Combined Notice of Filings #1, 17821-17822 [2021-07006]

Download as PDF Federal Register / Vol. 86, No. 64 / Tuesday, April 6, 2021 / Notices Pedricktown Cogeneration Company LP, Susquehanna Nuclear, LLC, Talen Montana, LLC, York Generation The grant of an Interim Waiver is also Company LLC, TrailStone Energy supported by sound public policy. The Marketing, LLC. models for which an interim waiver is Description: Supplement to April 27, sought utilize technological advances 2020 Notification of Change in Status of that increase energy efficiency, reduce the Indicated MBR Sellers. energy consumption, lower costs for Filed Date: 3/29/21. consumers, and provide enhanced Accession Number: 20210329–5273. Dated: March 31, 2021. comfort. Comments Due: 5 p.m. ET 4/19/21. Kimberly D. Bose, Conclusion Docket Numbers: ER21–772–000. Secretary. Applicants: Resi Station, LLC. Midea respectfully requests that DOE [FR Doc. 2021–07076 Filed 4–5–21; 8:45 am] Description: Response to February 24, grant this Petition for Waiver and BILLING CODE P 2021 Deficiency Letter of Resi Station, Application for Interim Waiver. By LLC. granting this Waiver, DOE will ensure Filed Date: 3/26/21. that consumers will have access to new, DEPARTMENT OF ENERGY Accession Number: 20210326–5228. innovative and energy efficient Comments Due: 5 p.m. ET 4/16/21. Federal Energy Regulatory combined-duct PACs with and without Docket Numbers: ER21–787–001. Commission VSCs. Applicants: ISO New England Inc. Respectfully submitted, Combined Notice of Filings #1 Description: Tariff Amendment: ISO /s/ lllllllllllllllllll New England Inc.; Response to Take notice that the Commission Scott Blake Harris Commission Deficiency Notice; ER21– received the following electric rate John Hodges 787–000 to be effective 5/29/2021. filings: Harris, Wiltshire & Grannis LLP, 1919 M Filed Date: 3/30/21. Docket Numbers: ER15–705–008. Street NW, Washington, DC 20036, Counsel Accession Number: 20210330–5269. Applicants: Pacific Gas and Electric for GD Midea Air Conditioning Equipment Comments Due: 5 p.m. ET 4/20/21. Co. LTD. Company. Docket Numbers: ER21–1553–000. Description: Compliance filing: [FR Doc. 2021–07025 Filed 4–5–21; 8:45 am] Applicants: Luna Storage, LLC. Compliance filing CCSF IA and TFAs BILLING CODE 6450–01–P Description: § 205(d) Rate Filing: Luna Following Order on Compliance (TO SA Storage, LLC MISA Certificate of 284) to be effective 7/23/2015. Concurrence to be effective 3/31/2021. Filed Date: 3/30/21. DEPARTMENT OF ENERGY Filed Date: 3/30/21. Accession Number: 20210330–5158 Accession Number: 20210330–5002. Federal Energy Regulatory Comments Due: 5 p.m. ET 4/20/21. Comments Due: 5 p.m. ET 4/20/21. Commission Docket Numbers: ER15–705–009. Docket Numbers: ER21–1554–000. Applicants: Pacific Gas and Electric Notice of Waiver Period for Water Applicants: Luna Storage, LLC. Company. Quality Certification Application Description: § 205(d) Rate Filing: Luna Description: Compliance filing: Storage, LLC LGIA Certificate of Compliance filing CCSF IA and TFAs Project No. Following Order on Compliance (TO SA Concurrence to be effective 3/31/2021. Filed Date: 3/30/21. Eagle Creek Hydro Power, LLC ......... 10482–122 284) to be effective 7/1/2015. Eagle Creek Water Resources, LLC Accession Number: 20210330–5003. Filed Date: 3/30/21. Eagle Creek Land Resources, LLC Comments Due: 5 p.m. ET 4/20/21. Accession Number: 20210330–5159. Eagle Creek Hydro Power, LLC ......... 10481–069 Docket Numbers: ER21–1555–000. Eagle Creek Water Resources, LLC Comments Due: 5 p.m. ET 4/20/21. Eagle Creek Land Resources, LLC Applicants: New Mexico Wind, LLC. Docket Numbers: ER15–2013–010; Eagle Creek Hydro Power, LLC ......... 9690–115 Description: Baseline eTariff Filing: ER12–2510–009; ER15–2014–005; Eagle Creek Water Resources, LLC Reactive Power Compensation Filing to Eagle Creek Land Resources, LLC ER10–2435–016; ER10–2440–012; be effective 3/31/2021. ER10–2442–014; ER12–2512–009; Filed Date: 3/30/21. On March 30, 2021, Eagle Creek ER19–481–002; ER15–2018–005; ER18– Accession Number: 20210330–5004. Hydro Power, LLC, Eagle Creek Water 2252–001; ER10–3286–013; ER15–2022– Comments Due: 5 p.m. ET 4/20/21. Resources, LLC, and Eagle Creek Land 005; ER10–3299–012; ER10–2444–016; Docket Numbers: ER21–1556–000. Resources, LLC (co-licensees) submitted ER10–2446–012; ER15–2026–005; Applicants: TGE Pennsylvania 202, to the Federal Energy Regulatory ER15–2020–008; ER10–2449–014; LLC, TGE Pennsylvania 203, LLC. Commission a copy of their application ER19–2250–002. Description: Petition for Waiver, et al. for a Clean Water Act section 401(a)(1) Applicants: Talen Energy Marketing, of TGE Pennsylvania 202, LLC, et al. water quality certification filed with the LLC, Brandon Shores LLC, Brunner Filed Date: 3/29/21. New York State Department of Island, LLC, Camden Plant Holding, Accession Number: 20210329–5316. Environmental Conservation (New York L.L.C., Dartmouth Power Associates Comments Due: 5 p.m. ET 4/8/21. DEC), in conjunction with the above Limited Partnership, Elmwood Park captioned projects. Pursuant to 40 CFR Docket Numbers: ER21–1557–000. Power, LLC, H.A. Wagner