Sunshine Act Meetings, 20538-20539 [2021-08168]
Download as PDF
20538
Federal Register / Vol. 86, No. 74 / Tuesday, April 20, 2021 / Notices
LICENSE AMENDMENT ISSUANCE(S)—Continued
Brief Description of Amendment(s) ....................
Public Comments Received as to Proposed
NSHC (Yes/No).
IV. Previously Published Notices of
Consideration of Issuance of
Amendments to Facility Operating
Licenses and Combined Licenses,
Proposed No Significant Hazards
Consideration Determination, and
Opportunity for a Hearing
The following notices were previously
published as separate individual
The amendment revised Technical Specification (TS) Administrative Control (AC) 5.3.1, under
TS 5.3, ‘‘Unit Staff Qualifications,’’ and deleted TS AC 5.3.1.1 and TS AC 5.3.1.2 to remove
details specified for the qualification of certain positions within the unit staff that are already
specified in the Operating Quality Assurance Manual.
No.
notices. They were published as
individual notices either because time
did not allow the Commission to wait
for this monthly notice or because the
action involved exigent circumstances.
They are repeated here because the
monthly notice lists all amendments
issued or proposed to be issued
involving NSHC.
For details, including the applicable
notice period, see the individual notice
in the Federal Register on the day and
page cited.
LICENSE AMENDMENT REQUEST(S)—REPEAT OF INDIVIDUAL Federal Register NOTICE
Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Station, Unit 3; New London County, CT
Docket No(s) .......................................................
Application Date ..................................................
ADAMS Accession No ........................................
Brief Description of Amendment(s) ....................
Date & Cite of Federal Register Individual Notice.
Expiration Dates for Public Comments & Hearing Requests.
50–423.
November 19, 2020.
ML20324A703.
The proposed amendment would revise the renewed facility operating license and technical
specifications to support a measurement uncertainty recapture power uprate from 3,650
megawatts thermal (MWt) to 3,709 MWt. The proposed amendment was previously noticed
on January 26, 2021 (86 FR 7115), and is being re-noticed to include the instructions for requesting access to sensitive unclassified non-safeguards information.
April 1, 2021 (86 FR 17211).
May 3, 2021 (Public Comments); June 1, 2021 (Hearing Requests).
Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2; Rhea County, TN
Docket No(s) .......................................................
Application Date ..................................................
ADAMS Accession No ........................................
Brief Description of Amendment(s) ....................
Date & Cite of Federal Register Individual Notice.
Expiration Dates for Public Comments & Hearing Requests.
50–391.
February 25, 2021.
ML21056A623.
The proposed amendment would revise the Watts Bar Updated Final Safety Analysis Report
(UFSAR) to apply a temperature adjustment to the growth rate calculation used to determine
the end-of-cycle distribution of indications of axial outer diameter stress corrosion cracking
at steam generator tube support plates in support of the Watts Bar, Unit 2 operational assessment. The proposed revision to the UFSAR would apply to Unit 2 only.
March 24, 2021 (86 FR 15727).
April 23, 2021 (Public Comments); May 24, 2021 (Hearing Requests).
Dated: April 9, 2021.
For the Nuclear Regulatory Commission.
Craig G. Erlanger,
Director, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
PLACE:
[FR Doc. 2021–07632 Filed 4–19–21; 8:45 am]
Week of April 19, 2021
BILLING CODE 7590–01–P
Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS:
Public.
Week of May 10, 2021—Tentative
There are no meetings scheduled for
the week of May 10, 2021.
Week of May 17, 2021—Tentative
MATTERS TO BE CONSIDERED:
There are no meetings scheduled for
the week of April 19, 2021.
There are no meetings scheduled for
the week of May 17, 2021.
Week of May 24, 2021—Tentative
NUCLEAR REGULATORY
COMMISSION
Week of April 26, 2021—Tentative
Tuesday, May 25, 2021
[NRC–2021–0001]
There are no meetings scheduled for
the week of April 26, 2021.
