Sunshine Act Meeting, 14421-14423 [2021-05492]
Download as PDF
Federal Register / Vol. 86, No. 49 / Tuesday, March 16, 2021 / Notices
https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P–15054) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05382 Filed 3–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15059–000]
jbell on DSKJLSW7X2PROD with NOTICES
Kinet, Inc.; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 3, 2020, Kinet, Inc.,
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of a conventional
hydropower project located in
Anderson, Woodford, and Mercer
Counties, Kentucky. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed Kentucky River Lock
and Dam No. 5 Hydroelectric Project
would consist of the following: (1) An
existing 594-foot-long, 36-foot-high,
timber crib dam with concrete overlay
connected to a 390-foot-long, and 38foot-wide abandoned navigation lock,
which are owned by the Kentucky River
Authority; (2) a reservoir with a surface
area of 448 acres and a storage capacity
of 7,500 acre-feet; (3) five, proposed, 32foot-long, 9-foot-diameter penstocks
connected to five generating units with
a combined capacity of 2.4 megawatts,
within the existing lock; (4) a proposed
powerhouse/control room adjacent to
the lock; (5) a 30-foot-long by 63-footwide tailrace; and (6) a 175-foot-long,
12.47 kilo-Volt transmission line. The
proposed project would have an
estimated annual generation of 16,243
megawatt-hours.
Applicant Contact: Dan Panko, Kinet,
Inc., 2401 Monarch Street, Alameda, CA
9401; phone: (802) 578–7973.
1 163
FERC ¶ 62,080 (2018).
VerDate Sep<11>2014
16:52 Mar 15, 2021
FERC Contact: Joshua Dub; phone:
(202) 502–8138.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P–15059) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
Jkt 253001
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14863–001]
BM Energy Park, LLC; Notice of
Surrender of Preliminary Permit
Take notice that BM Energy Park LLC,
permittee for the proposed Banner
PO 00000
Mountain Pumped Storage Hydro
Project, has requested that its
preliminary permit be terminated. The
permit was issued on May 8, 2018 and
would have expired on April 30, 2021.1
The project would have been located in
Converse County, Wyoming.
The preliminary permit for Project
No. 14863 will remain in effect until the
close of business, April 9, 2021. But, if
the Commission is closed on this day,
then the permit remains in effect until
the close of business on the next day in
which the Commission is open.2 New
applications for this site may not be
submitted until after the permit
surrender is effective.
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05381 Filed 3–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
TIME AND DATE:
Open to the public via audio
Webcast only. Join FERC online to listen
live at https://ferc.capitolconnection.org/.
PLACE:
STATUS:
Open.
Agenda.
* Note—Items listed on the agenda may
be deleted without further notice.
MATTERS TO BE CONSIDERED:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
website at https://
ferc.capitolconnection.org/ using the
eLibrary link.
CFR 385.2007(a)(2) (2020).
Frm 00019
Fmt 4703
Sfmt 4703
March 18, 2021, 10:00
a.m.
CONTACT PERSON FOR MORE INFORMATION:
[FR Doc. 2021–05383 Filed 3–15–21; 8:45 am]
2 18
14421
E:\FR\FM\16MRN1.SGM
16MRN1
14422
Federal Register / Vol. 86, No. 49 / Tuesday, March 16, 2021 / Notices
1076TH—MEETING
[Open meeting; March 18, 2021; 10:00 a.m.]
Item No.
Docket No.
Company
ADMINISTRATIVE
A–1 ...................
A–2 ...................
A–3 ...................
AD21–1–000 ............................................
AD21–2–000 ............................................
AD06–3–000 ............................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Market Update.
ELECTRIC
E–1 ...................
RM18–9–002 ...........................................
E–2 ...................
RM21–14–000 .........................................
E–3 ...................
E–4 ...................
QF17–454–006 ........................................
EL19–47–000 ...........................................
EL19–63–000 ...........................................
E–5 ...................
E–6 ...................
EL21–35–000 ...........................................
EL21–14–000 ...........................................
E–7 ...................
E–8 ...................
E–9 ...................
E–10 .................
E–11 .................
E–12 .................
E–13 .................
E–14 .................
E–15 .................
E–16 .................
RM16–17–000 .........................................
Omitted
ER21–679–000 ........................................
