Combined Notice of Filings #1, 16592-16593 [2021-06479]
Download as PDF
16592
Federal Register / Vol. 86, No. 59 / Tuesday, March 30, 2021 / Notices
is hereby given that on April 15, 2021,
the eXtensible Business Reporting
Language (XBRL) taxonomies,
validation rules, and rendering files
needed to file FERC Form Nos. 1, 1–F,
3–Q (electric), 2, 2–A, 3–Q (natural gas),
6, 6–Q (oil), 60, and 714 (collectively,
Commission Forms),1 will be updated to
Release 1.5.2 The updated taxonomies
will be available in the Yeti viewer at
https://xbrlview.ferc.gov/.3 The updated
validation rules and rendering files will
be available at https://www.ferc.gov/
ferc-online/ferc-online/filing-forms/
eforms-refresh. The eForms system will
incorporate the updated (Release 1.5)
taxonomies, validation rules, and
rendering files and use them to process
filers’ test-only submissions in May
2021. In addition, as noted below, the
deadlines for submitting the third
quarter 2021 filings of FERC Form Nos.
3–Q (electric), 3–Q (natural gas), and
6–Q (oil) are extended until December
31, 2021.
The updated (Release 1.5)
taxonomies, validation rules, and
rendering files will become effective
beginning with the third quarter 2021
filings of FERC Form Nos. 3–Q
(electric),
3–Q (natural gas), and 6–Q (oil). The
current Visual FoxPro-based system for
filing Commission Forms will no longer
be available for submissions after
September 30, 2021. Therefore, all
subsequent filings and any future
refilings, i.e., all post-September 30,
2021 filings and refilings, of the FERC
Form Nos. 3–Q (electric), 3–Q (natural
gas), and 6–Q (oil) and the other
Commission Forms (i.e., FERC Form
Nos. 1, 1–F, 2, 2–A, 6, 60, and 714) must
be made using the applicable
taxonomies, validation rules, and
rendering files for the relevant form, as
indicated on the eForms portal.
To provide the additional time
necessary to complete the transition to
an XBRL-based system, the deadlines
for the third quarter filings of the FERC
jbell on DSKJLSW7X2PROD with NOTICES
1 The
Commission adopted the XBRL process for
filing the Commission Forms in Order No. 859.
Revisions to the Filing Process for Comm’n Forms,
Order No. 859, 167 FERC ¶ 61,241 (2019).
2 The Commission adopted the final XBRL
taxonomy, protocols, implementation guide, and
other supporting documents, and established the
implementation schedule for filing the Commission
Forms following a technical conference in this
proceeding. Revisions to the Filing Process for
Comm’n Forms, 172 FERC ¶ 61,059 (2020). The
Commission also stated that technical updates, such
as the updates referenced here, will not take effect
until at least 60 days after issuance of a notice from
the Office of the Secretary. Id. P 26.
3 These technical updates incorporate feedback
on the taxonomies submitted by interested parties
through various means, including the Yeti review
tool.
VerDate Sep<11>2014
17:59 Mar 29, 2021
Jkt 253001
Form Nos. 3–Q (electric), 3–Q (natural
gas), and 6–Q (oil) are hereby extended.
Accordingly, the deadline for filing
the FERC Form No. 3–Q (electric) for
Major Electric Utilities, Licensees, and
Others for the third quarter of 2021 is
extended from November 29, 2021 until
December 31, 2021. The deadline for
filing the FERC Form No. 3–Q (electric)
for Non-major Public Utilities and
Licensees for the third quarter of 2021
is extended from December 9, 2021 until
December 31, 2021.
In addition, the deadline for filing the
FERC Form No. 3–Q (natural gas) for
Major Natural Gas Companies for the
third quarter of 2021 is extended from
November 29, 2021 until December 31,
2021. The deadline for filing the FERC
Form No. 3–Q (natural gas) for Nonmajor Gas Companies for the third
quarter of 2021 is extended from
December 9, 2021 until December 31,
2021.
Finally, the deadline for filing the
FERC Form No. 6–Q (oil) for Oil
Pipeline Companies for the third quarter
of 2021 is extended from December 9,
2021 until December 31, 2021.
Dated: March 23, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–06477 Filed 3–29–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6731–000[
Coneross Power Corporation; Notice
of Authorization for Continued Project
Operation
On February 28, 2019 Coneross Power
Corporation, licensee for the Coneross
Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Coneross Hydroelectric Project is
on the Coneross Creek, in Oconee
County, South Carolina
The license for Project No.6731 was
issued for a period ending February 28,
2021. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No.6731 is
issued to the Coneross Power
Corporation for a period effective March
1, 2021 through February 28, 2022, or
until the issuance of a new license for
the project or other disposition under
the FPA, whichever comes first. If
issuance of a new license (or other
disposition) does not take place on or
before February 2022, notice is hereby
given that, pursuant to 18 CFR 16.18(c),
an annual license under section 15(a)(1)
of the FPA is renewed automatically
without further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the Coneross Power Corporation, is
authorized to continue operation of the
Coneross Hydroelectric Project, until
such time as the Commission acts on its
application for a subsequent license.
