Northern States Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 20140-20141 [2021-07841]

Download as PDF 20140 Federal Register / Vol. 86, No. 72 / Friday, April 16, 2021 / Notices Description: § 205(d) Rate Filing: 2021–04–09 OATT-Transmn Svc Study Filing to be effective 6/8/2021. Filed Date: 4/9/21. Accession Number: 20210409–5259. Comments Due: 5 p.m. ET 4/30/21. jbell on DSKJLSW7X2PROD with NOTICES Docket Numbers: ER21–1653–000. Applicants: Deer Creek Solar I LLC. Description: Baseline eTariff Filing: Deer Creek Solar I LLC MBR Tariff to be effective 4/10/2021. Filed Date: 4/9/21. Accession Number: 20210409–5283. Comments Due: 5 p.m. ET 4/30/21. Docket Numbers: ER21–1654–000. Applicants: ISO New England Inc., The Connecticut Light and Power Company. Description: Compliance filing: Connecticut Light and Power; Order No. 864 Supplemental Compliance Filing to be effective 1/1/2020. Filed Date: 4/9/21. Accession Number: 20210409–5291. Comments Due: 5 p.m. ET 4/30/21. Docket Numbers: ER21–1656–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of ISA, SA No. 4856; Queue No. AA2–121/AB2–104/ AC1–003 to be effective 5/25/2021. Filed Date: 4/9/21. Accession Number: 20210409–5313. Comments Due: 5 p.m. ET 4/30/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated April 9, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–07835 Filed 4–15–21; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 19:57 Apr 15, 2021 Jkt 253001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P–2697–042] Northern States Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Non-capacity amendment to modify dam spillway. b. Project No.: 2697–042. c. Date Filed: February 4, 2021, supplemented March 26, 2021. d. Applicant: Northern States Power Company. e. Name of Project: Cedar Falls Hydroelectric Project. f. Location: The project is located on the Red Cedar River in Dunn County, Wisconsin. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Matthew Miller, 1414 West Hamilton Avenue, P.O. Box 8, Eau Claire, WI 54702, (715) 737–1353. i. FERC Contact: Mr. Steven Sachs, (202) 502–8666, Steven.Sachs@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/doc-sfiling/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2697–042. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The applicant proposes to modify the dam to increase its flow capacity in order to safely pass the inflow design flood. To do so, the applicant intends to fill most of the existing Amberson-style dam with mass concrete, redesign the existing Tainter gate spillway at the right side of the dam as a non-overflow dam section, convert an adjacent section of the dam to a larger Tainter gate spillway, construct a stilling basin below this new spillway, and deepen a crest gate section to aid in flow and debris management. Construction activities are expected to commence in 2021 and be completed in 2023. The proposed modifications are not expected to affect the operating regime or reservoir elevation and flow requirements. l. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Motions to Intervene, or Protests: Anyone may submit comments, a motion to intervene, or a protest in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, motions to intervene, or protests must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title E:\FR\FM\16APN1.SGM 16APN1 Federal Register / Vol. 86, No. 72 / Friday, April 16, 2021 / Notices ‘‘COMMENTS’’, ‘‘MOTION TO INTERVENE’’, or ‘‘PROTEST’’ as applicable; (2) set forth in the heading the name of the applicant and the project number(s) of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person intervening or protesting; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: April 12, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–07841 Filed 4–15–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER21–1632–000] jbell on DSKJLSW7X2PROD with NOTICES EcoPlus Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of EcoPlus Power, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is April 29, 2021. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// VerDate Sep<11>2014 19:57 Apr 15, 2021 Jkt 253001 www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: April 9, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–07826 Filed 4–15–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL21–64–000] James H. Bankston, Jr., Ralph B. Pfeiffer, Jr., Mark Johnston, Teresa K. Thorne, GASP, Inc.; Notice of Petition for Enforcement (Commission) initiate an enforcement action against Alabama Public Service Commission to remedy its alleged improper implementation of PURPA, all as more fully explained in their petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Petitioners. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on April 23, 2021. Dated: April 9, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–07833 Filed 4–15–21; 8:45 am] BILLING CODE 6717–01–P Take notice that on March 31, 2021, pursuant to section 210(h)(2)(B) of the Public Utility Regulatory Policies Act of 1978 (PURPA), James H. Bankston, Jr., Ralph B. Pfeiffer, Jr., Mark Johnston, Teresa K. Thorne, and GASP, Inc. (together, Petitioners) filed a Petition for Enforcement, requesting that the Federal Energy Regulatory Commission PO 00000 Frm 00028 Fmt 4703 Sfmt 9990 20141 E:\FR\FM\16APN1.SGM 16APN1

Agencies

[Federal Register Volume 86, Number 72 (Friday, April 16, 2021)]
[Notices]
[Pages 20140-20141]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-07841]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[P-2697-042]


Northern States Power Company; Notice of Application Accepted for 
Filing and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Non-capacity amendment to modify dam 
spillway.
    b. Project No.: 2697-042.
    c. Date Filed: February 4, 2021, supplemented March 26, 2021.
    d. Applicant: Northern States Power Company.
    e. Name of Project: Cedar Falls Hydroelectric Project.
    f. Location: The project is located on the Red Cedar River in Dunn 
County, Wisconsin.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Matthew Miller, 1414 West Hamilton 
Avenue, P.O. Box 8, Eau Claire, WI 54702, (715) 737-1353.
    i. FERC Contact: Mr. Steven Sachs, (202) 502-8666, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 30 days from the issuance of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file comments, 
motions to intervene, and protests using the Commission's eFiling 
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/doc-sfiling/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-2697-042.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. Description of Request: The applicant proposes to modify the dam 
to increase its flow capacity in order to safely pass the inflow design 
flood. To do so, the applicant intends to fill most of the existing 
Amberson-style dam with mass concrete, redesign the existing Tainter 
gate spillway at the right side of the dam as a non-overflow dam 
section, convert an adjacent section of the dam to a larger Tainter 
gate spillway, construct a stilling basin below this new spillway, and 
deepen a crest gate section to aid in flow and debris management. 
Construction activities are expected to commence in 2021 and be 
completed in 2023. The proposed modifications are not expected to 
affect the operating regime or reservoir elevation and flow 
requirements.
    l. In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Motions to Intervene, or Protests: Anyone may submit 
comments, a motion to intervene, or a protest in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, motions to 
intervene, or protests must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title

[[Page 20141]]

``COMMENTS'', ``MOTION TO INTERVENE'', or ``PROTEST'' as applicable; 
(2) set forth in the heading the name of the applicant and the project 
number(s) of the application to which the filing responds; (3) furnish 
the name, address, and telephone number of the person intervening or 
protesting; and (4) otherwise comply with the requirements of 18 CFR 
385.2001 through 385.2005. All comments, motions to intervene, or 
protests must set forth their evidentiary basis. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 385.2010.

    Dated: April 12, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-07841 Filed 4-15-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.