Proposed Information Collection Request; Comment Request; 41 Source Categories, 19256-19262 [2021-07562]

Download as PDF 19256 Federal Register / Vol. 86, No. 69 / Tuesday, April 13, 2021 / Notices OPE ID: llllllllllllllllllll Date:llllllllllllllllllll Paperwork Burden Statement According to the Paperwork Reduction Act of 1995, no persons are required to respond to a collection of information unless such collection displays a valid OMB control number. The valid OMB control number for this information collection is XXX–XXX. Public reporting burden for this collection of information is estimated to average 5 hours per response, including time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. The obligation to respond to this collection is required to obtain or retain benefit (section 314(a)(1) of the Coronavirus Response and Relief Supplemental Appropriations Act, 2021 (Pub. L. 116–260)). If you have any comments concerning the accuracy of the time estimate, suggestions for improving this individual collection, or if you have comments or concerns regarding the status of your individual form, application or survey, please contact Karen Epps, 400 Maryland Avenue SW, Washington, DC 20202 directly. OMB Number: XXXX–XXXX Expiration Date: XX/XX/XXXX [FR Doc. 2021–07658 Filed 4–9–21; 4:15 pm] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Environmental Management SiteSpecific Advisory Board, Northern New Mexico Office of Environmental Management, Department of Energy. ACTION: Notice of Open Virtual Meeting. AGENCY: This notice announces an online virtual meeting of the Environmental Management SiteSpecific Advisory Board (EM SSAB), Northern New Mexico. The Federal Advisory Committee Act requires that public notice of this online virtual meeting be announced in the Federal Register. SUMMARY: Wednesday, May 19, 2021; 1:00 p.m.–5:00 p.m. ADDRESSES: This meeting will be held virtually via Webex. To attend, please contact Menice Santistevan by email, Menice.Santistevan@em.doe.gov, no later than 5:00 p.m. MT on Monday, May 17, 2021. To Sign Up for Public Comment: Please contact Menice Santistevan by email, Menice.Santistevan@em.doe.gov, no later than 5:00 p.m. MT on Monday, May 17, 2021. FOR FURTHER INFORMATION CONTACT: Menice Santistevan, Northern New jbell on DSKJLSW7X2PROD with NOTICES DATES: VerDate Sep<11>2014 17:42 Apr 12, 2021 Jkt 253001 Mexico Citizens’ Advisory Board (NNMCAB), 94 Cities of Gold Road, Santa Fe, NM 87506. Phone (505) 995– 0393 or email: Menice.Santistevan@ em.doe.gov. ENVIRONMENTAL PROTECTION AGENCY SUPPLEMENTARY INFORMATION: Proposed Information Collection Request; Comment Request; 41 Source Categories Purpose of the Board: The purpose of the Board is to make recommendations to DOE–EM and site management in the areas of environmental restoration, waste management, and related activities. • Overview and Approval of Agenda • Approval of March 17, 2021 Minutes • Old Business Æ Report from NNMCAB Chair and Vice Chair Æ Report from NNMCAB Committee Chairs • New Business • Proposal to Update New Mexico Water Quality Standards: Copper Site-Specific Water Quality Criteria for the Pajarito Plateau • Public Comment Period • Presentation on Surface, Groundwater and Soil Sampling Program • Update from EM Los Alamos Field Office and NNMCAB Deputy Designated Federal Officer • Update from N3B • Update from New Mexico Environment Department • Future Presentation Requests Public Participation: The online virtual meeting is open to the public. Written statements may be filed with the Board either before or within five days after the meeting by sending them to Menice Santistevan at the aforementioned email address. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments. Minutes: Minutes will be available by writing or calling Menice Santistevan at the address or telephone number listed above. Minutes and other Board documents are on the internet at: https://www.energy.gov/em/nnmcab/ meeting-materials. Signed in Washington, DC on April 8, 2021. LaTanya Butler, Deputy Committee Management Officer. [FR Doc. 2021–07555 Filed 4–12–21; 8:45 am] BILLING CODE 6450–01–P Frm 00046 Fmt 4703 Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The U.S. Environmental Protection Agency is planning to submit the below listed information collection requests (ICR) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection as described below. These are proposed extensions of the currently approved ICRs. An agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. DATES: Comments must be submitted on or before June 14, 2021. ADDRESSES: Submit your comments, referencing the Docket ID numbers provided for each item in the text, online using https:// www.regulations.gov/ (our preferred method), by email to a-and-r-docket@ epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460. The EPA’s policy is that all relevant comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information or other information whose disclosure is restricted by statute. Out of an abundance of caution for members of the public and our staff, the EPA Docket Center and Reading Room are closed to the public, with limited exceptions, to reduce the risk of transmitting COVID– 19. Our Docket Center staff will continue to provide remote customer service via email, phone, and webform. We encourage the public to submit comments via https:// www.regulations.gov/ or email, as there may be a delay in processing mail and SUMMARY: Tentative Agenda PO 00000 [See Item Specific ICR Titles Provided in the Text; FRL–10022–42–OAR] Sfmt 4703 E:\FR\FM\13APN1.SGM 13APN1 jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 86, No. 69 / Tuesday, April 13, 2021 / Notices faxes. Hand deliveries and couriers may be received by scheduled appointment only. For further information on EPA Docket Center services and the current status, please visit us online at https:// www.epa.gov/dockets. FOR FURTHER INFORMATION CONTACT: Mr. Muntasir Ali, Sector Policies and Programs Division, (D243–05), Office of Air Quality Planning and Standards, U.S. Environmental Protection Agency, Research Triangle Park, North Carolina 27711; telephone number: (919)–541– 0833; email address: Ali.Muntasir@ epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail the information that the EPA will be collecting are available in the public docket for this ICR. The docket can be viewed online at https:// www.regulations.gov/ or in person at the EPA Docket Center, WJC West Building, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit https:// www.epa.gov/dockets. Pursuant to section 3506(c)(2)(A) of the PRA, the EPA is soliciting comments and information to enable it to: (i) Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the Agency, including whether the information will have practical utility; (ii) evaluate the accuracy of the Agency’s estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (iii) enhance the quality, utility, and clarity of the information to be collected; and (iv) minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submission of responses. Burden is defined at 5 CFR 1320.03(b). EPA will consider the comments received and amend the ICR as appropriate. The final ICR package will then be submitted to OMB for review and approval. At that time, EPA will issue another Federal Register notice to announce the submission of the ICR to OMB and the opportunity to submit additional comments to OMB. General Abstract: For the first ICR in this notice (item (1) below), regulated entities are required to submit initial notifications when an aerosol coating is manufactured and notification of changes in the initial report, to report VerDate Sep<11>2014 17:42 Apr 12, 2021 Jkt 253001 formulation data and exemptions claimed, and to maintain records. In addition, regulated entities are required to submit triennial reports that include formulation data and VOC usage. The reports required enable the EPA to determine compliance with the national VOC emission standards for aerosol coatings. For the remaining listed ICRs in this notice, owners and operators of affected facilities are required to comply with reporting and record keeping requirements for the general provisions of 40 CFR part 60, subpart A or part 63, subpart A, as well as the applicable specific standards. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by EPA to determine compliance with the standards. (1) Docket ID Number: EPA–HQ– OAR–2006–0971; National Volatile Organic Compound Emission Standards for Aerosol Coatings (40 CFR part 59, subpart E) (Renewal); EPA ICR Number 2289.05; OMB Control Number 2060– 0617; Expiration date November 30, 2021. Respondents: Manufacturers, distributors, and importers of aerosol coatings. Respondent’s obligation to respond: Mandatory (40 CFR part 59, subpart E). Estimated number of respondents: 65. Frequency of response: Annually, triennially. Estimated Annual burden: 12,259 hours. Estimated Annual cost: $855,113, includes no annualized capital or operations & maintenance (O&M) costs. Changes in Estimates: There is no change in burden from the previous ICR. (2) Docket ID Number: EPA–HQ– OAR–2021–0085; New Source Performance Standards (NSPS) for New Residential Wood Heaters (40 CFR part 60, subpart AAA) (Renewal); EPA ICR Number 1176.14; OMB Control Number 2060–0161; Expiration date March 31, 2022. Respondents: Residential wood heaters. Respondent’s obligation to respond: Mandatory (40 CFR part 60, subpart AAA). Estimated number of respondents: 45. Frequency of response: Annually. Estimated Annual burden: 4,320 hours. Estimated Annual cost: $1,210,000, includes $740,000 annualized capital or operations & maintenance (O&M) costs. PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 19257 Changes in Estimates: There is no change in burden from the previous ICR. (3) Docket ID Number: EPA–HQ– OAR–2021–0087; National Emission Standards for Hazardous Air Pollutants (NESHAP) for Benzene Waste Operations (40 CFR part 61, subpart FF) (Renewal); EPA ICR Number 1541.13; OMB Control Number 2060–0183; Expiration date March 31, 2022. Respondents: Facilities that generate waste containing benzene. Respondent’s obligation to respond: Mandatory (40 CFR part 61, subpart FF). Estimated number of respondents: 270. Frequency of response: Quarterly and annually. Estimated Annual burden: 19,500 hours. Estimated Annual cost: $2,130,000, includes no annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (4) Docket ID Number: EPA–HQ– OAR–2021–0089; NESHAP for Chromium Emissions from Hard and Decorative Chromium Electroplating and Chromium Anodizing Tanks (40 CFR part 63, subpart N) (Renewal); EPA ICR Number 1611.13; OMB Control Number 2060–0327; Expiration date March 31, 2022. Respondents: Hard and decorative chromium electroplating and chromium anodizing tanks. