Environmental Impact Statements; Notice of Availability, 16207 [2021-06280]
Download as PDF
Federal Register / Vol. 86, No. 57 / Friday, March 26, 2021 / Notices
on those extension requests that are
uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning COVID–19,
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission. To mail
via USPS, use the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Time on April 6, 2021.
Dated: March 22, 2021.
Kimberly D. Bose,
Secretary.
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
Environmental Protection
Agency (EPA).
ACTION: Notice; request for public
comment.
AGENCY:
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9055–8]
Environmental Impact Statements;
Notice of Availability
khammond on DSKJM1Z7X2PROD with NOTICES
[FR Doc. 2021–06280 Filed 3–25–21; 8:45 am]
Notice of Administrative Settlement
Agreement and Order on Consent for
Response Action by Prospective
Purchaser
BILLING CODE 6717–01–P
Jkt 253001
In accordance with the
requirements of the Resource
Conservation and Recovery Act, as
amended by the Hazardous and Solid
Waste Amendments (RCRA), and the
Comprehensive Environmental
Response, Compensation, and Liability
Act of 1980, as amended (CERLCA),
notice is hereby given by the U.S.
Environmental Protection Agency
(EPA), of an Administrative Settlement
Agreement and Order on Consent for
Response Action by Prospective
Purchaser (Settlement Agreement), with
NP Falls Township Industrial 2, LLC
SUMMARY:
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EIS)
Filed March 15, 2021 10 a.m. EST
Through March 22, 2021 10 a.m. EST
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air
Act requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment
17:14 Mar 25, 2021
Dated: March 22, 2021.
Cindy S. Barger,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FRL 10022–02–Region 3]
[FR Doc. 2021–06309 Filed 3–25–21; 8:45 am]
VerDate Sep<11>2014
letters on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepapublic/action/eis/search.
EIS No. 20210034, Final, NPS, NY,
Adoption—Fire Island Inlet to
Montauk Point Reformulation Study,
Contact: Joe Neubauer 215–597–1903.
The National Park Service (NPS) has
adopted the Army Corps of Engineers
Final EIS No. 20200043, filed 2/14/2020
with EPA. NPS was a cooperating
agency on this project. Therefore,
republication of the document is not
necessary under Section 1506.3(b)(2) of
the CEQ regulations.
EIS No. 20210035, Final, NPS, NC, Cape
Hatteras National Seashore Sediment
Management Framework, Review
Period Ends: 04/26/2021, Contact:
Dave Hallac 252–475–9032.
EIS No. 20210036, Final, BR, WA,
Leavenworth National Fish Hatchery
Surface Water Intake Fish Screens and
Fish Passage Project, Review Period
Ends: 04/26/2021, Contact: Jason
Sutter 208–378–5390.
EIS No. 20210037, Draft, USACE, MT,
Fort Peck Dam Test Releases,
Comment Period Ends: 05/25/2021,
Contact: Aaron Quinn 402–995–2669.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
16207
(Purchaser). The Settlement Agreement
pertains to Purchaser’s acquisition of a
342.97-acre property (Property) at the
2799-acre U.S. Steel Mon Valley
Works—Fairless Hills Facility, located
at S Pennsylvania Avenue, Fairless
Hills, PA (Facility). The Settlement
Agreement requires performance of
specified cleanup activities pursuant to
EPA’s RCRA corrective action program
at the Property and establishment of
financial assurance for the benefit of
EPA to ensure completion of the
cleanup work. In return, the Settlement
Agreement will resolve potential claims
of the United States government for
cleanup at the Facility under RCRA and
CERCLA.
DATES: Comments must be submitted on
or before April 26, 2021.
ADDRESSES: The proposed Settlement
Agreement is available at: https://
www.epa.gov/sites/production/files/
2020-12/documents/us_steel_
northpoint_2_ppa_final_.pdf.
Comments should be submitted to Linda
Matyskiela, Remedial Project Manager,
EPA Region 3, Mail Code 3LD20, 1650
Arch Street, Philadelphia, PA 19103,
(215) 814–3420, Matyskiela.Linda@
epa.gov and should reference the
Settlement Agreement.
You may also send comments,
identified by Docket ID No. CERCLA–
RCRA–03–2021–0051PP to https://
www.regulations.gov. Follow the online
instructions for submitting comments.
FOR FURTHER INFORMATION CONTACT:
Thomas A. Cinti, Senior Assistant
Regional Counsel, Office of Regional
Counsel, EPA Region III, Mail Code
3RC20, 1650 Arch Street, Philadelphia,
PA 19103, (215) 814–2634,
Cinti.Thomas@epa.gov.
SUPPLEMENTARY INFORMATION: EPA will
receive written comments relating to the
Settlement Agreement. EPA will
consider all comments received and
may modify or withdraw its consent to
the Settlement Agreement if comments
received disclose facts or considerations
that indicate that the Settlement
Agreement is inappropriate, improper,
or inadequate. Once submitted,
comments cannot be edited or removed
from Regulations.gov. EPA may publish
any comment received to its public
docket. Do not submit electronically any
information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute. If CBI exists, please
contact Ms. Linda Matyskiela.
Multimedia submissions (audio, video,
etc.) must be accompanied by a written
comment. The written comment is
considered the official comment and
should include discussion of all points
E:\FR\FM\26MRN1.SGM
26MRN1
Agencies
[Federal Register Volume 86, Number 57 (Friday, March 26, 2021)]
[Notices]
[Page 16207]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-06280]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9055-8]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information 202-564-5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact Statements (EIS)
Filed March 15, 2021 10 a.m. EST Through March 22, 2021 10 a.m. EST
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air Act requires that EPA make
public its comments on EISs issued by other Federal agencies. EPA's
comment letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20210034, Final, NPS, NY, Adoption--Fire Island Inlet to
Montauk Point Reformulation Study, Contact: Joe Neubauer 215-597-1903.
The National Park Service (NPS) has adopted the Army Corps of
Engineers Final EIS No. 20200043, filed 2/14/2020 with EPA. NPS was a
cooperating agency on this project. Therefore, republication of the
document is not necessary under Section 1506.3(b)(2) of the CEQ
regulations.
EIS No. 20210035, Final, NPS, NC, Cape Hatteras National Seashore
Sediment Management Framework, Review Period Ends: 04/26/2021, Contact:
Dave Hallac 252-475-9032.
EIS No. 20210036, Final, BR, WA, Leavenworth National Fish Hatchery
Surface Water Intake Fish Screens and Fish Passage Project, Review
Period Ends: 04/26/2021, Contact: Jason Sutter 208-378-5390.
EIS No. 20210037, Draft, USACE, MT, Fort Peck Dam Test Releases,
Comment Period Ends: 05/25/2021, Contact: Aaron Quinn 402-995-2669.
Dated: March 22, 2021.
Cindy S. Barger,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2021-06280 Filed 3-25-21; 8:45 am]
BILLING CODE 6560-50-P