Northern States Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 20140-20141 [2021-07841]
Download as PDF
20140
Federal Register / Vol. 86, No. 72 / Friday, April 16, 2021 / Notices
Description: § 205(d) Rate Filing:
2021–04–09 OATT-Transmn Svc Study
Filing to be effective 6/8/2021.
Filed Date: 4/9/21.
Accession Number: 20210409–5259.
Comments Due: 5 p.m. ET 4/30/21.
jbell on DSKJLSW7X2PROD with NOTICES
Docket Numbers: ER21–1653–000.
Applicants: Deer Creek Solar I LLC.
Description: Baseline eTariff Filing:
Deer Creek Solar I LLC MBR Tariff to be
effective 4/10/2021.
Filed Date: 4/9/21.
Accession Number: 20210409–5283.
Comments Due: 5 p.m. ET 4/30/21.
Docket Numbers: ER21–1654–000.
Applicants: ISO New England Inc.,
The Connecticut Light and Power
Company.
Description: Compliance filing:
Connecticut Light and Power; Order No.
864 Supplemental Compliance Filing to
be effective 1/1/2020.
Filed Date: 4/9/21.
Accession Number: 20210409–5291.
Comments Due: 5 p.m. ET 4/30/21.
Docket Numbers: ER21–1656–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA, SA No.
4856; Queue No. AA2–121/AB2–104/
AC1–003 to be effective 5/25/2021.
Filed Date: 4/9/21.
Accession Number: 20210409–5313.
Comments Due: 5 p.m. ET 4/30/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated April 9, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–07835 Filed 4–15–21; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:57 Apr 15, 2021
Jkt 253001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–2697–042]
Northern States Power Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Non-capacity
amendment to modify dam spillway.
b. Project No.: 2697–042.
c. Date Filed: February 4, 2021,
supplemented March 26, 2021.
d. Applicant: Northern States Power
Company.
e. Name of Project: Cedar Falls
Hydroelectric Project.
f. Location: The project is located on
the Red Cedar River in Dunn County,
Wisconsin.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Matthew
Miller, 1414 West Hamilton Avenue,
P.O. Box 8, Eau Claire, WI 54702, (715)
737–1353.
i. FERC Contact: Mr. Steven Sachs,
(202) 502–8666, Steven.Sachs@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file comments, motions to
intervene, and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/doc-sfiling/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2697–042.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Request: The
applicant proposes to modify the dam to
increase its flow capacity in order to
safely pass the inflow design flood. To
do so, the applicant intends to fill most
of the existing Amberson-style dam with
mass concrete, redesign the existing
Tainter gate spillway at the right side of
the dam as a non-overflow dam section,
convert an adjacent section of the dam
to a larger Tainter gate spillway,
construct a stilling basin below this new
spillway, and deepen a crest gate
section to aid in flow and debris
management. Construction activities are
expected to commence in 2021 and be
completed in 2023. The proposed
modifications are not expected to affect
the operating regime or reservoir
elevation and flow requirements.
l. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions to Intervene, or
Protests: Anyone may submit
comments, a motion to intervene, or a
protest in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
motions to intervene, or protests must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
E:\FR\FM\16APN1.SGM
16APN1
Federal Register / Vol. 86, No. 72 / Friday, April 16, 2021 / Notices
‘‘COMMENTS’’, ‘‘MOTION TO
INTERVENE’’, or ‘‘PROTEST’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number(s) of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person intervening or
protesting; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis. A copy of all other filings in
reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: April 12, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–07841 Filed 4–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER21–1632–000]
jbell on DSKJLSW7X2PROD with NOTICES
EcoPlus Power, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of EcoPlus
Power, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is April 29,
2021.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
VerDate Sep<11>2014
19:57 Apr 15, 2021
Jkt 253001
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: April 9, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–07826 Filed 4–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL21–64–000]
James H. Bankston, Jr., Ralph B.
Pfeiffer, Jr., Mark Johnston, Teresa K.
Thorne, GASP, Inc.; Notice of Petition
for Enforcement
(Commission) initiate an enforcement
action against Alabama Public Service
Commission to remedy its alleged
improper implementation of PURPA, all
as more fully explained in their petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Petitioners.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on April 23, 2021.
Dated: April 9, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–07833 Filed 4–15–21; 8:45 am]
BILLING CODE 6717–01–P
Take notice that on March 31, 2021,
pursuant to section 210(h)(2)(B) of the
Public Utility Regulatory Policies Act of
1978 (PURPA), James H. Bankston, Jr.,
Ralph B. Pfeiffer, Jr., Mark Johnston,
Teresa K. Thorne, and GASP, Inc.
(together, Petitioners) filed a Petition for
Enforcement, requesting that the Federal
Energy Regulatory Commission
PO 00000
Frm 00028
Fmt 4703
Sfmt 9990
20141
E:\FR\FM\16APN1.SGM
16APN1
Agencies
[Federal Register Volume 86, Number 72 (Friday, April 16, 2021)]
[Notices]
[Pages 20140-20141]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-07841]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[P-2697-042]
Northern States Power Company; Notice of Application Accepted for
Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Non-capacity amendment to modify dam
spillway.
b. Project No.: 2697-042.
c. Date Filed: February 4, 2021, supplemented March 26, 2021.
d. Applicant: Northern States Power Company.
e. Name of Project: Cedar Falls Hydroelectric Project.
f. Location: The project is located on the Red Cedar River in Dunn
County, Wisconsin.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Matthew Miller, 1414 West Hamilton
Avenue, P.O. Box 8, Eau Claire, WI 54702, (715) 737-1353.
i. FERC Contact: Mr. Steven Sachs, (202) 502-8666,
[email protected].
j. Deadline for filing comments, motions to intervene, and protests
is 30 days from the issuance of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file comments,
motions to intervene, and protests using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/doc-sfiling/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-2697-042.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Request: The applicant proposes to modify the dam
to increase its flow capacity in order to safely pass the inflow design
flood. To do so, the applicant intends to fill most of the existing
Amberson-style dam with mass concrete, redesign the existing Tainter
gate spillway at the right side of the dam as a non-overflow dam
section, convert an adjacent section of the dam to a larger Tainter
gate spillway, construct a stilling basin below this new spillway, and
deepen a crest gate section to aid in flow and debris management.
Construction activities are expected to commence in 2021 and be
completed in 2023. The proposed modifications are not expected to
affect the operating regime or reservoir elevation and flow
requirements.
l. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Motions to Intervene, or Protests: Anyone may submit
comments, a motion to intervene, or a protest in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, motions to
intervene, or protests must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title
[[Page 20141]]
``COMMENTS'', ``MOTION TO INTERVENE'', or ``PROTEST'' as applicable;
(2) set forth in the heading the name of the applicant and the project
number(s) of the application to which the filing responds; (3) furnish
the name, address, and telephone number of the person intervening or
protesting; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, motions to intervene, or
protests must set forth their evidentiary basis. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 385.2010.
Dated: April 12, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-07841 Filed 4-15-21; 8:45 am]
BILLING CODE 6717-01-P