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart N). Estimated number of respondents: 1,343. Frequency of response: Quarterly, semiannually, and annually. Estimated Annual burden: 242,000 hours. Estimated Annual cost: $46,900,000, includes $20,400,000 annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (5) Docket ID Number: EPA–HQ– OAR–2021–0090; NESHAP for Flexible Polyurethane Foam Product (40 CFR part 63, subpart III) (Renewal); EPA ICR Number 1783.10; OMB Control Number 2060–0357; Expiration date March 31, 2022. Respondents: Flexible polyurethane foam production facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart III). Estimated number of respondents: 12. Frequency of response: Semiannually and annually. Estimated Annual burden: 869 hours. Estimated Annual cost: $94,700, includes no annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. E:\FR\FM\13APN1.SGM 13APN1 jbell on DSKJLSW7X2PROD with NOTICES 19258 Federal Register / Vol. 86, No. 69 / Tuesday, April 13, 2021 / Notices (6) Docket ID Number: EPA–HQ– OAR–2021–0091; NESHAP for Pesticide Active Ingredient Production (40 CFR part 63, subpart MMM) (Renewal); EPA ICR Number 1807.10; OMB Control Number 2060–0370; Expiration date March 31, 2022. Respondents: Pesticide active ingredient production facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart MMM) Estimated number of respondents: 18. Frequency of response: Quarterly and semiannually. Estimated Annual burden: 12,100 hours. Estimated Annual cost: $1,350,000, includes $26,500 annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (7) Docket ID Number: EPA–HQ– OAR–2021–0093; NESHAP for Ferroalloys Production: Ferromanganese and Silicomanganese (40 CFR part 63, subpart XXX) (Renewal); EPA ICR Number 1831.08; OMB Control Number 2060–0391; Expiration date March 31, 2022. Respondents: Facilities that produce ferroalloys. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart XXX). Estimated number of respondents: 2. Frequency of response: Quarterly, semiannually, and annually. Estimated Annual burden: 1,170 hours. Estimated Annual cost: $133,000, includes no annualized capital or O&M costs. Changes in Estimates: There is a projected increase in burden due to incorporation of burden from previously promulgated rule amendments. (8) Docket ID Number: EPA–HQ– OAR–2021–0108; NESHAP for Metal Coil Surface Coating Plants (40 CFR part 63, subpart SSSS) (Renewal); EPA ICR Number 1957.11; OMB Control Number 2060–0487; Expiration date March 31, 2022. Respondents: Metal coil surface coating facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart SSSS). Estimated number of respondents: 48. Frequency of response: Semiannually and occasionally. Estimated Annual burden: 16,100 hours. Estimated Annual cost: $1,820,000, includes $57,600 annualized capital or O&M costs. Changes in Estimates: There is a projected increase in burden due to VerDate Sep<11>2014 17:42 Apr 12, 2021 Jkt 253001 incorporation of burden from previously promulgated rule amendments. (9) Docket ID Number: EPA–HQ– OAR–2021–0111; NESHAP for Industrial, Commercial, and Institutional Boilers and Process Heaters (40 CFR part 63, subpart DDDDD) (Renewal); EPA ICR Number 2028.12; OMB Control Number 2060–0551; Expiration date March 31, 2022. Respondents: Industrial, commercial, and institutional boilers and process heaters. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart DDDDD). Estimated number of respondents: 2,012. Frequency of response: Semiannually, annually, biennially, and five-year. Estimated Annual burden: 199,000 hours. Estimated Annual cost: $196,000,000, includes $131,000,000 annualized capital or O&M costs. Changes in Estimates: There is a projected increase in burden due to an increase in the number of sources subject to the regulation. (10) Docket ID Number: EPA–HQ– OAR–2021–0112; NESHAP for Printing, Coating and Dyeing of Fabrics and Other Textiles (40 CFR part 63, subpart OOOO) (Renewal); EPA ICR Number 2071.10; OMB Control Number 2060– 0522; Expiration date March 31, 2022. Respondents: Printing, coating, slashing, dyeing, or finishing of fabric and other textiles facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart OOOO). Estimated number of respondents: 43. Frequency of response: Semiannually. Estimated Annual burden: 7,248 hours. Estimated Annual cost: $160,000, includes $110,000 annualized capital or O&M costs. Changes in Estimates: There is a projected decrease in burden following implementation of previously promulgated rule amendments. (11) Docket ID Number: EPA–HQ– OAR–2021–0113; NESHAP for Coaland Oil-fired Electric Utility Steam Generating Units (40 CFR part 63, subpart UUUUU) (Renewal); EPA ICR Number 2137.10; OMB Control Number 2060–0567; Expiration date March 31, 2022. Respondents: Coal- and oil-fired electric utility steam generating units. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart UUUUU). Estimated number of respondents: 322. Frequency of response: Semiannually. PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 Estimated Annual burden: 284,000 hours. Estimated Annual cost: $132,000,000, includes $104,000,000 annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (12) Docket ID Number: EPA–HQ– OAR–2021–0114; NESHAP for Gasoline Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities and Gasoline Dispensing Facilities (40 CFR part 63, subparts BBBBBB and CCCCCC) (Renewal); EPA ICR Number 2237.06; OMB Control Number 2060–0620; Expiration date March 31, 2022. Respondents: Gasoline distribution facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subparts BBBBBB and CCCCCC). Estimated number of respondents: 19,120. Frequency of response: Semiannually. Estimated Annual burden: 214,000 hours. Estimated Annual cost: $23,500,000, includes $110,000 annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (13) Docket ID Number: EPA–HQ– OAR–2021–0115; NESHAP for Paint Stripping and Miscellaneous Surface Coating at Area Sources (40 CFR part 63, subpart HHHHHH) (Renewal); EPA ICR Number 2268.06; OMB Control Number 2060–0607; Expiration date March 31, 2022. Respondents: Paint stripping operations using methylene chloride (MeCl)-containing paint strippers, motor vehicle and mobile equipment surface coating operations, and miscellaneous surface coating operations. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart HHHHHH). Estimated number of respondents: 39,812. Frequency of response: Initially and annually. Estimated Annual burden: 169,000 hours. Estimated Annual cost: $18,500,000, includes $117,000 annualized capital or O&M costs. Changes in Estimates: There is a projected increase in burden due to an increase in the number of sources subject to the regulation. (14) Docket ID Number: EPA–HQ– OAR–2021–0116; NESHAP for Plating and Polishing Area Sources (40 CFR part 63, subpart WWWWWW) (Renewal); EPA ICR Number 2294.06; OMB Control Number 2060–0623; Expiration date March 31, 2022. Respondents: Plating and polishing facilities. E:\FR\FM\13APN1.SGM 13APN1 jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 86, No. 69 / Tuesday, April 13, 2021 / Notices Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart WWWWWW). Estimated number of respondents: 2,900. Frequency of response: Annually. Estimated Annual burden: 67,700 hours. Estimated Annual cost: $7,410,000, includes no annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (15) Docket ID Number: EPA–HQ– OAR–2021–0084; NESHAP for Mercury (40 CFR part 61, subpart E) (Renewal); EPA ICR Number 0113.14; OMB Control Number 2060–0097; Expiration date April 30, 2022. Respondents: Mercury ore processing facilities, mercury cell chlor-alkali plants, sludge incineration plants, and sludge drying plants. Respondent’s obligation to respond: Mandatory (40 CFR part 61, subpart E). Estimated number of respondents: 107. Frequency of response: Semiannually and annually. Estimated Annual burden: 20,600 hours. Estimated Annual cost: $2,260,000, includes no annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (16) Docket ID Number: EPA–HQ– OAR–2021–0086; NESHAP for Coke Oven Batteries (40 CFR part 63, subpart L) (Renewal); EPA ICR Number 1362.12; OMB Control Number 2060–0253; Expiration date April 30, 2022. Respondents: Coke oven batteries. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart L). Estimated number of respondents: 19. Frequency of response: Semiannually. Estimated Annual burden: 79,800 hours. Estimated Annual cost: $8,730,000, includes no annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (17) Docket ID Number: EPA–HQ– OAR–2021–0092; NESHAP for Steel Pickling, HCI Process Facilities and Hydrochloric Acid Regeneration Plants (40 CFR part 63, subpart CCC) (Renewal); EPA ICR Number 1821.10; OMB Control Number 2060–0419; Expiration date April 30, 2022. Respondents: Steel pickling, HCl process facilities and hydrochloric acid regeneration plants Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart CCC) Estimated number of respondents: 100. VerDate Sep<11>2014 17:42 Apr 12, 2021 Jkt 253001 Frequency of response: Semiannually. Estimated Annual burden: 35,000 hours. Estimated Annual cost: $3,840,000, includes $10,600 annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (18) Docket ID Number: EPA–HQ– OAR–2021–0094; NESHAP for Source Categories: Generic Maximum Achievable Control Technology Standards (40 CFR part 63, subpart YY) (Renewal); EPA ICR Number 1871.11; OMB Control Number 2060–0420; Expiration date April 30, 2022. Respondents: Polycarbonate, acrylic and modacrylic fiber, acetal resin, and hydrogen fluoride production facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart YY). Estimated number of respondents: 7. Frequency of response: Semiannually. Estimated Annual burden: 2,910 hours. Estimated Annual cost: $361,000, includes $43,100 annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (19) Docket ID Number: EPA–HQ– OAR–2021–0106; NESHAP for Paper and Other Web Coating (40 CFR part 63, subpart JJJJ) (Renewal); EPA ICR Number 1951.10; OMB Control Number 2060–0511; Expiration date April 30, 2022. Respondents: Paper and other web coating facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart JJJJ) Estimated number of respondents: 170. Frequency of response: Semiannually. Estimated Annual burden: 