n. Project Description: The existing
Sandy Hollow Hydroelectric Project
consists of (1) a 20-acre reservoir at a
normal pool elevation of 419.1 feet
National Geodetic Vertical Datum of
1929; (2) a main 106-foot-long concrete
gravity dam with a maximum height of
25 feet that includes a 55-foot-long
spillway, and three 3- to 4-foot-high
concrete diversion spillway dams that
are 21 feet, 46 feet and 64 feet long,
respectively; (3) a 23-foot-long by 23foot-wide brick and concrete
powerhouse containing a 150-kilowatt
(kW), a 265-kW, and a 400-kW turbinegenerator unit; (4) two 12- to 15-footlong, 6-foot-diameter steel penstocks,
with one penstock that bifurcates before
joining the two turbine units; (5) two
trash racks; (6) a 400-foot-long tailrace
channel; (7) a 480-volt, 300-foot-long
transmission line connecting to a 480volt to 23-kilovolt step-up transformer at
a nearby substation; and (8) appurtenant
facilities. The average annual generation
was 933 megawatt-hours between 2012
and 2017.
The project is operated in a run-ofriver mode and discharges a minimum
flow of 35 cubic feet per second (cfs) or
inflow to the reservoir, whichever is
less, into the project’s bypassed reach
for the protection and enhancement of
aquatic resources.
As part of the license application,
Sandy Hollow Hydro filed a settlement
agreement entered into between itself,
the U.S. Fish and Wildlife Service, and
the New York State Department of
Environmental Conservation. As part of
the settlement agreement, Sandy Hollow
Hydro proposes to: (1) Continue to
operate the project in a run-of-river
mode; (2) provide a year-round
minimum flow in the bypassed reach of
35 cfs, or inflow, whichever is less; (3)
continue the existing stream flow and
water level monitoring; (4) maintain the
existing trash rack on turbine unit 3
with 1-inch clear spacing and, within 5
years of any license issued for the
project, install trash racks with either
1-inch clear spacing or the equivalent
(e.g., an overlay-type system) on turbine
units 1 and 2; (5) within 3 years of the
effective date of any license issued for
the project, install and maintain a yearround downstream fish passage
structure at one of the three diversion
spillway dams; (6) maintain the existing
portage trail; and (7) implement the
Invasive Species Management Plan filed
with the final license application.
o. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
VerDate Sep<11>2014
16:52 Mar 15, 2021
Jkt 253001
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–5728).
At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter (if
necessary).
Request Additional Information.
Issue Acceptance Letter .......
Issue Scoping Document 1
for comments.
Request Additional Information (if necessary).
Issue Scoping Document 2 ..
Issue Notice of Ready for
Environmental Analysis.
April 2021
July 2021
August 2021
October 2021
[FR Doc. 2021–05389 Filed 3–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Frm 00022
Fmt 4703
EG21–52–000
EG21–53–000
EG21–54–000
EG21–55–000
EG21–57–000
EG21–58–000
EG21–59–000
EG21–60–000
EG21–61–000
EG21–62–000
EG21–63–000
Take notice that during the month of
February 2021, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a) (2020).
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05388 Filed 3–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15060–000]
November
2021
November
2021
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
PO 00000
EG21–50–000
EG21–51–000
April 2021
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Wolf Ridge Wind Energy,
LLC.
Blue Summit I Wind, LLC ...
Dickerson Power, LLC .........
Morgantown Power, LLC .....
Morgantown Station, LLC ....
Water Strider Solar, LLC .....
325MK 8ME LLC ..................
Chalk Point Power, LLC ......
Flat Ridge 2 Wind Energy
LLC.
Harry Allen Solar Energy
LLC.
Centerfield Cooper Solar,
LLC.
PGR Lessee O, LLC ..............
Dry Lake Solar Holdings
LLC.
HO Clarke II, LLC .................
Indiana Crossroads Wind
Farm LLC.
