Modernizing Electricity Market Design; Supplemental Notice of Technical Conference on Resource Adequacy in the Evolving Electricity Sector, 15212 [2021-05863]
Download as PDF
15212
Federal Register / Vol. 86, No. 53 / Monday, March 22, 2021 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD21–10–000]
Modernizing Electricity Market Design;
Supplemental Notice of Technical
Conference on Resource Adequacy in
the Evolving Electricity Sector
As first announced in the Notice of
Technical Conference issued in this
proceeding on February 18, 2021, the
Federal Energy Regulatory Commission
(Commission) will convene a
Commissioner-led technical conference
in the above-referenced proceeding on
Tuesday, March 23, 2021, from
approximately 9:00 a.m. to 5:00 p.m.
Eastern time. The conference will be
held remotely. Attached to this
Supplemental Notice is an agenda for
the technical conference, which
includes the final conference program.
Commissioners may attend and
participate in the staff-led portions of
the technical conference.
Discussions at the conference may
involve issues raised in proceedings that
are currently pending before the
Commission. These proceedings
include, but are not limited to:
Docket Nos.
ISO New England Inc ..............................................................................................................................
ISO New England Inc ..............................................................................................................................
New England Power Generators Ass’n, Inc v. ISO New England Inc ....................................................
ISO New England Inc ..............................................................................................................................
Independent Market Monitor for PJM v. PJM Interconnection, L.L.C., Docket No .................................
Office of the People’s Counsel for D.C. et al. v. PJM Interconnection ...................................................
Hollow Road Solar, LLC ..........................................................................................................................
PJM Interconnection, L.L.C ......................................................................................................................
PJM Interconnection, L.L.C ......................................................................................................................
PJM Interconnection, L.L.C ......................................................................................................................
PJM Interconnection, L.L.C ......................................................................................................................
New York Independent System Operator, Inc .........................................................................................
New York State Public Service Commission, et al. v. New York Independent System Operator, Inc ...
New York Independent System Operator, Inc .........................................................................................
New York Independent System Operator, Inc .........................................................................................
jbell on DSKJLSW7X2PROD with NOTICES
New York Independent System Operator, Inc .........................................................................................
New York Independent System Operator, Inc .........................................................................................
Cricket Valley Energy Center LLC and Empire Generating Company, LLC v. New York Independent
System Operator, Inc.
The conference will be open for the
public to attend remotely. There is no
fee for attendance. Information on this
technical conference, including a link to
the webcast, will be posted on the
conference’s event page on the
Commission’s website https://
www.ferc.gov/news-events/events/
technical-conference-regardingresource-adequacy-evolving-electricitysector prior to the event.
The conference will be transcribed.
Transcripts will be available for a fee
from Ace Reporting (202–347–3700).
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–208–8659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
For more information about this
technical conference, please contact
David Rosner at david.rosner@ferc.gov
or (202) 502–8479 or Emma Nicholson
at emma.nicholson@ferc.gov or (202)
502–8741. For legal information, please
contact Kathryn Shook at
kathryn.shook@ferc.gov or (202) 502–
6190. For information related to
VerDate Sep<11>2014
18:46 Mar 19, 2021
Jkt 253001
logistics, please contact Sarah McKinley
at sarah.mckinley@ferc.gov or (202)
502–8368.
Dated: March 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05863 Filed 3–19–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER21–1397–000]
PGR 2020 Lessee 8, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of PGR
2020 Lessee 8, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
ER21–787–000.
ER21–943–000.
EL21–26–000.
ER21–1226–000.
EL19–47–000.
EL19–63–000.
EL21–35–000.
EL19–100–000.
ER21–278–000 and ER21–278–001.
EL19–58–005.
ER18–1314–011.
ER20–1718–002.
EL16–92–004 and ER17–996–004.
ER21–1001–000.
ER16–1404–005, ER16–1404–006, and
ER16–1404–007.
ER21–502–000 and ER21–502–001.
ER21–1018–000.
EL21–7–000.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is April 5,
2021.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
E:\FR\FM\22MRN1.SGM
22MRN1
Agencies
[Federal Register Volume 86, Number 53 (Monday, March 22, 2021)]
[Notices]
[Page 15212]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05863]
[[Page 15212]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD21-10-000]
Modernizing Electricity Market Design; Supplemental Notice of
Technical Conference on Resource Adequacy in the Evolving Electricity
Sector
As first announced in the Notice of Technical Conference issued in
this proceeding on February 18, 2021, the Federal Energy Regulatory
Commission (Commission) will convene a Commissioner-led technical
conference in the above-referenced proceeding on Tuesday, March 23,
2021, from approximately 9:00 a.m. to 5:00 p.m. Eastern time. The
conference will be held remotely. Attached to this Supplemental Notice
is an agenda for the technical conference, which includes the final
conference program. Commissioners may attend and participate in the
staff-led portions of the technical conference.
Discussions at the conference may involve issues raised in
proceedings that are currently pending before the Commission. These
proceedings include, but are not limited to:
----------------------------------------------------------------------------------------------------------------
Docket Nos.
----------------------------------------------------------------------------------------------------------------
ISO New England Inc......................... ER21-787-000.
ISO New England Inc......................... ER21-943-000.
New England Power Generators Ass'n, Inc v. EL21-26-000.
ISO New England Inc.
ISO New England Inc......................... ER21-1226-000.
Independent Market Monitor for PJM v. PJM EL19-47-000.
Interconnection, L.L.C., Docket No.
Office of the People's Counsel for D.C. et EL19-63-000.
al. v. PJM Interconnection.
Hollow Road Solar, LLC...................... EL21-35-000.
PJM Interconnection, L.L.C.................. EL19-100-000.
PJM Interconnection, L.L.C.................. ER21-278-000 and ER21-278-001.
PJM Interconnection, L.L.C.................. EL19-58-005.
PJM Interconnection, L.L.C.................. ER18-1314-011.
New York Independent System Operator, Inc... ER20-1718-002.
New York State Public Service Commission, et EL16-92-004 and ER17-996-004.
al. v. New York Independent System
Operator, Inc.
New York Independent System Operator, Inc... ER21-1001-000.
New York Independent System Operator, Inc... ER16-1404-005, ER16-1404-006, and ER16-1404-007.
New York Independent System Operator, Inc... ER21-502-000 and ER21-502-001.
New York Independent System Operator, Inc... ER21-1018-000.
Cricket Valley Energy Center LLC and Empire EL21-7-000.
Generating Company, LLC v. New York
Independent System Operator, Inc.
----------------------------------------------------------------------------------------------------------------
The conference will be open for the public to attend remotely.
There is no fee for attendance. Information on this technical
conference, including a link to the webcast, will be posted on the
conference's event page on the Commission's website https://www.ferc.gov/news-events/events/technical-conference-regarding-resource-adequacy-evolving-electricity-sector prior to the event.
The conference will be transcribed. Transcripts will be available
for a fee from Ace Reporting (202-347-3700).
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an email to [email protected] or call toll free 1-866-208-
3372 (voice) or 202-208-8659 (TTY), or send a fax to 202-208-2106 with
the required accommodations.
For more information about this technical conference, please
contact David Rosner at [email protected] or (202) 502-8479 or Emma
Nicholson at [email protected] or (202) 502-8741. For legal
information, please contact Kathryn Shook at [email protected] or
(202) 502-6190. For information related to logistics, please contact
Sarah McKinley at [email protected] or (202) 502-8368.
Dated: March 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-05863 Filed 3-19-21; 8:45 am]