Plant-Specific, Risk-Informed Decisionmaking: Inservice Testing, 17860-17861 [2021-07088]
Download as PDF
17860
Federal Register / Vol. 86, No. 64 / Tuesday, April 6, 2021 / Notices
Certification of PUI Eligibility
By submission of this proposal, the
institution hereby certifies that the
originating and managing institution is
an accredited college or university that
awards Associates degrees, Bachelor’s
degrees, and/or Master’s degrees in
NSF-supported fields, but has awarded
20 or fewer Ph.D./D.Sci. degrees in all
NSF-supported fields during the
combined previous two academic years.
Authorized Organizational
Representative
Typed Name and Title
Signature
Date
Expected Respondents: HispanicServing Institutions.
Estimate of Burden: We anticipate 175
proposals for 2 minutes which is
approximately 6 hours.
Dated: March 26, 2021.
Suzanne H. Plimpton,
Reports Clearance Officer, National Science
Foundation.
[FR Doc. 2021–07087 Filed 4–5–21; 8:45 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2021–0047]
Plant-Specific, Risk-Informed
Decisionmaking: Inservice Testing
Nuclear Regulatory
Commission.
ACTION: Draft regulatory guide; request
for comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing for public
comment Revision 1 to draft regulatory
guide (DG), DG–1286, ‘‘Plant-Specific,
Risk-Informed Decisionmaking:
Inservice Testing.’’ This DG is proposed
Revision 1 of RG 1.175, ‘‘An Approach
for Plant-Specific, Risk-Informed
Decisionmaking: Inservice Testing.’’ It
has been revised to incorporate
additional information since Revision 0
was issued, particularly information to
be consistent with the terminology and
defense-in-depth philosophy provided
in RG 1.174, ‘‘An Approach for Using
Probabilistic Risk Assessment in RiskInformed Decisions on Plant-Specific
Changes to the Licensing Basis,’’ as well
as to endorse a standard by the
American Society of Mechanical
Engineers Code for Operations and
Maintenance of Nuclear Power Plant
(OM Code).
DATES: Submit comments by May 6,
2021. Comments received after this date
will be considered if it is practical to do
khammond on DSKJM1Z7X2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:34 Apr 05, 2021
Jkt 253001
so, but the NRC is able to ensure
consideration only for comments
received on or before this date.
Although a time limit is given,
comments and suggestions in
connection with items for inclusion in
guides currently being developed or
improvements in all published guides
are encouraged at any time.
ADDRESSES: You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal Rulemaking website:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2021–0047. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individuals listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Mail comments to: Office of
Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, ATTN: Program Management,
Announcements and Editing Staff.
For additional direction on accessing
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Zeechung Wang, telephone: 301–415–
1686, email: Zeechung.Wang@nrc.gov
and Harriet Karagiannis, telephone:
301–415–2493, email:
Harriet.Karagiannis@nrc.gov. Both are
staff of the Office of Nuclear Regulatory
Research, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2021–
0047 when contacting the NRC about
the availability of information regarding
this action. You may obtain publicly
available information related to this
action, by any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2021–0047.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
PO 00000
Frm 00094
Fmt 4703
Sfmt 4703
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov.
• Attention: The PDR, where you may
examine, and order copies of public
documents, is currently closed. You
may submit your request to the PDR via
email at pdr.resource@nrc.gov or call
1–800–397–4209 or 301–415–4737,
between 8:00 a.m. and 4:00 p.m. (EST),
Monday through Friday, except Federal
holidays.
B. Submitting Comments
The NRC encourages electronic
comment submission through the
Federal Rulemaking website (https://
www.regulations.gov). Please include
Docket ID NRC–2021–0047 in your
comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enters
the comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
II. Additional Information
The NRC is issuing for public
comment a DG in the NRC’s ‘‘Regulatory
Guide’’ series. This series was
developed to describe methods that are
acceptable to the NRC staff for
implementing specific parts of the
agency’s regulations, to explain
techniques that the staff uses in
evaluating specific issues or postulated
events, and to describe information that
the staff needs in its review of
applications for permits and licenses.
