15214
Federal Register / Vol. 86, No. 53 / Monday, March 22, 2021 / Notices
elevation of 305 feet to accommodate
the proposed pool raise; (3) replace and
restore several recreation facilities; (4)
add an existing 0.25-mile road as a
primary project road to access the
powerhouse and switchyard; and (5)
modify the project boundary to account
for the removal of the 1.9-mile-long
transmission line from the license in
1991, corrections based on current
project operation and maintenance, and
changes under the category of a contour
20 feet above the 300-feet NMWSE or
proximity of 200-horizontal-feet from
the 300-foot NMWSE.
m. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (i.e., P–
2997). At this time, the Commission has
suspended access to the Commission’s
Public Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC Online
Support.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
VerDate Sep<11>2014
18:46 Mar 19, 2021
Jkt 253001
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Deadline for Filing Comments,
Recommendations, and Agency Terms
and Conditions/Prescriptions—May
17, 2021
Licensee’s Reply to REA Comments—
June 29, 2021
Commission issues Draft EA—January
2022
Comments on EA—February 2022
Commission issues Final EA—May 2022
Commission issues license order—
August 2022
Dated: March 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05861 Filed 3–19–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–109–000.
Applicants: Shaw Creek Solar, LLC.
Description: Notice of Self
Certification of Exempt Wholesale
Generator Status of Shaw Creek Solar,
LLC.
Filed Date: 3/15/21.
Accession Number: 20210315–5400.
Comments Due: 5 p.m. ET 4/5/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–704–022.
Applicants: Pacific Gas and Electric
Company.
Description: Compliance filing: CCSF
Compliance filing to update Intervening
Facilities (1 of 2) to be effective 7/23/
2015.
Filed Date: 3/15/21.
Accession Number: 20210315–5416.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER15–704–023.
Applicants: Pacific Gas and Electric
Company.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Description: Compliance filing: CCSF
Compliance filing to update Intervening
Facilities (2 of 2) to be effective 7/23/
2015.
Filed Date: 3/16/21.
Accession Number: 20210316–5038.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER19–2398–006;
ER20–1879–003; ER20–2019–002.
Applicants: Gray County Wind, LLC,
Oliver Wind I, LLC, Hancock County
Wind, LLC.
Description: Supplement to January
11, 2021 Notice of Change in Status of
Gray County Wind, LLC, et al.
Filed Date: 3/12/21.
Accession Number: 20210312–5363.
Comments Due: 5 p.m. ET 4/2/21.
Docket Numbers: ER21–1407–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
2021–03–15_SA 2799 ATC-City of New
London 1st Rev CFA to be effective 5/
15/2021.
Filed Date: 3/15/21.
Accession Number: 20210315–5210.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER21–1413–000.
Applicants: New York State Electric &
Gas Corporation, New York
Independent System Operator, Inc.
Description: § 205(d) Rate Filing: Joint
TPIA among the NYISO, NYSEG and
Transco Segment B SA No. 2604 CEII
partly to be effective 3/1/2021.
Filed Date: 3/15/21.
Accession Number: 20210315–5242.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER21–1415–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
2021–03–15_SA 3642 ATC-Onion River
Solar E&P (J1153) to be effective 4/1/
2021.
Filed Date: 3/15/21.
Accession Number: 20210315–5266.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER21–1442–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3211R2 North Iowa Municipal Electric
Cooperative Association NITSA and
NOA to be effective 3/1/2021.
Filed Date: 3/16/21.
Accession Number: 20210316–5008.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21–1445–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2900R15 KMEA NITSA NOA to be
effective 3/1/2021.
E:\FR\FM\22MRN1.SGM
22MRN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 86, No. 53 / Monday, March 22, 2021 / Notices
Filed Date: 3/16/21.
Accession Number: 20210316–5014.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21–1447–000.
Applicants: Rochester Gas and
Electric Corporation.
Description: § 205(d) Rate Filing:
Amendment to RGE–RED, RGE–RED
Borderline Service Agreement to be
effective 3/8/2021.
