Airworthiness Directives; Airbus SAS Airplanes, 15151-15154 [2021-05395]

Download as PDF Federal Register / Vol. 86, No. 53 / Monday, March 22, 2021 / Proposed Rules certificated in any category, serial numbers 4081 through 4591 inclusive. (d) Subject Air Transport Association (ATA) of America Code 54, Nacelles/pylons. (e) Reason This AD was prompted by a report that a number of nacelle A-frames were not manufactured in accordance with engineering drawings. The holes in the side brace sub-assemblies were not cold-worked as required. As a result the side brace fitting might not meet its fatigue life, and cracking of the A-frame bottom flange may result. The FAA is issuing this AD to address possible cracking of the A-frame. This condition, if not addressed, may lead to collapse of the main landing gear (MLG). jbell on DSKJLSW7X2PROD with PROPOSALS (f) Compliance Comply with this AD within the compliance times specified, unless already done. (g) Required Actions (1) Within the compliance time specified in paragraph (g)(2) of this AD, do the applicable actions specified in paragraphs (g)(1)(i) and (ii) of this AD. (i) For airplanes having serial numbers 4081 through 4582 inclusive: Remove the fasteners on the nacelle A-frame side brace sub-assemblies, do an eddy current inspection for cracking on airplanes having 30,000 total flight cycles or more, cold-work the holes, and install oversize fasteners, in accordance with Part A of paragraph 3.B. of the Accomplishment Instructions of De Havilland Aircraft of Canada Limited Service Bulletin 84–54–32, dated October 10, 2019. If any cracking is found, before further flight, repair the cracking using a method approved by the Manager, New York ACO Branch, FAA; or Transport Canada Civil Aviation (TCCA); or De Havilland Aircraft of Canada Limited’s TCCA Design Approval Organization (DAO). If approved by the DAO, the approval must include the DAOauthorized signature. (ii) For all airplanes: Re-identify the reworked side brace fitting and A-frame, in accordance with Part B of paragraph 3.B. of the Accomplishment Instructions of De Havilland Aircraft of Canada Limited Service Bulletin 84–54–32, dated October 10, 2019. (2) At the earlier of the times specified in paragraphs (g)(2)(i) and (ii) of this AD, do the applicable actions specified in paragraph (g)(1) of this AD. (i) Within 48 months or 8,000 flight hours after the effective date of this AD, whichever occurs first. (ii) At the later of the times specified in paragraphs (g)(2)(ii)(A) and (B) of this AD. (A) Before accumulating 40,000 total flight cycles. (B) Within 12 months or 1,290 flight cycles after the effective date of this AD, whichever occurs first. Branch, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or responsible Flight Standards Office, as appropriate. If sending information directly to the manager of the certification office, send it to ATTN: Program Manager, Continuing Operational Safety, FAA, New York ACO Branch, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516–228–7300; fax 516–794–5531. Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the responsible Flight Standards Office. (2) Contacting the Manufacturer: For any requirement in this AD to obtain instructions from a manufacturer, the instructions must be accomplished using a method approved by the Manager, New York ACO Branch, FAA; or TCCA; or De Havilland Aircraft of Canada Limited’s TCCA DAO. If approved by the DAO, the approval must include the DAO-authorized signature. (i) Related Information (1) Refer to Mandatory Continuing Airworthiness Information (MCAI) TCCA AD CF–2020–39, dated October 14, 2020, for related information. This MCAI may be found in the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA–2021–0183. (2) For more information about this AD, contact Andrea Jimenez, Aerospace Engineer, Airframe and Propulsion Section, FAA, New York ACO Branch, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516–228–7330; fax 516–794–5531; email 9avs-nyaco-cos@faa.gov. (3) For service information identified in this AD, contact De Havilland Aircraft of Canada Limited, Q-Series Technical Help Desk, 123 Garratt Boulevard, Toronto, Ontario M3K 1Y5, Canada; telephone 416– 375–4000; fax 416–375–4539; email thd@ dehavilland.com; internet https:// dehavilland.com. You may view this service information at the FAA, Airworthiness Products Section, Operational Safety Branch, 2200 South 216th St., Des Moines, WA. For information on the availability of this material at the FAA, call 206–231–3195. Issued on March 10, 2021. Lance T. Gant, Director, Compliance & Airworthiness Division, Aircraft Certification Service. [FR Doc. 2021–05352 Filed 3–19–21; 8:45 am] BILLING CODE 4910–13–P (h) Other FAA AD Provisions The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, New York ACO VerDate Sep<11>2014 16:27 Mar 19, 2021 Jkt 253001 PO 00000 Frm 00018 Fmt 4702 Sfmt 4702 15151 DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [Docket No. FAA–2021–0184; Project Identifier MCAI–2020–01599–T] RIN 2120–AA64 Airworthiness Directives; Airbus SAS Airplanes Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed rulemaking (NPRM). AGENCY: The FAA proposes to adopt a new airworthiness directive (AD) for all Airbus SAS Model A330–200, A330– 200 Freighter, A330–300, A340–200, and A340–300 series airplanes. This proposed