Sandy Hollow Hydroelectric Company, Inc.; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 14423-14424 [2021-05389]
Download as PDF
Federal Register / Vol. 86, No. 49 / Tuesday, March 16, 2021 / Notices
Issued: March 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
The public is invited to listen to the
meeting live at https://
ferc.capitolconnection.org/. Anyone
with internet access who desires to hear
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its audio
webcast. The Capitol Connection
provides technical support for this free
audio webcast. It will also offer access
to this event via phone bridge for a fee.
If you have any questions, visit https://
ferc.capitolconnection.org/ or contact
Shirley Al-Jarani at 703–993–3104.
[FR Doc. 2021–05492 Filed 3–12–21; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–104–000.
Applicants: Crystal Lake Wind Energy
III, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Crystal Lake Wind
Energy III, LLC.
Filed Date: 3/8/21.
Accession Number: 20210308–5276.
Comments Due: 5 p.m. ET 3/29/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–465–000;
ER19–465–001; ER19–465–003; ER19–
465–004.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Midcontinent
Independent System Operator, Inc.
submits Request to Defer Effective Date
of Compliance with Order No. 841.
Filed Date: 3/4/21.
Accession Number: 20210304–5215.
Comments Due: 5 p.m. ET 3/19/21.
Docket Numbers: ER19–2858–001.
Applicants: East Coast Power Linden
Holding, L.L.C.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 3/10/21.
Accession Number: 20210310–5077.
Comments Due: 5 p.m. ET 3/31/21.
Docket Numbers: ER21–1320–000.
Applicants: Crystal Lake Wind Energy
III, LLC.
VerDate Sep<11>2014
16:52 Mar 15, 2021
Jkt 253001
Description: Baseline eTariff Filing:
Crystal Lake Wind Energy III, LLC
Application for MBR Authority to be
effective 5/10/2021.
Filed Date: 3/10/21.
Accession Number: 20210310–5210.
Comments Due: 5 p.m. ET 3/31/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05386 Filed 3–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5728–021]
Sandy Hollow Hydroelectric Company,
Inc.; Notice of Application Tendered
for Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 5728–021.
c. Date filed: March 1, 2021.
d. Applicant: Sandy Hollow
Hydroelectric Company, Inc. (Sandy
Hollow Hydro).
e. Name of Project: Sandy Hollow
Hydroelectric Project.
f. Location: On the Indian River, in
the Town of Philadelphia in Jefferson
County, New York. The project does not
occupy any federal land.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
14423
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Kelly
Sackheim, 32151 Sandy Hollow Road,
Philadelphia, NY 13673; (916) 877–
5947; sandyhollow@kchydro.com.
i. FERC Contact: Chris Millard at
(202) 502–8256, or christopher.millard@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: April 30, 2021.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings
must clearly identify the project name
and docket number on the first page:
Sandy Hollow Hydroelectric Project (P–
5728–021).
m. The application is not ready for
environmental analysis at this time.
E:\FR\FM\16MRN1.SGM
16MRN1
jbell on DSKJLSW7X2PROD with NOTICES
14424
Federal Register / Vol. 86, No. 49 / Tuesday, March 16, 2021 / Notices
n. Project Description: The existing
Sandy Hollow Hydroelectric Project
consists of (1) a 20-acre reservoir at a
normal pool elevation of 419.1 feet
National Geodetic Vertical Datum of
1929; (2) a main 106-foot-long concrete
gravity dam with a maximum height of
25 feet that includes a 55-foot-long
spillway, and three 3- to 4-foot-high
concrete diversion spillway dams that
are 21 feet, 46 feet and 64 feet long,
respectively; (3) a 23-foot-long by 23foot-wide brick and concrete
powerhouse containing a 150-kilowatt
(kW), a 265-kW, and a 400-kW turbinegenerator unit; (4) two 12- to 15-footlong, 6-foot-diameter steel penstocks,
with one penstock that bifurcates before
joining the two turbine units; (5) two
trash racks; (6) a 400-foot-long tailrace
channel; (7) a 480-volt, 300-foot-long
transmission line connecting to a 480volt to 23-kilovolt step-up transformer at
a nearby substation; and (8) appurtenant
facilities. The average annual generation
was 933 megawatt-hours between 2012
and 2017.
