PGR 2020 Lessee 8, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 15212-15213 [2021-05893]
Download as PDF
15212
Federal Register / Vol. 86, No. 53 / Monday, March 22, 2021 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD21–10–000]
Modernizing Electricity Market Design;
Supplemental Notice of Technical
Conference on Resource Adequacy in
the Evolving Electricity Sector
As first announced in the Notice of
Technical Conference issued in this
proceeding on February 18, 2021, the
Federal Energy Regulatory Commission
(Commission) will convene a
Commissioner-led technical conference
in the above-referenced proceeding on
Tuesday, March 23, 2021, from
approximately 9:00 a.m. to 5:00 p.m.
Eastern time. The conference will be
held remotely. Attached to this
Supplemental Notice is an agenda for
the technical conference, which
includes the final conference program.
Commissioners may attend and
participate in the staff-led portions of
the technical conference.
Discussions at the conference may
involve issues raised in proceedings that
are currently pending before the
Commission. These proceedings
include, but are not limited to:
Docket Nos.
ISO New England Inc ..............................................................................................................................
ISO New England Inc ..............................................................................................................................
New England Power Generators Ass’n, Inc v. ISO New England Inc ....................................................
ISO New England Inc ..............................................................................................................................
Independent Market Monitor for PJM v. PJM Interconnection, L.L.C., Docket No .................................
Office of the People’s Counsel for D.C. et al. v. PJM Interconnection ...................................................
Hollow Road Solar, LLC ..........................................................................................................................
PJM Interconnection, L.L.C ......................................................................................................................
PJM Interconnection, L.L.C ......................................................................................................................
PJM Interconnection, L.L.C ......................................................................................................................
PJM Interconnection, L.L.C ......................................................................................................................
New York Independent System Operator, Inc .........................................................................................
New York State Public Service Commission, et al. v. New York Independent System Operator, Inc ...
New York Independent System Operator, Inc .........................................................................................
New York Independent System Operator, Inc .........................................................................................
jbell on DSKJLSW7X2PROD with NOTICES
New York Independent System Operator, Inc .........................................................................................
New York Independent System Operator, Inc .........................................................................................
Cricket Valley Energy Center LLC and Empire Generating Company, LLC v. New York Independent
System Operator, Inc.
The conference will be open for the
public to attend remotely. There is no
fee for attendance. Information on this
technical conference, including a link to
the webcast, will be posted on the
conference’s event page on the
Commission’s website https://
www.ferc.gov/news-events/events/
technical-conference-regardingresource-adequacy-evolving-electricitysector prior to the event.
The conference will be transcribed.
Transcripts will be available for a fee
from Ace Reporting (202–347–3700).
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–208–8659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
For more information about this
technical conference, please contact
David Rosner at david.rosner@ferc.gov
or (202) 502–8479 or Emma Nicholson
at emma.nicholson@ferc.gov or (202)
502–8741. For legal information, please
contact Kathryn Shook at
kathryn.shook@ferc.gov or (202) 502–
6190. For information related to
VerDate Sep<11>2014
18:46 Mar 19, 2021
Jkt 253001
logistics, please contact Sarah McKinley
at sarah.mckinley@ferc.gov or (202)
502–8368.
Dated: March 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05863 Filed 3–19–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER21–1397–000]
PGR 2020 Lessee 8, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of PGR
2020 Lessee 8, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
ER21–787–000.
ER21–943–000.
EL21–26–000.
ER21–1226–000.
EL19–47–000.
EL19–63–000.
EL21–35–000.
EL19–100–000.
ER21–278–000 and ER21–278–001.
EL19–58–005.
ER18–1314–011.
ER20–1718–002.
EL16–92–004 and ER17–996–004.
ER21–1001–000.
ER16–1404–005, ER16–1404–006, and
ER16–1404–007.
ER21–502–000 and ER21–502–001.
ER21–1018–000.
EL21–7–000.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is April 5,
2021.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
E:\FR\FM\22MRN1.SGM
22MRN1
Federal Register / Vol. 86, No. 53 / Monday, March 22, 2021 / Notices
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: March 16, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–05893 Filed 3–19–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2997–031]
jbell on DSKJLSW7X2PROD with NOTICES
South Sutter Water District; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major, new
license.
b. Project No.: P–2997–031.
c. Date filed: July 1, 2019.
d. Applicant: South Sutter Water
District.
e. Name of Project: Camp Far West
Hydroelectric Project.
f. Location: The existing project is
located on the Bear River in Yuba,
Nevada, and Placer Counties, California.
