Federal Register / Vol. 86, No. 74 / Tuesday, April 20, 2021 / Notices
such as bombers, tankers, and fighters.
The DAF considered other locations on
Andersen AFB for construction of
infrastructure upgrades; however, only
the Proposed Action locations were
determined to meet the criteria for the
infrastructure upgrades. The No Action
Alternative will be addressed in the EIS
as well.
Additional review and consultation
which will be incorporated into the
preparation of the Draft EIS will
include, but are not necessarily limited
to, consultation under Section 7 of the
Endangered Species Act and
consultation under Section 106 of the
National Historic Preservation Act. The
DAF will conduct cultural and natural
resources surveys in the areas proposed
for upgrades and consult with
appropriate resource agencies to
determine the potential for significant
impacts on those resources. During
construction, the DAF anticipates an
increased demand on the construction
workforce and an increase in local
spending. Currently, no other short- or
long-term notable impacts are
anticipated. Additional analysis will be
provided in the Draft EIS.
Scoping and Agency Coordination: To
effectively define the full range of issues
to be evaluated in the EIS, the Air Force
will determine the scope of the analysis
by soliciting comments from interested
local, territorial, and federal elected
officials and agencies, as well as
interested members of the public and
others. Comments are requested on
potential alternatives and impacts, and
identification of any relevant
information, studies, or analyses of any
kind concerning impacts affecting the
quality of the human environment.
Concurrent with the publication of this
notice of intent, public scoping notices
will be announced locally. In response
to the coronavirus (COVID–19)
pandemic in the United States and the
Center for Disease Control’s
recommendations for social distancing
and avoiding large public gatherings,
the DAF will not hold in-person public
scoping meetings. Public scoping will
instead be accomplished remotely, in
accordance with the 2020 version of 40
CFR1506.6, via the project website at
www.AAFBInfrastructureEIS.com. The
website provides posters, a presentation,
an informational brochure, in English
and Chamorro, other meeting materials,
and the capability for the public to
provide public scoping comments.
Scoping materials are also available in
print at the Nieves M. Flores Memorial
VerDate Sep<11>2014
17:10 Apr 19, 2021
Jkt 253001
Library (254 Martyr Street, Haga˚tn˜a,
Guam).
Adriane Paris,
Acting Air Force Federal Register Liaison
Officer.
[FR Doc. 2021–08054 Filed 4–19–21; 8:45 am]
BILLING CODE 5001–10–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP21–722–000]
Hartree Partners, LP v. Northern
Natural Gas Company; Notice of
Complaint
Take notice that on April 7, 2021,
pursuant to section 206 of the Federal
Power Act, 16 U.S.C. 824e and Rule 206
of the Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206
(2020), Hartree Partners, LP
(Complainant) filed a formal complaint
against Northern Natural Gas Company
(Respondent), alleging that the
Respondent unlawfully seeks to recover
an amount totaling $7,401,806.38 from
the complainant for quantities that
Northern allocated or curtailed during
the extreme winter weather event in
Texas and other parts of the south
central United States in February 2021,
all as more fully explained in its
complaint.
The Complainant certify that copies of
the complaint were served on the
contacts listed for Respondent in the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov, or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5:00 p.m. Eastern
Time on April 27, 2021.
Dated: April 14, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–08074 Filed 4–19–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–76–000.
Applicants: Caledonia Generating,
LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Caledonia
Generating, LLC.
Filed Date: 4/12/21.
Accession Number: 20210412–5888.
Comments Due: 5 p.m. ET 5/3/21.
Docket Numbers: EC21–77–000.
Applicants: FirstEnergy Corp.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of FirstEnergy Corp.,
on behalf of the FirstEnergy Utility
Affiliates.
Filed Date: 4/13/21.
Accession Number: 20210413–5131.
Comments Due: 5 p.m. ET 5/4/21.
Docket Numbers: EC21–78–000.
E:\FR\FM\20APN1.SGM
20APN1
Federal Register / Vol. 86, No. 74 / Tuesday, April 20, 2021 / Notices
Applicants: BPC US Wind
Corporation, High Prairie Wind Farm II,
LLC, Old Trail Wind Farm, LLC,
Telocaset Wind Power Partners, LLC,
ASHUSA Inc.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of BPC US Wind
Corporation, et al.
Filed Date: 4/13/21.
Accession Number: 20210413–5157.
Comments Due: 5 p.m. ET 5/4/21.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–123–000.
Applicants: Clines Corners Wind
Farm LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Clines Corners Wind
Farm LLC.
Filed Date: 4/14/21.
Accession Number: 20210414–5122.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: EG21–124–000.
Applicants: Duran Mesa LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Duran Mesa LLC.