Filed Date: 3/16/21.
Accession Number: 20210316–5096.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21–1448–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5993; Queue No.
NQ–166 to be effective 2/22/2021.
Filed Date: 3/16/21.
Accession Number: 20210316–5100.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21–1449–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing: Rate
Schedule FERC No. 323, Board Policy
No. 125 to be effective 3/17/2021.
Filed Date: 3/16/21.
Accession Number: 20210316–5125.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21–1450–000.
Applicants: Duke Energy Ohio, Inc.,
Duke Energy Kentucky, Inc., PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
DEOK submits Revisions to PJM Tariff
re: Materials & Supplies Inventory to be
effective 5/16/2021.
Filed Date: 3/16/21.
Accession Number: 20210316–5124.
Comments Due: 5 p.m. ET 4/6/21.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM21–11–000.
Applicants: Southern Maryland
Electric Cooperative, Inc.
Description: Application to Terminate
the Obligation to Purchase Power From
Certain Qualifying Facilities of Southern
Maryland Electric Cooperative, Inc.
Filed Date: 3/12/21.
Accession Number: 20210312–5365.
Comments Due: 5 p.m. ET 4/9/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
VerDate Sep<11>2014
18:46 Mar 19, 2021
Jkt 253001
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 16, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–05892 Filed 3–19–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–057–000]
Mountain Valley Pipeline, LLC; Notice
of Scoping Period and Requesting
Comments on Environmental Issues
for the Proposed Amendment to the
Certificate of Public Convenience and
Necessity for the Mountain Valley
Pipeline Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document, that will
discuss the environmental impacts of
the Amendment to the Certificate of
Public Convenience and Necessity for
the Mountain Valley Pipeline Project
(Amendment Project) involving
construction and operation of facilities
by Mountain Valley Pipeline, LLC
(Mountain Valley) in Wetzel, Lewis,
Webster, Nicholas, Greenbrier,
Summers, and Monroe Counties, West
Virginia and Giles, Montgomery,
Roanoke, Franklin, and Pittsylvania
Counties, Virginia. The Commission
will use this environmental document
in its decision-making process.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
amendment. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
from its action whenever it considers
the issuance or amendment of a
Certificate of Public Convenience and
Necessity. This gathering of public
input is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the environmental
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
15215
document on the important
environmental issues. Additional
information about the Commission’s
NEPA process is described below in the
NEPA Process and Environmental
Document section of this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00 pm Eastern Time on April
15, 2021. Comments may be submitted
in written form. Further details on how
to submit comments are provided in the
Public Participation section of this
notice.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
staff determine what issues they need to
evaluate in the environmental
document. Commission staff will
consider all written comments during
the preparation of the environmental
document.
If you submitted comments on this
project to the Commission before the
opening of this docket on February 19,
2021, you will need to file those
comments in Docket No. CP21–057–000
to ensure they are considered as part of
this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, the Natural Gas Act conveys
the right of eminent domain to the
company. Therefore, if you and the
company do not reach an easement
agreement, the pipeline company could
initiate condemnation proceedings in
court. In such instances, compensation
would be determined by a judge in
accordance with state law. The
Commission does not subsequently
grant, exercise, or oversee the exercise
of that eminent domain authority. The
courts have exclusive authority to
handle eminent domain cases; the
E:\FR\FM\22MRN1.SGM
22MRN1
Agencies
[Federal Register Volume 86, Number 53 (Monday, March 22, 2021)]
[Notices]
[Pages 15214-15215]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05892]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG21-109-000.
Applicants: Shaw Creek Solar, LLC.
Description: Notice of Self Certification of Exempt Wholesale
Generator Status of Shaw Creek Solar, LLC.
Filed Date: 3/15/21.
Accession Number: 20210315-5400.
Comments Due: 5 p.m. ET 4/5/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-704-022.
Applicants: Pacific Gas and Electric Company.
Description: Compliance filing: CCSF Compliance filing to update
Intervening Facilities (1 of 2) to be effective 7/23/2015.
