Combined Notice of Filings #1, 14621-14622 [2021-05497]
Download as PDF
Federal Register / Vol. 86, No. 50 / Wednesday, March 17, 2021 / Notices
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/ferc-online/elibrary/
overview. Enter the docket number (P–
15030) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–05493 Filed 3–16–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD10–12–012]
jbell on DSKJLSW7X2PROD with NOTICES
Increasing Market and Planning
Efficiency Through Improved Software;
Notice of Technical Conference:
Increasing Real-Time and Day-Ahead
Market Efficiency Through Improved
Software
Take notice that Commission staff
will convene a technical conference on
June 22, 23, and 24, 2021 to discuss
opportunities for increasing real-time
and day-ahead market efficiency of the
bulk power system through improved
software. A detailed agenda with the list
and times for the selected speakers will
be published on the Commission’s
website 1 after May 28, 2021.
This conference will bring together
and encourage discussion between
experts from diverse backgrounds.
Examples include electric power system
operators, software developers, and
professionals from government, research
centers, and academia. The conference
will bring these experts together for the
purposes of stimulating discussion,
sharing information, and identifying
fruitful avenues for research concerning
improved software for increasing
efficiency and reliability of the bulk
power system.
This conference will build on
discussions at prior conferences in this
proceeding by focusing on topics
identified as important to market
efficiency in prior conferences. Broadly,
such topics fall into the following
categories:
(1) Improvements to the
representation within market models of
physical constraints that are either not
currently modeled or are currently
modeled using mathematical
1 https://www.ferc.gov/industries-data/electric/
power-sales-and-markets/increasing-efficiencythrough-improved-software.
VerDate Sep<11>2014
17:47 Mar 16, 2021
Jkt 253001
14621
approximations (e.g., voltage and
reactive power constraints, stability
constraints, fuel delivery constraints,
and constraints related to
contingencies);
(2) Representations of uncertainty to
better maximize economic efficiency
(expected market surplus) and lead to
better understanding events of that
could impact the reliability of the bulk
power system (e.g., stochastic modeling,
or other improved modeling approaches
to energy and reserve dispatch and
system planning that efficiently manage
uncertainty);
(3) Software related to grid-enhancing
technologies (e.g., optimal transmission
switching, transmission flow control,
advanced transmission line ratings,
distributed energy resources, and
software for forecasting and enhancing
visibility into changing system
conditions);
(4) Improvements in markets’ ability
to identify, use, and/or enable
capabilities in the existing systems in
ways that improve bulk power system
economic efficiency and reliability (e.g.,
transmission constraint relaxation
practices, multi-stage generator
modeling, storage state-of-charge
management, and ramp management);
(5) Improvements to the duality
interpretations of the economic dispatch
model, with the goal of enabling the
calculation of prices which represent
better equilibrium and incentives for
efficient entry and exit;
(6) Limitations of current electricity
market software due to its interaction
with hardware, for example, parallel
computing and better cache
management;
(7) Other improvements in algorithms,
model formulations, or hardware that
may allow for increases in market
efficiency and enhanced bulk power
system reliability.
Within these or related topics, we
encourage presentations that discuss
best modeling practices, existing
modeling practices that need
improvement, any advances made, or
related perspectives on increasing
market efficiency through improved
power systems modeling.
The conference will take place
virtually via WebEx, with remote
participation from both presenters and
attendees. Further details on remote
attendance and participation will be
released prior to the conference.
Attendees must register through the
Commission’s website on or before June
11, 2021.2 WebEx connections may not
be available to those who do not
register.
Speaker nominations must be
submitted on or before May 7, 2021
through the Commission’s website 3 by
providing the proposed speaker’s
contact information along with a title,
abstract, and list of contributing authors
for the proposed presentation. Proposed
presentations should be related to the
topics discussed above. Speakers and
presentations will be selected to ensure
relevant topics and to accommodate
time constraints.
The Commission will accept
comments following the conference,
with a deadline of July 30, 2021.
There is an ‘‘eSubscription’’ link on
the Commission’s website that enables
subscribers to receive email notification
when a document is added to a
subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or (202) 502–
8659 (TTY), or send a fax to (202) 208–
2106 with the required
accommodations. This notice is issued
and published in accordance with 18
CFR 2.1 (2019).
For further information about these
conferences, please contact:
Sarah McKinley (Logistical
Information), Office of External Affairs,
(202) 502–8004, Sarah.McKinley@
ferc.gov.
Alexander Smith (Technical
Information), Office of Energy Policy
and Innovation, (202) 502–6601,
Alexander.Smith@ferc.gov.
2 The attendee registration form is located at
https://ferc.webex.com/ferc/onstage/
g.php?MTID=e97c1ef8334b1f4db52394fe644edfe57.
