15474
Federal Register / Vol. 86, No. 54 / Tuesday, March 23, 2021 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6904–040]
Battenkill Hydro Associates; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 6904–040.
c. Date Filed: February 1, 2021.
d. Submitted By: Battenkill Hydro
Associates (Battenkill Hydro).
e. Name of Project: Upper Greenwich
Hydroelectric Project.
f. Location: On the Batten Kill, a
tributary of the Hudson River in
Washington County, New York. The
project does not occupy any federal
land.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Mr.
Lewis Loon, General Manager,
Operations and Maintenance—USA,
Krueger Energy, 423 Brunswick Ave.,
Gardiner, ME 04345; (207) 203–3027;
Lewis.Loon@kruger.com.
i. FERC Contact: Andy Bernick at
(202) 502–8660; or email at
andrew.bernick@ferc.gov.
j. Battenkill Hydro filed its request to
use the Traditional Licensing Process on
February 1, 2021. Battenkill Hydro
provided public notice of its request on
January 20, 2021. In a letter dated March
17, 2021, the Director of the Division of
Hydropower Licensing approved
Battenkill Hydro’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
part 402. We are also initiating
consultation with the New York State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Battenkill Hydro as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act
and consultation pursuant to section
106 of the National Historic
Preservation Act.
m. Battenkill Hydro filed a PreApplication Document (PAD; including
VerDate Sep<11>2014
17:45 Mar 22, 2021
Jkt 253001
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD may be viewed
and/or printed on the Commission’s
website (https://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866) 208
3676 (toll free), or (202) 502–8659
(TTY).
o. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. 6904.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a subsequent
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by January 31,
2024.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: March 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05970 Filed 3–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1285–009.
Applicants: Craven County Wood
Energy Limited Partnership.
Description: Supplement to August 6,
2020 Notice of Non-Material Change in
Status of Craven County Wood Energy
Limited Partnership.
Filed Date: 3/12/21.
Accession Number: 20210312–5143.
Comments Due: 5 p.m. ET 4/2/21.
Docket Numbers: ER16–1720–017.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Applicants: Invenergy Energy
Management LLC.
Description: Notice of Change in Facts
under Market-Based Rate Authority of
Invenergy Energy Management LLC.
Filed Date: 3/17/21.
Accession Number: 20210317–5040.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER17–194–005.
Applicants: Hartree Partners, LP.
Description: Supplement to June 30,
2020 Updated Market Power Analysis
for the Northeast Region of Hartree
Partners, LP.
Filed Date: 3/16/21.
Accession Number: 20210316–5215.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER20–2597–002;
ER20–1991–002; ER20–2153–003;
ER20–2380–002.
Applicants: Soldier Creek Wind, LLC,
Ponderosa Wind, LLC, Sanford Airport
Solar, LLC, Saint Solar, LLC.
Description: Supplement to January
15, 2021 Notice of Non-Material Change
in Status of Soldier Creek Wind, LLC, et
al.
Filed Date: 3/15/21.
Accession Number: 20210315–5423.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER21–1137–001.
Applicants: NorthWestern
Corporation.
Description: Compliance filing: Errata
to Compliance Filing re Authority to
Transact at MBR in the EIM to be
effective 2/8/2021.
Filed Date: 3/15/21.
Accession Number: 20210315–5302.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER21–1251–000.
Applicants: Bighorn Solar 1, LLC.
Description: Supplement to March 2,
2021 Bighorn Solar 1, LLC tariff filing.
Filed Date: 3/16/21.
Accession Number: 20210316–5188.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21–1451–000.
Applicants: Cleveland-Cliffs Steel
LLC.
Description: Baseline eTariff Filing:
Baseline new generic title to be effective
3/16/2021.
Filed Date: 3/16/21.
Accession Number: 20210316–5159.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21–1452–000.
Applicants: Delta’s Edge Solar, LLC.
Description: Initial rate filing:
Proposed Revenue Requirement for
Reactive Service from the Deltas Edge
Facility to be effective 12/31/9998.
Filed Date: 3/16/21.
Accession Number: 20210316–5160.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21–1453–000.
Applicants: Crossett Solar Energy,
LLC.