Sunshine Act Meetings
Week of May 3, 2021—Tentative
Weeks of April 19, 26,
May 3, 10, 17, 24, 2021.
There are no meetings scheduled for
the week of May 3, 2021.
9:00 a.m. Strategic Programmatic
Overview of the Fuel Facilities and
the Spent Fuel Storage and
Transportation Business Lines
(Public Meeting) (Contact: Damaris
Marcano: 301–415–7328)
TIME AND DATE:
VerDate Sep<11>2014
17:10 Apr 19, 2021
Jkt 253001
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
E:\FR\FM\20APN1.SGM
20APN1
Federal Register / Vol. 86, No. 74 / Tuesday, April 20, 2021 / Notices
Additional Information: Due to
COVID–19, there will be no physical
public attendance. The public is invited
to attend the Commission’s meeting live
by webcast at the Web address—https://
video.nrc.gov/.
CONTACT PERSON FOR MORE INFORMATION:
For more information or to verify the
status of meetings, contact Wesley Held
at 301–287–3591 or via email at
Wesley.Held@nrc.gov. The schedule for
Commission meetings is subject to
change on short notice.
The NRC Commission Meeting
Schedule can be found on the internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.,
braille, large print), please notify Anne
Silk, NRC Disability Program Specialist,
at 301–287–0745, by videophone at
240–428–3217, or by email at
Anne.Silk@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
Members of the public may request to
receive this information electronically.
If you would like to be added to the
distribution, please contact the Nuclear
Regulatory Commission, Office of the
Secretary, Washington, DC 20555, at
301–415–1969, or by email at
Tyesha.Bush@nrc.gov.
The NRC is holding the meetings
under the authority of the Government
in the Sunshine Act, 5 U.S.C. 552b.
Dated: April 15, 2021.
For the Nuclear Regulatory Commission.
Wesley W. Held,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2021–08168 Filed 4–16–21; 11:15 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2020–0170]
Information Collection: Reactor Site
Criteria
Nuclear Regulatory
Commission.
ACTION: Notice of submission to the
Office of Management and Budget;
request for comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) recently submitted a
request for renewal of an existing
collection of information to the Office of
SUMMARY:
VerDate Sep<11>2014
17:10 Apr 19, 2021
Jkt 253001
Management and Budget (OMB) for
review. The information collection is
entitled, ‘‘Reactor Site Criteria.’’
DATES: Submit comments by May 20,
2021. Comments received after this date
will be considered if it is practical to do
so, but the Commission is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to https://www.reginfo.gov/
public/do/PRAMain. Find this
particular information collection by
selecting ‘‘Currently under Review—
Open for Public Comments’’ or by using
the search function.
FOR FURTHER INFORMATION CONTACT:
David Cullison, NRC Clearance Officer,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–2084; email:
INFOCOLLECTS.Resource@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2020–
0170 when contacting the NRC about
the availability of information for this
action. You may obtain publicly
available information related to this
action by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov/ and search
for Docket ID NRC–2020–0170. A copy
of the collection of information and
related instructions may be obtained
without charge by accessing Docket ID
NRC–2020–0170 on this website.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The supporting statement is
available in ADAMS under Accession
Nos. ML21041A452.
• Attention: The PDR, where you may
examine and order copies of public
documents, is currently closed. You
may submit your request to the PDR via
email at pdr.resource@nrc.gov or call 1–
800–397–4209 or 301–415–4737,
between 8:00 a.m. and 4:00 p.m. (EST),
Monday through Friday, except Federal
holidays.
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
20539
• NRC’s Clearance Officer: A copy of
the collection of information and related
instructions may be obtained without
charge by contacting the NRC’s
Clearance Officer, David Cullison,
Office of the Chief Information Officer,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–2084; email:
INFOCOLLECTS.Resource@nrc.gov.
