Download as PDF 15474 Federal Register / Vol. 86, No. 54 / Tuesday, March 23, 2021 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6904–040] Battenkill Hydro Associates; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 6904–040. c. Date Filed: February 1, 2021. d. Submitted By: Battenkill Hydro Associates (Battenkill Hydro). e. Name of Project: Upper Greenwich Hydroelectric Project. f. Location: On the Batten Kill, a tributary of the Hudson River in Washington County, New York. The project does not occupy any federal land. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Mr. Lewis Loon, General Manager, Operations and Maintenance—USA, Krueger Energy, 423 Brunswick Ave., Gardiner, ME 04345; (207) 203–3027; Lewis.Loon@kruger.com. i. FERC Contact: Andy Bernick at (202) 502–8660; or email at andrew.bernick@ferc.gov. j. Battenkill Hydro filed its request to use the Traditional Licensing Process on February 1, 2021. Battenkill Hydro provided public notice of its request on January 20, 2021. In a letter dated March 17, 2021, the Director of the Division of Hydropower Licensing approved Battenkill Hydro’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR part 402. We are also initiating consultation with the New York State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Battenkill Hydro as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and consultation pursuant to section 106 of the National Historic Preservation Act. m. Battenkill Hydro filed a PreApplication Document (PAD; including VerDate Sep<11>2014 17:45 Mar 22, 2021 Jkt 253001 a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD may be viewed and/or printed on the Commission’s website (https://www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208 3676 (toll free), or (202) 502–8659 (TTY). o. The licensee states its unequivocal intent to submit an application for a subsequent license for Project No. 6904. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a subsequent license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by January 31, 2024. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: March 17, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–05970 Filed 3–22–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1285–009. Applicants: Craven County Wood Energy Limited Partnership. Description: Supplement to August 6, 2020 Notice of Non-Material Change in Status of Craven County Wood Energy Limited Partnership. Filed Date: 3/12/21. Accession Number: 20210312–5143. Comments Due: 5 p.m. ET 4/2/21. Docket Numbers: ER16–1720–017. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 Applicants: Invenergy Energy Management LLC. Description: Notice of Change in Facts under Market-Based Rate Authority of Invenergy Energy Management LLC. Filed Date: 3/17/21. Accession Number: 20210317–5040. Comments Due: 5 p.m. ET 4/7/21. Docket Numbers: ER17–194–005. Applicants: Hartree Partners, LP. Description: Supplement to June 30, 2020 Updated Market Power Analysis for the Northeast Region of Hartree Partners, LP. Filed Date: 3/16/21. Accession Number: 20210316–5215. Comments Due: 5 p.m. ET 4/6/21. Docket Numbers: ER20–2597–002; ER20–1991–002; ER20–2153–003; ER20–2380–002. Applicants: Soldier Creek Wind, LLC, Ponderosa Wind, LLC, Sanford Airport Solar, LLC, Saint Solar, LLC. Description: Supplement to January 15, 2021 Notice of Non-Material Change in Status of Soldier Creek Wind, LLC, et al. Filed Date: 3/15/21. Accession Number: 20210315–5423. Comments Due: 5 p.m. ET 4/5/21. Docket Numbers: ER21–1137–001. Applicants: NorthWestern Corporation. Description: Compliance filing: Errata to Compliance Filing re Authority to Transact at MBR in the EIM to be effective 2/8/2021. Filed Date: 3/15/21. Accession Number: 20210315–5302. Comments Due: 5 p.m. ET 4/5/21. Docket Numbers: ER21–1251–000. Applicants: Bighorn Solar 1, LLC. Description: Supplement to March 2, 2021 Bighorn Solar 1, LLC tariff filing. Filed Date: 3/16/21. Accession Number: 20210316–5188. Comments Due: 5 p.m. ET 4/6/21. Docket Numbers: ER21–1451–000. Applicants: Cleveland-Cliffs Steel LLC. Description: Baseline eTariff Filing: Baseline new generic title to be effective 3/16/2021. Filed Date: 3/16/21. Accession Number: 20210316–5159. Comments Due: 5 p.m. ET 4/6/21. Docket Numbers: ER21–1452–000. Applicants: Delta’s Edge Solar, LLC. Description: Initial rate filing: Proposed Revenue