Download as PDF jbell on DSKJLSW7X2PROD with NOTICES 20136 Federal Register / Vol. 86, No. 72 / Friday, April 16, 2021 / Notices (Commission) Rules of Practice and Procedure, 18 CFR 385.207, Holy Cross Electric Association, Inc. (HCE), filed a petition for declaratory order (Petition) requesting that the Commission find that HCE has the right to capacity offsets against the Full Requirements Service obligations otherwise required under the Power Supply Agreement for the power it purchases from Qualifying Facilities (QF) on its system; the right to use firm transmission under the Transmission Integration and Equalization Agreement; and the right to connect QFs to the Holy Cross system using its own interconnection procedures, as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to VerDate Sep<11>2014 19:57 Apr 15, 2021 Jkt 253001 Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5:00 p.m. Eastern time on May 5, 2021. Dated: April 12, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–07844 Filed 4–15–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD21–9–000] The Office of Public Participation; Second Supplemental Notice of Workshop As announced in the Notice of Workshop issued on February 22, 2021, and in the Supplemental Notice of Workshop issued on April 5, 2021, in the above-referenced proceeding, the Commission will convene a Commissioner-led workshop on Friday, April 16, 2021, from approximately 9:00 a.m. to 5:00 p.m. ET. The purpose of this workshop is to provide interested parties with the opportunity to provide input to the Commission on the creation of the Office of Public Participation (OPP). The updated agenda for the workshop is attached. The workshop will be open for the public to attend electronically, and there is no fee for attendance. Information on the workshop will be posted on the Calendar of Events and the OPP Workshop on the Commission’s website, www.ferc.gov, prior to the event. The conference will be transcribed. The workshop will be accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or 202–208– 8659 (TTY), or send a fax to 202–208– 2106 with the required accommodations. For more information about this workshop, please contact Stacey Steep of the Office of General Counsel at (202) 502–8148, or send an email to OPPWorkshop@ferc.gov. For logistical issues, contact Sarah McKinley, (202) 502–8368, sarah.mckinley@ferc.gov. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–07830 Filed 4–15–21; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP21–724–000. Applicants: East Tennessee Natural Gas, LLC. Description: § 4(d) Rate Filing: Updates to Tariff Contact Person to be effective 5/8/2021. Filed Date: 4/8/21. Accession Number: 20210408–5057. Comments Due: 5 p.m. ET 4/20/21. Docket Numbers: RP21–725–000. Applicants: Saltville Gas Storage Company L.L.C. Description: § 4(d) Rate Filing: SGSC Tariff Contact Person Update to be effective 5/8/2021. Filed Date: 4/8/21. Accession Number: 20210408–5064. Comments Due: 5 p.m. ET 4/20/21. Docket Numbers: RP21–726–000. Applicants: Southeast Supply Header, LLC. Description: § 4(d) Rate Filing: Update to Tariff Contact Person to be effective 5/8/2021. Filed Date: 4/8/21. Accession Number: 20210408–5089. Comments Due: 5 p.m. ET 4/20/21. Docket Numbers: RP21–727–000. Applicants: ANR Pipeline Company. Description: Compliance filing Petition for Limited Waivers. Filed Date: 4/8/21. Accession Number: 20210408–5236. Comments Due: 5 p.m. ET 4/13/21. Docket Numbers: RP21–728–000. Applicants: Columbia Gas Transmission, LLC. Description: Compliance filing Petition for Limited Waivers. Filed Date: 4/8/21. Accession Number: 20210408–5237. Comments Due: 5 p.m. ET 4/13/21. Docket Numbers: RP21–729–000. Applicants: Columbia Gulf Transmission, LLC. Description: Compliance filing Petition for Limited Waivers. Filed Date: 4/8/21. Accession Number: 20210408–5245. Comments Due: 5 p.m. ET 4/13/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 E:\FR\FM\16APN1.SGM 16APN1 Federal Register / Vol. 86, No. 72 / Friday, April 16, 2021 / Notices and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 12, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–07827 Filed 4–15–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–113–000] jbell on DSKJLSW7X2PROD with NOTICES Alliance Pipeline L.P.; Notice of Application and Establishing Intervention Deadline Take notice that on April 1, 2021, Alliance Pipeline L.P. (Alliance) filed an abbreviated application under Section 7(c) of the Natural Gas Act for its purposed Three Rivers Interconnection Project (Project). Specifically, Alliance requests: (i) Authorization to construct, own operate and maintain 2.85 miles of 20-inch diameter pipeline, a new meter and regulating station and related appurtenances to provide natural gas to Competitive Power Ventures’ new Three Rivers Energy Center, a power generation facility currently under construction in Grundy County, Illinois; and (ii) any waivers, authority, and further relief as may be necessary to implement the proposal contained in its application. Alliance estimates the total cost of the Project to be $27.7 million, all as more fully set forth in the application which is on file with the Commission and open for public inspection. Alliance’s application states that a water quality certificate under section 401 of the Clean Water Act is required for the project from the Illinois Environmental Protection Agency. The request for certification must be submitted to the certifying agency and to the Commission concurrently. Proof of the certifying agency’s receipt date must be filed no later than five (5) days after the request is submitted to the certifying agency. VerDate Sep<11>2014 19:57 Apr 15, 2021 Jkt 253001 In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this Application should be directed to Estela D. Lozano, Manager, Rates and Certificates, Alliance Pipeline L.P., P.O. Box 1642, Houston, Texas 77251–1642, or telephone (713) 627–4522, or fax (713) 627–5947 or by email estela.lozano@enbridge.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: Complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are two ways to become involved in the Commission’s review of this project: You can file comments on the project, and you can file a motion to intervene in the proceeding. There is no fee or cost for filing comments or intervening. The deadline for filing a 1 18 PO 00000 CFR (Code of Federal Regulations) § 157.9. Frm 00024 Fmt 4703 Sfmt 4703 20137 motion to intervene is 5:00 p.m. Eastern Time on May 3, 2021. Comments Any person wishing to comment on the project may do so. Comments may include statements of support or objections to the project as a whole or specific aspects of the project. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please submit your comments on or before May 3, 2021. There are three methods you can use to submit your comments to the Commission. In all instances, please reference the Project docket number (CP21–113–000) in your submission. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address below.2 Your written comments must reference the Project docket number (CP21–113–000). Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 The Commission encourages electronic filing of comments (options 1 and 2 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Persons who comment on the environmental review of this project will be placed on the Commission’s environmental mailing list, and will receive notification when the environmental documents (EA or EIS) are issued for this project and will be notified of meetings associated with the Commission’s environmental review process. 2 Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. E:\FR\FM\16APN1.SGM 16APN1

