Sunshine Act Meeting, 14421-14423 [2021-05492]

Download as PDF Federal Register / Vol. 86, No. 49 / Tuesday, March 16, 2021 / Notices https://elibrary.ferc.gov/eLibrary/search. Enter the docket number (P–15054) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: March 10, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–05382 Filed 3–15–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15059–000] jbell on DSKJLSW7X2PROD with NOTICES Kinet, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 3, 2020, Kinet, Inc., filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a conventional hydropower project located in Anderson, Woodford, and Mercer Counties, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Kentucky River Lock and Dam No. 5 Hydroelectric Project would consist of the following: (1) An existing 594-foot-long, 36-foot-high, timber crib dam with concrete overlay connected to a 390-foot-long, and 38foot-wide abandoned navigation lock, which are owned by the Kentucky River Authority; (2) a reservoir with a surface area of 448 acres and a storage capacity of 7,500 acre-feet; (3) five, proposed, 32foot-long, 9-foot-diameter penstocks connected to five generating units with a combined capacity of 2.4 megawatts, within the existing lock; (4) a proposed powerhouse/control room adjacent to the lock; (5) a 30-foot-long by 63-footwide tailrace; and (6) a 175-foot-long, 12.47 kilo-Volt transmission line. The proposed project would have an estimated annual generation of 16,243 megawatt-hours. Applicant Contact: Dan Panko, Kinet, Inc., 2401 Monarch Street, Alameda, CA 9401; phone: (802) 578–7973. 1 163 FERC ¶ 62,080 (2018). VerDate Sep<11>2014 16:52 Mar 15, 2021 FERC Contact: Joshua Dub; phone: (202) 502–8138. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://elibrary.ferc.gov/eLibrary/search. Enter the docket number (P–15059) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: March 10, 2021. Kimberly D. Bose, Secretary. Jkt 253001 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14863–001] BM Energy Park, LLC; Notice of Surrender of Preliminary Permit Take notice that BM Energy Park LLC, permittee for the proposed Banner PO 00000 Mountain Pumped Storage Hydro Project, has requested that its preliminary permit be terminated. The permit was issued on May 8, 2018 and would have expired on April 30, 2021.1 The project would have been located in Converse County, Wyoming. The preliminary permit for Project No. 14863 will remain in effect until the close of business, April 9, 2021. But, if the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.2 New applications for this site may not be submitted until after the permit surrender is effective. Dated: March 10, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–05381 Filed 3–15–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. TIME AND DATE: Open to the public via audio Webcast only. Join FERC online to listen live at https://ferc.capitolconnection.org/. PLACE: STATUS: Open. Agenda. * Note—Items listed on the agenda may be deleted without further notice. MATTERS TO BE CONSIDERED: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s website at https:// ferc.capitolconnection.org/ using the eLibrary link. CFR 385.2007(a)(2) (2020). Frm 00019 Fmt 4703 Sfmt 4703 March 18, 2021, 10:00 a.m. CONTACT PERSON FOR MORE INFORMATION: [FR Doc. 2021–05383 Filed 3–15–21; 8:45 am] 2 18 14421 E:\FR\FM\16MRN1.SGM 16MRN1 14422 Federal Register / Vol. 86, No. 49 / Tuesday, March 16, 2021 / Notices 1076TH—MEETING [Open meeting; March 18, 2021; 10:00 a.m.] Item No. Docket No. Company ADMINISTRATIVE A–1 ................... A–2 ................... A–3 ................... AD21–1–000 ............................................ AD21–2–000 ............................................ AD06–3–000 ............................................ Agency Administrative Matters. Customer Matters, Reliability, Security and Market Operations. Market Update. ELECTRIC E–1 ................... RM18–9–002 ........................................... E–2 ................... RM21–14–000 ......................................... E–3 ................... E–4 ................... QF17–454–006 ........................................ EL19–47–000 ........................................... EL19–63–000 ........................................... E–5 ................... E–6 ................... EL21–35–000 ........................................... EL21–14–000 ........................................... E–7 ................... E–8 ................... E–9 ................... E–10 ................. E–11 ................. E–12 ................. E–13 ................. E–14 ................. E–15 ................. E–16 ................. RM16–17–000 ......................................... Omitted ER21–679–000 ........................................ ER20–1210–001 ...................................... ER20–1237–000 ...................................... ER19–1276–001 ...................................... ER20–1892–000 ...................................... ER17–801–010 ........................................ ER18–2497–005 ...................................... EC21–10–000 .......................................... E–17 ................. E–18 ................. RD21–2–000 ............................................ EL21–13–000 ........................................... E–19 ................. EL20–69–000 ........................................... E–20 E–21 E–22 E–23 E–24 EL21–33–000, QF86–381–001 ............... ER19–2547–001 ...................................... ER18–2404–000 ...................................... ER19–477–000 ........................................ ER21–502–001 ........................................ ................. ................. ................. ................. ................. Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators. Participation of Aggregators of Retail Demand Response Customers in Markets Operated by Regional Transmission Organizations and Independent System Operators. Broadview Solar, LLC. Independent Market Monitor for PJM v. PJM Interconnection, L.L.C. Office of the People’s Counsel for the District of Columbia, Delaware Division of the Public Advocate, Citizens Utility Board, Indiana Office of Utility Consumer Counselor, Maryland Office of People’s Counsel, Pennsylvania Office of Consumer Advocate, West Virginia Consumer Advocate Division, and PJM Industrial Customer Coalition v. PJM Interconnection, L.L.C. Hollow Road Solar LLC. NextEra Energy, Inc., Evergy, Inc., American Electric Power Company, Exelon Corporation, Xcel Energy Services Inc. Data Collection for Analytics and Surveillance and Market-Based Rate Purposes. Midcontinent Independent System Operator, Inc. Hazleton Generation LLC. Ameren Illinois Company. Ameren Illinois Company. Midcontinent Independent System Operator, Inc. Constellation Power Source Generation, LLC. Lawrenceburg Power, LLC. NextEra Energy Transmission, LLC, GridLiance West LLC, GridLiance High Plains LLC, and GridLiance Hearthland LLC. North American Electric Reliability Corporation. Californians for Green Nuclear Power, Inc. v.The North American Electric Reliability Corporation, the Western Electricity Coordinating Council, the California Independent System Operator, the California Public Utilities Commission, the California State Water Resources Control Board, and the California State Lands Commission. Californians for Renewable Energy and Michael E. Boyd v. California Independent System Operator Corporation, California Public Utilities Commission, Pacific Gas and Electric Company, San Diego Gas and Electric Company and Southern California Edison Company. Citrus World, Inc. Pheasant Run Wind, LLC. Southwest Power Pool, Inc. Southwest Power Pool, Inc. New York Independent System Operator, Inc. Gas G–1 ................... G–2 ................... Omitted RP21–153–000 ........................................ Texas Eastern Transmission, LP. HYDRO H–1 ................... H–2 ................... P–405–106 P–405–121 ........................... P–12726–002 ........................................... Exelon Generation Company, LLC. Warm Springs Hydro LLC jbell on DSKJLSW7X2PROD with NOTICES Certificates C–1 ................... RM20–18–000 ......................................... C–2 C–3 C–4 C–5 C–6 CP20–466–000 ........................................ CP20–487–000 ........................................ CP17–40–000, CP17–40–001 ................. CP17–458–000, CP19–17–000 ............... IN19–4–000 ............................................. ................... ................... ................... ................... ................... VerDate Sep<11>2014 16:52 Mar 15, 2021 Jkt 253001 PO 00000 Frm 00020 Waiver of the Water Quality Certification Requirements of Section 401(a)(1) of the Clean Water Act. New Fortress Energy LLC. Northern Natural Gas Company. Spire STL Pipeline LLC. Midship Pipeline Company, LLC. Rover Pipeline, LLC and Energy Transfer Partners, L.P. Fmt 4703 Sfmt 4703 E:\FR\FM\16MRN1.SGM 16MRN1 Federal Register / Vol. 86, No. 49 / Tuesday, March 16, 2021 / Notices Issued: March 11, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. The public is invited to listen to the meeting live at https:// ferc.capitolconnection.org/. Anyone with internet access who desires to hear this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its audio webcast. The Capitol Connection provides technical support for this free audio webcast. It will also offer access to this event via phone bridge for a fee. If you have any questions, visit https:// ferc.capitolconnection.org/ or contact Shirley Al-Jarani at 703–993–3104. [FR Doc. 2021–05492 Filed 3–12–21; 11:15 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jbell on DSKJLSW7X2PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG21–104–000. Applicants: Crystal Lake Wind Energy III, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Crystal Lake Wind Energy III, LLC. Filed Date: 3/8/21. Accession Number: 20210308–5276. Comments Due: 5 p.m. ET 3/29/21. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–465–000; ER19–465–001; ER19–465–003; ER19– 465–004. Applicants: Midcontinent Independent System Operator, Inc. Description: Midcontinent Independent System Operator, Inc. submits Request to Defer Effective Date of Compliance with Order No. 841. Filed Date: 3/4/21. Accession Number: 20210304–5215. Comments Due: 5 p.m. ET 3/19/21. Docket Numbers: ER19–2858–001. Applicants: East Coast Power Linden Holding, L.L.C. Description: Report Filing: Refund Report to be effective N/A. Filed Date: 3/10/21. Accession Number: 20210310–5077. Comments Due: 5 p.m. ET 3/31/21. Docket Numbers: ER21–1320–000. Applicants: Crystal Lake Wind Energy III, LLC. VerDate Sep<11>2014 16:52 Mar 15, 2021 Jkt 253001 Description: Baseline eTariff Filing: Crystal Lake Wind Energy III, LLC Application for MBR Authority to be effective 5/10/2021. Filed Date: 3/10/21. Accession Number: 20210310–5210. Comments Due: 5 p.m. ET 3/31/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 10, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–05386 Filed 3–15–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5728–021] Sandy Hollow Hydroelectric Company, Inc.; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 5728–021. c. Date filed: March 1, 2021. d. Applicant: Sandy Hollow Hydroelectric Company, Inc. (Sandy Hollow Hydro). e. Name of Project: Sandy Hollow Hydroelectric Project. f. Location: On the Indian River, in the Town of Philadelphia in Jefferson County, New York. The project does not occupy any federal land. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 14423 g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Ms. Kelly Sackheim, 32151 Sandy Hollow Road, Philadelphia, NY 13673; (916) 877– 5947; sandyhollow@kchydro.com. i. FERC Contact: Chris Millard at (202) 502–8256, or christopher.millard@ ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See 94 FERC ¶ 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: April 30, 2021. The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Sandy Hollow Hydroelectric Project (P– 5728–021). m. The application is not ready for environmental analysis at this time. E:\FR\FM\16MRN1.SGM 16MRN1