AD was prompted by a report that the auxiliary power unit (APU) aft fuel pump printed circuit board (PCB) varnish had deteriorated; the varnish is one of the layers of protection against development of an ignition source. This proposed AD would require replacing each affected APU aft fuel pump, as specified in a European Union Aviation Safety Agency (EASA) AD, which is proposed for incorporation by reference. The FAA is proposing this AD to address the unsafe condition on these products. SUMMARY: The FAA must receive comments on this proposed AD by May 6, 2021. ADDRESSES: You may send comments, using the procedures found in 14 CFR 11.43 and 11.45, by any of the following methods: • Federal eRulemaking Portal: Go to https://www.regulations.gov. Follow the instructions for submitting comments. • Fax: 202–493–2251. • Mail: U.S. Department of Transportation, Docket Operations, M– 30, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE, Washington, DC 20590. • Hand Delivery: Deliver to Mail address above between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. For material that will be incorporated by reference (IBR) in this AD, contact EASA, Konrad-Adenauer-Ufer 3, 50668 Cologne, Germany; telephone +49 221 8999 000; email ADs@easa.europa.eu; internet www.easa.europa.eu. You may find this IBR material on the EASA website at https://ad.easa.europa.eu. You may view this IBR material at the FAA, Airworthiness Products Section, Operational Safety Branch, 2200 South 216th St., Des Moines, WA. For information on the availability of this DATES: E:\FR\FM\22MRP1.SGM 22MRP1 15152 Federal Register / Vol. 86, No. 53 / Monday, March 22, 2021 / Proposed Rules material at the FAA, call 206–231–3195. It is also available in the AD docket on the internet at https:// www.regulations.gov by searching for and locating Docket No. FAA–2021– 0184. Examining the AD Docket You may examine the AD docket on the internet at https:// www.regulations.gov by searching for and locating Docket No. FAA–2021– 0184; or in person at Docket Operations between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains this NPRM, any comments received, and other information. The street address for Docket Operations is listed above. FOR FURTHER INFORMATION CONTACT: Vladimir Ulyanov, Aerospace Engineer, Large Aircraft Section, International Validation Branch, FAA, 2200 South 216th St., Des Moines, WA 98198; telephone and fax 206–231–3229; email Vladimir.Ulyanov@faa.gov. SUPPLEMENTARY INFORMATION: jbell on DSKJLSW7X2PROD with PROPOSALS Comments Invited The FAA invites you to send any written relevant data, views, or arguments about this proposal. Send your comments to an address listed under ADDRESSES. Include ‘‘Docket No. FAA–2021–0184; Project Identifier MCAI–2020–01599–T’’ at the beginning of your comments. The most helpful comments reference a specific portion of the proposal, explain the reason for any recommended change, and include supporting data. The FAA will consider all comments received by the closing date and may amend the proposal because of those comments. Except for Confidential Business Information (CBI) as described in the following paragraph, and other information as described in 14 CFR 11.35, the FAA will post all comments received, without change, to https:// www.regulations.gov, including any personal information you provide. The agency will also post a report summarizing each substantive verbal contact received about this proposed AD. Confidential Business Information CBI is commercial or financial information that is both customarily and actually treated as private by its owner. Under the Freedom of Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public disclosure. If your comments responsive to this NPRM contain commercial or financial information that is customarily treated as private, that you actually treat as private, and that is relevant or VerDate Sep<11>2014 16:27 Mar 19, 2021 Jkt 253001 responsive to this NPRM, it is important that you clearly designate the submitted comments as CBI. Please mark each page of your submission containing CBI as ‘‘PROPIN.’’ The FAA will treat such marked submissions as confidential under the FOIA, and they will not be placed in the public docket of this NPRM. Submissions containing CBI should be sent to Vladimir Ulyanov, Aerospace Engineer, Large Aircraft Section, International Validation Branch, FAA, 2200 South 216th St., Des Moines, WA 98198; telephone and fax 206–231–3229; email Vladimir.Ulyanov@faa.gov. Any commentary that the FAA receives which is not specifically designated as CBI will be placed in the public docket for this rulemaking. Discussion The EASA, which is the Technical Agent for the Member States of the European Union, has issued EASA AD 2020–0265, dated December 2, 2020 (EASA AD 2020–0265) (also referred to as the Mandatory Continuing Airworthiness Information, or the MCAI), to correct an unsafe condition for all Airbus SAS Model A330–201, A330–202, A330–203, A330–223, A330– 243, A330–223F, A330–243F, A330– 301, A330–302, A330–303, A330–321, A330–322, A330–323, A330–341, A330– 342, A330–343, A340–211, A340–212, A340–213, A340–311, A340–312, and A340–313 airplanes. This proposed AD was prompted by a report that the APU aft fuel pump PCB varnish had deteriorated. The varnish is one of the layers of protection against development of an