The project, with the proposed project
boundary modifications, would occupy
a total of 2,674 acres. No federal or tribal
lands occur within or adjacent to the
VerDate Sep<11>2014
18:46 Mar 19, 2021
Jkt 253001
project boundary or along the Bear River
downstream of the project.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Brad
Arnold, General Manager, South Sutter
Water District, 2464 Pacific Avenue,
Trowbridge, California 95659.
i. FERC Contact: Quinn Emmering,
(202) 502–6382, quinn.emmering@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–2997–031.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is ready for environmental analysis
at this time.
l. The existing Camp Far West
Hydroelectric Project operates to
provide water during the irrigation
season, generate power, and meet
streamflow requirements for the Bear
River. The project includes: (1) A 185foot-high, 40-foot-wide, 2,070-foot-long,
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
15213
earth-filled main dam; (2) a 45-foothigh, 20-foot-wide, 1,060-foot-long,
earth-filled south wing dam; (3) a 25foot-high, 20-foot-wide, 1,460-foot-long,
earth-filled north wing dam; (4) a 15foot-high, 20-foot-wide, 1,450-foot-long,
earth-filled north dike; (5) a 2,020-acre
reservoir with a gross storage capacity of
about 104,000 acre-feet at the normal
maximum water surface elevation
(NMWSE) of 300 feet; (6) an overflow
spillway with a maximum design
capacity of 106,500 cubic feet per
second (cfs) at a reservoir elevation of
320 feet with a 15-foot-wide concrete
approach apron, 300-foot-long ungated,
ogee-type concrete structure, and a 77foot-long downstream concrete chute
with concrete sidewalls and a 302.5-foot
single span steel-truss bridge across the
spillway crest; (7) a 1,200-foot-long,
unlined, rock channel that carries spill
downstream to the Bear River; (8) a 22foot-high, concrete, power intake tower
with openings on three sides protected
by steel trashracks; (9) a 25-foot-4-inchhigh, concrete, intake tower with
openings on three sides, each of which
is protected by steel trashracks that
receives water for the outlet works; (10)
a 760-foot-long, 8-foot-diameter concrete
tunnel through the left abutment of the
main dam that conveys water from the
power intake to the powerhouse; (11) a
steel-reinforced, concrete powerhouse
with a 6.8-megawatt, vertical-shaft,
Francis-type turbine, which discharges
to the Bear River at the base of the main
dam; (12) a 350-foot-long, 48-inchdiameter steel pipe that conveys water
from the intake structure to a valve
chamber for the outlet works; (13) a 400foot-long, 7.5-foot-diameter concretelined horseshoe tunnel that connects to
the valve chamber to a 48-inchdiameter, Howell Bunger outlet valve
with a capacity of 500 cfs that
discharges directly into the Bear River;
(14) a fenced switchyard adjacent to the
powerhouse; (15) two recreation areas
with campgrounds, day-use areas, boat
ramps, restrooms, and sewage holding
ponds; and (16) a recreational water
system that includes two pumps in the
reservoir that deliver water to a
treatment facility that is piped to a
60,000-gallon storage tank to supply
water to recreation facilities. The project
has no transmission facilities. The
estimated average annual generation
(2010 to 2017) is 22,637 megawatthours.
South Sutter Water District proposes
to: (1) Raise the NMWSE of the project
reservoir by 5 feet from an elevation of
300 feet to an elevation of 305 feet; (2)
raise the crest of the existing spillway
from an elevation of 300 feet to an
E:\FR\FM\22MRN1.SGM
22MRN1
Agencies
[Federal Register Volume 86, Number 53 (Monday, March 22, 2021)]
[Notices]
[Pages 15212-15213]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05893]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER21-1397-000]
PGR 2020 Lessee 8, LLC; Supplemental Notice That Initial Market-
Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
PGR 2020 Lessee 8, LLC's application for market-based rate authority,
with an accompanying rate tariff, noting that such application includes
a request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is April 5, 2021.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically may mail similar pleadings to
the
[[Page 15213]]
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426. Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Dated: March 16, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-05893 Filed 3-19-21; 8:45 am]
BILLING CODE 6717-01-P