17,300 hours. Estimated Annual cost: $2,735,000, includes $765,000 annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (20) Docket ID Number: EPA–HQ– OAR–2021–0107; NESHAP for Metal Furniture Surface Coating (40 CFR part 63, subpart RRRR) (Renewal); EPA ICR Number 1952.10; OMB Control Number 2060–0518; Expiration date April 30, 2022. Respondents: Metal furniture surface coating facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart RRRR). Estimated number of respondents: 16. Frequency of response: Semiannually. Estimated Annual burden: 190,000 hours. PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 19259 Estimated Annual cost: $17,200,000, includes $700,000 annualized capital or O&M costs. Changes in Estimates: There is a projected decrease in burden following implementation of previously promulgated rule amendments. (21) Docket ID Number: EPA–HQ– OAR–2021–0109; NESHAP for Reinforced Plastic Composites Production (40 CFR part 63, subpart WWWW) (Renewal); EPA ICR Number 1976.10; OMB Control Number 2060– 0509; Expiration date April 30, 2022. Respondents: Reinforced plastic composites production facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart WWWW) Estimated number of respondents: 448. Frequency of response: Semiannually. Estimated Annual burden: 38,125 hours. Estimated Annual cost: $3,749,000, includes no annualized capital or O&M costs. Changes in Estimates: There is a projected decrease in burden following implementation of previously promulgated rule amendments. (22) Docket ID Number: EPA–HQ– OAR–2021–0110; NESHAP for Coke Oven Pushing, Quenching, and Battery Stacks (40 CFR part 63, subpart CCCCC) (Renewal); EPA ICR Number 1995.08; OMB Control Number 2060–0521; Expiration date April 30, 2022. Respondents: Coke oven batteries. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart CCCCC). Estimated number of respondents: 16. Frequency of response: Quarterly and semiannually. Estimated Annual burden: 27,200 hours. Estimated Annual cost: $3,240,000, includes $143,000 annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (23) Docket ID Number: EPA–HQ– OAR–2021–0101; NESHAP for Integrated Iron and Steel Manufacturing (40 CFR part 63, subpart FFFFF) (Renewal); EPA ICR Number 2003.10; OMB Control Number 2060–0517; Expiration date April 30, 2022. Respondents: Sinter plants, blast furnaces, and basic oxygen process furnace shops at integrated iron and steel manufacturing facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart FFFFF). Estimated number of respondents: 11. Frequency of response: Semiannually. Estimated Annual burden: 6,500 hours. E:\FR\FM\13APN1.SGM 13APN1 jbell on DSKJLSW7X2PROD with NOTICES 19260 Federal Register / Vol. 86, No. 69 / Tuesday, April 13, 2021 / Notices Estimated Annual cost: $800,000, includes $50,300 annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (24) Docket ID Number: EPA–HQ– OAR–2021–0102; NESHAP for Flexible Polyurethane Foam Fabrication (40 CFR part 63, subpart MMMMM) (Renewal); EPA ICR Number 2027.11; OMB Control Number 2060–0516; Expiration date April 30, 2022. Respondents: Flexible polyurethane foam fabrication facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart MMMMM) Estimated number of respondents: 18. Frequency of response: Semiannually. Estimated Annual burden: 22,200 hours. Estimated Annual cost: $2,560,000, includes $34,500 annualized capital or O&M costs. Changes in Estimates: There is a projected decrease in burden due to anticipated shutdown of existing sources. (25) Docket ID Number: EPA–HQ– OAR–2021–0104; NESHAP for Refractory Products Manufacturing (40 CFR part 63, subpart SSSSS) (Renewal); EPA ICR Number 2040.11; OMB Control Number 2060–0515; Expiration date April 30, 2022. Respondents: Refractory products manufacturing facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart SSSSS). Estimated number of respondents: 8. Frequency of response: Semiannually. Estimated Annual burden: 306 hours. Estimated Annual cost: $37,800, includes $3,040 annualized capital or O&M costs. Changes in Estimates: There is a projected decrease in burden due to anticipated shutdown of existing sources. (26) Docket ID Number: EPA–HQ– OAR–2021–0121; NESHAP for Industrial, Commercial, and Institutional Boilers Area Sources (40 CFR part 63, subpart JJJJJJ) (Renewal); EPA ICR Number 2253.05; OMB Control Number 2060–0668; Expiration date April 30, 2022. Respondents: Industrial, commercial, and institutional boilers designed to burn biomass, coal, or liquid fuels. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart JJJJJJ). Estimated number of respondents: 100,344. Frequency of response: Annually and biennially. Estimated Annual burden: 1,830,000 hours. VerDate Sep<11>2014 17:42 Apr 12, 2021 Jkt 253001 Estimated Annual cost: $340,000,000, includes $132,000,000 annualized capital or O&M costs. Changes in Estimates: There is a projected increase in burden due to an increase in the number of sources subject to the regulation. (27) Docket ID Number: EPA–HQ– OAR–2021–0122; NESHAP for Nine Metal Fabrication and Area Finishing Source (40 CFR part 63, subpart XXXXXX) (Renewal); EPA ICR Number 2298.06; OMB Control Number 2060– 0622; Expiration date April 30, 2022. Respondents: Metal fabrication and finishing facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart XXXXXX). Estimated number of respondents: 5,800. Frequency of response: Annually. Estimated Annual burden: 39,000 hours. Estimated Annual cost: $4,440,000, includes no annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (28) Docket ID Number: EPA–HQ– OAR–2021–0125; NESHAP for Polyvinyl Chloride and Copolymer Production (40 CFR part 63, subpart HHHHHHH) (Renewal); EPA ICR Number 2432.07; OMB Control Number 2060–0666; Expiration date April 30, 2022. Respondents: Polyvinyl chloride and copolymer production facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart HHHHHHH). Estimated number of respondents: 15. Frequency of response: Semiannually. Estimated Annual burden: 338,000 hours. Estimated Annual cost: $45,500,000, includes $7,060,000 annualized capital or O&M costs. Changes in Estimates: There is a projected decrease in burden due to anticipated shutdown of existing sources. (29) Docket ID Number: EPA–HQ– OAR–2021–0096; NESHAP for Asbestos (40 CFR part 61, subpart M) (Renewal); EPA ICR Number 0111.16; OMB Control Number 2060–0101; Expiration date May 31, 2022. Respondents: Demolition and renovation facilities; asbestos waste disposal; asbestos milling, manufacturing and fabricating; the use of asbestos on roadways; asbestos waste converting facilities; and the use of asbestos insulation and sprayed-on materials. Respondent’s obligation to respond: Mandatory (40 CFR part 61, subpart M). PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 Estimated number of respondents: 9,687. Frequency of response: Quarterly, semiannually, and annually. Estimated Annual burden: 287,000 hours. Estimated Annual cost: $32,700,000, includes no annualized capital or O&M costs. Changes in Estimates: There is a projected increase in burden due to an increase in the number of sources subject to the regulation. (30) Docket ID Number: EPA–HQ– OAR–2021–0098; NESHAP for the Surface Coating of Large Household and Commercial Appliances (40 CFR part 63, subpart NNNN) (Renewal); EPA ICR Number 1954.10; OMB Control Number 2060–0457; Expiration date May 31, 2022. Respondents: Large household and commercial appliance surface coating facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart NNNN) Estimated number of respondents: 10. Frequency of response: Semiannually. Estimated Annual burden: 3,870 hours. Estimated Annual cost: $429,000, includes $5,400 annualized capital or O&M costs. Changes in Estimates: There is a projected decrease in burden following implementation of previously promulgated rule amendments. (31) Docket ID Number: EPA–HQ– OAR–2021–0100; NESHAP for Rubber Tire Manufacturing (40 CFR part 63, subpart XXXX) (Renewal); EPA ICR Number 1982.05; OMB Control Number 2060–0449; Expiration date May 31, 2022. Respondents: Rubber processing, tire production, tire cord production, and puncture sealant application facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart XXXX) Estimated number of respondents: 23. Frequency of response: Semiannually and annually. Estimated Annual burden: 6,520 hours. Estimated Annual cost: $910,000, includes no annualized capital or O&M costs. Changes in Estimates: There is a projected decrease in burden due to anticipated shutdown of existing sources. (32) Docket ID Number: EPA–HQ– OAR–2021–0103; NESHAP for Asphalt Processing and Asphalt Roofing Manufacturing (40 CFR part 63, subpart LLLLL) (Renewal); EPA ICR Number 2029.09; OMB Control Number 2060– 0520; Expiration date May 31, 2022. E:\FR\FM\13APN1.SGM 13APN1 jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 86, No. 69 / Tuesday, April 13, 2021 / Notices Respondents: Asphalt processing and asphalt roofing facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart LLLLL) Estimated number of respondents: 8. Frequency of response: Semiannually. Estimated Annual burden: 3,970 hours. Estimated Annual cost: $472,000, includes $20,000 annualized capital or O&M costs. Changes in Estimates: There is a projected increase in burden due to incorporation of burden from previously promulgated rule amendments. (33) Docket ID Number: EPA–HQ– OAR–2021–0105; NESHAP for Semiconductor Manufacturing (40 CFR part 63, subpart BBBBB) (Renewal); EPA ICR Number 2042.08; OMB Control Number 2060–0519; Expiration date May 31, 2022. Respondents: Semiconductor manufacturing facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart BBBBB). Estimated number of respondents: 1. Frequency of response: Semiannually. Estimated Annual burden: 41 hours. Estimated Annual cost: $5,270, includes $550 annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (34) Docket ID Number: EPA–HQ– OAR–2021–0123; NESHAP for Chemical Manufacturing Area Sources (40 CFR part 63, subpart VVVVVV) (Renewal); EPA ICR Number 2323.08; OMB Control Number 2060–0621; Expiration date May 31, 2022. Respondents: Chemical manufacturing facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart VVVVVV). Estimated number of respondents: 528. Frequency of response: Semiannually. Estimated Annual burden: 10,200 hours. Estimated Annual cost: $2,650,000, includes $1,490,000 annualized capital or O&M costs. Changes in Estimates: There is a projected increase in burden due to an increase in the number of sources subject to the regulation. (35) Docket