ignition source. The root cause for the varnish deterioration is unknown, but suspected to be linked to aging. The FAA is proposing this AD to address PCB varnish deterioration. This condition, if not addressed, could, in case of a spark or flame in the area of the pump PCB, result in a fire or explosion and consequent loss of the airplane. See the MCAI for additional background information. Related Service Information Under 1 CFR Part 51 EASA AD 2020–0265 describes procedures for replacing each affected APU aft fuel pump. This material is reasonably available because the interested parties have access to it through their normal course of business or by the means identified in the ADDRESSES section. FAA’s Determination and Requirements of This Proposed AD This product has been approved by the aviation authority of another PO 00000 Frm 00019 Fmt 4702 Sfmt 4702 country, and is approved for operation in the United States. Pursuant to the FAA’s bilateral agreement with the State of Design Authority, the FAA has been notified of the unsafe condition described in the MCAI referenced above. The FAA is proposing this AD because the FAA evaluated all the relevant information and determined the unsafe condition described previously is likely to exist or develop in other products of the same type design. Proposed AD Requirements This proposed AD would require accomplishing the actions specified in EASA AD 2020–0265 described previously, as incorporated by reference, except for any differences identified as exceptions in the regulatory text of this AD. Explanation of Required Compliance Information In the FAA’s ongoing efforts to improve the efficiency of the AD process, the FAA initially worked with Airbus and EASA to develop a process to use certain EASA ADs as the primary source of information for compliance with requirements for corresponding FAA ADs. The FAA has since coordinated with other manufacturers and civil aviation authorities (CAAs) to use this process. As a result, EASA AD 2020–0265 will be incorporated by reference in the FAA final rule. This proposed AD would, therefore, require compliance with EASA AD 2020–0265 in its entirety, through that incorporation, except for any differences identified as exceptions in the regulatory text of this proposed AD. Using common terms that are the same as the heading of a particular section in the EASA AD does not mean that operators need comply only with that section. For example, where the AD requirement refers to ‘‘all required actions and compliance times,’’ compliance with this AD requirement is not limited to the section titled ‘‘Required Action(s) and Compliance Time(s)’’ in the EASA AD. Service information specified in EASA AD 2020–0265 that is required for compliance with EASA AD 2020–0265 will be available on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA–2021–0184 after the FAA final rule is published. Costs of Compliance The FAA estimates that this proposed AD affects 112 airplanes of U.S. registry. The FAA estimates the following costs to comply with this proposed AD: E:\FR\FM\22MRP1.SGM 22MRP1 Federal Register / Vol. 86, No. 53 / Monday, March 22, 2021 / Proposed Rules 15153 ESTIMATED COSTS FOR REQUIRED ACTIONS Labor cost Parts cost Cost per product Cost on U.S. operators 4 work-hours × $85 per hour = $340 .......................................................................................... $7,000 $7,340 $822,080 According to the manufacturer, some or all of the costs of this proposed AD may be covered under warranty, thereby reducing the cost impact on affected operators. The FAA does not control warranty coverage for affected operators. As a result, the FAA has included all known costs in the cost estimate. The Proposed Amendment Accordingly, under the authority delegated to me by the Administrator, the FAA proposes to amend 14 CFR part 39 as follows: PART 39—AIRWORTHINESS DIRECTIVES Authority for This Rulemaking Title 49 of the United States Code specifies the FAA’s authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. Subtitle VII: Aviation Programs, describes in more detail the scope of the Agency’s authority. The FAA is issuing this rulemaking under the authority described in Subtitle VII, Part A, Subpart III, Section 44701: General requirements. Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action. jbell on DSKJLSW7X2PROD with PROPOSALS Regulatory Findings The FAA determined that this proposed AD would not have federalism implications under Executive Order 13132. This proposed AD would not have a substantial direct effect on the States, on the relationship between the national Government and the States, or on the distribution of power and responsibilities among the various levels of government. For the reasons discussed above, I certify this proposed regulation: (1) Is not a ‘‘significant regulatory action’’ under Executive Order 12866, (2) Would not affect intrastate aviation in Alaska, and (3) Would not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. List of Subjects in 14 CFR Part 39 Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety. VerDate Sep<11>2014 19:01 Mar 19, 2021 Jkt 253001 1. The authority citation for part 39 continues to read as follows: ■ Authority: 49 U.S.C. 106(g), 40113, 44701. § 39.13 [Amended] 2. The FAA amends § 39.13 by adding the following new airworthiness