ER20–1210–001 ......................................
ER20–1237–000 ......................................
ER19–1276–001 ......................................
ER20–1892–000 ......................................
ER17–801–010 ........................................
ER18–2497–005 ......................................
EC21–10–000 ..........................................
E–17 .................
E–18 .................
RD21–2–000 ............................................
EL21–13–000 ...........................................
E–19 .................
EL20–69–000 ...........................................
E–20
E–21
E–22
E–23
E–24
EL21–33–000, QF86–381–001 ...............
ER19–2547–001 ......................................
ER18–2404–000 ......................................
ER19–477–000 ........................................
ER21–502–001 ........................................
.................
.................
.................
.................
.................
Participation of Distributed Energy Resource Aggregations in Markets Operated by
Regional Transmission Organizations and Independent System Operators.
Participation of Aggregators of Retail Demand Response Customers in Markets
Operated by Regional Transmission Organizations and Independent System
Operators.
Broadview Solar, LLC.
Independent Market Monitor for PJM v. PJM Interconnection, L.L.C.
Office of the People’s Counsel for the District of Columbia, Delaware Division of
the Public Advocate, Citizens Utility Board, Indiana Office of Utility Consumer
Counselor, Maryland Office of People’s Counsel, Pennsylvania Office of Consumer Advocate, West Virginia Consumer Advocate Division, and PJM Industrial Customer Coalition v. PJM Interconnection, L.L.C.
Hollow Road Solar LLC.
NextEra Energy, Inc., Evergy, Inc., American Electric Power Company, Exelon
Corporation, Xcel Energy Services Inc.
Data Collection for Analytics and Surveillance and Market-Based Rate Purposes.
Midcontinent Independent System Operator, Inc.
Hazleton Generation LLC.
Ameren Illinois Company.
Ameren Illinois Company.
Midcontinent Independent System Operator, Inc.
Constellation Power Source Generation, LLC.
Lawrenceburg Power, LLC.
NextEra Energy Transmission, LLC, GridLiance West LLC, GridLiance High Plains
LLC, and GridLiance Hearthland LLC.
North American Electric Reliability Corporation.
Californians for Green Nuclear Power, Inc. v.The North American Electric Reliability Corporation, the Western Electricity Coordinating Council, the California
Independent System Operator, the California Public Utilities Commission, the
California State Water Resources Control Board, and the California State Lands
Commission.
Californians for Renewable Energy and Michael E. Boyd v. California Independent
System Operator Corporation, California Public Utilities Commission, Pacific
Gas and Electric Company, San Diego Gas and Electric Company and Southern California Edison Company.
Citrus World, Inc.
Pheasant Run Wind, LLC.
Southwest Power Pool, Inc.
Southwest Power Pool, Inc.
New York Independent System Operator, Inc.
Gas
G–1 ...................
G–2 ...................
Omitted
RP21–153–000 ........................................
Texas Eastern Transmission, LP.
HYDRO
H–1 ...................
H–2 ...................
P–405–106 P–405–121 ...........................
P–12726–002 ...........................................
Exelon Generation Company, LLC.
Warm Springs Hydro LLC
jbell on DSKJLSW7X2PROD with NOTICES
Certificates
C–1 ...................
RM20–18–000 .........................................
C–2
C–3
C–4
C–5
C–6
CP20–466–000 ........................................
CP20–487–000 ........................................
CP17–40–000, CP17–40–001 .................
CP17–458–000, CP19–17–000 ...............
IN19–4–000 .............................................
...................
...................
...................
...................
...................
VerDate Sep<11>2014
16:52 Mar 15, 2021
Jkt 253001
PO 00000
Frm 00020
Waiver of the Water Quality Certification Requirements of Section 401(a)(1) of the
Clean Water Act.
New Fortress Energy LLC.
Northern Natural Gas Company.
Spire STL Pipeline LLC.
Midship Pipeline Company, LLC.
Rover Pipeline, LLC and Energy Transfer Partners, L.P.
Fmt 4703
Sfmt 4703
E:\FR\FM\16MRN1.SGM
16MRN1
Federal Register / Vol. 86, No. 49 / Tuesday, March 16, 2021 / Notices
Issued: March 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
The public is invited to listen to the
meeting live at https://
ferc.capitolconnection.org/. Anyone
with internet access who desires to hear
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its audio
webcast. The Capitol Connection
provides technical support for this free
audio webcast. It will also offer access
to this event via phone bridge for a fee.