ID Number: EPA–HQ– OAR–2021–0124; NESHAP for Aluminum, Copper, and Other NonFerrous Foundries (40 CFR part 63, subpart ZZZZZZ) (Renewal); EPA ICR Number 2332.06; OMB Control Number 2060–0630; Expiration date May 31, 2022. Respondents: Aluminum, copper, and other non-ferrous metals foundries. VerDate Sep<11>2014 17:42 Apr 12, 2021 Jkt 253001 Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart ZZZZZZ). Estimated number of respondents: 318. Frequency of response: Semiannually. Estimated Annual burden: 11,900 hours. Estimated Annual cost: $1,360,000, includes no annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (36) Docket ID Number: EPA–HQ– OAR–2021–0126; Title: NESHAP for Polyvinyl Chloride and Copolymers Production Area Sources (40 CFR part 63, subpart DDDDDD) (Renewal); EPA ICR Number 2454.06; OMB Control Number 2060–0684; Expiration date May 31, 2022. Respondents: Polyvinyl chloride and copolymer production facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart DDDDDD). Estimated number of respondents: 4. Frequency of response: Semiannually. Estimated Annual burden: 92,300 hours. Estimated Annual cost: $1,360,000, includes no annualized capital or O&M costs. Changes in Estimates: There is a projected decrease in burden due to anticipated shutdown of existing sources. (37) Docket ID Number: EPA–HQ– OAR–2021–0118; NESHAP for Mercury Cell Chlor-Alkali Plants (40 CFR part 63, subpart IIIII) (Renewal); EPA ICR Number 2046.11; OMB Control Number 2060–0542; Expiration date June 30, 2022. Respondents: Mercury cell chloralkali facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart IIIII). Estimated number of respondents: 2. Frequency of response: Semiannually. Estimated Annual burden: 3,760 hours. Estimated Annual cost: $444,000, includes $16,400 annualized capital or O&M costs. Changes in Estimates: There is a projected decrease in burden due to anticipated shutdown of existing sources. (38) Docket ID Number: EPA–HQ– OAR–2021–0119; NESHAP for Taconite Iron Ore Processing (40 CFR part 63 subpart RRRRR) (Renewal); EPA ICR Number 2050.10; OMB Control Number 2060–0538; Expiration date June 30, 2022. Respondents: Taconite iron ore processing facilities. PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 19261 Respondent’s obligation to respond: Mandatory (40 CFR part 63 subpart RRRRR). Estimated number of respondents: 8. Frequency of response: Semiannually. Estimated Annual burden: 483 hours. Estimated Annual cost: $576,000, includes $521,000 annualized capital or O&M costs. Changes in Estimates: There is a projected increase in burden due to an increase in the number of sources subject to the regulation. (39) Docket ID Number: EPA–HQ– OAR–2021–0120; NESHAP for Primary Magnesium Refining (40 CFR part 63, subpart TTTTT) (Renewal); EPA ICR Number 2098.11; OMB Control Number 2060–0536; Expiration date June 30, 2022. Respondents: Primary magnesium refining facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart TTTTT). Estimated number of respondents: 1. Frequency of response: Semiannually. Estimated Annual burden: 611 hours. Estimated Annual cost: $70,900, includes $1,200 annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. (40) Docket ID Number: EPA–HQ– OAR–2021–0097; NESHAP for Municipal Solid Waste Landfills (40 CFR part 63, subpart AAAA) (Renewal); EPA ICR Number 1938.08; OMB Control Number 2060–0505; Expiration date July 31, 2022. Respondents: Municipal solid waste landfills. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart AAAA). Estimated number of respondents: 1,151. Frequency of response: Semiannually. Estimated Annual burden: 35,200 hours. Estimated Annual cost: $3,170,000, includes $10,800 annualized capital or O&M costs. Changes in Estimates: There is a projected increase in burden due to an increase in the number of sources subject to the regulation. (41) Docket ID Number: EPA–HQ– OAR–2021–0099; NESHAP for WetFormed Fiberglass Mat Production (40 CFR part 63, subpart HHHH) (Renewal); EPA ICR Number 1964.10; OMB Control Number 2060–0496; Expiration date September 30, 2022. Respondents: Wet-formed fiberglass mat production facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart HHHH). E:\FR\FM\13APN1.SGM 13APN1 19262 Federal Register / Vol. 86, No. 69 / Tuesday, April 13, 2021 / Notices Estimated number of respondents: 7. Frequency of response: Semiannually. Estimated Annual burden: 1,470 hours. Estimated Annual cost: $95,500, includes no annualized capital or O&M costs. Changes in Estimates: There is no change in burden from the previous ICR. Dated: April 5, 2021. Penny Lassiter, Director, Sector Policies and Programs Division. [FR Doc. 2021–07562 Filed 4–12–21; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–ORD–2015–0467; FRL–10022–36– ORD] Board of Scientific Counselors (BOSC) Safe and Sustainable Water Resources Subcommittee Meeting—May 2021 Environmental Protection Agency (EPA). ACTION: Notice of public meeting. AGENCY: The Environmental Protection Agency (EPA), Office of Research and Development (ORD), gives notice of a series of virtual meetings of the Board of Scientific Counselors (BOSC) Safe and Sustainable Water Resources (SSWR) Subcommittee to discuss water treatment and infrastructure. DATES: 1. The initial meeting will be held over two days via videoconference: a. Wednesday, May 26, 2021, from 12 p.m. to 5 p.m. (EDT); and b. Thursday, May 27, 2021, from 12 p.m. to 5 p.m. (EDT). Attendees must register by May 25, 2021. 2. A BOSC deliberation will be held on June 22, 2021, from 11 a.m. to 2 p.m. (EDT). Attendees must register by June 21, 2021. 3. A final summary teleconference will be held on June 29, 2021, from 11 a.m. to 2 p.m. (EDT). Attendees must register by June 28, 2021. Meeting times are subject to change. This series of meetings is open to the public. Comments must be received by May 25, 2021, to be considered by the subcommittee. Requests for the draft agenda or making a presentation at the meeting will be accepted until May 25, 2021. ADDRESSES: Instructions on how to connect to the videoconference will be provided upon registration at: https:// www.eventbrite.com/e/us-epa-bosc-safeand-sustainable-water-resources- jbell on DSKJLSW7X2PROD with NOTICES SUMMARY: VerDate Sep<11>2014 17:42 Apr 12, 2021 Jkt 253001 subcommittee-meeting-tickets142587379691. Submit your comments to Docket ID No. EPA–HQ–ORD–2015–0467 by one of the following methods: • www.regulations.gov: Follow the online instructions for submitting comments. D Note: Comments submitted to the www.regulations.gov website are anonymous unless identifying information is included in the body of the comment. • Email: Send comments by electronic mail (email) to: ORD.Docket@ epa.gov, Attention Docket ID No. EPA– HQ–ORD–2015–0467. D Note: Comments submitted via email are not anonymous. The sender’s email will be included in the body of the comment and placed in the public docket which is made available on the internet. Instructions: All comments received, including any personal information provided, will be included in the public docket without change and may be made available online at www.regulations.gov. Information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute will not be included in the public docket, and should not be submitted through www.regulations.gov or email. For additional information about the EPA’s public docket visit the EPA Docket Center homepage at https:// www.epa.gov/dockets/. Public Docket: Publicly available docket materials may be accessed Online at www.regulations.gov. Copyrighted materials in the docket are only available via hard copy. The telephone number for the ORD Docket Center is (202) 566–1752. FOR FURTHER INFORMATION CONTACT: The Designated Federal Officer (DFO), Tom Tracy, via phone/voicemail at: (202) 564–6518; or via email at: tracy.tom@ epa.gov. Any member of the public interested in receiving a draft agenda, attending the meeting, or making a presentation at the meeting should contact Tom Tracy no later than May 25, 2021. SUPPLEMENTARY INFORMATION: The Board of Scientific Counselors (BOSC) is a federal advisory committee that provides advice and recommendations to EPA’s Office of Research and Development on technical and management issues of its research programs. The meeting agenda and materials will be posted to https:// www.epa.gov/bosc. Proposed agenda items for the meeting include, but are not limited to, PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 the following: Water treatment and infrastructure. Information on Services Available: For information on translation services, access, or services for individuals with disabilities, please contact Tom Tracy at (202) 564–6518 or tracy.tom@epa.gov. To request accommodation of a disability, please contact Tom Tracy at least ten days prior to the meeting to give the EPA adequate time to process your request. Authority: Pub. L. 92–463, 1, Oct. 6, 1972, 86 Stat. 770. Mary Ross, Director, Office of Science Advisor, Policy and Engagement. [FR Doc. 2021–07480 Filed 4–12–21; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OAR–2021–0233; 10022–32–OAR] Proposed Baseline Approval of the Contact-Handled Transuranic Waste Characterization Program Implemented at the Department of Energy’s Savannah River Site Environmental Protection Agency (EPA). ACTION: Notice of availability; opening of a 45-day public comment period. AGENCY: The Environmental Protection Agency (EPA or the Agency) is announcing the availability of, and soliciting public comments on, the proposed ‘‘baseline’’ approval of the contact-handled (CH) transuranic (TRU) debris waste characterization program implemented by the Central Characterization Program (CCP) at the U.S. Department of Energy’s (DOE) Savannah River Site (SRS), in Aiken, South Carolina. The inspections supporting this proposed baseline approval took place from November 30 through December 2, 2020, remotely and at SRS. The EPA identified no findings or concerns and proposes to approve the SRS CH TRU debris waste characterization program. The EPA’s report documenting the inspection results and proposed baseline approval is available for review in the public docket listed in the ADDRESSES section of this document. Until the Agency finalizes its baseline approval decision, the DOE Carlsbad Field Office may not certify SRS’ waste characterization program and the site may not ship transuranic waste to the Waste Isolation Pilot Plant for disposal. DATES: Comments must be received on or before May 28, 2021. SUMMARY: E:\FR\FM\13APN1.SGM 13APN1