The project is operated in a run-ofriver mode and discharges a minimum
flow of 35 cubic feet per second (cfs) or
inflow to the reservoir, whichever is
less, into the project’s bypassed reach
for the protection and enhancement of
aquatic resources.
As part of the license application,
Sandy Hollow Hydro filed a settlement
agreement entered into between itself,
the U.S. Fish and Wildlife Service, and
the New York State Department of
Environmental Conservation. As part of
the settlement agreement, Sandy Hollow
Hydro proposes to: (1) Continue to
operate the project in a run-of-river
mode; (2) provide a year-round
minimum flow in the bypassed reach of
35 cfs, or inflow, whichever is less; (3)
continue the existing stream flow and
water level monitoring; (4) maintain the
existing trash rack on turbine unit 3
with 1-inch clear spacing and, within 5
years of any license issued for the
project, install trash racks with either
1-inch clear spacing or the equivalent
(e.g., an overlay-type system) on turbine
units 1 and 2; (5) within 3 years of the
effective date of any license issued for
the project, install and maintain a yearround downstream fish passage
structure at one of the three diversion
spillway dams; (6) maintain the existing
portage trail; and (7) implement the
Invasive Species Management Plan filed
with the final license application.
o. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
VerDate Sep<11>2014
16:52 Mar 15, 2021
Jkt 253001
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–5728).
At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter (if
necessary).
Request Additional Information.
Issue Acceptance Letter .......
Issue Scoping Document 1
for comments.
Request Additional Information (if necessary).
Issue Scoping Document 2 ..
Issue Notice of Ready for
Environmental Analysis.
April 2021
July 2021
August 2021
October 2021
[FR Doc. 2021–05389 Filed 3–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Frm 00022
Fmt 4703
EG21–52–000
EG21–53–000
EG21–54–000
EG21–55–000
EG21–57–000
EG21–58–000
EG21–59–000
EG21–60–000
EG21–61–000
EG21–62–000
EG21–63–000
Take notice that during the month of
February 2021, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a) (2020).
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05388 Filed 3–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15060–000]
November
2021
November
2021
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
PO 00000
EG21–50–000
EG21–51–000
April 2021
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Wolf Ridge Wind Energy,
LLC.
Blue Summit I Wind, LLC ...
Dickerson Power, LLC .........
Morgantown Power, LLC .....
Morgantown Station, LLC ....
Water Strider Solar, LLC .....
325MK 8ME LLC ..................
Chalk Point Power, LLC ......
Flat Ridge 2 Wind Energy
LLC.
Harry Allen Solar Energy
LLC.
Centerfield Cooper Solar,
LLC.
PGR Lessee O, LLC ..............
Dry Lake Solar Holdings
LLC.
HO Clarke II, LLC .................
Indiana Crossroads Wind
Farm LLC.
Wallingford Renewable Energy LLC.
Topaz II, LLC ........................
Braes Bayou Generating,
LLC.
KCE TX 23, LLC ...................
Midway-Sunset Cogeneration Company.
EG21–43–000
EG21–44–000
EG21–45–000
EG21–46–000
EG21–47–000
EG21–48–000
EG21–49–000
Sfmt 4703
Kinet, Inc.; Notice of Preliminary
Permit Application Accepted For Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 3, 2020, Kinet, Inc.,
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of a conventional
hydropower project located in
Jessamine, Woodford, and Mercer
Counties, Kentucky. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed Kentucky River Lock
and Dam No. 6 Hydroelectric Project
would consist of the following: (1) An
existing 465-foot-long, 34-foot-high,
timber crib dam with concrete overlay
connected to a 280-foot-long, and 45foot-wide abandoned navigation lock,
which are owned by the Kentucky River
E:\FR\FM\16MRN1.SGM
16MRN1
Agencies
[Federal Register Volume 86, Number 49 (Tuesday, March 16, 2021)]
[Notices]
[Pages 14423-14424]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05389]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5728-021]
Sandy Hollow Hydroelectric Company, Inc.; Notice of Application
Tendered for Filing With the Commission and Soliciting Additional Study
Requests and Establishing Procedural Schedule for Relicensing and a
Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 5728-021.
