilton Patriot LLC.
Description: Compliance filing: Supplement to Informational Filing
& Requests for Waiver & Expedited Action to be effective 7/18/2020.
Filed Date: 4/16/21.
Accession Number: 20210416-5108.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-254-003.
Applicants: Harmony Florida Solar, LLC.
Description: Compliance filing: Harmony Florida Solar, LLC
Compliance Filing to be effective 12/29/2020.
Filed Date: 4/16/21.
Accession Number: 20210416-5149.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-502-002.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: Compliance Demand Curve Reset to be
effective 4/9/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5181.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1691-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2021-04-16_SA 3476 ATC-Grant
County Solar 1st Rev GIA (J947) to be effective 4/2/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5017.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1692-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA SA No. 6028;
Queue No. AF2-378 to be effective 3/29/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5039.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1693-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA SA No. 6029;
Queue No. AG1-140 to be effective 4/5/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5065.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1694-000.
Applicants: ISO New England Inc., Green Mountain Power Corporation.
Description: Compliance filing: Green Mountain Power; Supplement to
Order No. 864 Compliance Filing to be effective 1/1/2020.
Filed Date: 4/16/21.
Accession Number: 20210416-5090.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1696-000.
Applicants: Bluestone Farm Solar, LLC.
Description: Baseline eTariff Filing: Reactive Power Compensation
Filing to be effective 5/1/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5093.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1697-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA SA No. 6030;
Queue No. AG1-145 to be effective 4/5/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5105.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1698-000.
Applicants: New York State Electric & Gas Corporation, New York
Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: NYSEG 205 filing of EPA
between NYSEG andBluestone Wind SA No. 2616 to be effective 4/16/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5117.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1699-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: LGIA Luz Solar Partners
LTD., IX, LP Kramer Junction 9 SA No. 264 to be effective 4/18/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5134.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1700-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Americus Solar (Americus
Solar II) LGIA Amendment Filing to be effective 3/10/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5190.
Comments Due: 5 p.m. ET 5/7/21.
[[Page 21316]]
Docket Numbers: ER21-1701-000.
Applicants: Alabama Power Company.
Description: Initial rate filing: Cooperative Energy Morrow CC
Affected System Upgrade Agreement Filing to be effective 3/31/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5192.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1702-000.
Applicants: ISO New England Inc., Central Maine Power Company.
Description: Compliance filing: Central Maine Power; Order No. 864
Supplemental Compliance Filing to be effective 1/1/2020.
Filed Date: 4/16/21.
Accession Number: 20210416-5199.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1703-000.
Applicants: Georgia Power Company.
Description: Initial rate filing: Cooperative Energy Morrow CC
Affected System Upgrade Agreement Filing to be effective 3/31/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5210.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1704-000.
Applicants: Mississippi Power Company.
Description: Initial rate filing: Cooperative Energy Morrow CC
Affected System Upgrade Agreement Filing to be effective 3/31/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5211.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1705-000.
Applicants: Avista Corporation.
Description: Sec. 205(d) Rate Filing: Avista Corp LTF PTP
Agreement T-1179 to be effective 5/1/2021.
Filed Date: 4/16/21.
Accession Number: 20210416-5238.
Comments Due: 5 p.m. ET 5/7/21.
Docket Numbers: ER21-1706-000.
Applicants: Tri-State Generation and Transmission Association,
Inc., Southwest Power Pool, Inc.
Description: Compliance filing: Tri-State Generation and
Transmission Assoc., Inc. Order 864 Compliance Filing to be effective
1/27/2020.
Filed Date: 4/16/21.
Accession Number: 20210416-5285.
Comments Due: 5 p.m. ET 5/7/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-08382 Filed 4-21-21; 8:45 am]
BILLING CODE 6717-01-P