This DG, identified by its task
number, Revision 1 to DG–1286, titled,
‘‘Plant-Specific, Risk-Informed
Decisionmaking: Inservice Testing,’’ is a
proposed Revision 1 of RG 1.175
(ADAMS Accession No. ML19240B371).
This proposed revision of RG 1.175
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 86, No. 64 / Tuesday, April 6, 2021 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
(Revision 1) describes an approach that
is acceptable to the staff of the NRC for
developing an alternative request under
paragraph 50.55a(z)(1) of title 10 of the
Code of Federal Regulations (10 CFR) to
implement a risk-informed inservice
testing (RI–IST) programs and
supplements the guidance provided in
RG 1.174, ‘‘An Approach for Using
Probabilistic Risk Assessment in RiskInformed Decisions on Plant-Specific
Changes to the Licensing Basis’’
(ADAMS Accession No. ML17317A256).
It updates the defense-in-depth
philosophy to be consistent with the
philosophy described in RG 1.174. RG
1.174 was revised in 2018 to expand the
meaning of, and the process for,
assessing defense-in-depth
considerations. Specifically, this
proposed revision of RG 1.175
references the defense-in-depth
guidance in RG 1.174 in several staff
regulatory positions.
Additionally, the staff revised this
guide to (1) adopt the term ‘‘PRA
acceptability,’’ and related phrasing
variants, instead of terms such as ‘‘PRA
quality,’’ ‘‘PRA technical adequacy,’’
and ‘‘technical adequacy’’ to describe
the appropriateness of the probabilistic
risk assessment (PRA) used to support
risk-informed licensing submittals; (2)
update Regulatory Position C.2.3,
‘‘Probabilistic Risk Assessment,’’ of this
RG to be consistent with Section C.2.3
in RG 1.174, which provides specific
considerations with respect to
determining the acceptability of the
PRA used in risk-informed
decisionmaking; and (3) incorporate
guidance related to the OM Code
incorporated by reference in 10 CFR
50.55a for the inservice testing of pumps
and valves at commercial nuclear power
plants.
The staff is also issuing for public
comment a draft regulatory analysis
(ADAMS Accession No. ML19240B374).
The staff develops a regulatory analysis
to assess the value of issuing or revising
a regulatory guide as well as alternative
courses of action.
III. Backfitting, Forward Fitting, and
Issue Finality
RG 1.175, Revision 1, would provide
updated guidance for power reactor
applicants and licensees regarding
acceptable methods to the staff of the
NRC for developing RI–IST programs
and supplements the guidance provided
in RG 1.174. Issuance of this RG in final
form would not constitute backfitting or
forward fitting or affect issue finality as
further discussed below.
The staff does not intend to impose
the positions represented in the draft RG
(if finalized) in a manner that would
VerDate Sep<11>2014
17:34 Apr 05, 2021
Jkt 253001
constitute backfitting or affect the issue
finality of a part 52 approval. If, in the
future, the staff seeks to impose a
position in the draft RG (if finalized) in
a manner that constitutes backfitting or
does not provide issue finality as
described in the applicable issue finality
provision, then the staff would need to
address the backfit rule or the criteria
for issue finality as described in the
applicable issue finality provision.
The staff does not intend to impose
the positions represented in the draft RG
(if finalized) in a manner that would
constitute forward fitting. If, in the
future, the staff seeks to impose a
position in the draft RG (if finalized) in
a manner that constitutes forward
fitting, then the staff would need to
address the forward fitting criteria in
Management Directive 8.4,
‘‘Management of Backfitting, Forward
Fitting, Issue Finality, and Information
Requests’’ (ADAMS Accession No.
ML18093B087).
Dated: April 1, 2021.
For the Nuclear Regulatory Commission.
Edward F. O’Donnell,
Acting Chief, Regulatory Guidance and
Generic Issues Branch, Division of
Engineering, Office of Nuclear Regulatory
Research.
[FR Doc. 2021–07088 Filed 4–5–21; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2021–0067]
Applications and Amendments to
Facility Operating Licenses and
Combined Licenses Involving
Proposed No Significant Hazards
Considerations and Containing
Sensitive Unclassified Non-Safeguards
Information and Order Imposing
Procedures for Access to Sensitive
Unclassified Non-Safeguards
Information
Nuclear Regulatory
Commission.
