Alliance Pipeline L.P.; Notice of Application and Establishing Intervention Deadline, 20137-20138 [2021-07846]
Download as PDF
Federal Register / Vol. 86, No. 72 / Friday, April 16, 2021 / Notices
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 12, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–07827 Filed 4–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–113–000]
jbell on DSKJLSW7X2PROD with NOTICES
Alliance Pipeline L.P.; Notice of
Application and Establishing
Intervention Deadline
Take notice that on April 1, 2021,
Alliance Pipeline L.P. (Alliance) filed an
abbreviated application under Section
7(c) of the Natural Gas Act for its
purposed Three Rivers Interconnection
Project (Project). Specifically, Alliance
requests: (i) Authorization to construct,
own operate and maintain 2.85 miles of
20-inch diameter pipeline, a new meter
and regulating station and related
appurtenances to provide natural gas to
Competitive Power Ventures’ new Three
Rivers Energy Center, a power
generation facility currently under
construction in Grundy County, Illinois;
and (ii) any waivers, authority, and
further relief as may be necessary to
implement the proposal contained in its
application. Alliance estimates the total
cost of the Project to be $27.7 million,
all as more fully set forth in the
application which is on file with the
Commission and open for public
inspection.
Alliance’s application states that a
water quality certificate under section
401 of the Clean Water Act is required
for the project from the Illinois
Environmental Protection Agency. The
request for certification must be
submitted to the certifying agency and
to the Commission concurrently. Proof
of the certifying agency’s receipt date
must be filed no later than five (5) days
after the request is submitted to the
certifying agency.
VerDate Sep<11>2014
19:57 Apr 15, 2021
Jkt 253001
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
Application should be directed to Estela
D. Lozano, Manager, Rates and
Certificates, Alliance Pipeline L.P., P.O.
Box 1642, Houston, Texas 77251–1642,
or telephone (713) 627–4522, or fax
(713) 627–5947 or by email
estela.lozano@enbridge.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
Complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are two ways to become
involved in the Commission’s review of
this project: You can file comments on
the project, and you can file a motion
to intervene in the proceeding. There is
no fee or cost for filing comments or
intervening. The deadline for filing a
1 18
PO 00000
CFR (Code of Federal Regulations) § 157.9.
Frm 00024
Fmt 4703
Sfmt 4703
20137
motion to intervene is 5:00 p.m. Eastern
Time on May 3, 2021.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please submit your comments
on or before May 3, 2021.
There are three methods you can use
to submit your comments to the
Commission. In all instances, please
reference the Project docket number
(CP21–113–000) in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address below.2 Your written
comments must reference the Project
docket number (CP21–113–000).
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
2 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
E:\FR\FM\16APN1.SGM
16APN1
20138
Federal Register / Vol. 86, No. 72 / Friday, April 16, 2021 / Notices
jbell on DSKJLSW7X2PROD with NOTICES
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,3 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is May 3, 2021. As
described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number (CP21–113–000) in your
submission.
3 18
CFR 385.102(d).
CFR 385.214.
5 18 CFR 157.10.
4 18
VerDate Sep<11>2014
19:57 Apr 15, 2021
Jkt 253001
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docsfiling/
efinling/document-lessintervention.pdf.; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below.6 Your motion to
intervene must reference the Project
docket number (CP21–113–000).
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Motions to intervene must be served
on the applicant either by mail or email
at: P.O. Box 1642, Houston, Texas
77251, or by email at estela.lozano@
enbridge.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online. Service
can be via email with a link to the
document.
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
6 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
9 18 CFR 385.214(b)(3) and (d).
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docsfiling/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on May 3, 2021.
Dated: April 12, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–07846 Filed 4–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER21–1653–000]
Deer Creek Solar I LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Deer
Creek Solar I LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
E:\FR\FM\16APN1.SGM
16APN1
Agencies
[Federal Register Volume 86, Number 72 (Friday, April 16, 2021)]
[Notices]
[Pages 20137-20138]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-07846]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-113-000]
Alliance Pipeline L.P.; Notice of Application and Establishing
Intervention Deadline
Take notice that on April 1, 2021, Alliance Pipeline L.P.
(Alliance) filed an abbreviated application under Section 7(c) of the
Natural Gas Act for its purposed Three Rivers Interconnection Project
(Project). Specifically, Alliance requests: (i) Authorization to
construct, own operate and maintain 2.85 miles of 20-inch diameter
pipeline, a new meter and regulating station and related appurtenances
to provide natural gas to Competitive Power Ventures' new Three Rivers
Energy Center, a power generation facility currently under construction
in Grundy County, Illinois; and (ii) any waivers, authority, and
further relief as may be necessary to implement the proposal contained
in its application. Alliance estimates the total cost of the Project to
be $27.7 million, all as more fully set forth in the application which
is on file with the Commission and open for public inspection.
Alliance's application states that a water quality certificate
under section 401 of the Clean Water Act is required for the project
from the Illinois Environmental Protection Agency. The request for
certification must be submitted to the certifying agency and to the
Commission concurrently. Proof of the certifying agency's receipt date
must be filed no later than five (5) days after the request is
submitted to the certifying agency.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding this Application should be directed to
Estela D. Lozano, Manager, Rates and Certificates, Alliance Pipeline
L.P., P.O. Box 1642, Houston, Texas 77251-1642, or telephone (713) 627-
4522, or fax (713) 627-5947 or by email [email protected].
Pursuant to section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: Complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) Sec. 157.9.
---------------------------------------------------------------------------
Public Participation
There are two ways to become involved in the Commission's review of
this project: You can file comments on the project, and you can file a
motion to intervene in the proceeding. There is no fee or cost for
filing comments or intervening. The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on May 3, 2021.
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be. To ensure that your comments
are timely and properly recorded, please submit your comments on or
before May 3, 2021.
There are three methods you can use to submit your comments to the
Commission. In all instances, please reference the Project docket
number (CP21-113-000) in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; first select ``General'' and then select ``Comment on a
Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address below.\2\ Your written comments must reference
the Project docket number (CP21-113-000).
\2\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
[[Page 20138]]
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\3\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\3\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is May 3, 2021. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number (CP21-113-000) in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docsfiling/efinling/document-less-intervention.pdf.; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below.\6\
Your motion to intervene must reference the Project docket number
(CP21-113-000).
\6\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Motions to intervene must be served on the applicant either by mail
or email at: P.O. Box 1642, Houston, Texas 77251, or by email at
[email protected]. Any subsequent submissions by an intervenor
must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online. Service can be via
email with a link to the document.
All timely, unopposed \7\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\7\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\8\ 18 CFR 385.214(c)(1).
\9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docsfiling/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on May 3, 2021.
Dated: April 12, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-07846 Filed 4-15-21; 8:45 am]