BM Energy Park, LLC; Notice of Surrender of Preliminary Permit, 14421 [2021-05381]
Download as PDF
Federal Register / Vol. 86, No. 49 / Tuesday, March 16, 2021 / Notices
https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P–15054) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05382 Filed 3–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15059–000]
jbell on DSKJLSW7X2PROD with NOTICES
Kinet, Inc.; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 3, 2020, Kinet, Inc.,
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of a conventional
hydropower project located in
Anderson, Woodford, and Mercer
Counties, Kentucky. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed Kentucky River Lock
and Dam No. 5 Hydroelectric Project
would consist of the following: (1) An
existing 594-foot-long, 36-foot-high,
timber crib dam with concrete overlay
connected to a 390-foot-long, and 38foot-wide abandoned navigation lock,
which are owned by the Kentucky River
Authority; (2) a reservoir with a surface
area of 448 acres and a storage capacity
of 7,500 acre-feet; (3) five, proposed, 32foot-long, 9-foot-diameter penstocks
connected to five generating units with
a combined capacity of 2.4 megawatts,
within the existing lock; (4) a proposed
powerhouse/control room adjacent to
the lock; (5) a 30-foot-long by 63-footwide tailrace; and (6) a 175-foot-long,
12.47 kilo-Volt transmission line. The
proposed project would have an
estimated annual generation of 16,243
megawatt-hours.
Applicant Contact: Dan Panko, Kinet,
Inc., 2401 Monarch Street, Alameda, CA
9401; phone: (802) 578–7973.
1 163
FERC ¶ 62,080 (2018).
VerDate Sep<11>2014
16:52 Mar 15, 2021
FERC Contact: Joshua Dub; phone:
(202) 502–8138.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P–15059) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
Jkt 253001
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14863–001]
BM Energy Park, LLC; Notice of
Surrender of Preliminary Permit
Take notice that BM Energy Park LLC,
permittee for the proposed Banner
PO 00000
Mountain Pumped Storage Hydro
Project, has requested that its
preliminary permit be terminated. The
permit was issued on May 8, 2018 and
would have expired on April 30, 2021.1
The project would have been located in
Converse County, Wyoming.
The preliminary permit for Project
No. 14863 will remain in effect until the
close of business, April 9, 2021. But, if
the Commission is closed on this day,
then the permit remains in effect until
the close of business on the next day in
which the Commission is open.2 New
applications for this site may not be
submitted until after the permit
surrender is effective.
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05381 Filed 3–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
TIME AND DATE:
Open to the public via audio
Webcast only. Join FERC online to listen
live at https://ferc.capitolconnection.org/.
PLACE:
STATUS:
Open.
Agenda.
* Note—Items listed on the agenda may
be deleted without further notice.
MATTERS TO BE CONSIDERED:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
website at https://
ferc.capitolconnection.org/ using the
eLibrary link.
CFR 385.2007(a)(2) (2020).
Frm 00019
Fmt 4703
Sfmt 4703
March 18, 2021, 10:00
a.m.
CONTACT PERSON FOR MORE INFORMATION:
[FR Doc. 2021–05383 Filed 3–15–21; 8:45 am]
2 18
14421
E:\FR\FM\16MRN1.SGM
16MRN1
Agencies
[Federal Register Volume 86, Number 49 (Tuesday, March 16, 2021)]
[Notices]
[Page 14421]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05381]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14863-001]
BM Energy Park, LLC; Notice of Surrender of Preliminary Permit
Take notice that BM Energy Park LLC, permittee for the proposed
Banner Mountain Pumped Storage Hydro Project, has requested that its
preliminary permit be terminated. The permit was issued on May 8, 2018
and would have expired on April 30, 2021.\1\ The project would have
been located in Converse County, Wyoming.
---------------------------------------------------------------------------
\1\ 163 FERC ] 62,080 (2018).
---------------------------------------------------------------------------
The preliminary permit for Project No. 14863 will remain in effect
until the close of business, April 9, 2021. But, if the Commission is
closed on this day, then the permit remains in effect until the close
of business on the next day in which the Commission is open.\2\ New
applications for this site may not be submitted until after the permit
surrender is effective.
---------------------------------------------------------------------------
\2\ 18 CFR 385.2007(a)(2) (2020).
Dated: March 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-05381 Filed 3-15-21; 8:45 am]
BILLING CODE 6717-01-P