Combined Notice of Filings #1, 17376-17377 [2021-06817]

Download as PDF jbell on DSKJLSW7X2PROD with NOTICES 17376 Federal Register / Vol. 86, No. 62 / Friday, April 2, 2021 / Notices Accession Number: 20210325–5123. Comments Due: 5 p.m. ET 4/6/21. Docket Numbers: RP21–652–000. Applicants: Horizon Pipeline Company, L.L.C. Description: Compliance filing Horizon Penalty Revenue Crediting Report for Year 2020. Filed Date: 3/25/21. Accession Number: 20210325–5125. Comments Due: 5 p.m. ET 4/6/21. Docket Numbers: RP21–653–000. Applicants: Ovintiv Marketing Inc., Kiwetinohk Marketing US Corp. Description: Joint Petition For Temporary Waiver of Capacity Release Regulations, et al. of Ovintiv Marketing Inc., et al. Filed Date: 3/25/21. Accession Number: 20210325–5128. Comments Due: 5 p.m. ET 4/6/21. Docket Numbers: RP21–654–000. Applicants: Leaf River Energy Center LLC. Description: § 4(d) Rate Filing: Leaf River Non-conforming agreement filing to be effective 4/1/2021. Filed Date: 3/25/21. Accession Number: 20210325–5143. Comments Due: 5 p.m. ET 4/6/21. Docket Numbers: RP21–655–000. Applicants: Enable Gas Transmission, LLC. Description: § 4(d) Rate Filing: Fuel Tracker Filing—Effective May 1 2021 to be effective 5/1/2021. Filed Date: 3/25/21. Accession Number: 20210325–5146. Comments Due: 5 p.m. ET 4/6/21. Docket Numbers: RP21–656–000. Applicants: Gulf South Pipeline Company, LLC. Description: § 4(d) Rate Filing: Amendment to NC Neg Rate Agmt (Entergy 48769) to be effective 4/1/2021. Filed Date: 3/26/21. Accession Number: 20210326–5011. Comments Due: 5 p.m. ET 4/7/21. Docket Numbers: RP21–657–000. Applicants: Rover Pipeline LLC. Description: Compliance filing Flow Through of Cash-Out and Penalty Revenues filed on 3–26–21. Filed Date: 3/26/21. Accession Number: 20210326–5010. Comments Due: 5 p.m. ET 4/7/21. Docket Numbers: RP21–658–000. Applicants: Fortigen Geneva LLC,NE Nitro Geneva LLC. Description: Joint Petition For Temporary Waiver of Capacity Release Regulations, et al. of Fortigen Geneva LLC, et al. Filed Date: 3/26/21. Accession Number: 20210326–5193. Comments Due: 5 p.m. ET 4/2/21. The filings are accessible in the Commission’s eLibrary system (https:// VerDate Sep<11>2014 23:04 Apr 01, 2021 Jkt 253001 elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 29, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–06818 Filed 4–1–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG21–117–000. Applicants: Azure Sky Solar Project, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Azure Sky Solar Project, LLC. Filed Date: 3/18/21. Accession Number: 20210318–5292. Comments Due: 5 p.m. ET 4/8/21. Docket Numbers: EG21–118–000. Applicants: Sky River Wind, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Sky River Wind, LLC. Filed Date: 3/25/21. Accession Number: 20210325–5243. Comments Due: 5 p.m. ET 4/15/21. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–2507–003; ER13–1793–015; ER12–1260–016. Applicants: Convergent Energy and Power LP, Hazle Spindle, LLC, Stephentown Spindle, LLC. Description: Supplement to July 30, 2020 Notice of Change in Status of the Convergent MBR Sellers. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Filed Date: 3/25/21. Accession Number: 20210325–5249. Comments Due: 5 p.m. ET 4/15/21. Docket Numbers: ER21–1020–001. Applicants: Midcontinent Independent System Operator, Inc., ALLETE, Inc. Description: Tariff Amendment: 2021–03–26_Amendment to ALLETE Depreciation Rate Filing to be effective 1/1/2020. Filed Date: 3/26/21. Accession Number: 20210326–5111. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1519–000. Applicants: Cool Springs Solar, LLC. Description: Baseline eTariff Filing: Cool Springs Solar, LLC Application for MBR Authority to be effective 5/25/2021. Filed Date: 3/25/21. Accession Number: 20210325–5185. Comments Due: 5 p.m. ET 4/15/21. Docket Numbers: ER21–1520–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 4518; Queue No. W4–005 to be effective 6/30/2017. Filed Date: 3/26/21. Accession Number: 20210326–5009. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1521–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: SCE’s Revision to Formula Rate Tariff Authorized 2021 PBOPs Expense Amount to be effective 1/1/2021. Filed Date: 3/26/21. Accession Number: 20210326–5012. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1522–000. Applicants: Midcontinent Independent System Operator, Inc., ALLETE, Inc. Description: § 205(d) Rate Filing: 2021–03–26_SA 3640 and 3641 MP– GRE Riverton Agreements of Sale to be effective 3/27/2021. Filed Date: 3/26/21. Accession Number: 20210326–5016. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1523–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of WMPA, Service Agreement No. 4699; Queue No. AB1–065 to be effective 11/20/2020. Filed Date: 3/26/21. Accession Number: 20210326–5018. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1524–000. Applicants: Florida Power & Light Company. E:\FR\FM\02APN1.SGM 02APN1 jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 86, No. 62 / Friday, April 2, 2021 / Notices Description: § 205(d) Rate Filing: FPL and OUC Service Agreement for Firm Point-To-Point Transmission Service to be effective 6/1/2021. Filed Date: 3/26/21. Accession Number: 20210326–5019. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1525–000. Applicants: Centerfield Cooper Solar, LLC. Description: Baseline eTariff Filing: Reactive Power Compensation Filing to be effective 3/27/2021. Filed Date: 3/26/21. Accession Number: 20210326–5028. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1526–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: 2021 TACBAA Update to be effective 6/1/ 2021. Filed Date: 3/26/21. Accession Number: 20210326–5060. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1527–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: Tariff Cancellation: Notice of Cancellation of Rate Schedule FERC No. 99 to be effective 3/27/2021. Filed Date: 3/26/21. Accession Number: 20210326–5068. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1528–000. Applicants: Midcontinent Independent System Operator, Inc., Duke Energy Indiana, LLC. Description: § 205(d) Rate Filing: 2021–03–26_SA 3646 DEI-Hardy Hills E&P (J1063) to be effective 3/27/2021. Filed Date: 3/26/21. Accession Number: 20210326–5090. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1529–000. Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description: § 205(d) Rate Filing: Joint 205 SGIA among NYISO, NMPC and Tayandenega Solar SA 2600 to be effective 3/3/2021. Filed Date: 3/26/21. Accession Number: 20210326–5099. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1530–000. Applicants: PECO Energy Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: PECO submits Revisions to Att. H–7A re: Depreciation and Amortization Rate to be effective 5/28/2021. Filed Date: 3/26/21. Accession Number: 20210326–5104. Comments Due: 5 p.m. ET 4/16/21. Docket Numbers: ER21–1531–000. VerDate Sep<11>2014 23:04 Apr 01, 2021 Jkt 253001 Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Work Performance Agreement for CDWR Contra Costa-Tesla (TO SA 275) to be effective 5/28/2021. Filed Date: 3/26/21. Accession Number: 20210326–5118. Comments Due: 5 p.m. ET 4/16/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 26, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–06817 Filed 4–1–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline; Stingray Pipeline Company, L.L.C. Take notice that on March 19, 2021, Stingray Pipeline Company, L.L.C. (Stingray), 1300 Main Street, Houston, Texas 77002, filed in the above reference docket a prior notice pursuant to sections 157.205 and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA) and its blanket certificate issued in Docket No. CP91– 1505–000 for authorization to abandon in-place the approximately 11.24-mile, 24-inch-diameter WC 144 Lateral, which extends from West Cameron Block 148 to West Cameron Block 144, and related appurtenances, all located in federal waters, offshore Louisiana in the Gulf of Mexico. The WC 144 Lateral has been idled since 2016 and Stingray has no Frm 00029 Fmt 4703 Sfmt 4703 intention of flowing gas on the lateral. Additionally, on November 10, 2020, Stingray received approval from the Bureau of Safety and Environmental Enforcement to relinquish its right-ofway and abandon in-place the WC 144 Lateral, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to Blair Lichtenwalter, Senior Director of Certificates, Stingray Pipeline Company, L.L.C., 1300 Main Street, Houston, Texas 77002, by phone at (713) 989– 2605, by fax at (713) 989–1205, or by email at blair.lichtenwalter@ energytransfer.com. Public Participation [Docket No. CP21–90–000] PO 00000 17377 There are three ways to become involved in the Commission’s review of this project: You can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on May 28, 2021. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 2 Persons E:\FR\FM\02APN1.SGM 02APN1

Agencies

[Federal Register Volume 86, Number 62 (Friday, April 2, 2021)]
[Notices]
[Pages 17376-17377]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-06817]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG21-117-000.
    Applicants: Azure Sky Solar Project, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Azure Sky Solar Project, LLC.
    Filed Date: 3/18/21.
    Accession Number: 20210318-5292.
    Comments Due: 5 p.m. ET 4/8/21.