Filed Date: 4/14/21.
Accession Number: 20210414–5126.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: EG21–125–000.
Applicants: Red Cloud Wind LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Red Cloud Wind
LLC.
Filed Date: 4/14/21.
Accession Number: 20210414–5128.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: EG21–126–000.
Applicants: Tecolote Wind LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Tecolote Wind LLC.
Filed Date: 4/14/21.
Accession Number: 20210414–5133.
Comments Due: 5 p.m. ET 5/5/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2881–035;
ER10–2882–036; ER10–2883–034;
ER10–2884–034; ER16–2509–005;
ER17–2400–006; ER17–2401–006;
ER17–2403–006; ER17–2404–006.
Applicants: Alabama Power
Company, Mississippi Power Company,
Georgia Power Company, Rutherford
Farm, LLC, SP Butler Solar, LLC, SP
Decatur Parkway Solar, LLC, SP
Pawpaw Solar, LLC, SP Sandhills Solar,
LLC.
Description: Supplement to June 30,
2020 Updated Market Power Analysis
VerDate Sep<11>2014
17:10 Apr 19, 2021
Jkt 253001
for the Southeast Region of Alabama
Power Company, et al.
Filed Date: 4/13/21.
Accession Number: 20210413–5335.
Comments Due: 5 p.m. ET 5/4/21.
Docket Numbers: ER20–686–002.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Compliance filing: TriState Order No. 864 Compliance Filing
to be effective 2/25/2020.
Filed Date: 4/14/21.
Accession Number: 20210414–5028.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER20–2040–001.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Deficiency Response in ER20–2040—
Prairie Wind Order No. 864 Compliance
Filing to be effective N/A.
Filed Date: 4/14/21.
Accession Number: 20210414–5044.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER20–2041–001.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Deficiency Response in ER20–2041—
KCPL Order No. 864 Compliance Filing
to be effective N/A.
Filed Date: 4/14/21.
Accession Number: 20210414–5039.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER20–2042–001.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Deficiency Response in ER20–2042—
KCPL–GMO Order No. 864 Compliance
Filing to be effective N/A.
Filed Date: 4/14/21.
Accession Number: 20210414–5042.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER20–2044–001.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Deficiency Response in ER20–2044—
Westar Energy Order No. 864
Compliance Filing to be effective N/A.
Filed Date: 4/14/21.
Accession Number: 20210414–5043.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21–461–002.
Applicants: El Paso Electric Company.
Description: Tariff Amendment:
Service Agreement No. 346, EPE- La
Mesa PV I LLC SGIA As Amended to be
effective 4/9/2021.
Filed Date: 4/14/21.
Accession Number: 20210414–5163.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21–1674–000.
Applicants: TBE Montgomery, LLC.
Description: Petition for Limited
Waiver, et. al. of TBE Montgomery, LLC.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
20489
Filed Date: 4/9/21.
Accession Number: 20210409–5383.
Comments Due: 5 p.m. ET 4/23/21.
Docket Numbers: ER21–1675–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–04–14_SA 3445 MEC-Plymouth
Wind Energy 1st Rev GIA (J748) to be
effective 3/26/2021.
Filed Date: 4/14/21.
Accession Number: 20210414–5029.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21–1676–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Add the Waiver of Base
Plan Allocation Methodology to be
effective 6/14/2021.
Filed Date: 4/14/21.
Accession Number: 20210414–5040.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21–1677–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, Service Agreement No.
6002; Queue No. AD2–073 to be
effective 3/15/2021.
Filed Date: 4/14/21.
Accession Number: 20210414–5050.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21–1678–000.
Applicants: Griffith Energy LLC.
Description: § 205(d) Rate Filing:
Certificate of Concurrence for SRSG
Participation Agreement to be effective
4/15/2021.
Filed Date: 4/14/21.
Accession Number: 20210414–5071.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21–1679–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Transmission Company of
Illinois.
Description: § 205(d) Rate Filing:
2021–04–14_SA 3649 ATXI-Northeast
Missouri Wind E&P (J1025) to be
effective 4/12/2021.
Filed Date: 4/14/21.
Accession Number: 20210414–5084.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21–1680–000.
Applicants: Virginia Electric and
Power Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Dominion submits Revisions to OATT,
Att. H–16C re: OPEB to be effective 6/
15/2021.
Filed Date: 4/14/21.
Accession Number: 20210414–5136.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21–1681–000.
Applicants: Duke Energy Carolinas,
LLC.
E:\FR\FM\20APN1.SGM
20APN1
20490
Federal Register / Vol. 86, No. 74 / Tuesday, April 20, 2021 / Notices
Description: § 205(d) Rate Filing:
DEC—NCEMC Metering Service
Agreement SA—569 to be effective 6/1/
2021.