Agencies

[Federal Register Volume 86, Number 69 (Tuesday, April 13, 2021)]
[Notices]
[Pages 19256-19262]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-07562]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[See Item Specific ICR Titles Provided in the Text; FRL-10022-42-OAR]


Proposed Information Collection Request; Comment Request; 41 
Source Categories

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The U.S. Environmental Protection Agency is planning to submit 
the below listed information collection requests (ICR) to the Office of 
Management and Budget (OMB) for review and approval in accordance with 
the Paperwork Reduction Act. Before doing so, EPA is soliciting public 
comments on specific aspects of the proposed information collection as 
described below. These are proposed extensions of the currently 
approved ICRs. An agency may not conduct or sponsor and a person is not 
required to respond to a collection of information unless it displays a 
currently valid OMB control number.

DATES: Comments must be submitted on or before June 14, 2021.

ADDRESSES: Submit your comments, referencing the Docket ID numbers 
provided for each item in the text, online using https://www.regulations.gov/ (our preferred method), by email to [email protected], or by mail to: EPA Docket Center, Environmental 
Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, 
Washington, DC 20460.
    The EPA's policy is that all relevant comments received will be 
included in the public docket without change including any personal 
information provided, unless the comment includes profanity, threats, 
information claimed to be Confidential Business Information or other 
information whose disclosure is restricted by statute. Out of an 
abundance of caution for members of the public and our staff, the EPA 
Docket Center and Reading Room are closed to the public, with limited 
exceptions, to reduce the risk of transmitting COVID-19. Our Docket 
Center staff will continue to provide remote customer service via 
email, phone, and webform. We encourage the public to submit comments 
via https://www.regulations.gov/ or email, as there may be a delay in 
processing mail and

[[Page 19257]]

faxes. Hand deliveries and couriers may be received by scheduled 
appointment only. For further information on EPA Docket Center services 
and the current status, please visit us online at https://www.epa.gov/dockets.

FOR FURTHER INFORMATION CONTACT: Mr. Muntasir Ali, Sector Policies and 
Programs Division, (D243-05), Office of Air Quality Planning and 
Standards, U.S. Environmental Protection Agency, Research Triangle 
Park, North Carolina 27711; telephone number: (919)-541-0833; email 
address: [email protected].

SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail 
the information that the EPA will be collecting are available in the 
public docket for this ICR. The docket can be viewed online at https://www.regulations.gov/ or in person at the EPA Docket Center, WJC West 
Building, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The 
telephone number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit https://www.epa.gov/dockets.
    Pursuant to section 3506(c)(2)(A) of the PRA, the EPA is soliciting 
comments and information to enable it to: (i) Evaluate whether the 
proposed collection of information is necessary for the proper 
performance of the functions of the Agency, including whether the 
information will have practical utility; (ii) evaluate the accuracy of 
the Agency's estimate of the burden of the proposed collection of 
information, including the validity of the methodology and assumptions 
used; (iii) enhance the quality, utility, and clarity of the 
information to be collected; and (iv) minimize the burden of the 
collection of information on those who are to respond, including 
through the use of appropriate automated electronic, mechanical, or 
other technological collection techniques or other forms of information 
technology, e.g., permitting electronic submission of responses. Burden 
is defined at 5 CFR 1320.03(b). EPA will consider the comments received 
and amend the ICR as appropriate. The final ICR package will then be 
submitted to OMB for review and approval. At that time, EPA will issue 
another Federal Register notice to announce the submission of the ICR 
to OMB and the opportunity to submit additional comments to OMB.
    General Abstract: For the first ICR in this notice (item (1) 
below), regulated entities are required to submit initial notifications 
when an aerosol coating is manufactured and notification of changes in 
the initial report, to report formulation data and exemptions claimed, 
and to maintain records. In addition, regulated entities are required 
to submit triennial reports that include formulation data and VOC 
usage. The reports required enable the EPA to determine compliance with 
the national VOC emission standards for aerosol coatings. For the 
remaining listed ICRs in this notice, owners and operators of affected 
facilities are required to comply with reporting and record keeping 
requirements for the general provisions of 40 CFR part 60, subpart A or 
part 63, subpart A, as well as the applicable specific standards. This 
includes submitting initial notifications, performance tests and 
periodic reports and results, and maintaining records of the occurrence 
and duration of any startup, shutdown, or malfunction in the operation 
of an affected facility, or any period during which the monitoring 
system is inoperative. These reports are used by EPA to determine 
compliance with the standards.
    (1) Docket ID Number: EPA-HQ-OAR-2006-0971; National Volatile 
Organic Compound Emission Standards for Aerosol Coatings (40 CFR part 
59, subpart E) (Renewal); EPA ICR Number 2289.05; OMB Control Number 
2060-0617; Expiration date November 30, 2021.
    Respondents: Manufacturers, distributors, and importers of aerosol 
coatings.
    Respondent's obligation to respond: Mandatory (40 CFR part 59, 
subpart E).
    Estimated number of respondents: 65.
    Frequency of response: Annually, triennially.
    Estimated Annual burden: 12,259 hours.
    Estimated Annual cost: $855,113, includes no annualized capital or 
operations & maintenance (O&M) costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (2) Docket ID Number: EPA-HQ-OAR-2021-0085; New Source Performance 
Standards (NSPS) for New Residential Wood Heaters (40 CFR part 60, 
subpart AAA) (Renewal); EPA ICR Number 1176.14; OMB Control Number 
2060-0161; Expiration date March 31, 2022.
    Respondents: Residential wood heaters.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart AAA).
    Estimated number of respondents: 45.
    Frequency of response: Annually.
    Estimated Annual burden: 4,320 hours.
    Estimated Annual cost: $1,210,000, includes $740,000 annualized 
capital or operations & maintenance (O&M) costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (3) Docket ID Number: EPA-HQ-OAR-2021-0087; National Emission 
Standards for Hazardous Air Pollutants (NESHAP) for Benzene Waste 
Operations (40 CFR part 61, subpart FF) (Renewal); EPA ICR Number 
1541.13; OMB Control Number 2060-0183; Expiration date March 31, 2022.
    Respondents: Facilities that generate waste containing benzene.
    Respondent's obligation to respond: Mandatory (40 CFR part 61, 
subpart FF).
    Estimated number of respondents: 270.
    Frequency of response: Quarterly and annually.
    Estimated Annual burden: 19,500 hours.
    Estimated Annual cost: $2,130,000, includes no annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (4) Docket ID Number: EPA-HQ-OAR-2021-0089; NESHAP for Chromium 
Emissions from Hard and Decorative Chromium Electroplating and Chromium 
Anodizing Tanks (40 CFR part 63, subpart N) (Renewal); EPA ICR Number 
1611.13; OMB Control Number 2060-0327; Expiration date March 31, 2022.
    Respondents: Hard and decorative chromium electroplating and 
chromium anodizing tanks.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart N).
    Estimated number of respondents: 1,343.
    Frequency of response: Quarterly, semiannually, and annually.
    Estimated Annual burden: 242,000 hours.
    Estimated Annual cost: $46,900,000, includes $20,400,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (5) Docket ID Number: EPA-HQ-OAR-2021-0090; NESHAP for Flexible 
Polyurethane Foam Product (40 CFR part 63, subpart III) (Renewal); EPA 
ICR Number 1783.10; OMB Control Number 2060-0357; Expiration date March 
31, 2022.
    Respondents: Flexible polyurethane foam production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart III).
    Estimated number of respondents: 12.
    Frequency of response: Semiannually and annually.
    Estimated Annual burden: 869 hours.
    Estimated Annual cost: $94,700, includes no annualized capital or 
O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.