Requirement for Reactive Service from the Deltas Edge Facility to be effective 12/31/9998. Filed Date: 3/16/21. Accession Number: 20210316–5160. Comments Due: 5 p.m. ET 4/6/21. Docket Numbers: ER21–1453–000. Applicants: Crossett Solar Energy, LLC. E:\FR\FM\23MRN1.SGM 23MRN1 Federal Register / Vol. 86, No. 54 / Tuesday, March 23, 2021 / Notices Description: Initial rate filing: Proposed Revenue Requirement for Reactive Service from Crossett Solar Facility to be effective 12/31/9998. Filed Date: 3/16/21. Accession Number: 20210316–5163. Comments Due: 5 p.m. ET 4/6/21. Docket Numbers: ER21–1454–000. Applicants: Midcontinent Independent System Operator, Inc., American Transmission Company LLC. Description: § 205(d) Rate Filing: 2021–03–17_SA 2800 ATC-City of Stoughton 1st Rev CFA to be effective 5/17/2021. Filed Date: 3/17/21. Accession Number: 20210317–5019. Comments Due: 5 p.m. ET 4/7/21. Docket Numbers: ER21–1455–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3499R2 Poplar Bluff Municipal Utilities NITSA NOA to be effective 3/1/2021. Filed Date: 3/17/21. Accession Number: 20210317–5028. Comments Due: 5 p.m. ET 4/7/21. Docket Numbers: ER21–1456–000. Applicants: Midcontinent Independent System Operator Inc., American Transmission Company LLC. Description: § 205(d) Rate Filing: 2021–03–17_SA 2777 ATC-Wisconsin Rapids 1st Rev CFA to be effective 5/17/2021. Filed Date: 3/17/21. Accession Number: 20210317–5031. Comments Due: 5 p.m. ET 4/7/21. Docket Numbers: ER21–1457–000. Applicants: Central Maine Power Company. Description: Notice of Cancellation of Service Agreement No. 154 of Central Maine Power Company. Filed Date: 3/16/21. Accession Number: 20210316–5219. Comments Due: 5 p.m. ET 4/6/21. Docket Numbers: ER21–1458–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2415R14 Kansas Municipal Energy Agency NITSA and NOA to be effective 3/1/2021. Filed Date: 3/17/21. Accession Number: 20210317–5032. Comments Due: 5 p.m. ET 4/7/21. Docket Numbers: ER21–1459–000. Applicants: Georgia Power Company. Description: Initial rate filing: SR Perry Affected System Construction Agreement (GPAS 013) Filing to be effective 10/7/2020. Filed Date: 3/17/21. Accession Number: 20210317–5106. Comments Due: 5 p.m. ET 4/7/21. Docket Numbers: ER21–1460–000. VerDate Sep<11>2014 17:45 Mar 22, 2021 Jkt 253001 Applicants: Georgia Power Company. Description: Initial rate filing: SR Clay Affected System Construction Agreement (GPAS 014) Filing to be effective 2/5/2021. Filed Date: 3/17/21. Accession Number: 20210317–5107. Comments Due: 5 p.m. ET 4/7/21. Docket Numbers: ER21–1461–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, SA No. 5986; Queue No. AE2–254 to be effective 2/19/2021. Filed Date: 3/17/21. Accession Number: 20210317–5127. Comments Due: 5 p.m. ET 4/7/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 17, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–05932 Filed 3–22–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15094–000] Ohio Power and Light, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February19, 2021, Ohio Power and Light, LLC. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Robert C. Byrd Lock and Dam Hydroelectric Project to be located on the Ohio River, near the Town of Gallipolis, in Gallia County, Ohio, and Mason County, West PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 15475 Virginia. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would utilize the impoundment formed by the U.S. Army Corps of Engineers R.C. Byrd Locks and Dam and consist of the following: (1) A new 150-foot-long by 250-foot-wide concrete-walled intake/ forebay structure; (2) a new 250-footwide by 170-foot-long concrete powerhouse containing four 5.75megawatt (MW) pit turbine-generators for a total project capacity of 21.1 MW; (3) a new 300-foot-long by 300-foot-wide tailrace; (4) a new 60-foot-long by 60foot-wide substation; (5) a new 2.41mile-long, 138-kilovolt transmission line.; and (6) appurtenant facilities. The estimated annual generation of the Robert C. Byrd Lock and Dam Hydroelectric Project would be 165,000 megawatt-hours. Applicant Contact: Mr. Alan W. Skelly, Ohio Power and Light, LLC., 127 Longwood Boulevard, Mount Orab, Ohio 45154; phone: (937) 802–8866. FERC Contact: Tyrone Williams; phone: (202) 502–6331. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, E:\FR\FM\23MRN1.SGM 23MRN1