E:\FR\FM\23MRN1.SGM
23MRN1
Federal Register / Vol. 86, No. 54 / Tuesday, March 23, 2021 / Notices
Description: Initial rate filing:
Proposed Revenue Requirement for
Reactive Service from Crossett Solar
Facility to be effective 12/31/9998.
Filed Date: 3/16/21.
Accession Number: 20210316–5163.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21–1454–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
2021–03–17_SA 2800 ATC-City of
Stoughton 1st Rev CFA to be effective
5/17/2021.
Filed Date: 3/17/21.
Accession Number: 20210317–5019.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21–1455–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3499R2 Poplar Bluff Municipal Utilities
NITSA NOA to be effective 3/1/2021.
Filed Date: 3/17/21.
Accession Number: 20210317–5028.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21–1456–000.
Applicants: Midcontinent
Independent System Operator Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
2021–03–17_SA 2777 ATC-Wisconsin
Rapids 1st Rev CFA to be effective
5/17/2021.
Filed Date: 3/17/21.
Accession Number: 20210317–5031.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21–1457–000.
Applicants: Central Maine Power
Company.
Description: Notice of Cancellation of
Service Agreement No. 154 of Central
Maine Power Company.
Filed Date: 3/16/21.
Accession Number: 20210316–5219.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21–1458–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2415R14 Kansas Municipal Energy
Agency NITSA and NOA to be effective
3/1/2021.
Filed Date: 3/17/21.
Accession Number: 20210317–5032.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21–1459–000.
Applicants: Georgia Power Company.
Description: Initial rate filing: SR
Perry Affected System Construction
Agreement (GPAS 013) Filing to be
effective 10/7/2020.
Filed Date: 3/17/21.
Accession Number: 20210317–5106.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21–1460–000.
VerDate Sep<11>2014
17:45 Mar 22, 2021
Jkt 253001
Applicants: Georgia Power Company.
Description: Initial rate filing: SR Clay
Affected System Construction
Agreement (GPAS 014) Filing to be
effective 2/5/2021.
Filed Date: 3/17/21.
Accession Number: 20210317–5107.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21–1461–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5986; Queue No.
AE2–254 to be effective 2/19/2021.
Filed Date: 3/17/21.
Accession Number: 20210317–5127.
Comments Due: 5 p.m. ET 4/7/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 17, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–05932 Filed 3–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15094–000]
Ohio Power and Light, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February19, 2021, Ohio Power and
Light, LLC. filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Robert C.
Byrd Lock and Dam Hydroelectric
Project to be located on the Ohio River,
near the Town of Gallipolis, in Gallia
County, Ohio, and Mason County, West
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
15475
Virginia. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would utilize
the impoundment formed by the U.S.
Army Corps of Engineers R.C. Byrd
Locks and Dam and consist of the
following: (1) A new 150-foot-long by
250-foot-wide concrete-walled intake/
forebay structure; (2) a new 250-footwide by 170-foot-long concrete
powerhouse containing four 5.75megawatt (MW) pit turbine-generators
for a total project capacity of 21.1 MW;
(3) a new 300-foot-long by 300-foot-wide
tailrace; (4) a new 60-foot-long by 60foot-wide substation; (5) a new 2.41mile-long, 138-kilovolt transmission
line.; and (6) appurtenant facilities. The
estimated annual generation of the
Robert C. Byrd Lock and Dam
Hydroelectric Project would be 165,000
megawatt-hours.
Applicant Contact: Mr. Alan W.
Skelly, Ohio Power and Light, LLC., 127
Longwood Boulevard, Mount Orab,
Ohio 45154; phone: (937) 802–8866.
FERC Contact: Tyrone Williams;
phone: (202) 502–6331.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 86, Number 54 (Tuesday, March 23, 2021)]
[Notices]
[Pages 15474-15475]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05932]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1285-009.
Applicants: Craven County Wood Energy Limited Partnership.
Description: Supplement to August 6, 2020 Notice of Non-Material
Change in Status of Craven County Wood Energy Limited Partnership.
Filed Date: 3/12/21.
Accession Number: 20210312-5143.
Comments Due: 5 p.m. ET 4/2/21.
Docket Numbers: ER16-1720-017.
Applicants: Invenergy Energy Management LLC.
Description: Notice of Change in Facts under Market-Based Rate
Authority of Invenergy Energy Management LLC.
Filed Date: 3/17/21.
Accession Number: 20210317-5040.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER17-194-005.