c. Date filed: March 1, 2021.
d. Applicant: Sandy Hollow Hydroelectric Company, Inc. (Sandy
Hollow Hydro).
e. Name of Project: Sandy Hollow Hydroelectric Project.
f. Location: On the Indian River, in the Town of Philadelphia in
Jefferson County, New York. The project does not occupy any federal
land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Kelly Sackheim, 32151 Sandy Hollow Road,
Philadelphia, NY 13673; (916) 877-5947; [email protected].
i. FERC Contact: Chris Millard at (202) 502-8256, or
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: April 30, 2021.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. All filings must clearly identify the project name and
docket number on the first page: Sandy Hollow Hydroelectric Project (P-
5728-021).
m. The application is not ready for environmental analysis at this
time.
[[Page 14424]]
n. Project Description: The existing Sandy Hollow Hydroelectric
Project consists of (1) a 20-acre reservoir at a normal pool elevation
of 419.1 feet National Geodetic Vertical Datum of 1929; (2) a main 106-
foot-long concrete gravity dam with a maximum height of 25 feet that
includes a 55-foot-long spillway, and three 3- to 4-foot-high concrete
diversion spillway dams that are 21 feet, 46 feet and 64 feet long,
respectively; (3) a 23-foot-long by 23-foot-wide brick and concrete
powerhouse containing a 150-kilowatt (kW), a 265-kW, and a 400-kW
turbine-generator unit; (4) two 12- to 15-foot-long, 6-foot-diameter
steel penstocks, with one penstock that bifurcates before joining the
two turbine units; (5) two trash racks; (6) a 400-foot-long tailrace
channel; (7) a 480-volt, 300-foot-long transmission line connecting to
a 480-volt to 23-kilovolt step-up transformer at a nearby substation;
and (8) appurtenant facilities. The average annual generation was 933
megawatt-hours between 2012 and 2017.
The project is operated in a run-of-river mode and discharges a
minimum flow of 35 cubic feet per second (cfs) or inflow to the
reservoir, whichever is less, into the project's bypassed reach for the
protection and enhancement of aquatic resources.
As part of the license application, Sandy Hollow Hydro filed a
settlement agreement entered into between itself, the U.S. Fish and
Wildlife Service, and the New York State Department of Environmental
Conservation. As part of the settlement agreement, Sandy Hollow Hydro
proposes to: (1) Continue to operate the project in a run-of-river
mode; (2) provide a year-round minimum flow in the bypassed reach of 35
cfs, or inflow, whichever is less; (3) continue the existing stream
flow and water level monitoring; (4) maintain the existing trash rack
on turbine unit 3 with 1-inch clear spacing and, within 5 years of any
license issued for the project, install trash racks with either 1-inch
clear spacing or the equivalent (e.g., an overlay-type system) on
turbine units 1 and 2; (5) within 3 years of the effective date of any
license issued for the project, install and maintain a year-round
downstream fish passage structure at one of the three diversion
spillway dams; (6) maintain the existing portage trail; and (7)
implement the Invasive Species Management Plan filed with the final
license application.
o. In addition to publishing the full text of this notice in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., license application) via
the internet through the Commission's Home Page (https://www.ferc.gov)
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document (P-
5728). At this time, the Commission has suspended access to the
Commission's Public Reference Room due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19)
issued by the President on March 13, 2020. For assistance, contact FERC
at [email protected] or call toll-free, (866) 208-3676 or
(202) 502-8659 (TTY).
You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule: The application will be processed according
to the following preliminary schedule. Revisions to the schedule will
be made as appropriate.
Issue Deficiency Letter (if necessary)... April 2021
Request Additional Information........... April 2021
Issue Acceptance Letter.................. July 2021
Issue Scoping Document 1 for comments.... August 2021
Request Additional Information (if October 2021
necessary).
Issue Scoping Document 2................. November 2021
Issue Notice of Ready for Environmental November 2021
Analysis.
q. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-05389 Filed 3-15-21; 8:45 am]
BILLING CODE 6717-01-P