Agencies

[Federal Register Volume 86, Number 49 (Tuesday, March 16, 2021)]
[Notices]
[Pages 14421-14423]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05492]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING:  Federal Energy Regulatory Commission.

TIME AND DATE: March 18, 2021, 10:00 a.m.

PLACE: Open to the public via audio Webcast only. Join FERC online to 
listen live at https://ferc.capitolconnection.org/.

STATUS: Open.

MATTERS TO BE CONSIDERED: Agenda. * Note--Items listed on the agenda 
may be deleted without further notice.

CONTACT PERSON FOR MORE INFORMATION:  Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's website at https://ferc.capitolconnection.org/ using the 
eLibrary link.

[[Page 14422]]



                                                 1076th--Meeting
                                   [Open meeting; March 18, 2021; 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
          Item No.                      Docket No.                                  Company
----------------------------------------------------------------------------------------------------------------
                                                 ADMINISTRATIVE
----------------------------------------------------------------------------------------------------------------
A-1.........................  AD21-1-000....................  Agency Administrative Matters.
A-2.........................  AD21-2-000....................  Customer Matters, Reliability, Security and Market
                                                               Operations.
A-3.........................  AD06-3-000....................  Market Update.
----------------------------------------------------------------------------------------------------------------
                                                    ELECTRIC
----------------------------------------------------------------------------------------------------------------
E-1.........................  RM18-9-002....................  Participation of Distributed Energy Resource
                                                               Aggregations in Markets Operated by Regional
                                                               Transmission Organizations and Independent System
                                                               Operators.
E-2.........................  RM21-14-000...................  Participation of Aggregators of Retail Demand
                                                               Response Customers in Markets Operated by
                                                               Regional Transmission Organizations and
                                                               Independent System Operators.
E-3.........................  QF17-454-006..................  Broadview Solar, LLC.
E-4.........................  EL19-47-000...................  Independent Market Monitor for PJM v. PJM
                                                               Interconnection, L.L.C.
                              EL19-63-000...................  Office of the People's Counsel for the District of
                                                               Columbia, Delaware Division of the Public
                                                               Advocate, Citizens Utility Board, Indiana Office
                                                               of Utility Consumer Counselor, Maryland Office of
                                                               People's Counsel, Pennsylvania Office of Consumer
                                                               Advocate, West Virginia Consumer Advocate
                                                               Division, and PJM Industrial Customer Coalition
                                                               v. PJM Interconnection, L.L.C.
E-5.........................  EL21-35-000...................  Hollow Road Solar LLC.
E-6.........................  EL21-14-000...................  NextEra Energy, Inc., Evergy, Inc., American
                                                               Electric Power Company, Exelon Corporation, Xcel
                                                               Energy Services Inc.
E-7.........................  RM16-17-000...................  Data Collection for Analytics and Surveillance and
                                                               Market-Based Rate Purposes.
E-8.........................  Omitted                         ..................................................
E-9.........................  ER21-679-000..................  Midcontinent Independent System Operator, Inc.
E-10........................  ER20-1210-001.................  Hazleton Generation LLC.
E-11........................  ER20-1237-000.................  Ameren Illinois Company.
E-12........................  ER19-1276-001.................  Ameren Illinois Company.
E-13........................  ER20-1892-000.................  Midcontinent Independent System Operator, Inc.
E-14........................  ER17-801-010..................  Constellation Power Source Generation, LLC.