If you have any questions, visit https://
ferc.capitolconnection.org/ or contact
Shirley Al-Jarani at 703–993–3104.
[FR Doc. 2021–05492 Filed 3–12–21; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–104–000.
Applicants: Crystal Lake Wind Energy
III, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Crystal Lake Wind
Energy III, LLC.
Filed Date: 3/8/21.
Accession Number: 20210308–5276.
Comments Due: 5 p.m. ET 3/29/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–465–000;
ER19–465–001; ER19–465–003; ER19–
465–004.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Midcontinent
Independent System Operator, Inc.
submits Request to Defer Effective Date
of Compliance with Order No. 841.
Filed Date: 3/4/21.
Accession Number: 20210304–5215.
Comments Due: 5 p.m. ET 3/19/21.
Docket Numbers: ER19–2858–001.
Applicants: East Coast Power Linden
Holding, L.L.C.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 3/10/21.
Accession Number: 20210310–5077.
Comments Due: 5 p.m. ET 3/31/21.
Docket Numbers: ER21–1320–000.
Applicants: Crystal Lake Wind Energy
III, LLC.
VerDate Sep<11>2014
16:52 Mar 15, 2021
Jkt 253001
Description: Baseline eTariff Filing:
Crystal Lake Wind Energy III, LLC
Application for MBR Authority to be
effective 5/10/2021.
Filed Date: 3/10/21.
Accession Number: 20210310–5210.
Comments Due: 5 p.m. ET 3/31/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05386 Filed 3–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5728–021]
Sandy Hollow Hydroelectric Company,
Inc.; Notice of Application Tendered
for Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 5728–021.
c. Date filed: March 1, 2021.
d. Applicant: Sandy Hollow
Hydroelectric Company, Inc. (Sandy
Hollow Hydro).
e. Name of Project: Sandy Hollow
Hydroelectric Project.
f. Location: On the Indian River, in
the Town of Philadelphia in Jefferson
County, New York. The project does not
occupy any federal land.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
14423
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Kelly
Sackheim, 32151 Sandy Hollow Road,
Philadelphia, NY 13673; (916) 877–
5947; sandyhollow@kchydro.com.
i. FERC Contact: Chris Millard at
(202) 502–8256, or christopher.millard@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: April 30, 2021.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings
must clearly identify the project name
and docket number on the first page:
Sandy Hollow Hydroelectric Project (P–
5728–021).
m. The application is not ready for
environmental analysis at this time.
E:\FR\FM\16MRN1.SGM
16MRN1
Agencies
[Federal Register Volume 86, Number 49 (Tuesday, March 16, 2021)]
[Notices]
[Pages 14421-14423]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05492]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
TIME AND DATE: March 18, 2021, 10:00 a.m.
PLACE: Open to the public via audio Webcast only. Join FERC online to
listen live at https://ferc.capitolconnection.org/.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda. * Note--Items listed on the agenda
may be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's website at https://ferc.capitolconnection.org/ using the
eLibrary link.
[[Page 14422]]
1076th--Meeting
[Open meeting; March 18, 2021; 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
ADMINISTRATIVE
----------------------------------------------------------------------------------------------------------------
A-1......................... AD21-1-000.................... Agency Administrative Matters.
A-2......................... AD21-2-000.................... Customer Matters, Reliability, Security and Market
Operations.
A-3......................... AD06-3-000.................... Market Update.
----------------------------------------------------------------------------------------------------------------
ELECTRIC
----------------------------------------------------------------------------------------------------------------
E-1......................... RM18-9-002.................... Participation of Distributed Energy Resource
Aggregations in Markets Operated by Regional
Transmission Organizations and Independent System
Operators.
E-2......................... RM21-14-000................... Participation of Aggregators of Retail Demand
Response Customers in Markets Operated by
Regional Transmission Organizations and
Independent System Operators.
E-3......................... QF17-454-006.................. Broadview Solar, LLC.
E-4......................... EL19-47-000................... Independent Market Monitor for PJM v. PJM
Interconnection, L.L.C.