directive: ■ Airbus SAS: Docket No. FAA–2021–0184; Project Identifier MCAI–2020–01599–T. (a) Comments Due Date The FAA must receive comments on this airworthiness directive (AD) action by May 6, 2021. (b) Affected ADs None. (c) Applicability This AD applies to all Airbus SAS airplanes, certificated in any category, specified in paragraphs (c)(1) through (5) of this AD. (1) Model A330–201, –202, –203, –223, and –243 airplanes. (2) Model A330–223F and –243F airplanes. (3) Model A330–301, –302, –303, –321, –322, –323, –341, –342, and –343 airplanes. (4) Model A340–211, –212, and –213 airplanes. (5) Model A340–311, –312, and –313 airplanes. (d) Subject Air Transport Association (ATA) of America Code 28, Fuel system. (e) Reason This AD was prompted by a report that the auxiliary power unit (APU) aft fuel pump printed circuit board (PCB) varnish had deteriorated; the varnish is one of the layers of protection against development of an ignition source. The FAA is issuing this AD to address PCB varnish deterioration. This condition, if not addressed, could, in case of a spark or flame in the area of the pump PCB, result in a fire or explosion and consequent loss of the airplane. (f) Compliance Comply with this AD within the compliance times specified, unless already done. PO 00000 Frm 00020 Fmt 4702 Sfmt 4702 (g) Requirements Except as specified in paragraph (h) of this AD: Comply with all required actions and compliance times specified in, and in accordance with, European Union Aviation Safety Agency (EASA) AD 2020–0265, dated December 2, 2020 (EASA AD 2020–0265). (h) Exceptions to EASA AD 2020–0265 (1) Where EASA AD 2020–0265 refers to its effective date, this AD requires using the effective date of this AD. (2) The ‘‘Remarks’’ section of EASA AD 2020–0265 does not apply to this AD. (i) No Reporting Requirement Although the service information referenced in EASA AD 2020–0265 specifies to submit certain information to the manufacturer, this AD does not include that requirement. (j) Other FAA AD Provisions The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, Large Aircraft Section, International Validation Branch, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or responsible Flight Standards Office, as appropriate. If sending information directly to the Large Aircraft Section, International Validation Branch, send it to the attention of the person identified in paragraph (k)(2) of this AD. Information may be emailed to: 9-AVS-AIR730-AMOC@faa.gov. Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the responsible Flight Standards Office. (2) Contacting the Manufacturer: For any requirement in this AD to obtain instructions from a manufacturer, the instructions must be accomplished using a method approved by the Manager, Large Aircraft Section, International Validation Branch, FAA; or EASA; or Airbus SAS’s EASA Design Organization Approval (DOA). If approved by the DOA, the approval must include the DOA-authorized signature. (3) Required for Compliance (RC): Except as required by paragraph (j)(2) of this AD, if any service information contains procedures or tests that are identified as RC, those procedures and tests must be done to comply with this AD; any procedures or tests that are not identified as RC are recommended. Those procedures and tests that are not identified as RC may be deviated from using accepted methods in accordance with the operator’s maintenance or inspection program without obtaining approval of an AMOC, provided the procedures and tests identified as RC can be done and the airplane can be put back in E:\FR\FM\22MRP1.SGM 22MRP1 15154 Federal Register / Vol. 86, No. 53 / Monday, March 22, 2021 / Proposed Rules an airworthy condition. Any substitutions or changes to procedures or tests identified as RC require approval of an AMOC. (k) Related Information (1) For information about EASA AD 2020– 0265, contact the EASA, Konrad-AdenauerUfer 3, 50668 Cologne, Germany; telephone +49 221 8999 000; email ADs@ easa.europa.eu; Internet www.easa.europa.eu. You may find this EASA AD on the EASA website at https:// ad.easa.europa.eu. You may view this material at the FAA, Airworthiness Products Section, Operational Safety Branch, 2200 South 216th St., Des Moines, WA. For information on the availability of this material at the FAA, call 206–231–3195. This material may be found in the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA–2021–0184. (2) For more information about this AD, contact Vladimir Ulyanov, Aerospace Engineer, Large Aircraft Section, International Validation Branch, FAA, 2200 South 216th St., Des Moines, WA 98198; telephone and fax 206–231–3229; email Vladimir.Ulyanov@faa.gov. Issued on March 10, 2021. Lance T. Gant, Director, Compliance & Airworthiness Division, Aircraft Certification Service. [FR Doc. 2021–05395 Filed 3–19–21; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF LABOR Employment and Training Administration 20 CFR Parts 655 and 656 [Docket No. ETA–2020–0006] RIN 1205–AC00 Strengthening Wage Protections for the Temporary and Permanent Employment of Certain Immigrants and Non-Immigrants in the United States: Proposed Delay of Effective and Transition Dates Employment and Training Administration, Department of Labor. ACTION: Proposed delay of effective and transition dates; request for comments. AGENCY: On March 12, 2021, the