E-15........................  ER18-2497-005.................  Lawrenceburg Power, LLC.
E-16........................  EC21-10-000...................  NextEra Energy Transmission, LLC, GridLiance West
                                                               LLC, GridLiance High Plains LLC, and GridLiance
                                                               Hearthland LLC.
E-17........................  RD21-2-000....................  North American Electric Reliability Corporation.
E-18........................  EL21-13-000...................  Californians for Green Nuclear Power, Inc. v.The
                                                               North American Electric Reliability Corporation,
                                                               the Western Electricity Coordinating Council, the
                                                               California Independent System Operator, the
                                                               California Public Utilities Commission, the
                                                               California State Water Resources Control Board,
                                                               and the California State Lands Commission.
E-19........................  EL20-69-000...................  Californians for Renewable Energy and Michael E.
                                                               Boyd v. California Independent System Operator
                                                               Corporation, California Public Utilities
                                                               Commission, Pacific Gas and Electric Company, San
                                                               Diego Gas and Electric Company and Southern
                                                               California Edison Company.
E-20........................  EL21-33-000, QF86-381-001.....  Citrus World, Inc.
E-21........................  ER19-2547-001.................  Pheasant Run Wind, LLC.
E-22........................  ER18-2404-000.................  Southwest Power Pool, Inc.
E-23........................  ER19-477-000..................  Southwest Power Pool, Inc.
E-24........................  ER21-502-001..................  New York Independent System Operator, Inc.
----------------------------------------------------------------------------------------------------------------
                                                       Gas
----------------------------------------------------------------------------------------------------------------
G-1.........................  Omitted                         ..................................................
G-2.........................  RP21-153-000..................  Texas Eastern Transmission, LP.
----------------------------------------------------------------------------------------------------------------
                                                      HYDRO
----------------------------------------------------------------------------------------------------------------
H-1.........................  P-405-106 P-405-121...........  Exelon Generation Company, LLC.
H-2.........................  P-12726-002...................  Warm Springs Hydro LLC
----------------------------------------------------------------------------------------------------------------
                                                  Certificates
----------------------------------------------------------------------------------------------------------------
C-1.........................  RM20-18-000...................  Waiver of the Water Quality Certification
                                                               Requirements of Section 401(a)(1) of the Clean
                                                               Water Act.
C-2.........................  CP20-466-000..................  New Fortress Energy LLC.
C-3.........................  CP20-487-000..................  Northern Natural Gas Company.
C-4.........................  CP17-40-000, CP17-40-001......  Spire STL Pipeline LLC.
C-5.........................  CP17-458-000, CP19-17-000.....  Midship Pipeline Company, LLC.
C-6.........................  IN19-4-000....................  Rover Pipeline, LLC and Energy Transfer Partners,
                                                               L.P.
----------------------------------------------------------------------------------------------------------------



[[Page 14423]]

    Issued: March 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.

    The public is invited to listen to the meeting live at https://ferc.capitolconnection.org/. Anyone with internet access who desires to 
hear this event can do so by navigating to www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its audio webcast. The Capitol Connection provides technical 
support for this free audio webcast. It will also offer access to this 
event via phone bridge for a fee. If you have any questions, visit 
https://ferc.capitolconnection.org/ or contact Shirley Al-Jarani at 703-
993-3104.

[FR Doc. 2021-05492 Filed 3-12-21; 11:15 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.