Applicants: Hartree Partners, LP.
Description: Supplement to June 30, 2020 Updated Market Power
Analysis for the Northeast Region of Hartree Partners, LP.
Filed Date: 3/16/21.
Accession Number: 20210316-5215.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER20-2597-002; ER20-1991-002; ER20-2153-003; ER20-
2380-002.
Applicants: Soldier Creek Wind, LLC, Ponderosa Wind, LLC, Sanford
Airport Solar, LLC, Saint Solar, LLC.
Description: Supplement to January 15, 2021 Notice of Non-Material
Change in Status of Soldier Creek Wind, LLC, et al.
Filed Date: 3/15/21.
Accession Number: 20210315-5423.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER21-1137-001.
Applicants: NorthWestern Corporation.
Description: Compliance filing: Errata to Compliance Filing re
Authority to Transact at MBR in the EIM to be effective 2/8/2021.
Filed Date: 3/15/21.
Accession Number: 20210315-5302.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER21-1251-000.
Applicants: Bighorn Solar 1, LLC.
Description: Supplement to March 2, 2021 Bighorn Solar 1, LLC
tariff filing.
Filed Date: 3/16/21.
Accession Number: 20210316-5188.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21-1451-000.
Applicants: Cleveland-Cliffs Steel LLC.
Description: Baseline eTariff Filing: Baseline new generic title to
be effective 3/16/2021.
Filed Date: 3/16/21.
Accession Number: 20210316-5159.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21-1452-000.
Applicants: Delta's Edge Solar, LLC.
Description: Initial rate filing: Proposed Revenue Requirement for
Reactive Service from the Deltas Edge Facility to be effective 12/31/
9998.
Filed Date: 3/16/21.
Accession Number: 20210316-5160.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21-1453-000.
Applicants: Crossett Solar Energy, LLC.
[[Page 15475]]
Description: Initial rate filing: Proposed Revenue Requirement for
Reactive Service from Crossett Solar Facility to be effective 12/31/
9998.
Filed Date: 3/16/21.
Accession Number: 20210316-5163.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21-1454-000.
Applicants: Midcontinent Independent System Operator, Inc.,
American Transmission Company LLC.
Description: Sec. 205(d) Rate Filing: 2021-03-17_SA 2800 ATC-City
of Stoughton 1st Rev CFA to be effective 5/17/2021.
Filed Date: 3/17/21.
Accession Number: 20210317-5019.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21-1455-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3499R2 Poplar Bluff
Municipal Utilities NITSA NOA to be effective 3/1/2021.
Filed Date: 3/17/21.
Accession Number: 20210317-5028.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21-1456-000.
Applicants: Midcontinent Independent System Operator Inc., American
Transmission Company LLC.
Description: Sec. 205(d) Rate Filing: 2021-03-17_SA 2777 ATC-
Wisconsin Rapids 1st Rev CFA to be effective 5/17/2021.
Filed Date: 3/17/21.
Accession Number: 20210317-5031.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21-1457-000.
Applicants: Central Maine Power Company.
Description: Notice of Cancellation of Service Agreement No. 154 of
Central Maine Power Company.
Filed Date: 3/16/21.
Accession Number: 20210316-5219.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21-1458-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2415R14 Kansas Municipal
Energy Agency NITSA and NOA to be effective 3/1/2021.
Filed Date: 3/17/21.
Accession Number: 20210317-5032.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21-1459-000.
Applicants: Georgia Power Company.
Description: Initial rate filing: SR Perry Affected System
Construction Agreement (GPAS 013) Filing to be effective 10/7/2020.
Filed Date: 3/17/21.
Accession Number: 20210317-5106.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21-1460-000.
Applicants: Georgia Power Company.
Description: Initial rate filing: SR Clay Affected System
Construction Agreement (GPAS 014) Filing to be effective 2/5/2021.
Filed Date: 3/17/21.
Accession Number: 20210317-5107.
Comments Due: 5 p.m. ET 4/7/21.
Docket Numbers: ER21-1461-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, SA No. 5986;
Queue No. AE2-254 to be effective 2/19/2021.
Filed Date: 3/17/21.
Accession Number: 20210317-5127.
Comments Due: 5 p.m. ET 4/7/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 17, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-05932 Filed 3-22-21; 8:45 am]