    Docket Numbers: EG21-118-000.
    Applicants: Sky River Wind, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Sky River Wind, LLC.
    Filed Date: 3/25/21.
    Accession Number: 20210325-5243.
    Comments Due: 5 p.m. ET 4/15/21.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER19-2507-003; ER13-1793-015; ER12-1260-016.
    Applicants: Convergent Energy and Power LP, Hazle Spindle, LLC, 
Stephentown Spindle, LLC.
    Description: Supplement to July 30, 2020 Notice of Change in Status 
of the Convergent MBR Sellers.
    Filed Date: 3/25/21.
    Accession Number: 20210325-5249.
    Comments Due: 5 p.m. ET 4/15/21.

    Docket Numbers: ER21-1020-001.
    Applicants: Midcontinent Independent System Operator, Inc., ALLETE, 
Inc.
    Description: Tariff Amendment: 2021-03-26_Amendment to ALLETE 
Depreciation Rate Filing to be effective 1/1/2020.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5111.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1519-000.
    Applicants: Cool Springs Solar, LLC.
    Description: Baseline eTariff Filing: Cool Springs Solar, LLC 
Application for MBR Authority to be effective 5/25/2021.
    Filed Date: 3/25/21.
    Accession Number: 20210325-5185.
    Comments Due: 5 p.m. ET 4/15/21.

    Docket Numbers: ER21-1520-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to ISA, Service 
Agreement No. 4518; Queue No. W4-005 to be effective 6/30/2017.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5009.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1521-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: SCE's Revision to Formula 
Rate Tariff Authorized 2021 PBOPs Expense Amount to be effective 1/1/
2021.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5012.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1522-000.
    Applicants: Midcontinent Independent System Operator, Inc., ALLETE, 
Inc.
    Description: Sec.  205(d) Rate Filing: 2021-03-26_SA 3640 and 3641 
MP-GRE Riverton Agreements of Sale to be effective 3/27/2021.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5016.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1523-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation of WMPA, 
Service Agreement No. 4699; Queue No. AB1-065 to be effective 11/20/
2020.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5018.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1524-000.
    Applicants: Florida Power & Light Company.

[[Page 17377]]

    Description: Sec.  205(d) Rate Filing: FPL and OUC Service 
Agreement for Firm Point-To-Point Transmission Service to be effective 
6/1/2021.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5019.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1525-000.
    Applicants: Centerfield Cooper Solar, LLC.
    Description: Baseline eTariff Filing: Reactive Power Compensation 
Filing to be effective 3/27/2021.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5028.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1526-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: 2021 TACBAA Update to be 
effective 6/1/2021.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5060.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1527-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Tariff Cancellation: Notice of Cancellation of Rate 
Schedule FERC No. 99 to be effective 3/27/2021.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5068.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1528-000.
    Applicants: Midcontinent Independent System Operator, Inc., Duke 
Energy Indiana, LLC.
    Description: Sec.  205(d) Rate Filing: 2021-03-26_SA 3646 DEI-Hardy 
Hills E&P (J1063) to be effective 3/27/2021.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5090.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1529-000.
    Applicants: New York Independent System Operator, Inc., Niagara 
Mohawk Power Corporation.
    Description: Sec.  205(d) Rate Filing: Joint 205 SGIA among NYISO, 
NMPC and Tayandenega Solar SA 2600 to be effective 3/3/2021.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5099.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1530-000.
    Applicants: PECO Energy Company, PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: PECO submits Revisions to 
Att. H-7A re: Depreciation and Amortization Rate to be effective 5/28/
2021.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5104.
    Comments Due: 5 p.m. ET 4/16/21.

    Docket Numbers: ER21-1531-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: Work Performance Agreement 
for CDWR Contra Costa-Tesla (TO SA 275) to be effective 5/28/2021.
    Filed Date: 3/26/21.
    Accession Number: 20210326-5118.
    Comments Due: 5 p.m. ET 4/16/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 26, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-06817 Filed 4-1-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.