ANR Pipeline Company; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 14898-14900 [2021-05727]

Download as PDF jbell on DSKJLSW7X2PROD with NOTICES 14898 Federal Register / Vol. 86, No. 52 / Friday, March 19, 2021 / Notices Comments Due: 5 p.m. ET 4/5/21. Docket Numbers: ER21–1391–000. Applicants: Southwest Power Pool, Inc.. Description: § 205(d) Rate Filing: 2646R8 Kansas Municipal Energy Agency NITSA NOA to be effective 3/ 1/2021. Filed Date: 3/15/21. Accession Number: 20210315–5121. Comments Due: 5 p.m. ET 4/5/21. Docket Numbers: ER21–1393–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, Service Agreement No. 5997; Queue No. AF1–249 to be effective 2/11/2021. Filed Date: 3/15/21. Accession Number: 20210315–5130. Comments Due: 5 p.m. ET 4/5/21. Docket Numbers: ER21–1395–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 5984; Queue Nos. AC1–174/AC1–175 to be effective 2/11/2021. Filed Date: 3/15/21. Accession Number: 20210315–5135. Comments Due: 5 p.m. ET 4/5/21. Docket Numbers: ER21–1396–000. Applicants: Sugar Solar, LLC. Description: Baseline eTariff Filing: Sugar Solar, LLC MBR Tariff to be effective 3/16/2021. Filed Date: 3/15/21. Accession Number: 20210315–5141. Comments Due: 5 p.m. ET 4/5/21. Docket Numbers: ER21–1397–000. Applicants: PGR 2020 Lessee 8, LLC. Description: Baseline eTariff Filing: PGR 2020 Lessee 8, LLC MBR Tariff to be effective 3/16/2021. Filed Date: 3/15/21. Accession Number: 20210315–5142. Comments Due: 5 p.m. ET 4/5/21. Docket Numbers: ER21–1401–000. Applicants: Northern States Power Company, a Minnesota, corporation Northern States Power Company, a Wisconsin corporation. Description: § 205(d) Rate Filing: 2021 Interchange Agreement Annual Filing to be effective 1/1/2021.. Filed Date: 3/15/21. Accession Number: 20210315–5178. Comments Due: 5 p.m. ET 4/5/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s VerDate Sep<11>2014 19:13 Mar 18, 2021 Jkt 253001 Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 15, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–05706 Filed 3–18–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER21–1374–000] Diamond Energy PJM, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced Diamond Energy PJM, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is April 5, 2021. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: March 15, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–05723 Filed 3–18–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–68–000] ANR Pipeline Company; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on March 4, 2021, ANR Pipeline Company (ANR), 700 Louisiana Street, Suite 1300, Houston, Texas 77002, filed in the above referenced docket a prior notice pursuant to Section 157.205 and 157.216 of the Federal Energy Regulatory Commission’s regulations under the Natural Gas Act and the blanket certificate issued by the Commission in Docket No. CP82–480– 000,1 seeking authorization to abandon 1 Michigan Wisconsin Pipe Line Company, 20 FERC ¶ 62,595 (1982). E:\FR\FM\19MRN1.SGM 19MRN1 Federal Register / Vol. 86, No. 52 / Friday, March 19, 2021 / Notices jbell on DSKJLSW7X2PROD with NOTICES by removal twenty injection/withdrawal wells and related pipelines; and abandon seventeen storage line segments and appurtenant facilities in the Lincoln-Freeman Storage Field in Clare County, Michigan. ANR estimates the cost of the project to be $3.3 million, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to Sorana Linder, Director, Modernization & Certificates, ANR Pipeline Company, 700 Louisiana Street, Suite 1300, Houston, Texas 77002, by telephone at (832) 320–5209, or by email at sorana_ linder@tcenergy.com. withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,4 and must be submitted by the protest deadline, which is May 14, 2021. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 5 and the regulations under the NGA 6 by the intervention deadline for the project, which is May 14, 2021. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a Public Participation landowner, ratepayer, resident of an impacted community, or recreationist. There are three ways to become involved in the Commission’s review of You do not need to have property this project: you can file a protest to the directly impacted by the project in order to intervene. For more information project, you can file a motion to about motions to intervene, refer to the intervene in the proceeding, and you can file comments on the project. There FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. is no fee or cost for filing protests, All timely, unopposed motions to motions to intervene, or comments. The intervene are automatically granted by deadline for filing protests, motions to operation of Rule 214(c)(1). Motions to intervene, and comments is 5:00 p.m. intervene that are filed after the Eastern Time on May 14, 2021. How to intervention deadline are untimely and file protests, motions to intervene, and may be denied. Any late-filed motion to comments is explained below. intervene must show good cause for Protests being late and must explain why the time limitation should be waived and Pursuant to section 157.205 of the provide justification by reference to Commission’s regulations under the 2 3 NGA, any person or the Commission’s factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A staff may file a protest to the request. If person obtaining party status will be no protest is filed within the time placed on the service list maintained by allowed or if a protest is filed and then the Secretary of the Commission and 2 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 3 Persons VerDate Sep<11>2014 19:13 Mar 18, 2021 Jkt 253001 4 18 CFR 157.205(e). CFR 385.214. 6 18 CFR 157.10. 5 18 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 14899 will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before May 14, 2021. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How to File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP21–68–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing.’’ The Commission’s eFiling staff are available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. (2) You can file a paper copy of your submission. Your submission must reference the Project docket number CP21–68–000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: Sorana Linder, Director, Modernization & Certificates, ANR Pipeline Company, 700 Louisiana Street, Suite 1300, Houston, Texas 77002, by telephone at (832) 320–5209, or by email at sorana_linder@ tcenergy.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be E:\FR\FM\19MRN1.SGM 19MRN1 14900 Federal Register / Vol. 86, No. 52 / Friday, March 19, 2021 / Notices downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: March 15, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–05727 Filed 3–18–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER21–1376–000] jbell on DSKJLSW7X2PROD with NOTICES Sanborn Solar 1A, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Sanborn Solar 1A, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket VerDate Sep<11>2014 19:13 Mar 18, 2021 Jkt 253001 authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is April 5, 2021. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: March 15, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–05712 Filed 3–18–21; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER21–1370–000] Assembly Solar II, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced Assembly Solar II, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is April 5, 2021. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number E:\FR\FM\19MRN1.SGM 19MRN1

