Combined Notice of Filings #1, 16345-16346 [2021-06364]
Download as PDF
Federal Register / Vol. 86, No. 58 / Monday, March 29, 2021 / Notices
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Filing—
Mercuria Energy America to be effective
4/1/2021.
Filed Date: 3/19/21.
Accession Number: 20210319–5140.
Comments Due: 5 p.m. ET 3/31/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 22, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–06362 Filed 3–26–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–10–000.
Applicants: NextEra Energy
Transmission, LLC, GridLiance West
LLC, GridLiance High Plains LLC,
GridLiance HeartLand LLC.
Description: Compliance filing to
March 18, 2021 Order of NextEra Energy
Transmission, LLC, et al.
Filed Date: 3/19/21.
Accession Number: 20210319–5285.
Comments Due: 5 p.m. ET 3/25/21.
Docket Numbers: EC21–66–000.
Applicants: Terra-Gen Power
Holdings II, LLC, Energy Capital
Partners III, LLC, Golden NA Power
Holdings LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Terra-Gen Power
Holdings II, LLC, et al.
Filed Date: 3/19/21.
VerDate Sep<11>2014
17:20 Mar 26, 2021
Jkt 253001
Accession Number: 20210319–5265.
Comments Due: 5 p.m. ET 4/9/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–2115–009.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Compliance Filing in Response to Order
issued in ER15–2115–008 (NIPCO) to be
effective N/A.
Filed Date: 3/22/21.
Accession Number: 20210322–5107.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER17–2087–005;
ER17–1315–007; ER17–1316–004;
ER17–1318–004; ER20–2746–001.
Applicants: Hog Creek Wind Project,
LLC, Meadow Lake Wind Farm V LLC,
Quilt Block Wind Farm LLC, Redbed
Plains Wind Farm LLC, Riverstart Solar
Park LLC.
Description: Notice of Change in
Status of Hog Creek Wind Project, LLC,
et al.
Filed Date: 3/19/21.
Accession Number: 20210319–5281.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–834–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2021–03–22_SA 3599 Deficiency
Response to MidAmerican-Heartland
Divide FSA to be effective 1/1/2021.
Filed Date: 3/22/21.
Accession Number: 20210322–5205.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21–836–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2021–03–22_SA 3601 Deficiency
Response to MidAmerican-Heartland
Divide FSA to be effective 1/1/2021.
Filed Date: 3/22/21.
Accession Number: 20210322–5206.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21–837–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2021–03–22_SA 3602 Deficiency
Response to MidAmerican-Heartland
Divide FSA to be effective 1/1/2021.
Filed Date: 3/22/21.
Accession Number: 20210322–5208.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21–1489–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
MidAmerican Energy Company.
Description: § 205(d) Rate Filing:
2021–03–22_SA 2237 MEC–NIPCO IA
(GFA 480) to be effective 3/23/2021.
Filed Date: 3/22/21.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
16345
Accession Number: 20210322–5092.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21–1490–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
5990; Queue No. AF2–265 to be
effective 2/18/2021.
Filed Date: 3/22/21.
Accession Number: 20210322–5094.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21–1491–000.
Applicants: PacifiCorp.
Description: Notice of Cancellation of
Rate Schedule No. 274 with Utah Power
and Light Company and El Paso Electric
Company of PacifiCorp.
Filed Date: 3/19/21.
Accession Number: 20210319–5259.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1492–000.
Applicants: Blue Lake Power, LLC.
Description: Request for Limited
Waiver of California Independent
System Operator Corporation Tariff
Provisions of Blue Lake Power, LLC.
Filed Date: 3/19/21.
Accession Number: 20210319–5260.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1493–000.
Applicants: El Paso Electric Company.
Description: Notice of Cancellation of
Rate Schedule No. 26 with Utah Power
and Light Company of El Paso Electric
Company.
Filed Date: 3/19/21.
Accession Number: 20210319–5279.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1494–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
5987; Queue No. AF2–247 to be
effective 2/19/2021.
Filed Date: 3/22/21.
Accession Number: 20210322–5163.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21–1495–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: EPC
Agreement among NYISO, NMPC,
Roaring Brook and Flat Rock SA 2598 to
be effective 3/8/2021.
Filed Date: 3/22/21.
Accession Number: 20210322–5215.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21–1496–000.
Applicants: American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ATSI Submits Revised IA No. 3992 to be
effective 5/22/2021.
Filed Date: 3/22/21.
E:\FR\FM\29MRN1.SGM
29MRN1
16346
Federal Register / Vol. 86, No. 58 / Monday, March 29, 2021 / Notices
Accession Number: 20210322–5220.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21–1497–000.
Applicants: The Empire District
Electric Company.
Description: § 205(d) Rate Filing:
Amendment to Cost-Based Generation
Formula Rate to be effective 5/14/2021.
Filed Date: 3/22/21.
Accession Number: 20210322–5240.
Comments Due: 5 p.m. ET 4/12/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 22, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–06364 Filed 3–26–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL21–60–000]
Arcadia Solar, LLC; WGL Georgia
Project Group, LLC; Notice of Petition
for Declaratory Order
Take notice that on March 19, 2021,
pursuant to Rule 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207, Arcadia
Solar, LLC and WGL Georgia Project
Group, LLC (Petitioners), filed a petition
for declaratory order (Petition)
requesting that the Commission issue a
declaratory order providing partial
waiver from the filing requirement of
section 292.203(a)(3) of the
Commission’s regulations for four
qualifying small power production
facilities, for varying time periods prior
to February 9, 2021, as more fully
explained in the petition.