ACTION: License amendment request;
notice of opportunity to comment,
request a hearing, and petition for leave
to intervene; order imposing
procedures.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) received and is
considering approval of one amendment
request. The amendment request is for
Oyster Creek Nuclear Generating
Station. For the amendment request, the
NRC proposes to determine that it
involves no significant hazards
consideration (NSHC). Because the
SUMMARY:
PO 00000
Frm 00095
Fmt 4703
Sfmt 4703
17861
amendment request contains sensitive
unclassified non-safeguards information
(SUNSI) and/or safeguards information
(SGI), an order imposes procedures to
obtain access to SUNSI for contention
preparation.
Comments must be filed by May
6, 2021. A request for a hearing or
petitions for leave to intervene must be
filed by June 7, 2021. Any potential
party as defined in section 2.4 of title 10
of the Code of Federal Regulations (10
CFR) who believes access to SUNSI is
necessary to respond to this notice must
request document access by April 16,
2021.
DATES:
You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal Rulemaking website:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2021–0067. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Mail comments to: Office of
Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, ATTN: Program Management,
Announcements and Editing Staff.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT: Kay
Goldstein, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, telephone: 301–415–1506, email:
Kay.Goldstein@nrc.gov.
SUPPLEMENTARY INFORMATION:
ADDRESSES:
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2021–
0067, facility name, unit number(s),
docket number(s), application date, and
subject when contacting the NRC about
the availability of information for this
action. You may obtain publicly
available information related to this
action by any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2021–0067.
• NRC’s Agencywide Documents
Access and Management System
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 86, Number 64 (Tuesday, April 6, 2021)]
[Notices]
[Pages 17860-17861]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-07088]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2021-0047]
Plant-Specific, Risk-Informed Decisionmaking: Inservice Testing
AGENCY: Nuclear Regulatory Commission.
ACTION: Draft regulatory guide; request for comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for
public comment Revision 1 to draft regulatory guide (DG), DG-1286,
``Plant-Specific, Risk-Informed Decisionmaking: Inservice Testing.''
This DG is proposed Revision 1 of RG 1.175, ``An Approach for Plant-
Specific, Risk-Informed Decisionmaking: Inservice Testing.'' It has
been revised to incorporate additional information since Revision 0 was
issued, particularly information to be consistent with the terminology
and defense-in-depth philosophy provided in RG 1.174, ``An Approach for
Using Probabilistic Risk Assessment in Risk-Informed Decisions on
Plant-Specific Changes to the Licensing Basis,'' as well as to endorse
a standard by the American Society of Mechanical Engineers Code for
Operations and Maintenance of Nuclear Power Plant (OM Code).
DATES: Submit comments by May 6, 2021. Comments received after this
date will be considered if it is practical to do so, but the NRC is
able to ensure consideration only for comments received on or before
this date. Although a time limit is given, comments and suggestions in
connection with items for inclusion in guides currently being developed
or improvements in all published guides are encouraged at any time.
ADDRESSES: You may submit comments by any of the following methods;
however, the NRC encourages electronic comment submission through the
Federal Rulemaking website:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0047. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individuals listed in the FOR FURTHER
INFORMATION CONTACT section of this document.
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on accessing information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Zeechung Wang, telephone: 301-415-
1686, email: [email protected] and Harriet Karagiannis, telephone:
301-415-2493, email: [email protected]. Both are staff of the
Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2021-0047 when contacting the NRC
about the availability of information regarding this action. You may
obtain publicly available information related to this action, by any of
the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0047.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected].
Attention: The PDR, where you may examine, and order
copies of public documents, is currently closed. You may submit your
request to the PDR via email at [email protected] or call 1-800-397-
4209 or 301-415-4737, between 8:00 a.m. and 4:00 p.m. (EST), Monday
through Friday, except Federal holidays.