LLC, LMBE 121.6, we hereby notify the New York Applicants: Leeward Renewable Project Company LLC, Martins Creek, DEC of the following: Energy, LLC. LLC, MC Project Company LLC, Date of Receipt of the Certification Description: Petition for Limited Millennium Power Partners, LP, Request: March 30, 2021. Waiver, et al. of Leeward Renewable Montour, LLC, New Athens Generating Reasonable Period of Time to Act on Energy, LLC. Company, LLC, Newark Bay the Certification Request: One year. Filed Date: 3/29/21. Cogeneration Partnership, L.P, C. Sound Public Policy Supports Grant of the Interim Waiver khammond on DSKJM1Z7X2PROD with NOTICES 17821 VerDate Sep<11>2014 17:34 Apr 05, 2021 Jkt 253001 Date Waiver Occurs for Failure to Act: March 30, 2022. If the New York DEC fails or refuses to act on the water quality certification request by the above waiver date, then the agency’s certifying authority is deemed waived pursuant to section 401(a)(1) of the Clean Water Act, 33 U.S.C. 1341(a)(1). PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:\FR\FM\06APN1.SGM 06APN1 khammond on DSKJM1Z7X2PROD with NOTICES 17822 Federal Register / Vol. 86, No. 64 / Tuesday, April 6, 2021 / Notices Accession Number: 20210329–5317. Comments Due: 5 p.m. ET 4/8/21. Docket Numbers: ER21–1558–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1276R23 Evergy Metro NITSA NOA to be effective 3/1/2021. Filed Date: 3/30/21. Accession Number: 20210330–5118. Comments Due: 5 p.m. ET 4/20/21. Docket Numbers: ER21–1559–000. Applicants: Duke Energy Indiana, LLC. Description: § 205(d) Rate Filing: DEI—Revisions to FERC Electric Tariff Volume No. 10, Reactive Tariff to be effective 6/1/2021. Filed Date: 3/30/21. Accession Number: 20210330–5194. Comments Due: 5 p.m. ET 4/20/21. Docket Numbers: ER21–1560–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2021–03–30_SA 2294 ATC–DTE Garden Wind Farm 5th Rev GIA (J060 J061 J557 J928) to be effective 3/11/2021. Filed Date: 3/30/21. Accession Number: 20210330–5195. Comments Due: 5 p.m. ET 4/20/21. Docket Numbers: ER21–1561–000. Applicants: Duke Energy Florida, LLC. Description: § 205(d) Rate Filing: Revised DEF Rate Schedule No. 226 (Seminole Electric Cooperative, Inc.) (Second) to be effective 6/1/2021. Filed Date: 3/30/21. Accession Number: 20210330–5268. Comments Due: 5 p.m. ET 4/20/21. Take notice that the Commission received the following PURPA 210(m)(3) filings: Docket Numbers: QM21–13–000. Applicants: Upper Peninsula Power Company. Description: Application of Upper Peninsula Power Company to Terminate Mandatory Purchase Obligation under the Public Utility Regulatory Policies Act of 1978. Filed Date: 3/26/21. Accession Number: 20210326–5284. Comments Due: 5 p.m. ET 4/23/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. VerDate Sep<11>2014 17:34 Apr 05, 2021 Jkt 253001 Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 30, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–07006 Filed 4–5–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2292–153] Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Request for approval of a Drawdown Plan and temporary variance of reservoir elevation and run-of-river requirements. b. Project No.: 2292–153. c. Date Filed: February 17, 2021 and supplemented March 12 and 26, 2021. d. Applicant: Domtar Wisconsin Corporation. e. Name of Project: Nekoosa Dam Hydroelectric Project. f. Location: The project is located on the Wisconsin River in Wood County, Wisconsin. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Mr. David S. Orcutt, Environmental Manager, Domtar Wisconsin Corporation, 301 Point Basse Ave., Nekoosa, WI 54457–1422, Phone: (715) 886–7358, Email: david.orcutt@ domtar.com. i. FERC Contact: Anumzziatta Purchiaroni, (202)502–6191, anumzziatta.purchiaroni@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: 15 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 eComment system at https:// www.ferc.gov/doc-sfiling/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2292–029. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The licensee requests Commission approval of a Drawdown Plan and a temporary variance of the reservoir elevation and run-of-river requirements for the Nekoosa Hydroelectric Project No. 2292. The licensee is requesting the drawdown to perform concrete repairs on the Nekoosa Dam intake structure and overflow spillway, as well as improvements to the spillway flashboard sections. The licensee proposes to lower the reservoir 941.3 feet NGVD, which correlates to 5.0 feet below the minimum elevation of 946.3 feet NGVD required by the project license. The licensee plans to begin the drawdown by June 8 and be completed by June 14, 2021. The licensee plans to start the refilling of the reservoir as soon as the activities requiring the drawdown are completed, which would be approximately 11 weeks. The licensee will restrict the drawdown to a maximum rate of 12 inches per day. During the refill of the reservoir, the licensee would release less than 1,000 cubic feet per second of water flow through the dam. l. Locations of the Applications: This filing may be viewed on the E:\FR\FM\06APN1.SGM 06APN1