[[Page 19258]]

    (6) Docket ID Number: EPA-HQ-OAR-2021-0091; NESHAP for Pesticide 
Active Ingredient Production (40 CFR part 63, subpart MMM) (Renewal); 
EPA ICR Number 1807.10; OMB Control Number 2060-0370; Expiration date 
March 31, 2022.
    Respondents: Pesticide active ingredient production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart MMM)
    Estimated number of respondents: 18.
    Frequency of response: Quarterly and semiannually.
    Estimated Annual burden: 12,100 hours.
    Estimated Annual cost: $1,350,000, includes $26,500 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (7) Docket ID Number: EPA-HQ-OAR-2021-0093; NESHAP for Ferroalloys 
Production: Ferromanganese and Silicomanganese (40 CFR part 63, subpart 
XXX) (Renewal); EPA ICR Number 1831.08; OMB Control Number 2060-0391; 
Expiration date March 31, 2022.
    Respondents: Facilities that produce ferroalloys.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart XXX).
    Estimated number of respondents: 2.
    Frequency of response: Quarterly, semiannually, and annually.
    Estimated Annual burden: 1,170 hours.
    Estimated Annual cost: $133,000, includes no annualized capital or 
O&M costs.
    Changes in Estimates: There is a projected increase in burden due 
to incorporation of burden from previously promulgated rule amendments.
    (8) Docket ID Number: EPA-HQ-OAR-2021-0108; NESHAP for Metal Coil 
Surface Coating Plants (40 CFR part 63, subpart SSSS) (Renewal); EPA 
ICR Number 1957.11; OMB Control Number 2060-0487; Expiration date March 
31, 2022.
    Respondents: Metal coil surface coating facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart SSSS).
    Estimated number of respondents: 48.
    Frequency of response: Semiannually and occasionally.
    Estimated Annual burden: 16,100 hours.
    Estimated Annual cost: $1,820,000, includes $57,600 annualized 
capital or O&M costs.
    Changes in Estimates: There is a projected increase in burden due 
to incorporation of burden from previously promulgated rule amendments.
    (9) Docket ID Number: EPA-HQ-OAR-2021-0111; NESHAP for Industrial, 
Commercial, and Institutional Boilers and Process Heaters (40 CFR part 
63, subpart DDDDD) (Renewal); EPA ICR Number 2028.12; OMB Control 
Number 2060-0551; Expiration date March 31, 2022.
    Respondents: Industrial, commercial, and institutional boilers and 
process heaters.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart DDDDD).
    Estimated number of respondents: 2,012.
    Frequency of response: Semiannually, annually, biennially, and 
five-year.
    Estimated Annual burden: 199,000 hours.
    Estimated Annual cost: $196,000,000, includes $131,000,000 
annualized capital or O&M costs.
    Changes in Estimates: There is a projected increase in burden due 
to an increase in the number of sources subject to the regulation.
    (10) Docket ID Number: EPA-HQ-OAR-2021-0112; NESHAP for Printing, 
Coating and Dyeing of Fabrics and Other Textiles (40 CFR part 63, 
subpart OOOO) (Renewal); EPA ICR Number 2071.10; OMB Control Number 
2060-0522; Expiration date March 31, 2022.
    Respondents: Printing, coating, slashing, dyeing, or finishing of 
fabric and other textiles facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart OOOO).
    Estimated number of respondents: 43.
    Frequency of response: Semiannually.
    Estimated Annual burden: 7,248 hours.
    Estimated Annual cost: $160,000, includes $110,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is a projected decrease in burden 
following implementation of previously promulgated rule amendments.
    (11) Docket ID Number: EPA-HQ-OAR-2021-0113; NESHAP for Coal- and 
Oil-fired Electric Utility Steam Generating Units (40 CFR part 63, 
subpart UUUUU) (Renewal); EPA ICR Number 2137.10; OMB Control Number 
2060-0567; Expiration date March 31, 2022.
    Respondents: Coal- and oil-fired electric utility steam generating 
units.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart UUUUU).
    Estimated number of respondents: 322.
    Frequency of response: Semiannually.
    Estimated Annual burden: 284,000 hours.
    Estimated Annual cost: $132,000,000, includes $104,000,000 
annualized capital or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (12) Docket ID Number: EPA-HQ-OAR-2021-0114; NESHAP for Gasoline 
Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities and 
Gasoline Dispensing Facilities (40 CFR part 63, subparts BBBBBB and 
CCCCCC) (Renewal); EPA ICR Number 2237.06; OMB Control Number 2060-
0620; Expiration date March 31, 2022.
    Respondents: Gasoline distribution facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subparts BBBBBB and CCCCCC).
    Estimated number of respondents: 19,120.
    Frequency of response: Semiannually.
    Estimated Annual burden: 214,000 hours.
    Estimated Annual cost: $23,500,000, includes $110,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (13) Docket ID Number: EPA-HQ-OAR-2021-0115; NESHAP for Paint 
Stripping and Miscellaneous Surface Coating at Area Sources (40 CFR 
part 63, subpart HHHHHH) (Renewal); EPA ICR Number 2268.06; OMB Control 
Number 2060-0607; Expiration date March 31, 2022.
    Respondents: Paint stripping operations using methylene chloride 
(MeCl)-containing paint strippers, motor vehicle and mobile equipment 
surface coating operations, and miscellaneous surface coating 
operations.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart HHHHHH).
    Estimated number of respondents: 39,812.
    Frequency of response: Initially and annually.
    Estimated Annual burden: 169,000 hours.
    Estimated Annual cost: $18,500,000, includes $117,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is a projected increase in burden due 
to an increase in the number of sources subject to the regulation.
    (14) Docket ID Number: EPA-HQ-OAR-2021-0116; NESHAP for Plating and 
Polishing Area Sources (40 CFR part 63, subpart WWWWWW) (Renewal); EPA 
ICR Number 2294.06; OMB Control Number 2060-0623; Expiration date March 
31, 2022.
    Respondents: Plating and polishing facilities.

