Green Mountain Power; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 16205-16206 [2021-06304]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 86, No. 57 / Friday, March 26, 2021 / Notices
Filed Date: 3/19/21.
Accession Number: 20210319–5102.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1479–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Notice of Termination of Service
Agreement No. 258 Terra-Gen, Sanborn
Hybrid 3 to be effective 3/12/2021.
Filed Date: 3/19/21.
Accession Number: 20210319–5105.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1480–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Tariff Cancellation:
Notice of Cancellation of Rate Schedule
No. 232 to be effective 6/30/2021.
Filed Date: 3/19/21.
Accession Number: 20210319–5110.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1481–000.
Applicants: Idaho Power Company.
Description: § 205(d) Rate Filing: CF
Conversion to Bridge—Part II, Section
15 and 22 to be effective 5/28/2021.
Filed Date: 3/19/21.
Accession Number: 20210319–5116.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1482–000.
Applicants: Riverstart Solar Park LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 3/20/2021.
Filed Date: 3/19/21.
Accession Number: 20210319–5122.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1483–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing: Rate
Schedule FERC No. 324 between TriState and SLVREC to be effective 7/1/
2021.
Filed Date: 3/19/21.
Accession Number: 20210319–5134.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1484–000.
Applicants: Duke Energy Carolinas,
LLC, Duke Energy Progress, LLC.
Description: § 205(d) Rate Filing:
Revisions to Joint OATT Formula
Rates—Recovery of DEP 2019 Storm
Costs to be effective 5/19/2021.
Filed Date: 3/19/21.
Accession Number: 20210319–5149.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1485–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2021–03–19 ESDER 4 to be effective 5/
19/2021.
Filed Date: 3/19/21.
Accession Number: 20210319–5156.
Comments Due: 5 p.m. ET 4/9/21.
VerDate Sep<11>2014
17:14 Mar 25, 2021
Jkt 253001
Docket Numbers: ER21–1486–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
Wholesale Contract Revisions to Rate
Schedule No. 326 to be effective 1/1/
2021.
Filed Date: 3/19/21.
Accession Number: 20210319–5181.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1487–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2021–03–19 ESDER Phase 4 to be
effective 5/19/2021.
Filed Date: 3/19/21.
Accession Number: 20210319–5190.
Comments Due: 5 p.m. ET 4/9/21.
Docket Numbers: ER21–1488–000.
Applicants: Luna Storage, LLC.
Description: Baseline eTariff Filing:
Luna Storage, LLC MBR Tariff to be
effective 3/20/2021.
Filed Date: 3/19/21.
Accession Number: 20210319–5211.
Comments Due: 5 p.m. ET 4/9/21.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 19, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–06253 Filed 3–25–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11478–021]
Green Mountain Power; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
16205
with the Commission and is available
for public inspection:
a. Application Type: Amend license
to temporarily lower reservoir and
replace outlet conduit.
b. Project No: 11478–021.
c. Date Filed: March 18, 2021.
d. Applicant: Green Mountain Power.
e. Name of Project: Silver Lake.
f. Location: Sucker Brook, Addison
County, Vermont.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: John Greenan,
Green Mountain Power Corporation,
2152 Post Road, Rutland, VT 05701,
(802) 770–2195.
i. FERC Contact: David Rudisail, (202)
502–6376, david.rudisail@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: April
6, 2021.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–11478–021.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
E:\FR\FM\26MRN1.SGM
26MRN1
khammond on DSKJM1Z7X2PROD with NOTICES
16206
Federal Register / Vol. 86, No. 57 / Friday, March 26, 2021 / Notices
k. Green Mountain Power proposes to
temporarily lower the Sugar Hill
Reservoir approximately 27.5 feet from
the current elevation to allow
replacement of the outlet conduit.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
VerDate Sep<11>2014
17:14 Mar 25, 2021
Jkt 253001
Dated: March 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–06304 Filed 3–25–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–101–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Request for
Extension of Time
Take notice that on March 19, 2021,
Transcontinental Gas Pipe Line
Company, LLC (Transco) requested that
the Federal Energy Regulatory
Commission (Commission) grant an
extension of time until May 3, 2023 to
complete construction of, and place into
service, its Northeast Supply
Enhancement (NESE) Project located in
Pennsylvania, onshore and offshore
New Jersey, and offshore New York as
authorized in the Order Issuing
Certificate (Order) on May 3, 2019.1
Ordering Paragraph (B)(1) of the Order
required Transco to complete the
construction of the NESE Project
facilities and make them available for
service within two years of the date of
the Order, or by May 3, 2021.
On May 15, 2020, the New York State
Department of Environmental
Conservation (NYSDEC) denied
Transco’s application for a water quality
certification under section 401 of the
Clean Water Act. Simultaneously, the
New Jersey Department of
Environmental Protection denied
Transco’s application for a water quality
certification and other individual
permits. As part of its denial, NYSDEC
cites lack of demand for the NESE
Project. Transco asserts that the market
disruption caused by the COVID–19
pandemic is temporary and a need for
additional firm transportation remains.
Transco states that its binding precedent
agreement with National Grid remains
in full force and effect and Transco
remains fully committed to constructing
the NESE Project. Transco avers the
COVID–19 pandemic is also having a
direct and adverse impact on state and
local areas resources and Transco’s
development of the NESE Project.
Moreover, Transco states that it plans to
refile its section 401 applications later
this year. Transco avers that
postponement of the in-service date for
the NESE Project has no impact on the
1 Transcontinental Gas Pipe Line Company, LLC,
167 FERC ¶ 61,110 (2019).
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
public interest findings in the Order and
the environmental record is current and
relevant. Accordingly, Transco now
requests an additional two years, or
until May 3, 2023, to complete the
construction of the NESE Project and
make it available for service.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on Transco’s request for an
extension of time may do so. No reply
comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).2
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,3 the Commission will aim to
issue an order acting on the request
within 45 days.4 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.5 The Commission will not
consider arguments that re-litigate the
issuance of the Order, including
whether the Commission properly
found the project to be in the public
convenience and necessity and whether
the Commission’s environmental
analysis for the certificate complied
with the National Environmental Policy
Act.6 At the time a pipeline requests an
extension of time, orders on certificates
of public convenience and necessity are
final and the Commission will not relitigate their issuance.7 The OEP
Director, or his or her designee, will act
2 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC ¶ 61,144, at P 39 (2020).
3 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2020).
4 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
5 Id. P 40.
6 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
7 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
E:\FR\FM\26MRN1.SGM
26MRN1
Agencies
[Federal Register Volume 86, Number 57 (Friday, March 26, 2021)]
[Notices]
[Pages 16205-16206]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-06304]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 11478-021]
Green Mountain Power; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Amend license to temporarily lower reservoir
and replace outlet conduit.
b. Project No: 11478-021.
c. Date Filed: March 18, 2021.
d. Applicant: Green Mountain Power.
e. Name of Project: Silver Lake.
f. Location: Sucker Brook, Addison County, Vermont.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: John Greenan, Green Mountain Power
Corporation, 2152 Post Road, Rutland, VT 05701, (802) 770-2195.
i. FERC Contact: David Rudisail, (202) 502-6376,
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: April 6, 2021.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include the docket number P-11478-021. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
[[Page 16206]]
k. Green Mountain Power proposes to temporarily lower the Sugar
Hill Reservoir approximately 27.5 feet from the current elevation to
allow replacement of the outlet conduit.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: March 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-06304 Filed 3-25-21; 8:45 am]
BILLING CODE 6717-01-P