Agencies

[Federal Register Volume 86, Number 52 (Friday, March 19, 2021)]
[Notices]
[Pages 14898-14900]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05727]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP21-68-000]


ANR Pipeline Company; Notice of Request Under Blanket 
Authorization and Establishing Intervention and Protest Deadline

    Take notice that on March 4, 2021, ANR Pipeline Company (ANR), 700 
Louisiana Street, Suite 1300, Houston, Texas 77002, filed in the above 
referenced docket a prior notice pursuant to Section 157.205 and 
157.216 of the Federal Energy Regulatory Commission's regulations under 
the Natural Gas Act and the blanket certificate issued by the 
Commission in Docket No. CP82-480-000,\1\ seeking authorization to 
abandon

[[Page 14899]]

by removal twenty injection/withdrawal wells and related pipelines; and 
abandon seventeen storage line segments and appurtenant facilities in 
the Lincoln-Freeman Storage Field in Clare County, Michigan. ANR 
estimates the cost of the project to be $3.3 million, all as more fully 
set forth in the request which is on file with the Commission and open 
to public inspection.
---------------------------------------------------------------------------

    \1\ Michigan Wisconsin Pipe Line Company, 20 FERC ] 62,595 
(1982).
---------------------------------------------------------------------------

    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions concerning this application should be directed to 
Sorana Linder, Director, Modernization & Certificates, ANR Pipeline 
Company, 700 Louisiana Street, Suite 1300, Houston, Texas 77002, by 
telephone at (832) 320-5209, or by email at [email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on May 14, 2021. How 
to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\2\ any person \3\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \2\ 18 CFR 157.205.
    \3\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\4\ and must be submitted by 
the protest deadline, which is May 14, 2021. A protest may also serve 
as a motion to intervene so long as the protestor states it also seeks 
to be an intervenor.
---------------------------------------------------------------------------

    \4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \5\ and the regulations under the NGA \6\ by the 
intervention deadline for the project, which is May 14, 2021. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \5\ 18 CFR 385.214.
    \6\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before May 14, 2021. The filing of a comment alone will not serve 
to make the filer a party to the proceeding. To become a party, you 
must intervene in the proceeding.

How to File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP21-68-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing.'' The Commission's eFiling 
staff are available to assist you at (202) 502-8258 or 
[email protected]
    (2) You can file a paper copy of your submission. Your submission 
must reference the Project docket number CP21-68-000.
    To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.
    To mail via any other courier, use the following address: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: Sorana 
Linder, Director, Modernization & Certificates, ANR Pipeline Company, 
700 Louisiana Street, Suite 1300, Houston, Texas 77002, by telephone at 
(832) 320-5209, or by email at [email protected]. Any 
subsequent submissions by an intervenor must be served on the applicant 
and all other parties to the proceeding. Contact information for 
parties can be

[[Page 14900]]

downloaded from the service list at the eService link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: March 15, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-05727 Filed 3-18-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.