Agencies

[Federal Register Volume 86, Number 54 (Tuesday, March 23, 2021)]
[Notices]
[Pages 15474-15475]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05932]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-1285-009.
    Applicants: Craven County Wood Energy Limited Partnership.
    Description: Supplement to August 6, 2020 Notice of Non-Material 
Change in Status of Craven County Wood Energy Limited Partnership.
    Filed Date: 3/12/21.
    Accession Number: 20210312-5143.
    Comments Due: 5 p.m. ET 4/2/21.

    Docket Numbers: ER16-1720-017.
    Applicants: Invenergy Energy Management LLC.
    Description: Notice of Change in Facts under Market-Based Rate 
Authority of Invenergy Energy Management LLC.
    Filed Date: 3/17/21.
    Accession Number: 20210317-5040.
    Comments Due: 5 p.m. ET 4/7/21.

    Docket Numbers: ER17-194-005.
    Applicants: Hartree Partners, LP.
    Description: Supplement to June 30, 2020 Updated Market Power 
Analysis for the Northeast Region of Hartree Partners, LP.
    Filed Date: 3/16/21.
    Accession Number: 20210316-5215.
    Comments Due: 5 p.m. ET 4/6/21.

    Docket Numbers: ER20-2597-002; ER20-1991-002; ER20-2153-003; ER20-
2380-002.
    Applicants: Soldier Creek Wind, LLC, Ponderosa Wind, LLC, Sanford 
Airport Solar, LLC, Saint Solar, LLC.
    Description: Supplement to January 15, 2021 Notice of Non-Material 
Change in Status of Soldier Creek Wind, LLC, et al.
    Filed Date: 3/15/21.
    Accession Number: 20210315-5423.
    Comments Due: 5 p.m. ET 4/5/21.

    Docket Numbers: ER21-1137-001.
    Applicants: NorthWestern Corporation.
    Description: Compliance filing: Errata to Compliance Filing re 
Authority to Transact at MBR in the EIM to be effective 2/8/2021.
    Filed Date: 3/15/21.
    Accession Number: 20210315-5302.
    Comments Due: 5 p.m. ET 4/5/21.

    Docket Numbers: ER21-1251-000.
    Applicants: Bighorn Solar 1, LLC.
    Description: Supplement to March 2, 2021 Bighorn Solar 1, LLC 
tariff filing.
    Filed Date: 3/16/21.
    Accession Number: 20210316-5188.
    Comments Due: 5 p.m. ET 4/6/21.

    Docket Numbers: ER21-1451-000.
    Applicants: Cleveland-Cliffs Steel LLC.
    Description: Baseline eTariff Filing: Baseline new generic title to 
be effective 3/16/2021.
    Filed Date: 3/16/21.
    Accession Number: 20210316-5159.
    Comments Due: 5 p.m. ET 4/6/21.

    Docket Numbers: ER21-1452-000.
    Applicants: Delta's Edge Solar, LLC.
    Description: Initial rate filing: Proposed Revenue Requirement for 
Reactive Service from the Deltas Edge Facility to be effective 12/31/
9998.
    Filed Date: 3/16/21.
    Accession Number: 20210316-5160.
    Comments Due: 5 p.m. ET 4/6/21.

    Docket Numbers: ER21-1453-000.
    Applicants: Crossett Solar Energy, LLC.

[[Page 15475]]

    Description: Initial rate filing: Proposed Revenue Requirement for 
Reactive Service from Crossett Solar Facility to be effective 12/31/
9998.
    Filed Date: 3/16/21.
    Accession Number: 20210316-5163.
    Comments Due: 5 p.m. ET 4/6/21.

    Docket Numbers: ER21-1454-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
American Transmission Company LLC.
    Description: Sec.  205(d) Rate Filing: 2021-03-17_SA 2800 ATC-City 
of Stoughton 1st Rev CFA to be effective 5/17/2021.
    Filed Date: 3/17/21.
    Accession Number: 20210317-5019.
    Comments Due: 5 p.m. ET 4/7/21.

    Docket Numbers: ER21-1455-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3499R2 Poplar Bluff 
Municipal Utilities NITSA NOA to be effective 3/1/2021.
    Filed Date: 3/17/21.
    Accession Number: 20210317-5028.
    Comments Due: 5 p.m. ET 4/7/21.

    Docket Numbers: ER21-1456-000.
    Applicants: Midcontinent Independent System Operator Inc., American 
Transmission Company LLC.
    Description: Sec.  205(d) Rate Filing: 2021-03-17_SA 2777 ATC-
Wisconsin Rapids 1st Rev CFA to be effective 5/17/2021.
    Filed Date: 3/17/21.
    Accession Number: 20210317-5031.
    Comments Due: 5 p.m. ET 4/7/21.

    Docket Numbers: ER21-1457-000.
    Applicants: Central Maine Power Company.
    Description: Notice of Cancellation of Service Agreement No. 154 of 
Central Maine Power Company.
    Filed Date: 3/16/21.
    Accession Number: 20210316-5219.
    Comments Due: 5 p.m. ET 4/6/21.

    Docket Numbers: ER21-1458-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 2415R14 Kansas Municipal 
Energy Agency NITSA and NOA to be effective 3/1/2021.
    Filed Date: 3/17/21.
    Accession Number: 20210317-5032.
    Comments Due: 5 p.m. ET 4/7/21.

    Docket Numbers: ER21-1459-000.
    Applicants: Georgia Power Company.
    Description: Initial rate filing: SR Perry Affected System 
Construction Agreement (GPAS 013) Filing to be effective 10/7/2020.
    Filed Date: 3/17/21.
    Accession Number: 20210317-5106.
    Comments Due: 5 p.m. ET 4/7/21.

    Docket Numbers: ER21-1460-000.
    Applicants: Georgia Power Company.
    Description: Initial rate filing: SR Clay Affected System 
Construction Agreement (GPAS 014) Filing to be effective 2/5/2021.
    Filed Date: 3/17/21.
    Accession Number: 20210317-5107.
    Comments Due: 5 p.m. ET 4/7/21.

    Docket Numbers: ER21-1461-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, SA No. 5986; 
Queue No. AE2-254 to be effective 2/19/2021.
    Filed Date: 3/17/21.
    Accession Number: 20210317-5127.
    Comments Due: 5 p.m. ET 4/7/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 17, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-05932 Filed 3-22-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.