Department of Labor (Department or DOL) published a final rule delaying the effective date of the rule entitled Strengthening Wage Protections for the Temporary and Permanent Employment of Certain Aliens in the United States (the rule or Final Rule), published in the Federal Register on January 14, 2021, from March 15, 2021 until May 14, 2021. This action proposes to further delay the effective date of the rule by eighteen months or until November 14, jbell on DSKJLSW7X2PROD with PROPOSALS SUMMARY: VerDate Sep<11>2014 16:27 Mar 19, 2021 Jkt 253001 2022, along with corresponding proposed delays to the rule’s transition dates. This additional delay will provide a sufficient amount of time to thoroughly consider the legal and policy issues raised in the rule, and offer the public, through the issuance of a separate Request for Information, an opportunity to provide information on the sources and methods for determining prevailing wage levels covering employment opportunities that United States (U.S.) employers seek to fill with foreign workers on a permanent or temporary basis through certain employment-based immigrant visas or through H–1B, H–1B1, or E–3 nonimmigrant visas. This proposed delay will also provide agency officials with a sufficient amount of time to compute and validate prevailing wage data covering specific occupations and geographic areas, complete and thoroughly test system modifications, train staff, and conduct public outreach to ensure an effective and orderly implementation of any revisions to the prevailing wage levels. DATES: The Department invites written comments on the proposed delayed effective date and transition dates from interested parties. Written comments must be received by April 21, 2021. ADDRESSES: You may submit written comments electronically by the following method: • Federal eRulemaking Portal: https:// www.regulations.gov. Follow the instructions on the website for submitting comments. Instructions. Include the docket number ETA–2020–0006 in your comments. All comments received will be posted without change to https:// www.regulations.gov. Please do not include any personally identifiable or confidential business information you do not want publicly disclosed. FOR FURTHER INFORMATION CONTACT: Brian Pasternak, Administrator, Office of Foreign Labor Certification, Employment and Training Administration, Department of Labor, 200 Constitution Avenue NW, Room N– 5311, Washington, DC 20210, telephone: (202) 693–8200 (this is not a toll-free number). Individuals with hearing or speech impairments may access the telephone numbers above via TTY/TDD by calling the toll-free Federal Information Relay Service at 1 (877) 889–5627. SUPPLEMENTARY INFORMATION: I. Background On January 14, 2021 (86 FR 3608), the Department published a final rule in the Federal Register, which adopted PO 00000 Frm 00021 Fmt 4702 Sfmt 4702 changes to an interim final rule (IFR), published on October 8, 2020 (85 FR 63872), that amended Employment and Training Administration (ETA) regulations governing the prevailing wages for employment opportunities that U.S. employers seek to fill with foreign workers on a permanent or temporary basis through certain employment-based immigrant visas or through H–1B, H–1B1, or E–3 nonimmigrant visas. Specifically, the IFR amended the Department’s regulations governing permanent (PERM) labor certifications and Labor Condition Applications (LCAs) to incorporate changes to the computation of wage levels under the Department’s four-tiered wage structure based on the Occupational Employment Statistics (OES) wage survey administered by the Bureau of Labor Statistics (BLS). A general overview of the labor certification and prevailing wage process as well as further background on the rulemaking is available in the Department’s Final Rule, as published in the Federal Register on January 14, 2021, and will not be restated herein. 86 FR 3608, 3608–3611. Although the Final Rule contained an effective date of March 15, 2021, the Department also included two sets of transition periods under which adjustments to the new wage levels will not begin until July 1, 2021. 86 FR 3608, 3642. For most job opportunities, the transition would occur in two steps and conclude on July 1, 2022. For job opportunities that will be filled by workers who are the beneficiary of an approved Immigrant Petition for Alien Worker, or successor form, or are eligible for an extension of their H–1B status under sections 106(a) and (b) of the American Competitiveness in the Twenty-first Century Act of 2000, Public Law 106–313, as amended by the 21st Century Department of Justice Appropriations Authorization Act, Public Law 107–273 (2002), the transition would occur in four steps and conclude on July 1, 2024. 86 FR 3608, 3660. On February 1, 2021 (86 FR 7656), the Department published a notice of proposed rulemaking (NPRM) in the Federal Register (60-day NPRM) proposing to delay the effective date of the Final Rule for 60 days. The Department based the action on the Presidential directive as expressed in the memorandum of January 20, 2021, from the Assistant to the President and Chief of Staff, entitled ‘‘Regulatory Freeze Pending Review.’’ The memorandum directs agencies to consider delaying the effective date for regulations for the purpose of reviewing E:\FR\FM\22MRP1.SGM 22MRP1

