Combined Notice of Filings #1, 20680-20681 [2021-08221]

Download as PDF 20680 Federal Register / Vol. 86, No. 75 / Wednesday, April 21, 2021 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission khammond on DSKJM1Z7X2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC21–56–000. Applicants: Duke Energy Indiana, LLC, GIC Infra Holdings Pte. Ltd. Description: Joint Motion for Leave to Answer and Answer to Protest of Duke Energy Indiana, LLC and GIC Infra Holdings Pte. Ltd. Filed Date: 3/26/21. Accession Number: 20210326–5177. Comments Due: 5 p.m. ET 4/23/21. Docket Numbers: EC21–79–000. Applicants: Crystal Lake Wind III, LLC, Crystal Lake Wind Energy III, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act of Crystal Lake Wind III, LLC, et al. Filed Date: 4/15/21. Accession Number: 20210415–5099. Comments Due: 5 p.m. ET 5/6/21. Take notice that the Commission received the following electric rate filings:. Docket Numbers: ER21–255–003. Applicants: Taylor Creek Solar, LLC. Description: Compliance filing: Taylor Creek Solar, LLC Compliance Filing to be effective 12/29/2020. Filed Date: 4/15/21. Accession Number: 20210415–5250. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–454–002. Applicants: Southern California Edison Company. Description: Tariff Amendment: 2nd Refiling TOT Revisions to Incorporate Letter Agreements to be effective 6/15/ 2021. Filed Date: 4/15/21. Accession Number: 20210415–5125. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–455–002. Applicants: Southern California Edison Company. Description: Tariff Amendment: 2nd Refiling WDAT Revisions to Incorporate Curtailment and Qualifying Facilities to be effective 6/15/2021. Filed Date: 4/15/21. Accession Number: 20210415–5160. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–456–002. Applicants: Southern California Edison Company. Description: Tariff Amendment: 2nd Refiling WDAT Revisions to Incorporate Letter Agreements to be effective 6/15/ 2021. VerDate Sep<11>2014 18:12 Apr 20, 2021 Jkt 253001 Filed Date: 4/15/21. Accession Number: 20210415–5207. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–1181–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 3127R3 Montana-Dakota Utilities Co. NITSA NOA to be effective 2/1/2021. Filed Date: 4/15/21. Accession Number: 20210415–5097. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–1209–001. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: Tariff Amendment: MAIT submits amendment to ECSA No. 5921 to be effective 4/27/2021. Filed Date: 4/15/21. Accession Number: 20210415–5288. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–1270–001. Applicants: Alabama Power Company. Description: Tariff Amendment: Rabun Gap Enhanced Reliability Upgrade Construction Agreement Errata Filing to be effective 2/23/2021. Filed Date: 4/15/21. Accession Number: 20210415–5272. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–1683–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 6011; Queue No. AD1–125 to be effective 3/18/2021. Filed Date: 4/15/21. Accession Number: 20210415–5038. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–1685–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: Compliance filing: Order No. 864 Compliance Filing to be effective 2/25/2020. Filed Date: 4/15/21. Accession Number: 20210415–5141. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–1686–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Letter Agreement—Sky River, LLC and SCE SA No. 263 to be effective 4/16/ 2021. Filed Date: 4/15/21. Accession Number: 20210415–5171. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–1687–000. Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description: § 205(d) Rate Filing: Joint TPIA among NYISO, NMPC and LS PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 Power SA No. 2612 CEII to be effective 4/2/2021. Filed Date: 4/15/21. Accession Number: 20210415–5188. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–1688–000. Applicants: Harmony Florida Solar, LLC. Description: Compliance filing: Harmony Florida Solar, LLC Compliance Filing to be effective 12/29/ 2020. Filed Date: 4/15/21. Accession Number: 20210415–5235. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–1689–000. Applicants: Duke Energy Florida, LLC. Description: Tariff Cancellation: DEF– FL Solar 10—Termination of E&P Agmt RS 329 to be effective 6/15/2021. Filed Date: 4/15/21. Accession Number: 20210415–5263. Comments Due: 5 p.m. ET 5/6/21. Docket Numbers: ER21–1690–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: TriState Generation and Transmission Association, Inc. Normalization Filing to be effective 6/15/2021. Filed Date: 4/15/21. Accession Number: 20210415–5317. Comments Due: 5 p.m. ET 5/6/21. Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF21–689–000. Applicants: Caleco Solar Farm LLC. Description: Form 556 of Caleco Solar Farm LLC. Filed Date: 4/14/21. Accession Number: 20210414–5048. Comments Due: Non-Applicable. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\21APN1.SGM 21APN1 Federal Register / Vol. 86, No. 75 / Wednesday, April 21, 2021 / Notices Dated: April 14, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–08221 Filed 4–20–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15021–000] khammond on DSKJM1Z7X2PROD with NOTICES Bard College, New York; Notice of Application Accepted For Filing, Intent To Waive Scoping, and Soliciting Motions To Intervene And Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Exemption from Licensing. b. Project No.: 15021–000. c. Date filed: December 23, 2019. d. Applicant: Bard College, New York. e. Name of Project: Annandale Micro Hydropower Project (Annandale Project). f. Location: On Saw Kill, a tributary of the Hudson River, in the Town of Red Hook, Dutchess County, New York. The project does not occupy federal land. g. Filed Pursuant to: Public Utility Regulatory Policies Act of 1978, 16 U.S.C. 2705, 2708 (2018), amended by the Hydropower Regulatory Efficiency Act of 2013, Public Law 113–23, 127 Stat. 493 (2013). h. Applicant Contact: Randy Clum, Director, Buildings and Grounds, Bard College, 30 Campus Road, Annandaleon-Hudson, NY 12504; and/or Joel Herm/Jan Borchert, Current Hydro, Inc., PO Box 224, Rhinebeck, NY 12572. i. FERC Contact: Monir Chowdhury, (202) 502–6736 or monir.chowdhury@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: 60 days from the issuance date of this notice. All reply comments must be filed with the Commission within 75 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene and protests using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at VerDate Sep<11>2014 18:12 Apr 20, 2021 Jkt 253001 FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–15021–000. The Commission’s Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted but is not ready for environmental analysis at this time. l. The Annandale Project would consist of: (1) An existing 240-foot-long dam with a maximum height of 13 feet impounding a 3-acre reservoir at a normal pool elevation of 148 feet North American Vertical datum of 1988; (2) one new 9-foot-wide, 9-foot-long, 8-foothigh concrete tank with a spiral internal shape and housing a 10-kilowatt gravitational vortex turbine-generator unit; (3) a new 60-foot-long, 480-volt underground generator lead connecting the turbine-generator unit with an electrical panel that is connected to a step-up transformer via a new 10-footlong, 480-volt underground transmission line; (4) a new 50-footlong, 7.6-kilovolt underground transmission line connecting the stepup transformer to the local grid; and (5) appurtenant facilities. The project is estimated to generate an average of 51 megawatt-hours annually. The applicant proposes to operate the project in a runof-river mode. m. A copy of the application can be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 20681 For assistance, contact FERC Online Support n. Due to the small size and location of this project, the applicant’s close coordination with federal and state agencies during preparation of the application, and studies completed during pre-filing consultation, we intend to waive scoping and expedite the licensing process. Based on a review of the application and resource agency consultation letters including comments filed to date, Commission staff intends to prepare a NEPA document to address resource issues identified during the pre-filing period. Commission staff does not anticipate that any new issues would be identified through additional scoping. The NEPA document will assess the potential effects of project operation on geology and soils, aquatic, terrestrial, threatened and endangered species, recreation, cultural and historic resources, and flooding upstream of the dam. o. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice. p. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must: (1) Bear in all capital letters the title ‘‘PROTEST,’’ ‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ ‘‘COMPETING APPLICATION,’’ ‘‘COMMENTS,’’ or ‘‘REPLY COMMENTS;’’ (2) set forth in E:\FR\FM\21APN1.SGM 21APN1

Agencies

[Federal Register Volume 86, Number 75 (Wednesday, April 21, 2021)]
[Notices]
[Pages 20680-20681]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-08221]



[[Page 20680]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC21-56-000.
    Applicants: Duke Energy Indiana, LLC, GIC Infra Holdings Pte. Ltd.
    Description: Joint Motion for Leave to Answer and Answer to Protest 
of Duke Energy Indiana, LLC and GIC Infra Holdings Pte. Ltd.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5177.
    Comments Due: 5 p.m. ET 4/23/21.