Wallingford Renewable Energy LLC.
Topaz II, LLC ........................
Braes Bayou Generating,
LLC.
KCE TX 23, LLC ...................
Midway-Sunset Cogeneration Company.
EG21–43–000
EG21–44–000
EG21–45–000
EG21–46–000
EG21–47–000
EG21–48–000
EG21–49–000
Sfmt 4703
Kinet, Inc.; Notice of Preliminary
Permit Application Accepted For Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 3, 2020, Kinet, Inc.,
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of a conventional
hydropower project located in
Jessamine, Woodford, and Mercer
Counties, Kentucky. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed Kentucky River Lock
and Dam No. 6 Hydroelectric Project
would consist of the following: (1) An
existing 465-foot-long, 34-foot-high,
timber crib dam with concrete overlay
connected to a 280-foot-long, and 45foot-wide abandoned navigation lock,
which are owned by the Kentucky River
E:\FR\FM\16MRN1.SGM
16MRN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 86, No. 49 / Tuesday, March 16, 2021 / Notices
Authority; (2) a reservoir with a surface
area of 666 acres and a storage capacity
of 12,000 acre-feet; (3) five, proposed,
32-foot-long, 9-foot-diameter penstocks
connected to five generating units with
a combined capacity of 2.1 megawatts,
within the existing lock; (4) a proposed
powerhouse/control room adjacent to
the lock; (5) a 30-foot-long by 63-footwide tailrace; and (6) a 270-foot-long,
12.47 kilo-Volt transmission line. The
proposed project would have an
estimated annual generation of 13,998
megawatt-hours.
Applicant Contact: Dan Panko, Kinet,
Inc., 2401 Monarch Street, Alameda, CA
9401; phone: (802) 578–7973.
FERC Contact: Joshua Dub; phone:
(202) 502–8138.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P–15060) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
VerDate Sep<11>2014
16:52 Mar 15, 2021
Jkt 253001
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05384 Filed 3–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–105–000.
Applicants: Elara Energy Project, LLC.
Description: Elara Energy Project, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 3/4/21.
Accession Number: 20210304–5214.
Comments Due: 5 p.m. ET 3/25/21.
Docket Numbers: EG21–106–000.
Applicants: Taygete Energy Project II,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Taygete Energy
Project II, LLC.
Filed Date: 3/10/21.
Accession Number: 20210310–5068.
Comments Due: 5 p.m. ET 3/31/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2034–007;
ER15–190–016; ER18–490–000.
Applicants: Duke Energy Renewable
Services, LLC, Duke Energy Indiana,
LLC.
Description: Supplement to December
18, 2020 Triennial Market Power
Analysis for Central Region of Duke
Companies.
Filed Date: 3/4/21.
Accession Number: 20210304–5210.
Comments Due: 5 p.m. ET 3/25/21.
Docket Numbers: ER18–126–001;
ER16–2019–005.
Applicants: AL Solar A, LLC, Five
Points Solar Park LLC.
Description: Notice of Non-Material
Change in Status of AL Solar A, LLC, et
al.
Filed Date: 3/9/21.
Accession Number: 20210309–5195.
Comments Due: 5 p.m. ET 3/30/21.
Docket Numbers: ER21–1176–000.
Applicants: Delta’s Edge Solar, LLC.
Description: Delta’s Edge Solar, LLC
submits Supplemental Information
Regarding the Application for Market
Based Rate Authority.
Filed Date: 2/25/21.
Accession Number: 20210225–5221.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
14425
Comments Due: 5 p.m. ET 3/18/21.
Docket Numbers: ER21–1249–001.
Applicants: Vineyard Reliability LLC.
Description: Tariff Amendment:
Vineyard_Rel_MBRA_App_Supp to be
effective 3/5/2021.
Filed Date: 3/10/21.
Accession Number: 20210310–5000.
Comments Due: 5 p.m. ET 3/24/21.