Agencies

[Federal Register Volume 86, Number 53 (Monday, March 22, 2021)]
[Proposed Rules]
[Pages 15151-15154]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05395]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2021-0184; Project Identifier MCAI-2020-01599-T]
RIN 2120-AA64


Airworthiness Directives; Airbus SAS Airplanes

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: The FAA proposes to adopt a new airworthiness directive (AD) 
for all Airbus SAS Model A330-200, A330-200 Freighter, A330-300, A340-
200, and A340-300 series airplanes. This proposed AD was prompted by a 
report that the auxiliary power unit (APU) aft fuel pump printed 
circuit board (PCB) varnish had deteriorated; the varnish is one of the 
layers of protection against development of an ignition source. This 
proposed AD would require replacing each affected APU aft fuel pump, as 
specified in a European Union Aviation Safety Agency (EASA) AD, which 
is proposed for incorporation by reference. The FAA is proposing this 
AD to address the unsafe condition on these products.

DATES: The FAA must receive comments on this proposed AD by May 6, 
2021.

ADDRESSES: You may send comments, using the procedures found in 14 CFR 
11.43 and 11.45, by any of the following methods:
     Federal eRulemaking Portal: Go to https://www.regulations.gov. Follow the instructions for submitting comments.
     Fax: 202-493-2251.
     Mail: U.S. Department of Transportation, Docket 
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New 
Jersey Avenue SE, Washington, DC 20590.
     Hand Delivery: Deliver to Mail address above between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
    For material that will be incorporated by reference (IBR) in this 
AD, contact EASA, Konrad-Adenauer-Ufer 3, 50668 Cologne, Germany; 
telephone +49 221 8999 000; email [email protected]; internet 
www.easa.europa.eu. You may find this IBR material on the EASA website 
at https://ad.easa.europa.eu. You may view this IBR material at the 
FAA, Airworthiness Products Section, Operational Safety Branch, 2200 
South 216th St., Des Moines, WA. For information on the availability of 
this

[[Page 15152]]

material at the FAA, call 206-231-3195. It is also available in the AD 
docket on the internet at https://www.regulations.gov by searching for 
and locating Docket No. FAA-2021-0184.

Examining the AD Docket

    You may examine the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2021-
0184; or in person at Docket Operations between 9 a.m. and 5 p.m., 
Monday through Friday, except Federal holidays. The AD docket contains 
this NPRM, any comments received, and other information. The street 
address for Docket Operations is listed above.

FOR FURTHER INFORMATION CONTACT: Vladimir Ulyanov, Aerospace Engineer, 
Large Aircraft Section, International Validation Branch, FAA, 2200 
South 216th St., Des Moines, WA 98198; telephone and fax 206-231-3229; 
email [email protected].

SUPPLEMENTARY INFORMATION:

Comments Invited

    The FAA invites you to send any written relevant data, views, or 
arguments about this proposal. Send your comments to an address listed 
under ADDRESSES. Include ``Docket No. FAA-2021-0184; Project Identifier 
MCAI-2020-01599-T'' at the beginning of your comments. The most helpful 
comments reference a specific portion of the proposal, explain the 
reason for any recommended change, and include supporting data. The FAA 
will consider all comments received by the closing date and may amend 
the proposal because of those comments.
    Except for Confidential Business Information (CBI) as described in 
the following paragraph, and other information as described in 14 CFR 
11.35, the FAA will post all comments received, without change, to 
https://www.regulations.gov, including any personal information you 
provide. The agency will also post a report summarizing each 
substantive verbal contact received about this proposed AD.

Confidential Business Information

    CBI is commercial or financial information that is both customarily 
and actually treated as private by its owner. Under the Freedom of 
Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public 
disclosure. If your comments responsive to this NPRM contain commercial 
or financial information that is customarily treated as private, that 
you actually treat as private, and that is relevant or responsive to 
this NPRM, it is important that you clearly designate the submitted 
comments as CBI. Please mark each page of your submission containing 
CBI as ``PROPIN.'' The FAA will treat such marked submissions as 
confidential under the FOIA, and they will not be placed in the public 
docket of this NPRM. Submissions containing CBI should be sent to 
Vladimir Ulyanov, Aerospace Engineer, Large Aircraft Section, 
International Validation Branch, FAA, 2200 South 216th St., Des Moines, 
WA 98198; telephone and fax 206-231-3229; email 
[email protected]. Any commentary that the FAA receives which is 
not specifically designated as CBI will be placed in the public docket 
for this rulemaking.