B. Submitting Comments
The NRC encourages electronic comment submission through the
Federal Rulemaking website (https://www.regulations.gov). Please
include Docket ID NRC-2021-0047 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at
https://www.regulations.gov as well as enters the comment submissions
into ADAMS. The NRC does not routinely edit comment submissions to
remove identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Additional Information
The NRC is issuing for public comment a DG in the NRC's
``Regulatory Guide'' series. This series was developed to describe
methods that are acceptable to the NRC staff for implementing specific
parts of the agency's regulations, to explain techniques that the staff
uses in evaluating specific issues or postulated events, and to
describe information that the staff needs in its review of applications
for permits and licenses.
This DG, identified by its task number, Revision 1 to DG-1286,
titled, ``Plant-Specific, Risk-Informed Decisionmaking: Inservice
Testing,'' is a proposed Revision 1 of RG 1.175 (ADAMS Accession No.
ML19240B371). This proposed revision of RG 1.175
[[Page 17861]]
(Revision 1) describes an approach that is acceptable to the staff of
the NRC for developing an alternative request under paragraph
50.55a(z)(1) of title 10 of the Code of Federal Regulations (10 CFR) to
implement a risk-informed inservice testing (RI-IST) programs and
supplements the guidance provided in RG 1.174, ``An Approach for Using
Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-
Specific Changes to the Licensing Basis'' (ADAMS Accession No.
ML17317A256). It updates the defense-in-depth philosophy to be
consistent with the philosophy described in RG 1.174. RG 1.174 was
revised in 2018 to expand the meaning of, and the process for,
assessing defense-in-depth considerations. Specifically, this proposed
revision of RG 1.175 references the defense-in-depth guidance in RG
1.174 in several staff regulatory positions.
Additionally, the staff revised this guide to (1) adopt the term
``PRA acceptability,'' and related phrasing variants, instead of terms
such as ``PRA quality,'' ``PRA technical adequacy,'' and ``technical
adequacy'' to describe the appropriateness of the probabilistic risk
assessment (PRA) used to support risk-informed licensing submittals;
(2) update Regulatory Position C.2.3, ``Probabilistic Risk
Assessment,'' of this RG to be consistent with Section C.2.3 in RG
1.174, which provides specific considerations with respect to
determining the acceptability of the PRA used in risk-informed
decisionmaking; and (3) incorporate guidance related to the OM Code
incorporated by reference in 10 CFR 50.55a for the inservice testing of
pumps and valves at commercial nuclear power plants.
The staff is also issuing for public comment a draft regulatory
analysis (ADAMS Accession No. ML19240B374). The staff develops a
regulatory analysis to assess the value of issuing or revising a
regulatory guide as well as alternative courses of action.
III. Backfitting, Forward Fitting, and Issue Finality
RG 1.175, Revision 1, would provide updated guidance for power
reactor applicants and licensees regarding acceptable methods to the
staff of the NRC for developing RI-IST programs and supplements the
guidance provided in RG 1.174. Issuance of this RG in final form would
not constitute backfitting or forward fitting or affect issue finality
as further discussed below.
The staff does not intend to impose the positions represented in
the draft RG (if finalized) in a manner that would constitute
backfitting or affect the issue finality of a part 52 approval. If, in
the future, the staff seeks to impose a position in the draft RG (if
finalized) in a manner that constitutes backfitting or does not provide
issue finality as described in the applicable issue finality provision,
then the staff would need to address the backfit rule or the criteria
for issue finality as described in the applicable issue finality
provision.
The staff does not intend to impose the positions represented in
the draft RG (if finalized) in a manner that would constitute forward
fitting. If, in the future, the staff seeks to impose a position in the
draft RG (if finalized) in a manner that constitutes forward fitting,
then the staff would need to address the forward fitting criteria in
Management Directive 8.4, ``Management of Backfitting, Forward Fitting,
Issue Finality, and Information Requests'' (ADAMS Accession No.
ML18093B087).
Dated: April 1, 2021.
For the Nuclear Regulatory Commission.
Edward F. O'Donnell,
Acting Chief, Regulatory Guidance and Generic Issues Branch, Division
of Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2021-07088 Filed 4-5-21; 8:45 am]
BILLING CODE 7590-01-P