Filed Date: 4/14/21.
Accession Number: 20210414–5167.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21–1682–000.
Applicants: Elora Solar, LLC.
Description: Baseline eTariff Filing:
Elora Solar, LLC Application for MBR
Authority to be effective 6/14/2021.
Filed Date: 4/14/21.
Accession Number: 20210414–5178.
Comments Due: 5 p.m. ET 5/5/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 14, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–08076 Filed 4–19–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–17–000]
Sabal Trail Transmission, LLC; Notice
of Request for Extension of Time
Take notice that on April 7, 2021,
Sabal Trail Transmission, LLC (Sabal
Trail) requested that the Federal Energy
Regulatory Commission (Commission)
grant an extension of time, until May 1,
2023, to install two compressor units
needed to complete Phase III of its Sabal
Trail Project, as authorized in the
February 2, 2016 Order Issuing
Certificates and Approving
Abandonment (February 2 Order).1
1 Florida Southeast Connection, LLC, et al., 154
FERC ¶ 61,080 (2016) (February 2 Order), order on
VerDate Sep<11>2014
17:10 Apr 19, 2021
Jkt 253001
Ordering Paragraph (F)(1) of the
February 2 Order, as amended, provides
a deadline of May 1, 2021, for Sabal
Trail to install these remaining two
compressor units and make them
available for service.2
Sabal Trail states that, due to
unforeseen delays in reaching full
commercialization of the project,
additional time is now required in order
to complete the construction of the
authorized project facilities.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on the applicant’s request for
an extension of time may do so. No
reply comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).3
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,4 the Commission will aim to
issue an order acting on the request
within 45 days.5 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.6 The Commission will not
consider arguments that re-litigate the
issuance of the certificate order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.7 At the time
reh’g, Florida Southeast Connection, LLC, et al., 156
FERC ¶ 61,160 (2016), order on remand, Florida
Southeast Connection, LLC, et al., 162 FERC
¶ 61,233 (2018).
2 Sabal Trail Transmission, LLC, Letter Order
Granting Extension of Time, Docket No. CP15–17–
000 (Jan 31, 2018).
3 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC ¶ 61,144, at P 39 (2020).
4 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2019).
5 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
6 Id. at P 40.
7 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
PO 00000
Frm 00015
Fmt 4703
Sfmt 9990
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.8 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments in lieu of
paper using the ‘‘eFile’’ link at https://
www.ferc.gov. In lieu of electronic filing,
you may submit a paper copy.
Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Time on April 29, 2021.
Dated: April 14, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–08073 Filed 4–19–21; 8:45 am]
BILLING CODE 6717–01–P
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
8 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
E:\FR\FM\20APN1.SGM
20APN1
Agencies
[Federal Register Volume 86, Number 74 (Tuesday, April 20, 2021)]
[Notices]
[Pages 20488-20490]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-08076]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC21-76-000.
Applicants: Caledonia Generating, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of Caledonia Generating, LLC.
Filed Date: 4/12/21.
Accession Number: 20210412-5888.
Comments Due: 5 p.m. ET 5/3/21.
Docket Numbers: EC21-77-000.
Applicants: FirstEnergy Corp.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of FirstEnergy Corp., on behalf of the FirstEnergy
Utility Affiliates.
Filed Date: 4/13/21.
Accession Number: 20210413-5131.
Comments Due: 5 p.m. ET 5/4/21.
Docket Numbers: EC21-78-000.
[[Page 20489]]
Applicants: BPC US Wind Corporation, High Prairie Wind Farm II,
LLC, Old Trail Wind Farm, LLC, Telocaset Wind Power Partners, LLC,
ASHUSA Inc.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of BPC US Wind Corporation, et al.
Filed Date: 4/13/21.
Accession Number: 20210413-5157.
Comments Due: 5 p.m. ET 5/4/21.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG21-123-000.
Applicants: Clines Corners Wind Farm LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Clines Corners Wind Farm LLC.
Filed Date: 4/14/21.
Accession Number: 20210414-5122.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: EG21-124-000.
Applicants: Duran Mesa LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Duran Mesa LLC.
Filed Date: 4/14/21.
Accession Number: 20210414-5126.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: EG21-125-000.
Applicants: Red Cloud Wind LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Red Cloud Wind LLC.
Filed Date: 4/14/21.
Accession Number: 20210414-5128.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: EG21-126-000.
Applicants: Tecolote Wind LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Tecolote Wind LLC.
Filed Date: 4/14/21.
Accession Number: 20210414-5133.