Discussion

    The EASA, which is the Technical Agent for the Member States of the 
European Union, has issued EASA AD 2020-0265, dated December 2, 2020 
(EASA AD 2020-0265) (also referred to as the Mandatory Continuing 
Airworthiness Information, or the MCAI), to correct an unsafe condition 
for all Airbus SAS Model A330-201, A330-202, A330-203, A330-223, A330-
243, A330-223F, A330-243F, A330-301, A330-302, A330-303, A330-321, 
A330-322, A330-323, A330-341, A330-342, A330-343, A340-211, A340-212, 
A340-213, A340-311, A340-312, and A340-313 airplanes.
    This proposed AD was prompted by a report that the APU aft fuel 
pump PCB varnish had deteriorated. The varnish is one of the layers of 
protection against development of an ignition source. The root cause 
for the varnish deterioration is unknown, but suspected to be linked to 
aging. The FAA is proposing this AD to address PCB varnish 
deterioration. This condition, if not addressed, could, in case of a 
spark or flame in the area of the pump PCB, result in a fire or 
explosion and consequent loss of the airplane. See the MCAI for 
additional background information.

Related Service Information Under 1 CFR Part 51

    EASA AD 2020-0265 describes procedures for replacing each affected 
APU aft fuel pump. This material is reasonably available because the 
interested parties have access to it through their normal course of 
business or by the means identified in the ADDRESSES section.

FAA's Determination and Requirements of This Proposed AD

    This product has been approved by the aviation authority of another 
country, and is approved for operation in the United States. Pursuant 
to the FAA's bilateral agreement with the State of Design Authority, 
the FAA has been notified of the unsafe condition described in the MCAI 
referenced above. The FAA is proposing this AD because the FAA 
evaluated all the relevant information and determined the unsafe 
condition described previously is likely to exist or develop in other 
products of the same type design.

Proposed AD Requirements

    This proposed AD would require accomplishing the actions specified 
in EASA AD 2020-0265 described previously, as incorporated by 
reference, except for any differences identified as exceptions in the 
regulatory text of this AD.

Explanation of Required Compliance Information

    In the FAA's ongoing efforts to improve the efficiency of the AD 
process, the FAA initially worked with Airbus and EASA to develop a 
process to use certain EASA ADs as the primary source of information 
for compliance with requirements for corresponding FAA ADs. The FAA has 
since coordinated with other manufacturers and civil aviation 
authorities (CAAs) to use this process. As a result, EASA AD 2020-0265 
will be incorporated by reference in the FAA final rule. This proposed 
AD would, therefore, require compliance with EASA AD 2020-0265 in its 
entirety, through that incorporation, except for any differences 
identified as exceptions in the regulatory text of this proposed AD. 
Using common terms that are the same as the heading of a particular 
section in the EASA AD does not mean that operators need comply only 
with that section. For example, where the AD requirement refers to 
``all required actions and compliance times,'' compliance with this AD 
requirement is not limited to the section titled ``Required Action(s) 
and Compliance Time(s)'' in the EASA AD. Service information specified 
in EASA AD 2020-0265 that is required for compliance with EASA AD 2020-
0265 will be available on the internet at https://www.regulations.gov 
by searching for and locating Docket No. FAA-2021-0184 after the FAA 
final rule is published.

Costs of Compliance

    The FAA estimates that this proposed AD affects 112 airplanes of 
U.S. registry. The FAA estimates the following costs to comply with 
this proposed AD:

[[Page 15153]]



                                      Estimated Costs for Required Actions
----------------------------------------------------------------------------------------------------------------
                                                                                    Cost per       Cost on U.S.
                          Labor cost                              Parts cost        product         operators
----------------------------------------------------------------------------------------------------------------
4 work-hours x $85 per hour = $340...........................          $7,000           $7,340         $822,080
----------------------------------------------------------------------------------------------------------------

    According to the manufacturer, some or all of the costs of this 
proposed AD may be covered under warranty, thereby reducing the cost 
impact on affected operators. The FAA does not control warranty 
coverage for affected operators. As a result, the FAA has included all 
known costs in the cost estimate.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. Subtitle VII: Aviation Programs, 
describes in more detail the scope of the Agency's authority.
    The FAA is issuing this rulemaking under the authority described in 
Subtitle VII, Part A, Subpart III, Section 44701: General requirements. 
Under that section, Congress charges the FAA with promoting safe flight 
of civil aircraft in air commerce by prescribing regulations for 
practices, methods, and procedures the Administrator finds necessary 
for safety in air commerce. This regulation is within the scope of that 
authority because it addresses an unsafe condition that is likely to 
exist or develop on products identified in this rulemaking action.

Regulatory Findings

    The FAA determined that this proposed AD would not have federalism 
implications under Executive Order 13132. This proposed AD would not 
have a substantial direct effect on the States, on the relationship 
between the national Government and the States, or on the distribution 
of power and responsibilities among the various levels of government.
    For the reasons discussed above, I certify this proposed 
regulation:
    (1) Is not a ``significant regulatory action'' under Executive 
Order 12866,
    (2) Would not affect intrastate aviation in Alaska, and
    (3) Would not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

The Proposed Amendment

    Accordingly, under the authority delegated to me by the 
Administrator, the FAA proposes to amend 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13  [Amended]

0
2. The FAA amends Sec.  39.13 by adding the following new airworthiness 
directive:

Airbus SAS: Docket No. FAA-2021-0184; Project Identifier MCAI-2020-
01599-T.