Dated: March 24, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–06511 Filed 3–29–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–67–000.
Applicants: Ventura Energy Storage,
LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Ventura Energy
Storage, LLC.
Filed Date: 3/22/21.
E:\FR\FM\30MRN1.SGM
30MRN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 86, No. 59 / Tuesday, March 30, 2021 / Notices
Accession Number: 20210322–5462.
Comments Due: 5 p.m. ET 4/12/21.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–112–000.
Applicants: Maverick Solar 6, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Maverick Solar 6,
LLC.
Filed Date: 3/22/21.
Accession Number: 20210322–5405.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: EG21–113–000.
Applicants: Samson Solar Energy
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Samson Solar
Energy LLC.
Filed Date: 3/22/21.
Accession Number: 20210322–5454.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: EG21–114–000.
Applicants: Hawtree Creek Farm
Solar, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Hawtree Creek Farm
Solar, LLC.
Filed Date: 3/22/21.
Accession Number: 20210322–5455.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: EG21–115–000.
Applicants: Maverick Solar 7, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Maverick Solar 7,
LLC.
Filed Date: 3/22/21.
Accession Number: 20210322–5456.
Comments Due: 5 p.m. ET 4/12/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–3117–009;
ER10–3115–008; ER11–4060–010;
ER11–4061–010; ER13–445–010; ER14–
2823–008; ER15–1170–006; ER15–1171–
006; ER15–1172–006; ER15–1173–006.
Applicants: Lea Power Partners, LLC,
Waterside Power, LLC, Badger Creek
Limited, Double C Generation Limited
Partnership, High Sierra Limited, Kern
Front Limited, Bear Mountain Limited,
Chalk Cliff Limited, Live Oak Limited,
McKittrick Limited.
Description: Notice of Change in
Status of Lea Power Partners, LLC, et al.
Filed Date: 3/22/21.
Accession Number: 20210322–5472.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER20–844–001.
Applicants: Hamilton Projects
Acquiror, LLC.
Description: Notice of Non-Material
Change in Status of Hamilton Projects
Acquiror, LLC.
VerDate Sep<11>2014
17:59 Mar 29, 2021
Jkt 253001
Filed Date: 3/22/21.
Accession Number: 20210322–5516.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER20–1776–001.
Applicants: Yards Creek Energy, LLC.
Description: Compliance filing:
Reactive Service Rate Schedule
Compliance Filing to be effective 3/5/
2021.
Filed Date: 3/23/21.
Accession Number: 20210323–5027.
Comments Due: 5 p.m. ET 4/13/21.
Docket Numbers: ER21–726–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Response to the Commission’s 2/18/
2021 Deficiency Letter re: 2021 Annual
RTEP to be effective 1/1/2021.
Filed Date: 3/22/21.
Accession Number: 20210322–5277.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21–1498–000.
Applicants: Hawtree Creek Farm
Solar, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization, Request for Related
Waivers to be effective 5/22/2021.
Filed Date: 3/22/21.
Accession Number: 20210322–5296.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21–1499–000.
Applicants: ADG Group Inc.
Description: Notice of Cancellation of
Market Based Rate Tariff of ADG Group
Inc.
Filed Date: 3/22/21.
Accession Number: 20210322–5458.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21–1500–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Tariff Cancellation:
Notice of Cancellation of Rate Schedule
FERC No. 171 to be effective 3/24/2021.
Filed Date: 3/23/21.
Accession Number: 20210323–5032.
Comments Due: 5 p.m. ET 4/13/21.
Docket Numbers: ER21–1501–000.
Applicants: Sandy Ridge Wind, LLC.
Description: § 205(d) Rate Filing:
Reactive Rate Service as Rate Schedule
FERC No. 1 to be effective 5/24/2021.
Filed Date: 3/23/21.
Accession Number: 20210323–5135.
Comments Due: 5 p.m. ET 4/13/21.
Docket Numbers: ER21–1502–000.
Applicants: Maverick Solar 6, LLC.
Description: Baseline eTariff Filing:
Initial Market-Based Rate Petition of
Maverick Solar 6 to be effective 4/30/
2021.
Filed Date: 3/23/21.
Accession Number: 20210323–5147.
Comments Due: 5 p.m. ET 4/13/21.
Docket Numbers: ER21–1503–000.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
16593
Applicants: Maverick Solar 7, LLC.
Description: Baseline eTariff Filing:
Initial Market-Based Rate Petition of
Maverick Solar 7 to be effective 4/30/
2021.
Filed Date: 3/23/21.