Docket Numbers: ER21–1310–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA, SA No.
4730; Queue No. AC1–039 to be
effective 4/26/2021.
Filed Date: 3/9/21.
Accession Number: 20210309–5166.
Comments Due: 5 p.m. ET 3/30/21.
Docket Numbers: ER21–1312–000.
Applicants: New York State Electric &
Gas Corporation, New York
Independent System Operator, Inc.
Description: § 205(d) Rate Filing: 205:
NYISO–NYSEG Joint LGIA 2487 among
NYISO, NYSEG, Baron Winds to be
effective 2/24/2021.
Filed Date: 3/10/21.
Accession Number: 20210310–5051.
Comments Due: 5 p.m. ET 3/31/21.
Docket Numbers: ER21–1314–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Service Agreement No.
849 to be effective 2/11/2021.
Filed Date: 3/10/21.
Accession Number: 20210310–5091.
Comments Due: 5 p.m. ET 3/31/21.
Docket Numbers: ER21–1315–000.
Applicants: Midcontinent
Independent System Operator Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
2021–03–10_SA 2775 ATC-Marshfield
1st Rev CFA to be effective 5/10/2021.
Filed Date: 3/10/21.
Accession Number: 20210310–5106.
Comments Due: 5 p.m. ET 3/31/21.
Docket Numbers: ER21–1316–000.
Applicants: Louisville Gas and
Electric Company.
Description: § 205(d) Rate Filing:
EKPC Bullitt County CIAC Agreement to
be effective 3/10/2021.
Filed Date: 3/10/21.
Accession Number: 20210310–5138.
Comments Due: 5 p.m. ET 3/31/21.
Docket Numbers: ER21–1317–000.
Applicants: Kentucky Utilities
Company.
Description: § 205(d) Rate Filing: KU
Concurrence EKPC Bullitt County CIAC
Agreement to be effective 3/10/2021.
Filed Date: 3/10/21.
Accession Number: 20210310–5139.
Comments Due: 5 p.m. ET 3/31/21.
E:\FR\FM\16MRN1.SGM
16MRN1
Agencies
[Federal Register Volume 86, Number 49 (Tuesday, March 16, 2021)]
[Notices]
[Pages 14424-14425]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05384]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15060-000]
Kinet, Inc.; Notice of Preliminary Permit Application Accepted
For Filing and Soliciting Comments, Motions To Intervene, and Competing
Applications
On December 3, 2020, Kinet, Inc., filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of a conventional hydropower
project located in Jessamine, Woodford, and Mercer Counties, Kentucky.
The sole purpose of a preliminary permit, if issued, is to grant the
permit holder priority to file a license application during the permit
term. A preliminary permit does not authorize the permit holder to
perform any land-disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed Kentucky River Lock and Dam No. 6 Hydroelectric
Project would consist of the following: (1) An existing 465-foot-long,
34-foot-high, timber crib dam with concrete overlay connected to a 280-
foot-long, and 45-foot-wide abandoned navigation lock, which are owned
by the Kentucky River
[[Page 14425]]
Authority; (2) a reservoir with a surface area of 666 acres and a
storage capacity of 12,000 acre-feet; (3) five, proposed, 32-foot-long,
9-foot-diameter penstocks connected to five generating units with a
combined capacity of 2.1 megawatts, within the existing lock; (4) a
proposed powerhouse/control room adjacent to the lock; (5) a 30-foot-
long by 63-foot-wide tailrace; and (6) a 270-foot-long, 12.47 kilo-Volt
transmission line. The proposed project would have an estimated annual
generation of 13,998 megawatt-hours.
Applicant Contact: Dan Panko, Kinet, Inc., 2401 Monarch Street,
Alameda, CA 9401; phone: (802) 578-7973.
FERC Contact: Joshua Dub; phone: (202) 502-8138.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P-15060) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-05384 Filed 3-15-21; 8:45 am]
BILLING CODE 6717-01-P