Click ‘‘Register’’ to be taken to the form.
3 The speaker nomination form is located at
https://ferc.webex.com/ferc/onstage/
g.php?MTID=e3309f9a29fe364f2f4ee1ddb3101f580.
Click ‘‘Register’’ to be taken to the form.
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
Dated: March 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–05494 Filed 3–16–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
E:\FR\FM\17MRN1.SGM
17MRN1
jbell on DSKJLSW7X2PROD with NOTICES
14622
Federal Register / Vol. 86, No. 50 / Wednesday, March 17, 2021 / Notices
Docket Numbers: ER11–4380–006;
ER11–4381–006.
Applicants: Bellevue Solar, LLC,
Yamhill Solar, LLC.
Description: Notice of Non-Material
Change in Status of Bellevue Solar, LLC,
et al.
Filed Date: 3/10/21.
Accession Number: 20210310–5253.
Comments Due: 5 p.m. ET 3/31/21.
Docket Numbers: ER15–356–015;
ER15–357–015.
Applicants: Chief Conemaugh Power,
LLC, Chief Keystone Power, LLC.
Description: Notice of Change in
Status of Chief Conemaugh Power, LLC,
et al.
Filed Date: 3/11/21.
Accession Number: 20210311–5151.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21–1069–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment: Errata
to Notice of Cancellation of SA No.
5670; Queue No. AE2–151 to be
effective 2/27/2021.
Filed Date: 3/11/21.
Accession Number: 20210311–5158.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21–1321–000.
Applicants: Harbor Cogeneration
Company, LLC.
Description: Petition for Limited
Waiver or Alternative Remedial Relief of
Harbor Cogeneration Company, LLC.
Filed Date: 3/10/21.
Accession Number: 20210310–5233.
Comments Due: 5 p.m. ET 3/31/21.
Docket Numbers: ER21–1322–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
CDWR Work Performance Agreement
for Buena Vista Pumping Plant (TO SA
275) to be effective 5/11/2021.
Filed Date: 3/11/21.
Accession Number: 20210311–5009.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21–1325–000.
Applicants: ISO New England Inc.,
New Hampshire Transmission, LLC.
Description: Compliance filing: New
Hampshire Transmission, LLC;
Supplemental Order No. 864
Compliance Filing to be effective 1/1/
2020.
Filed Date: 3/11/21.
Accession Number: 20210311–5046.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21–1326–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA, Service
Agreement No. 5838; Queue No. AC2–
078 to be effective 4/16/2021.
VerDate Sep<11>2014
17:47 Mar 16, 2021
Jkt 253001
Filed Date: 3/11/21.
Accession Number: 20210311–5052.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21–1328–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
2021–03–11_SA 2804 ATC-City of
Richland Center 1st Rev CFA to be
effective 5/11/2021.
Filed Date: 3/11/21.
Accession Number: 20210311–5108.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21–1329–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
2021–03–11_SA 2769 ATC-City of
Reedsburg 1st Rev CFA to be effective
5/11/2021.
Filed Date: 3/11/21.
Accession Number: 20210311–5120.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21–1331–000.
Applicants: Southwest Power Pool
Inc., Southwest Power Pool Market
Monitoring Unit.
Description: Request for Limited
Waiver of Tariff Provisions, et al. of
Southwest Power Pool, Inc.
Filed Date: 3/11/21.
Accession Number: 20210311–5190.
Comments Due: 5 p.m. ET 3/16/21.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM21–10–000.
Applicants: Old Dominion Electric
Cooperative.
Description: Application of Old
Dominion Electric Cooperative to
Terminate Its Mandatory Purchase
Obligation under the Public Utility
Regulatory Policies Act of 1978.
Filed Date: 3/10/21.
Accession Number: 20210310–5247.
Comments Due: 5 p.m. ET 4/7/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–05497 Filed 3–16–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD20–18–000]
Offshore Wind Integration in RTOs/
ISOs; Notice Inviting Post-Technical
Conference Comments
On October 27, 2020, Federal Energy
Regulatory Commission (Commission)
staff convened a technical conference to
discuss whether and how existing
transmission planning, interconnection,
and merchant transmission facility
frameworks in Regional Transmission
Organizations/Independent System
Operators (RTOs/ISOs) can
accommodate anticipated growth in
offshore wind generation in an efficient
and cost-effective manner that
safeguards open access transmission
principles, and to consider possible
changes or improvements to the current
frameworks should they be needed to
accommodate such growth.