Agencies

[Federal Register Volume 86, Number 64 (Tuesday, April 6, 2021)]
[Notices]
[Pages 17821-17822]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-07006]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER15-705-008.
    Applicants: Pacific Gas and Electric Company.
    Description: Compliance filing: Compliance filing CCSF IA and TFAs 
Following Order on Compliance (TO SA 284) to be effective 7/23/2015.
    Filed Date: 3/30/21.
    Accession Number: 20210330-5158
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: ER15-705-009.
    Applicants: Pacific Gas and Electric Company.
    Description: Compliance filing: Compliance filing CCSF IA and TFAs 
Following Order on Compliance (TO SA 284) to be effective 7/1/2015.
    Filed Date: 3/30/21.
    Accession Number: 20210330-5159.
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: ER15-2013-010; ER12-2510-009; ER15-2014-005; ER10-
2435-016; ER10-2440-012; ER10-2442-014; ER12-2512-009; ER19-481-002; 
ER15-2018-005; ER18-2252-001; ER10-3286-013; ER15-2022-005; ER10-3299-
012; ER10-2444-016; ER10-2446-012; ER15-2026-005; ER15-2020-008; ER10-
2449-014; ER19-2250-002.
    Applicants: Talen Energy Marketing, LLC, Brandon Shores LLC, 
Brunner Island, LLC, Camden Plant Holding, L.L.C., Dartmouth Power 
Associates Limited Partnership, Elmwood Park Power, LLC, H.A. Wagner 
LLC, LMBE Project Company LLC, Martins Creek, LLC, MC Project Company 
LLC, Millennium Power Partners, LP, Montour, LLC, New Athens Generating 
Company, LLC, Newark Bay Cogeneration Partnership, L.P, Pedricktown 
Cogeneration Company LP, Susquehanna Nuclear, LLC, Talen Montana, LLC, 
York Generation Company LLC, TrailStone Energy Marketing, LLC.
    Description: Supplement to April 27, 2020 Notification of Change in 
Status of the Indicated MBR Sellers.
    Filed Date: 3/29/21.
    Accession Number: 20210329-5273.
    Comments Due: 5 p.m. ET 4/19/21.