VerDate Sep<11>2014
17:20 Mar 26, 2021
Jkt 253001
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Comment Date: 5:00 p.m. Eastern time
on April 19, 2021.
Dated: March 22, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–06366 Filed 3–26–21; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER21–1474–000]
KEI MASS Energy Storage I, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of KEI
MASS ENERGY STORAGE I, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is April 12,
2021.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 86, Number 58 (Monday, March 29, 2021)]
[Notices]
[Pages 16345-16346]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-06364]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC21-10-000.
Applicants: NextEra Energy Transmission, LLC, GridLiance West LLC,
GridLiance High Plains LLC, GridLiance HeartLand LLC.
Description: Compliance filing to March 18, 2021 Order of NextEra
Energy Transmission, LLC, et al.
Filed Date: 3/19/21.
Accession Number: 20210319-5285.
Comments Due: 5 p.m. ET 3/25/21.
Docket Numbers: EC21-66-000.
Applicants: Terra-Gen Power Holdings II, LLC, Energy Capital
Partners III, LLC, Golden NA Power Holdings LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of Terra-Gen Power Holdings II, LLC, et al.
Filed Date: 3/19/21.
Accession Number: 20210319-5265.
Comments Due: 5 p.m. ET 4/9/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-2115-009.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Compliance Filing in Response to
Order issued in ER15-2115-008 (NIPCO) to be effective N/A.
Filed Date: 3/22/21.
Accession Number: 20210322-5107.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER17-2087-005; ER17-1315-007; ER17-1316-004; ER17-
1318-004; ER20-2746-001.
Applicants: Hog Creek Wind Project, LLC, Meadow Lake Wind Farm V
LLC, Quilt Block Wind Farm LLC, Redbed Plains Wind Farm LLC, Riverstart
Solar Park LLC.
Description: Notice of Change in Status of Hog Creek Wind Project,
LLC, et al.
Filed Date: 3/19/21.
Accession Number: 20210319-5281.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21-834-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2021-03-22_SA 3599 Deficiency
Response to MidAmerican-Heartland Divide FSA to be effective 1/1/2021.
Filed Date: 3/22/21.
Accession Number: 20210322-5205.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21-836-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2021-03-22_SA 3601 Deficiency
Response to MidAmerican-Heartland Divide FSA to be effective 1/1/2021.
Filed Date: 3/22/21.
Accession Number: 20210322-5206.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21-837-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2021-03-22_SA 3602 Deficiency
Response to MidAmerican-Heartland Divide FSA to be effective 1/1/2021.
Filed Date: 3/22/21.
Accession Number: 20210322-5208.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21-1489-000.
Applicants: Midcontinent Independent System Operator, Inc.,
MidAmerican Energy Company.
Description: Sec. 205(d) Rate Filing: 2021-03-22_SA 2237 MEC-NIPCO
IA (GFA 480) to be effective 3/23/2021.
Filed Date: 3/22/21.
Accession Number: 20210322-5092.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21-1490-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, Service
Agreement No. 5990; Queue No. AF2-265 to be effective 2/18/2021.
Filed Date: 3/22/21.
Accession Number: 20210322-5094.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21-1491-000.
Applicants: PacifiCorp.
Description: Notice of Cancellation of Rate Schedule No. 274 with
Utah Power and Light Company and El Paso Electric Company of
PacifiCorp.
Filed Date: 3/19/21.
Accession Number: 20210319-5259.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21-1492-000.
Applicants: Blue Lake Power, LLC.
Description: Request for Limited Waiver of California Independent
System Operator Corporation Tariff Provisions of Blue Lake Power, LLC.
Filed Date: 3/19/21.
Accession Number: 20210319-5260.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21-1493-000.
Applicants: El Paso Electric Company.
Description: Notice of Cancellation of Rate Schedule No. 26 with
Utah Power and Light Company of El Paso Electric Company.
Filed Date: 3/19/21.
Accession Number: 20210319-5279.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21-1494-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, Service
Agreement No. 5987; Queue No. AF2-247 to be effective 2/19/2021.
Filed Date: 3/22/21.
Accession Number: 20210322-5163.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21-1495-000.
Applicants: New York Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: EPC Agreement among NYISO,
NMPC, Roaring Brook and Flat Rock SA 2598 to be effective 3/8/2021.
Filed Date: 3/22/21.
Accession Number: 20210322-5215.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21-1496-000.
Applicants: American Transmission Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ATSI Submits Revised IA No.
3992 to be effective 5/22/2021.
Filed Date: 3/22/21.
[[Page 16346]]
Accession Number: 20210322-5220.
Comments Due: 5 p.m. ET 4/12/21.
Docket Numbers: ER21-1497-000.
Applicants: The Empire District Electric Company.
Description: Sec. 205(d) Rate Filing: Amendment to Cost-Based
Generation Formula Rate to be effective 5/14/2021.
Filed Date: 3/22/21.
Accession Number: 20210322-5240.
Comments Due: 5 p.m. ET 4/12/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 22, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-06364 Filed 3-26-21; 8:45 am]
BILLING CODE 6717-01-P