Filed Date: 3/15/21.
Accession Number: 20210315-5416.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER15-704-023.
Applicants: Pacific Gas and Electric Company.
Description: Compliance filing: CCSF Compliance filing to update
Intervening Facilities (2 of 2) to be effective 7/23/2015.
Filed Date: 3/16/21.
Accession Number: 20210316-5038.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER19-2398-006; ER20-1879-003; ER20-2019-002.
Applicants: Gray County Wind, LLC, Oliver Wind I, LLC, Hancock
County Wind, LLC.
Description: Supplement to January 11, 2021 Notice of Change in
Status of Gray County Wind, LLC, et al.
Filed Date: 3/12/21.
Accession Number: 20210312-5363.
Comments Due: 5 p.m. ET 4/2/21.
Docket Numbers: ER21-1407-000.
Applicants: Midcontinent Independent System Operator, Inc.,
American Transmission Company LLC.
Description: Sec. 205(d) Rate Filing: 2021-03-15_SA 2799 ATC-City
of New London 1st Rev CFA to be effective 5/15/2021.
Filed Date: 3/15/21.
Accession Number: 20210315-5210.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER21-1413-000.
Applicants: New York State Electric & Gas Corporation, New York
Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: Joint TPIA among the NYISO,
NYSEG and Transco Segment B SA No. 2604 CEII partly to be effective 3/
1/2021.
Filed Date: 3/15/21.
Accession Number: 20210315-5242.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER21-1415-000.
Applicants: Midcontinent Independent System Operator, Inc.,
American Transmission Company LLC.
Description: Sec. 205(d) Rate Filing: 2021-03-15_SA 3642 ATC-Onion
River Solar E&P (J1153) to be effective 4/1/2021.
Filed Date: 3/15/21.
Accession Number: 20210315-5266.
Comments Due: 5 p.m. ET 4/5/21.
Docket Numbers: ER21-1442-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3211R2 North Iowa Municipal
Electric Cooperative Association NITSA and NOA to be effective 3/1/
2021.
Filed Date: 3/16/21.
Accession Number: 20210316-5008.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21-1445-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2900R15 KMEA NITSA NOA to be
effective 3/1/2021.
[[Page 15215]]
Filed Date: 3/16/21.
Accession Number: 20210316-5014.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21-1447-000.
Applicants: Rochester Gas and Electric Corporation.
Description: Sec. 205(d) Rate Filing: Amendment to RGE-RED, RGE-
RED Borderline Service Agreement to be effective 3/8/2021.
Filed Date: 3/16/21.
Accession Number: 20210316-5096.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21-1448-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, SA No. 5993;
Queue No. NQ-166 to be effective 2/22/2021.
Filed Date: 3/16/21.
Accession Number: 20210316-5100.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21-1449-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Rate Schedule FERC No. 323,
Board Policy No. 125 to be effective 3/17/2021.
Filed Date: 3/16/21.
Accession Number: 20210316-5125.
Comments Due: 5 p.m. ET 4/6/21.
Docket Numbers: ER21-1450-000.
Applicants: Duke Energy Ohio, Inc., Duke Energy Kentucky, Inc., PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: DEOK submits Revisions to
PJM Tariff re: Materials & Supplies Inventory to be effective 5/16/
2021.
Filed Date: 3/16/21.
Accession Number: 20210316-5124.
Comments Due: 5 p.m. ET 4/6/21.
Take notice that the Commission received the following PURPA
210(m)(3) filings:
Docket Numbers: QM21-11-000.
Applicants: Southern Maryland Electric Cooperative, Inc.
Description: Application to Terminate the Obligation to Purchase
Power From Certain Qualifying Facilities of Southern Maryland Electric
Cooperative, Inc.
Filed Date: 3/12/21.
Accession Number: 20210312-5365.
Comments Due: 5 p.m. ET 4/9/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 16, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-05892 Filed 3-19-21; 8:45 am]
BILLING CODE 6717-01-P