[[Page 19259]]

    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart WWWWWW).
    Estimated number of respondents: 2,900.
    Frequency of response: Annually.
    Estimated Annual burden: 67,700 hours.
    Estimated Annual cost: $7,410,000, includes no annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (15) Docket ID Number: EPA-HQ-OAR-2021-0084; NESHAP for Mercury (40 
CFR part 61, subpart E) (Renewal); EPA ICR Number 0113.14; OMB Control 
Number 2060-0097; Expiration date April 30, 2022.
    Respondents: Mercury ore processing facilities, mercury cell chlor-
alkali plants, sludge incineration plants, and sludge drying plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 61, 
subpart E).
    Estimated number of respondents: 107.
    Frequency of response: Semiannually and annually.
    Estimated Annual burden: 20,600 hours.
    Estimated Annual cost: $2,260,000, includes no annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (16) Docket ID Number: EPA-HQ-OAR-2021-0086; NESHAP for Coke Oven 
Batteries (40 CFR part 63, subpart L) (Renewal); EPA ICR Number 
1362.12; OMB Control Number 2060-0253; Expiration date April 30, 2022.
    Respondents: Coke oven batteries.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart L).
    Estimated number of respondents: 19.
    Frequency of response: Semiannually.
    Estimated Annual burden: 79,800 hours.
    Estimated Annual cost: $8,730,000, includes no annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (17) Docket ID Number: EPA-HQ-OAR-2021-0092; NESHAP for Steel 
Pickling, HCI Process Facilities and Hydrochloric Acid Regeneration 
Plants (40 CFR part 63, subpart CCC) (Renewal); EPA ICR Number 1821.10; 
OMB Control Number 2060-0419; Expiration date April 30, 2022.
    Respondents: Steel pickling, HCl process facilities and 
hydrochloric acid regeneration plants
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart CCC)
    Estimated number of respondents: 100.
    Frequency of response: Semiannually.
    Estimated Annual burden: 35,000 hours.
    Estimated Annual cost: $3,840,000, includes $10,600 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (18) Docket ID Number: EPA-HQ-OAR-2021-0094; NESHAP for Source 
Categories: Generic Maximum Achievable Control Technology Standards (40 
CFR part 63, subpart YY) (Renewal); EPA ICR Number 1871.11; OMB Control 
Number 2060-0420; Expiration date April 30, 2022.
    Respondents: Polycarbonate, acrylic and modacrylic fiber, acetal 
resin, and hydrogen fluoride production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart YY).
    Estimated number of respondents: 7.
    Frequency of response: Semiannually.
    Estimated Annual burden: 2,910 hours.
    Estimated Annual cost: $361,000, includes $43,100 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (19) Docket ID Number: EPA-HQ-OAR-2021-0106; NESHAP for Paper and 
Other Web Coating (40 CFR part 63, subpart JJJJ) (Renewal); EPA ICR 
Number 1951.10; OMB Control Number 2060-0511; Expiration date April 30, 
2022.
    Respondents: Paper and other web coating facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart JJJJ)
    Estimated number of respondents: 170.
    Frequency of response: Semiannually.
    Estimated Annual burden: 17,300 hours.
    Estimated Annual cost: $2,735,000, includes $765,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (20) Docket ID Number: EPA-HQ-OAR-2021-0107; NESHAP for Metal 
Furniture Surface Coating (40 CFR part 63, subpart RRRR) (Renewal); EPA 
ICR Number 1952.10; OMB Control Number 2060-0518; Expiration date April 
30, 2022.
    Respondents: Metal furniture surface coating facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart RRRR).
    Estimated number of respondents: 16.
    Frequency of response: Semiannually.
    Estimated Annual burden: 190,000 hours.
    Estimated Annual cost: $17,200,000, includes $700,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is a projected decrease in burden 
following implementation of previously promulgated rule amendments.
    (21) Docket ID Number: EPA-HQ-OAR-2021-0109; NESHAP for Reinforced 
Plastic Composites Production (40 CFR part 63, subpart WWWW) (Renewal); 
EPA ICR Number 1976.10; OMB Control Number 2060-0509; Expiration date 
April 30, 2022.
    Respondents: Reinforced plastic composites production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart WWWW)
    Estimated number of respondents: 448.
    Frequency of response: Semiannually.
    Estimated Annual burden: 38,125 hours.
    Estimated Annual cost: $3,749,000, includes no annualized capital 
or O&M costs.
    Changes in Estimates: There is a projected decrease in burden 
following implementation of previously promulgated rule amendments.
    (22) Docket ID Number: EPA-HQ-OAR-2021-0110; NESHAP for Coke Oven 
Pushing, Quenching, and Battery Stacks (40 CFR part 63, subpart CCCCC) 
(Renewal); EPA ICR Number 1995.08; OMB Control Number 2060-0521; 
Expiration date April 30, 2022.
    Respondents: Coke oven batteries.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart CCCCC).
    Estimated number of respondents: 16.
    Frequency of response: Quarterly and semiannually.
    Estimated Annual burden: 27,200 hours.
    Estimated Annual cost: $3,240,000, includes $143,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (23) Docket ID Number: EPA-HQ-OAR-2021-0101; NESHAP for Integrated 
Iron and Steel Manufacturing (40 CFR part 63, subpart FFFFF) (Renewal); 
EPA ICR Number 2003.10; OMB Control Number 2060-0517; Expiration date 
April 30, 2022.
    Respondents: Sinter plants, blast furnaces, and basic oxygen 
process furnace shops at integrated iron and steel manufacturing 
facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart FFFFF).
    Estimated number of respondents: 11.
    Frequency of response: Semiannually.
    Estimated Annual burden: 6,500 hours.

[[Page 19260]]

    Estimated Annual cost: $800,000, includes $50,300 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (24) Docket ID Number: EPA-HQ-OAR-2021-0102; NESHAP for Flexible 
Polyurethane Foam Fabrication (40 CFR part 63, subpart MMMMM) 
(Renewal); EPA ICR Number 2027.11; OMB Control Number 2060-0516; 
Expiration date April 30, 2022.
    Respondents: Flexible polyurethane foam fabrication facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart MMMMM)
    Estimated number of respondents: 18.
    Frequency of response: Semiannually.
    Estimated Annual burden: 22,200 hours.
    Estimated Annual cost: $2,560,000, includes $34,500 annualized 
capital or O&M costs.
    Changes in Estimates: There is a projected decrease in burden due 
to anticipated shutdown of existing sources.
    (25) Docket ID Number: EPA-HQ-OAR-2021-0104; NESHAP for Refractory 
Products Manufacturing (40 CFR part 63, subpart SSSSS) (Renewal); EPA 
ICR Number 2040.11; OMB Control Number 2060-0515; Expiration date April 
30, 2022.
    Respondents: Refractory products manufacturing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart SSSSS).
    Estimated number of respondents: 8.
    Frequency of response: Semiannually.
    Estimated Annual burden: 306 hours.
    Estimated Annual cost: $37,800, includes $3,040 annualized capital 
or O&M costs.
    Changes in Estimates: There is a projected decrease in burden due 
to anticipated shutdown of existing sources.
    (26) Docket ID Number: EPA-HQ-OAR-2021-0121; NESHAP for Industrial, 
Commercial, and Institutional Boilers Area Sources (40 CFR part 63, 
subpart JJJJJJ) (Renewal); EPA ICR Number 2253.05; OMB Control Number 
2060-0668; Expiration date April 30, 2022.
    Respondents: Industrial, commercial, and institutional boilers 
designed to burn biomass, coal, or liquid fuels.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart JJJJJJ).
    Estimated number of respondents: 100,344.
    Frequency of response: Annually and biennially.
    Estimated Annual burden: 1,830,000 hours.
    Estimated Annual cost: $340,000,000, includes $132,000,000 
annualized capital or O&M costs.
    Changes in Estimates: There is a projected increase in burden due 
to an increase in the number of sources subject to the regulation.
    (27) Docket ID Number: EPA-HQ-OAR-2021-0122; NESHAP for Nine Metal 
Fabrication and Area Finishing Source (40 CFR part 63, subpart XXXXXX) 
(Renewal); EPA ICR Number 2298.06; OMB Control Number 2060-0622; 
Expiration date April 30, 2022.
    Respondents: Metal fabrication and finishing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart XXXXXX).
    Estimated number of respondents: 5,800.
    Frequency of response: Annually.
    Estimated Annual burden: 39,000 hours.
    Estimated Annual cost: $4,440,000, includes no annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (28) Docket ID Number: EPA-HQ-OAR-2021-0125; NESHAP for Polyvinyl 
Chloride and Copolymer Production (40 CFR part 63, subpart HHHHHHH) 
(Renewal); EPA ICR Number 2432.07; OMB Control Number 2060-0666; 
Expiration date April 30, 2022.
    Respondents: Polyvinyl chloride and copolymer production 
facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart HHHHHHH).
    Estimated number of respondents: 15.
    Frequency of response: Semiannually.
    Estimated Annual burden: 338,000 hours.
    Estimated Annual cost: $45,500,000, includes $7,060,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is a projected decrease in burden due 
to anticipated shutdown of existing sources.
    (29) Docket ID Number: EPA-HQ-OAR-2021-0096; NESHAP for Asbestos 
(40 CFR part 61, subpart M) (Renewal); EPA ICR Number 0111.16; OMB 
Control Number 2060-0101; Expiration date May 31, 2022.
    Respondents: Demolition and renovation facilities; asbestos waste 
disposal; asbestos milling, manufacturing and fabricating; the use of 
asbestos on roadways; asbestos waste converting facilities; and the use 
of asbestos insulation and sprayed-on materials.
    Respondent's obligation to respond: Mandatory (40 CFR part 61, 
subpart M).
    Estimated number of respondents: 9,687.
    Frequency of response: Quarterly, semiannually, and annually.
    Estimated Annual burden: 287,000 hours.
    Estimated Annual cost: $32,700,000, includes no annualized capital 
or O&M costs.
    Changes in Estimates: There is a projected increase in burden due 
to an increase in the number of sources subject to the regulation.
    (30) Docket ID Number: EPA-HQ-OAR-2021-0098; NESHAP for the Surface 
Coating of Large Household and Commercial Appliances (40 CFR part 63, 
subpart NNNN) (Renewal); EPA ICR Number 1954.10; OMB Control Number 
2060-0457; Expiration date May 31, 2022.
    Respondents: Large household and commercial appliance surface 
coating facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart NNNN)
    Estimated number of respondents: 10.
    Frequency of response: Semiannually.
    Estimated Annual burden: 3,870 hours.
    Estimated Annual cost: $429,000, includes $5,400 annualized capital 
or O&M costs.
    Changes in Estimates: There is a projected decrease in burden 
following implementation of previously promulgated rule amendments.
    (31) Docket ID Number: EPA-HQ-OAR-2021-0100; NESHAP for Rubber Tire 
Manufacturing (40 CFR part 63, subpart XXXX) (Renewal); EPA ICR Number 
1982.05; OMB Control Number 2060-0449; Expiration date May 31, 2022.
    Respondents: Rubber processing, tire production, tire cord 
production, and puncture sealant application facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart XXXX)
    Estimated number of respondents: 23.
    Frequency of response: Semiannually and annually.
    Estimated Annual burden: 6,520 hours.
    Estimated Annual cost: $910,000, includes no annualized capital or 
O&M costs.
    Changes in Estimates: There is a projected decrease in burden due 
to anticipated shutdown of existing sources.
    (32) Docket ID Number: EPA-HQ-OAR-2021-0103; NESHAP for Asphalt 
Processing and Asphalt Roofing Manufacturing (40 CFR part 63, subpart 
LLLLL) (Renewal); EPA ICR Number 2029.09; OMB Control Number 2060-0520; 
Expiration date May 31, 2022.