Comments Due: 5 p.m. ET 5/5/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2881-035; ER10-2882-036; ER10-2883-034; ER10-
2884-034; ER16-2509-005; ER17-2400-006; ER17-2401-006; ER17-2403-006;
ER17-2404-006.
Applicants: Alabama Power Company, Mississippi Power Company,
Georgia Power Company, Rutherford Farm, LLC, SP Butler Solar, LLC, SP
Decatur Parkway Solar, LLC, SP Pawpaw Solar, LLC, SP Sandhills Solar,
LLC.
Description: Supplement to June 30, 2020 Updated Market Power
Analysis for the Southeast Region of Alabama Power Company, et al.
Filed Date: 4/13/21.
Accession Number: 20210413-5335.
Comments Due: 5 p.m. ET 5/4/21.
Docket Numbers: ER20-686-002.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Compliance filing: Tri-State Order No. 864 Compliance
Filing to be effective 2/25/2020.
Filed Date: 4/14/21.
Accession Number: 20210414-5028.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER20-2040-001.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Deficiency Response in ER20-2040--
Prairie Wind Order No. 864 Compliance Filing to be effective N/A.
Filed Date: 4/14/21.
Accession Number: 20210414-5044.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER20-2041-001.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Deficiency Response in ER20-2041--
KCPL Order No. 864 Compliance Filing to be effective N/A.
Filed Date: 4/14/21.
Accession Number: 20210414-5039.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER20-2042-001.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Deficiency Response in ER20-2042--
KCPL-GMO Order No. 864 Compliance Filing to be effective N/A.
Filed Date: 4/14/21.
Accession Number: 20210414-5042.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER20-2044-001.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Deficiency Response in ER20-2044--
Westar Energy Order No. 864 Compliance Filing to be effective N/A.
Filed Date: 4/14/21.
Accession Number: 20210414-5043.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21-461-002.
Applicants: El Paso Electric Company.
Description: Tariff Amendment: Service Agreement No. 346, EPE- La
Mesa PV I LLC SGIA As Amended to be effective 4/9/2021.
Filed Date: 4/14/21.
Accession Number: 20210414-5163.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21-1674-000.
Applicants: TBE Montgomery, LLC.
Description: Petition for Limited Waiver, et. al. of TBE
Montgomery, LLC.
Filed Date: 4/9/21.
Accession Number: 20210409-5383.
Comments Due: 5 p.m. ET 4/23/21.
Docket Numbers: ER21-1675-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2021-04-14_SA 3445 MEC-
Plymouth Wind Energy 1st Rev GIA (J748) to be effective 3/26/2021.
Filed Date: 4/14/21.
Accession Number: 20210414-5029.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21-1676-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Add the Waiver
of Base Plan Allocation Methodology to be effective 6/14/2021.
Filed Date: 4/14/21.
Accession Number: 20210414-5040.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21-1677-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, Service
Agreement No. 6002; Queue No. AD2-073 to be effective 3/15/2021.
Filed Date: 4/14/21.
Accession Number: 20210414-5050.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21-1678-000.
Applicants: Griffith Energy LLC.
Description: Sec. 205(d) Rate Filing: Certificate of Concurrence
for SRSG Participation Agreement to be effective 4/15/2021.
Filed Date: 4/14/21.
Accession Number: 20210414-5071.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21-1679-000.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Transmission Company of Illinois.
Description: Sec. 205(d) Rate Filing: 2021-04-14_SA 3649 ATXI-
Northeast Missouri Wind E&P (J1025) to be effective 4/12/2021.
Filed Date: 4/14/21.
Accession Number: 20210414-5084.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21-1680-000.
Applicants: Virginia Electric and Power Company, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Dominion submits Revisions
to OATT, Att. H-16C re: OPEB to be effective 6/15/2021.
Filed Date: 4/14/21.
Accession Number: 20210414-5136.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21-1681-000.
Applicants: Duke Energy Carolinas, LLC.
[[Page 20490]]
Description: Sec. 205(d) Rate Filing: DEC--NCEMC Metering Service
Agreement SA--569 to be effective 6/1/2021.
Filed Date: 4/14/21.
Accession Number: 20210414-5167.
Comments Due: 5 p.m. ET 5/5/21.
Docket Numbers: ER21-1682-000.
Applicants: Elora Solar, LLC.
Description: Baseline eTariff Filing: Elora Solar, LLC Application
for MBR Authority to be effective 6/14/2021.
Filed Date: 4/14/21.
Accession Number: 20210414-5178.
Comments Due: 5 p.m. ET 5/5/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 14, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-08076 Filed 4-19-21; 8:45 am]
BILLING CODE 6717-01-P