Accession Number: 20210323–5155.
Comments Due: 5 p.m. ET 4/13/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 23, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–06479 Filed 3–29–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER21–1498–000]
Hawtree Creek Farm Solar, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Hawtree
Creek Farm Solar, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
E:\FR\FM\30MRN1.SGM
30MRN1
Agencies
[Federal Register Volume 86, Number 59 (Tuesday, March 30, 2021)]
[Notices]
[Pages 16592-16593]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-06479]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC21-67-000.
Applicants: Ventura Energy Storage, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of Ventura Energy Storage, LLC.
Filed Date: 3/22/21.
[[Page 16593]]
Accession Number: 20210322-5462.
Comments Due: 5 p.m. ET 4/12/21.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG21-112-000.
Applicants: Maverick Solar 6, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Maverick Solar 6, LLC.
Filed Date: 3/22/21.
Accession Number: 20210322-5405.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: EG21-113-000.
Applicants: Samson Solar Energy LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Samson Solar Energy LLC.
Filed Date: 3/22/21.
Accession Number: 20210322-5454.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: EG21-114-000.
Applicants: Hawtree Creek Farm Solar, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Hawtree Creek Farm Solar, LLC.
Filed Date: 3/22/21.
Accession Number: 20210322-5455.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: EG21-115-000.
Applicants: Maverick Solar 7, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Maverick Solar 7, LLC.
Filed Date: 3/22/21.
Accession Number: 20210322-5456.
Comments Due: 5 p.m. ET 4/12/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-3117-009; ER10-3115-008; ER11-4060-010; ER11-
4061-010; ER13-445-010; ER14-2823-008; ER15-1170-006; ER15-1171-006;
ER15-1172-006; ER15-1173-006.
Applicants: Lea Power Partners, LLC, Waterside Power, LLC, Badger
Creek Limited, Double C Generation Limited Partnership, High Sierra
Limited, Kern Front Limited, Bear Mountain Limited, Chalk Cliff
Limited, Live Oak Limited, McKittrick Limited.
Description: Notice of Change in Status of Lea Power Partners, LLC,
et al.
Filed Date: 3/22/21.
Accession Number: 20210322-5472.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER20-844-001.
Applicants: Hamilton Projects Acquiror, LLC.
Description: Notice of Non-Material Change in Status of Hamilton
Projects Acquiror, LLC.
Filed Date: 3/22/21.
Accession Number: 20210322-5516.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER20-1776-001.
Applicants: Yards Creek Energy, LLC.
Description: Compliance filing: Reactive Service Rate Schedule
Compliance Filing to be effective 3/5/2021.
Filed Date: 3/23/21.
Accession Number: 20210323-5027.
Comments Due: 5 p.m. ET 4/13/21.
Docket Numbers: ER21-726-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Response to the Commission's 2/18/
2021 Deficiency Letter re: 2021 Annual RTEP to be effective 1/1/2021.
Filed Date: 3/22/21.
Accession Number: 20210322-5277.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21-1498-000.
Applicants: Hawtree Creek Farm Solar, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization, Request for Related Waivers to be effective 5/22/
2021.
Filed Date: 3/22/21.
Accession Number: 20210322-5296.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21-1499-000.
Applicants: ADG Group Inc.
Description: Notice of Cancellation of Market Based Rate Tariff of
ADG Group Inc.
Filed Date: 3/22/21.
Accession Number: 20210322-5458.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21-1500-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Tariff Cancellation: Notice of Cancellation of Rate
Schedule FERC No. 171 to be effective 3/24/2021.
Filed Date: 3/23/21.
Accession Number: 20210323-5032.
Comments Due: 5 p.m. ET 4/13/21.
Docket Numbers: ER21-1501-000.
Applicants: Sandy Ridge Wind, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Rate Service as
Rate Schedule FERC No. 1 to be effective 5/24/2021.
Filed Date: 3/23/21.
Accession Number: 20210323-5135.
Comments Due: 5 p.m. ET 4/13/21.
Docket Numbers: ER21-1502-000.
Applicants: Maverick Solar 6, LLC.
Description: Baseline eTariff Filing: Initial Market-Based Rate
Petition of Maverick Solar 6 to be effective 4/30/2021.
Filed Date: 3/23/21.
Accession Number: 20210323-5147.
Comments Due: 5 p.m. ET 4/13/21.
Docket Numbers: ER21-1503-000.
Applicants: Maverick Solar 7, LLC.
Description: Baseline eTariff Filing: Initial Market-Based Rate
Petition of Maverick Solar 7 to be effective 4/30/2021.
Filed Date: 3/23/21.
Accession Number: 20210323-5155.
Comments Due: 5 p.m. ET 4/13/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 23, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-06479 Filed 3-29-21; 8:45 am]
BILLING CODE 6717-01-P