EL19-63-000................... Office of the People's Counsel for the District of
Columbia, Delaware Division of the Public
Advocate, Citizens Utility Board, Indiana Office
of Utility Consumer Counselor, Maryland Office of
People's Counsel, Pennsylvania Office of Consumer
Advocate, West Virginia Consumer Advocate
Division, and PJM Industrial Customer Coalition
v. PJM Interconnection, L.L.C.
E-5......................... EL21-35-000................... Hollow Road Solar LLC.
E-6......................... EL21-14-000................... NextEra Energy, Inc., Evergy, Inc., American
Electric Power Company, Exelon Corporation, Xcel
Energy Services Inc.
E-7......................... RM16-17-000................... Data Collection for Analytics and Surveillance and
Market-Based Rate Purposes.
E-8......................... Omitted ..................................................
E-9......................... ER21-679-000.................. Midcontinent Independent System Operator, Inc.
E-10........................ ER20-1210-001................. Hazleton Generation LLC.
E-11........................ ER20-1237-000................. Ameren Illinois Company.
E-12........................ ER19-1276-001................. Ameren Illinois Company.
E-13........................ ER20-1892-000................. Midcontinent Independent System Operator, Inc.
E-14........................ ER17-801-010.................. Constellation Power Source Generation, LLC.
E-15........................ ER18-2497-005................. Lawrenceburg Power, LLC.
E-16........................ EC21-10-000................... NextEra Energy Transmission, LLC, GridLiance West
LLC, GridLiance High Plains LLC, and GridLiance
Hearthland LLC.
E-17........................ RD21-2-000.................... North American Electric Reliability Corporation.
E-18........................ EL21-13-000................... Californians for Green Nuclear Power, Inc. v.The
North American Electric Reliability Corporation,
the Western Electricity Coordinating Council, the
California Independent System Operator, the
California Public Utilities Commission, the
California State Water Resources Control Board,
and the California State Lands Commission.
E-19........................ EL20-69-000................... Californians for Renewable Energy and Michael E.
Boyd v. California Independent System Operator
Corporation, California Public Utilities
Commission, Pacific Gas and Electric Company, San
Diego Gas and Electric Company and Southern
California Edison Company.
E-20........................ EL21-33-000, QF86-381-001..... Citrus World, Inc.
E-21........................ ER19-2547-001................. Pheasant Run Wind, LLC.
E-22........................ ER18-2404-000................. Southwest Power Pool, Inc.
E-23........................ ER19-477-000.................. Southwest Power Pool, Inc.
E-24........................ ER21-502-001.................. New York Independent System Operator, Inc.
----------------------------------------------------------------------------------------------------------------
Gas
----------------------------------------------------------------------------------------------------------------
G-1......................... Omitted ..................................................
G-2......................... RP21-153-000.................. Texas Eastern Transmission, LP.
----------------------------------------------------------------------------------------------------------------
HYDRO
----------------------------------------------------------------------------------------------------------------
H-1......................... P-405-106 P-405-121........... Exelon Generation Company, LLC.
H-2......................... P-12726-002................... Warm Springs Hydro LLC
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1......................... RM20-18-000................... Waiver of the Water Quality Certification
Requirements of Section 401(a)(1) of the Clean
Water Act.
C-2......................... CP20-466-000.................. New Fortress Energy LLC.
C-3......................... CP20-487-000.................. Northern Natural Gas Company.
C-4......................... CP17-40-000, CP17-40-001...... Spire STL Pipeline LLC.
C-5......................... CP17-458-000, CP19-17-000..... Midship Pipeline Company, LLC.
C-6......................... IN19-4-000.................... Rover Pipeline, LLC and Energy Transfer Partners,
L.P.
----------------------------------------------------------------------------------------------------------------
[[Page 14423]]
Issued: March 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
The public is invited to listen to the meeting live at https://ferc.capitolconnection.org/. Anyone with internet access who desires to
hear this event can do so by navigating to www.ferc.gov's Calendar of
Events and locating this event in the Calendar. The event will contain
a link to its audio webcast. The Capitol Connection provides technical
support for this free audio webcast. It will also offer access to this
event via phone bridge for a fee. If you have any questions, visit
https://ferc.capitolconnection.org/ or contact Shirley Al-Jarani at 703-
993-3104.
[FR Doc. 2021-05492 Filed 3-12-21; 11:15 am]
BILLING CODE 6717-01-P