(a) Comments Due Date

    The FAA must receive comments on this airworthiness directive 
(AD) action by May 6, 2021.

(b) Affected ADs

    None.

(c) Applicability

    This AD applies to all Airbus SAS airplanes, certificated in any 
category, specified in paragraphs (c)(1) through (5) of this AD.
    (1) Model A330-201, -202, -203, -223, and -243 airplanes.
    (2) Model A330-223F and -243F airplanes.
    (3) Model A330-301, -302, -303, -321, -322, -323, -341, -342, 
and -343 airplanes.
    (4) Model A340-211, -212, and -213 airplanes.
    (5) Model A340-311, -312, and -313 airplanes.

(d) Subject

    Air Transport Association (ATA) of America Code 28, Fuel system.

(e) Reason

    This AD was prompted by a report that the auxiliary power unit 
(APU) aft fuel pump printed circuit board (PCB) varnish had 
deteriorated; the varnish is one of the layers of protection against 
development of an ignition source. The FAA is issuing this AD to 
address PCB varnish deterioration. This condition, if not addressed, 
could, in case of a spark or flame in the area of the pump PCB, 
result in a fire or explosion and consequent loss of the airplane.

(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

(g) Requirements

    Except as specified in paragraph (h) of this AD: Comply with all 
required actions and compliance times specified in, and in 
accordance with, European Union Aviation Safety Agency (EASA) AD 
2020-0265, dated December 2, 2020 (EASA AD 2020-0265).

(h) Exceptions to EASA AD 2020-0265

    (1) Where EASA AD 2020-0265 refers to its effective date, this 
AD requires using the effective date of this AD.
    (2) The ``Remarks'' section of EASA AD 2020-0265 does not apply 
to this AD.

(i) No Reporting Requirement

    Although the service information referenced in EASA AD 2020-0265 
specifies to submit certain information to the manufacturer, this AD 
does not include that requirement.

(j) Other FAA AD Provisions

    The following provisions also apply to this AD:
    (1) Alternative Methods of Compliance (AMOCs): The Manager, 
Large Aircraft Section, International Validation Branch, FAA, has 
the authority to approve AMOCs for this AD, if requested using the 
procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, 
send your request to your principal inspector or responsible Flight 
Standards Office, as appropriate. If sending information directly to 
the Large Aircraft Section, International Validation Branch, send it 
to the attention of the person identified in paragraph (k)(2) of 
this AD. Information may be emailed to: [email protected]. 
Before using any approved AMOC, notify your appropriate principal 
inspector, or lacking a principal inspector, the manager of the 
responsible Flight Standards Office.
    (2) Contacting the Manufacturer: For any requirement in this AD 
to obtain instructions from a manufacturer, the instructions must be 
accomplished using a method approved by the Manager, Large Aircraft 
Section, International Validation Branch, FAA; or EASA; or Airbus 
SAS's EASA Design Organization Approval (DOA). If approved by the 
DOA, the approval must include the DOA-authorized signature.
    (3) Required for Compliance (RC): Except as required by 
paragraph (j)(2) of this AD, if any service information contains 
procedures or tests that are identified as RC, those procedures and 
tests must be done to comply with this AD; any procedures or tests 
that are not identified as RC are recommended. Those procedures and 
tests that are not identified as RC may be deviated from using 
accepted methods in accordance with the operator's maintenance or 
inspection program without obtaining approval of an AMOC, provided 
the procedures and tests identified as RC can be done and the 
airplane can be put back in

[[Page 15154]]

an airworthy condition. Any substitutions or changes to procedures 
or tests identified as RC require approval of an AMOC.

(k) Related Information

    (1) For information about EASA AD 2020-0265, contact the EASA, 
Konrad-Adenauer-Ufer 3, 50668 Cologne, Germany; telephone +49 221 
8999 000; email [email protected]; Internet www.easa.europa.eu. You 
may find this EASA AD on the EASA website at https://ad.easa.europa.eu. You may view this material at the FAA, 
Airworthiness Products Section, Operational Safety Branch, 2200 
South 216th St., Des Moines, WA. For information on the availability 
of this material at the FAA, call 206-231-3195. This material may be 
found in the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA-
2021-0184.
    (2) For more information about this AD, contact Vladimir 
Ulyanov, Aerospace Engineer, Large Aircraft Section, International 
Validation Branch, FAA, 2200 South 216th St., Des Moines, WA 98198; 
telephone and fax 206-231-3229; email [email protected].

    Issued on March 10, 2021.
Lance T. Gant,
Director, Compliance & Airworthiness Division, Aircraft Certification 
Service.
[FR Doc. 2021-05395 Filed 3-19-21; 8:45 am]
BILLING CODE 4910-13-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.