    Docket Numbers: EC21-79-000.
    Applicants: Crystal Lake Wind III, LLC, Crystal Lake Wind Energy 
III, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of Crystal Lake Wind III, LLC, et al.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5099.
    Comments Due: 5 p.m. ET 5/6/21.

    Take notice that the Commission received the following electric 
rate filings:.
    Docket Numbers: ER21-255-003.
    Applicants: Taylor Creek Solar, LLC.
    Description: Compliance filing: Taylor Creek Solar, LLC Compliance 
Filing to be effective 12/29/2020.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5250.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-454-002.
    Applicants: Southern California Edison Company.
    Description: Tariff Amendment: 2nd Refiling TOT Revisions to 
Incorporate Letter Agreements to be effective 6/15/2021.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5125.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-455-002.
    Applicants: Southern California Edison Company.
    Description: Tariff Amendment: 2nd Refiling WDAT Revisions to 
Incorporate Curtailment and Qualifying Facilities to be effective 6/15/
2021.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5160.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-456-002.
    Applicants: Southern California Edison Company.
    Description: Tariff Amendment: 2nd Refiling WDAT Revisions to 
Incorporate Letter Agreements to be effective 6/15/2021.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5207.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-1181-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Tariff Amendment: 3127R3 Montana-Dakota Utilities Co. 
NITSA NOA to be effective 2/1/2021.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5097.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-1209-001.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Tariff Amendment: MAIT submits amendment to ECSA No. 
5921 to be effective 4/27/2021.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5288.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-1270-001.
    Applicants: Alabama Power Company.
    Description: Tariff Amendment: Rabun Gap Enhanced Reliability 
Upgrade Construction Agreement Errata Filing to be effective 2/23/2021.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5272.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-1683-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 6011; Queue No. AD1-125 to be effective 3/18/2021.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5038.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-1685-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Compliance filing: Order No. 864 Compliance Filing to 
be effective 2/25/2020.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5141.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-1686-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: Letter Agreement--Sky River, 
LLC and SCE SA No. 263 to be effective 4/16/2021.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5171.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-1687-000.
    Applicants: New York Independent System Operator, Inc., Niagara 
Mohawk Power Corporation.
    Description: Sec.  205(d) Rate Filing: Joint TPIA among NYISO, NMPC 
and LS Power SA No. 2612 CEII to be effective 4/2/2021.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5188.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-1688-000.
    Applicants: Harmony Florida Solar, LLC.
    Description: Compliance filing: Harmony Florida Solar, LLC 
Compliance Filing to be effective 12/29/2020.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5235.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-1689-000.
    Applicants: Duke Energy Florida, LLC.
    Description: Tariff Cancellation: DEF-FL Solar 10--Termination of 
E&P Agmt RS 329 to be effective 6/15/2021.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5263.
    Comments Due: 5 p.m. ET 5/6/21.

    Docket Numbers: ER21-1690-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: Tri-State Generation and 
Transmission Association, Inc. Normalization Filing to be effective 6/
15/2021.
    Filed Date: 4/15/21.
    Accession Number: 20210415-5317.
    Comments Due: 5 p.m. ET 5/6/21.

    Take notice that the Commission received the following qualifying 
facility filings:
    Docket Numbers: QF21-689-000.
    Applicants: Caleco Solar Farm LLC.
    Description: Form 556 of Caleco Solar Farm LLC.
    Filed Date: 4/14/21.
    Accession Number: 20210414-5048.
    Comments Due: Non-Applicable.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.


[[Page 20681]]


    Dated: April 14, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-08221 Filed 4-20-21; 8:45 am]