All interested persons are invited to
file post-technical conference comments
on the questions listed in the
attachment to this Notice. Commenters
need not answer all of the questions but
are encouraged to organize responses
using the numbering and sequencing in
the attached questions. Commenters
may also respond to the questions
outlined in the October 22, 2020
supplemental notice of technical
conference.1 Commenters need not
answer all of the questions included in
the October 22, 2020 notice, but, to the
extent that commenters respond to any
of those questions, please utilize the
question numbering included in that
notice. In addition, commenters are
invited to reference material previously
filed in this docket, including the
technical conference transcript and
submitted opening remarks, but are
encouraged to avoid repetition or
replication of previous material.
Comments must be submitted on or
1 Supplemental Notice of Technical Conference,
Docket No. AD20–18–000 (October 22, 2020),
https://www.ferc.gov/sites/default/files/2020-10/
AD20-18-000-Tech-Conf-Errata.pdf.
E:\FR\FM\17MRN1.SGM
17MRN1
Agencies
[Federal Register Volume 86, Number 50 (Wednesday, March 17, 2021)]
[Notices]
[Pages 14621-14622]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05497]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
[[Page 14622]]
Docket Numbers: ER11-4380-006; ER11-4381-006.
Applicants: Bellevue Solar, LLC, Yamhill Solar, LLC.
Description: Notice of Non-Material Change in Status of Bellevue
Solar, LLC, et al.
Filed Date: 3/10/21.
Accession Number: 20210310-5253.
Comments Due: 5 p.m. ET 3/31/21.
Docket Numbers: ER15-356-015; ER15-357-015.
Applicants: Chief Conemaugh Power, LLC, Chief Keystone Power, LLC.
Description: Notice of Change in Status of Chief Conemaugh Power,
LLC, et al.
Filed Date: 3/11/21.
Accession Number: 20210311-5151.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21-1069-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Errata to Notice of Cancellation of
SA No. 5670; Queue No. AE2-151 to be effective 2/27/2021.
Filed Date: 3/11/21.
Accession Number: 20210311-5158.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21-1321-000.
Applicants: Harbor Cogeneration Company, LLC.
Description: Petition for Limited Waiver or Alternative Remedial
Relief of Harbor Cogeneration Company, LLC.
Filed Date: 3/10/21.
Accession Number: 20210310-5233.
Comments Due: 5 p.m. ET 3/31/21.
Docket Numbers: ER21-1322-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: CDWR Work Performance
Agreement for Buena Vista Pumping Plant (TO SA 275) to be effective 5/
11/2021.
Filed Date: 3/11/21.
Accession Number: 20210311-5009.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21-1325-000.
Applicants: ISO New England Inc., New Hampshire Transmission, LLC.
Description: Compliance filing: New Hampshire Transmission, LLC;
Supplemental Order No. 864 Compliance Filing to be effective 1/1/2020.
Filed Date: 3/11/21.
Accession Number: 20210311-5046.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21-1326-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of ISA,
Service Agreement No. 5838; Queue No. AC2-078 to be effective 4/16/
2021.
Filed Date: 3/11/21.
Accession Number: 20210311-5052.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21-1328-000.
Applicants: Midcontinent Independent System Operator, Inc.,
American Transmission Company LLC.
Description: Sec. 205(d) Rate Filing: 2021-03-11_SA 2804 ATC-City
of Richland Center 1st Rev CFA to be effective 5/11/2021.
Filed Date: 3/11/21.
Accession Number: 20210311-5108.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21-1329-000.
Applicants: Midcontinent Independent System Operator, Inc.,
American Transmission Company LLC.
Description: Sec. 205(d) Rate Filing: 2021-03-11_SA 2769 ATC-City
of Reedsburg 1st Rev CFA to be effective 5/11/2021.
Filed Date: 3/11/21.
Accession Number: 20210311-5120.
Comments Due: 5 p.m. ET 4/1/21.
Docket Numbers: ER21-1331-000.
Applicants: Southwest Power Pool Inc., Southwest Power Pool Market
Monitoring Unit.
Description: Request for Limited Waiver of Tariff Provisions, et
al. of Southwest Power Pool, Inc.
Filed Date: 3/11/21.
Accession Number: 20210311-5190.
Comments Due: 5 p.m. ET 3/16/21.
Take notice that the Commission received the following PURPA
210(m)(3) filings:
Docket Numbers: QM21-10-000.
Applicants: Old Dominion Electric Cooperative.
Description: Application of Old Dominion Electric Cooperative to
Terminate Its Mandatory Purchase Obligation under the Public Utility
Regulatory Policies Act of 1978.
Filed Date: 3/10/21.
Accession Number: 20210310-5247.
Comments Due: 5 p.m. ET 4/7/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-05497 Filed 3-16-21; 8:45 am]
BILLING CODE 6717-01-P