[[Page 19261]]

    Respondents: Asphalt processing and asphalt roofing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart LLLLL)
    Estimated number of respondents: 8.
    Frequency of response: Semiannually.
    Estimated Annual burden: 3,970 hours.
    Estimated Annual cost: $472,000, includes $20,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is a projected increase in burden due 
to incorporation of burden from previously promulgated rule amendments.
    (33) Docket ID Number: EPA-HQ-OAR-2021-0105; NESHAP for 
Semiconductor Manufacturing (40 CFR part 63, subpart BBBBB) (Renewal); 
EPA ICR Number 2042.08; OMB Control Number 2060-0519; Expiration date 
May 31, 2022.
    Respondents: Semiconductor manufacturing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart BBBBB).
    Estimated number of respondents: 1.
    Frequency of response: Semiannually.
    Estimated Annual burden: 41 hours.
    Estimated Annual cost: $5,270, includes $550 annualized capital or 
O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (34) Docket ID Number: EPA-HQ-OAR-2021-0123; NESHAP for Chemical 
Manufacturing Area Sources (40 CFR part 63, subpart VVVVVV) (Renewal); 
EPA ICR Number 2323.08; OMB Control Number 2060-0621; Expiration date 
May 31, 2022.
    Respondents: Chemical manufacturing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart VVVVVV).
    Estimated number of respondents: 528.
    Frequency of response: Semiannually.
    Estimated Annual burden: 10,200 hours.
    Estimated Annual cost: $2,650,000, includes $1,490,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is a projected increase in burden due 
to an increase in the number of sources subject to the regulation.
    (35) Docket ID Number: EPA-HQ-OAR-2021-0124; NESHAP for Aluminum, 
Copper, and Other Non-Ferrous Foundries (40 CFR part 63, subpart 
ZZZZZZ) (Renewal); EPA ICR Number 2332.06; OMB Control Number 2060-
0630; Expiration date May 31, 2022.
    Respondents: Aluminum, copper, and other non-ferrous metals 
foundries.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart ZZZZZZ).
    Estimated number of respondents: 318.
    Frequency of response: Semiannually.
    Estimated Annual burden: 11,900 hours.
    Estimated Annual cost: $1,360,000, includes no annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (36) Docket ID Number: EPA-HQ-OAR-2021-0126; Title: NESHAP for 
Polyvinyl Chloride and Copolymers Production Area Sources (40 CFR part 
63, subpart DDDDDD) (Renewal); EPA ICR Number 2454.06; OMB Control 
Number 2060-0684; Expiration date May 31, 2022.
    Respondents: Polyvinyl chloride and copolymer production 
facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart DDDDDD).
    Estimated number of respondents: 4.
    Frequency of response: Semiannually.
    Estimated Annual burden: 92,300 hours.
    Estimated Annual cost: $1,360,000, includes no annualized capital 
or O&M costs.
    Changes in Estimates: There is a projected decrease in burden due 
to anticipated shutdown of existing sources.
    (37) Docket ID Number: EPA-HQ-OAR-2021-0118; NESHAP for Mercury 
Cell Chlor-Alkali Plants (40 CFR part 63, subpart IIIII) (Renewal); EPA 
ICR Number 2046.11; OMB Control Number 2060-0542; Expiration date June 
30, 2022.
    Respondents: Mercury cell chlor-alkali facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart IIIII).
    Estimated number of respondents: 2.
    Frequency of response: Semiannually.
    Estimated Annual burden: 3,760 hours.
    Estimated Annual cost: $444,000, includes $16,400 annualized 
capital or O&M costs.
    Changes in Estimates: There is a projected decrease in burden due 
to anticipated shutdown of existing sources.
    (38) Docket ID Number: EPA-HQ-OAR-2021-0119; NESHAP for Taconite 
Iron Ore Processing (40 CFR part 63 subpart RRRRR) (Renewal); EPA ICR 
Number 2050.10; OMB Control Number 2060-0538; Expiration date June 30, 
2022.
    Respondents: Taconite iron ore processing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63 
subpart RRRRR).
    Estimated number of respondents: 8.
    Frequency of response: Semiannually.
    Estimated Annual burden: 483 hours.
    Estimated Annual cost: $576,000, includes $521,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is a projected increase in burden due 
to an increase in the number of sources subject to the regulation.
    (39) Docket ID Number: EPA-HQ-OAR-2021-0120; NESHAP for Primary 
Magnesium Refining (40 CFR part 63, subpart TTTTT) (Renewal); EPA ICR 
Number 2098.11; OMB Control Number 2060-0536; Expiration date June 30, 
2022.
    Respondents: Primary magnesium refining facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart TTTTT).
    Estimated number of respondents: 1.
    Frequency of response: Semiannually.
    Estimated Annual burden: 611 hours.
    Estimated Annual cost: $70,900, includes $1,200 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.
    (40) Docket ID Number: EPA-HQ-OAR-2021-0097; NESHAP for Municipal 
Solid Waste Landfills (40 CFR part 63, subpart AAAA) (Renewal); EPA ICR 
Number 1938.08; OMB Control Number 2060-0505; Expiration date July 31, 
2022.
    Respondents: Municipal solid waste landfills.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart AAAA).
    Estimated number of respondents: 1,151.
    Frequency of response: Semiannually.
    Estimated Annual burden: 35,200 hours.
    Estimated Annual cost: $3,170,000, includes $10,800 annualized 
capital or O&M costs.
    Changes in Estimates: There is a projected increase in burden due 
to an increase in the number of sources subject to the regulation.
    (41) Docket ID Number: EPA-HQ-OAR-2021-0099; NESHAP for Wet-Formed 
Fiberglass Mat Production (40 CFR part 63, subpart HHHH) (Renewal); EPA 
ICR Number 1964.10; OMB Control Number 2060-0496; Expiration date 
September 30, 2022.
    Respondents: Wet-formed fiberglass mat production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart HHHH).

[[Page 19262]]

    Estimated number of respondents: 7.
    Frequency of response: Semiannually.
    Estimated Annual burden: 1,470 hours.
    Estimated Annual cost: $95,500, includes no annualized capital or 
O&M costs.
    Changes in Estimates: There is no change in burden from the 
previous ICR.

    Dated: April 5, 2021.
Penny Lassiter,
Director, Sector Policies and Programs Division.
[FR Doc. 2021-07562 Filed 4-12-21; 8:45 am]
BILLING CODE 6560-50-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.