Agencies

[Federal Register Volume 86, Number 72 (Friday, April 16, 2021)]
[Notices]
[Pages 20136-20137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-07827]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

    Docket Numbers: RP21-724-000.
    Applicants: East Tennessee Natural Gas, LLC.
    Description: Sec.  4(d) Rate Filing: Updates to Tariff Contact 
Person to be effective 5/8/2021.
    Filed Date: 4/8/21.
    Accession Number: 20210408-5057.
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: RP21-725-000.
    Applicants: Saltville Gas Storage Company L.L.C.
    Description: Sec.  4(d) Rate Filing: SGSC Tariff Contact Person 
Update to be effective 5/8/2021.
    Filed Date: 4/8/21.
    Accession Number: 20210408-5064.
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: RP21-726-000.
    Applicants: Southeast Supply Header, LLC.
    Description: Sec.  4(d) Rate Filing: Update to Tariff Contact 
Person to be effective 5/8/2021.
    Filed Date: 4/8/21.
    Accession Number: 20210408-5089.
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: RP21-727-000.
    Applicants: ANR Pipeline Company.
    Description: Compliance filing Petition for Limited Waivers.
    Filed Date: 4/8/21.
    Accession Number: 20210408-5236.
    Comments Due: 5 p.m. ET 4/13/21.

    Docket Numbers: RP21-728-000.
    Applicants: Columbia Gas Transmission, LLC.
    Description: Compliance filing Petition for Limited Waivers.
    Filed Date: 4/8/21.
    Accession Number: 20210408-5237.
    Comments Due: 5 p.m. ET 4/13/21.

    Docket Numbers: RP21-729-000.
    Applicants: Columbia Gulf Transmission, LLC.
    Description: Compliance filing Petition for Limited Waivers.
    Filed Date: 4/8/21.
    Accession Number: 20210408-5245.
    Comments Due: 5 p.m. ET 4/13/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211

[[Page 20137]]

and 214 of the Commission's Regulations (18 CFR 385.211 and 385.214) on 
or before 5:00 p.m. Eastern time on the specified comment date. 
Protests may be considered, but intervention is necessary to become a 
party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: April 12, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-07827 Filed 4-15-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.