B. Submitting Comments
The NRC cautions you not to include
identifying or contact information in
comment submissions that you do not
want to be publicly disclosed in your
comment submission. All comment
submissions are posted at https://
www.regulations.gov/ and entered into
ADAMS. Comment submissions are not
routinely edited to remove identifying
or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the OMB, then you
should inform those persons not to
include identifying or contact
information that they do not want to be
publicly disclosed in their comment
submission. Your request should state
that comment submissions are not
routinely edited to remove such
information before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Background
Under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35), the NRC recently
submitted a request for renewal of an
existing collection of information to
OMB for review entitled, ‘‘Reactor Site
Criteria.’’ The NRC hereby informs
potential respondents that an agency
may not conduct or sponsor, and that a
person is not required to respond to, a
collection of information unless it
displays a currently valid OMB control
number.
The NRC published a Federal
Register notice with a 60-day comment
period on this information collection on
December 10, 2020, (85 FR 79532).
1. The title of the information
collection: ‘‘Reactor Site Criteria’’.
2. OMB approval number: 3150–0093.
3. Type of submission: Extension.
4. The form number, if applicable:
N/A.
5. How often the collection is required
or requested: As necessary in order for
the NRC to assess the adequacy of
proposed seismic design bases and the
design bases for other site hazards for
nuclear power and test reactors
constructed and licensed in accordance
with Parts 50 and 52 of title 10 of the
Code of Federal Regulations (10 CFR)
E:\FR\FM\20APN1.SGM
20APN1
Agencies
[Federal Register Volume 86, Number 74 (Tuesday, April 20, 2021)]
[Notices]
[Pages 20538-20539]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-08168]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2021-0001]
Sunshine Act Meetings
TIME AND DATE: Weeks of April 19, 26, May 3, 10, 17, 24, 2021.
PLACE: Commissioners' Conference Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public.
MATTERS TO BE CONSIDERED:
Week of April 19, 2021
There are no meetings scheduled for the week of April 19, 2021.
Week of April 26, 2021--Tentative
There are no meetings scheduled for the week of April 26, 2021.
Week of May 3, 2021--Tentative
There are no meetings scheduled for the week of May 3, 2021.
Week of May 10, 2021--Tentative
There are no meetings scheduled for the week of May 10, 2021.
Week of May 17, 2021--Tentative
There are no meetings scheduled for the week of May 17, 2021.
Week of May 24, 2021--Tentative
Tuesday, May 25, 2021
9:00 a.m. Strategic Programmatic Overview of the Fuel Facilities and
the Spent Fuel Storage and Transportation Business Lines (Public
Meeting) (Contact: Damaris Marcano: 301-415-7328)
[[Page 20539]]
Additional Information: Due to COVID-19, there will be no physical
public attendance. The public is invited to attend the Commission's
meeting live by webcast at the Web address--https://video.nrc.gov/.
CONTACT PERSON FOR MORE INFORMATION: For more information or to verify
the status of meetings, contact Wesley Held at 301-287-3591 or via
email at [email protected]. The schedule for Commission meetings is
subject to change on short notice.
The NRC Commission Meeting Schedule can be found on the internet
at: https://www.nrc.gov/public-involve/public-meetings/schedule.html.
The NRC provides reasonable accommodation to individuals with
disabilities where appropriate. If you need a reasonable accommodation
to participate in these public meetings or need this meeting notice or
the transcript or other information from the public meetings in another
format (e.g., braille, large print), please notify Anne Silk, NRC
Disability Program Specialist, at 301-287-0745, by videophone at 240-
428-3217, or by email at [email protected]. Determinations on requests
for reasonable accommodation will be made on a case-by-case basis.
Members of the public may request to receive this information
electronically. If you would like to be added to the distribution,
please contact the Nuclear Regulatory Commission, Office of the
Secretary, Washington, DC 20555, at 301-415-1969, or by email at
[email protected].
The NRC is holding the meetings under the authority of the
Government in the Sunshine Act, 5 U.S.C. 552b.
Dated: April 15, 2021.
For the Nuclear Regulatory Commission.
Wesley W. Held,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2021-08168 Filed 4-16-21; 11:15 am]
BILLING CODE 7590-01-P