    Docket Numbers: ER21-772-000.
    Applicants: Resi Station, LLC.
    Description: Response to February 24, 2021 Deficiency Letter of 
Resi Station, LLC.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5228.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-787-001.
    Applicants: ISO New England Inc.
    Description: Tariff Amendment: ISO New England Inc.; Response to 
Commission Deficiency Notice; ER21-787-000 to be effective 5/29/2021.
    Filed Date: 3/30/21.
    Accession Number: 20210330-5269.
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: ER21-1553-000.
    Applicants: Luna Storage, LLC.
    Description: Sec.  205(d) Rate Filing: Luna Storage, LLC MISA 
Certificate of Concurrence to be effective 3/31/2021.
    Filed Date: 3/30/21.
    Accession Number: 20210330-5002.
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: ER21-1554-000.
    Applicants: Luna Storage, LLC.
    Description: Sec.  205(d) Rate Filing: Luna Storage, LLC LGIA 
Certificate of Concurrence to be effective 3/31/2021.
    Filed Date: 3/30/21.
    Accession Number: 20210330-5003.
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: ER21-1555-000.
    Applicants: New Mexico Wind, LLC.
    Description: Baseline eTariff Filing: Reactive Power Compensation 
Filing to be effective 3/31/2021.
    Filed Date: 3/30/21.
    Accession Number: 20210330-5004.
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: ER21-1556-000.
    Applicants: TGE Pennsylvania 202, LLC, TGE Pennsylvania 203, LLC.
    Description: Petition for Waiver, et al. of TGE Pennsylvania 202, 
LLC, et al.
    Filed Date: 3/29/21.
    Accession Number: 20210329-5316.
    Comments Due: 5 p.m. ET 4/8/21.

    Docket Numbers: ER21-1557-000.
    Applicants: Leeward Renewable Energy, LLC.
    Description: Petition for Limited Waiver, et al. of Leeward 
Renewable Energy, LLC.
    Filed Date: 3/29/21.

[[Page 17822]]

    Accession Number: 20210329-5317.
    Comments Due: 5 p.m. ET 4/8/21.

    Docket Numbers: ER21-1558-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1276R23 Evergy Metro NITSA 
NOA to be effective 3/1/2021.
    Filed Date: 3/30/21.
    Accession Number: 20210330-5118.
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: ER21-1559-000.
    Applicants: Duke Energy Indiana, LLC.
    Description: Sec.  205(d) Rate Filing: DEI--Revisions to FERC 
Electric Tariff Volume No. 10, Reactive Tariff to be effective 6/1/
2021.
    Filed Date: 3/30/21.
    Accession Number: 20210330-5194.
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: ER21-1560-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2021-03-30_SA 2294 ATC-DTE 
Garden Wind Farm 5th Rev GIA (J060 J061 J557 J928) to be effective 3/
11/2021.
    Filed Date: 3/30/21.
    Accession Number: 20210330-5195.
    Comments Due: 5 p.m. ET 4/20/21.

    Docket Numbers: ER21-1561-000.
    Applicants: Duke Energy Florida, LLC.
    Description: Sec.  205(d) Rate Filing: Revised DEF Rate Schedule 
No. 226 (Seminole Electric Cooperative, Inc.) (Second) to be effective 
6/1/2021.
    Filed Date: 3/30/21.
    Accession Number: 20210330-5268.
    Comments Due: 5 p.m. ET 4/20/21.

    Take notice that the Commission received the following PURPA 
210(m)(3) filings:

    Docket Numbers: QM21-13-000.
    Applicants: Upper Peninsula Power Company.
    Description: Application of Upper Peninsula Power Company to 
Terminate Mandatory Purchase Obligation under the Public Utility 
Regulatory Policies Act of 1978.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5284.
    Comments Due: 5 p.m. ET 4/23/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 30, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-07006 Filed 4-5-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.