Southern Natural Gas Company, L.L.C.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 14319-14320 [2021-05249]
Download as PDF
Federal Register / Vol. 86, No. 48 / Monday, March 15, 2021 / Notices
SUPPLEMENTARY INFORMATION:
AmeriCorps Seniors has proposed an
electronic collection technique of an
online survey as a way to minimize the
burden of the collection of the
information. The survey will be
submitted only once per grantee and
estimated time for completion is less
than 30 minutes, based on staff testing
of the survey. The survey will be
submitted electronically, can be
completed across multiple technical
platforms, and questions have been
crafted for ease of reporting and efficient
collection. The survey will be
complemented with an in-depth set of
instructions. Staff will also be available
to provide individualized assistance, if
needed.
Comments
khammond on DSKJM1Z7X2PROD with NOTICES
Title of Collection: AmeriCorps
Seniors Alternative Service Plan
Reporting.
OMB Control Number: 3045–0035
Type of Review: New Information
Collection.
Respondents/Affected Public:
Nonprofit organizations that are
grantees of AmeriCorps Seniors.
Total Estimated Number of Annual
Responses: 1,100.
Total Estimated Number of Annual
Burden Hours: 550 hours.
Abstract: The information provided
by the survey will enable AmeriCorps to
learn if and how current grantees are
engaged in service during the COVID–19
pandemic.
Additionally, it provides information
to AmeriCorps Seniors about how soon
grantees can begin in-person service
activities and the likelihood they can do
so. This will enable AmeriCorps Seniors
to better target training and technical
assistance to grantees. Information
collected will also influence the
decision as to extending the March 31
deadline of the temporary allowance—
the small payments made to volunteers
who are unable to serve due to
COPVID–19—in lieu of their traditional
stipend.
Dated: March 10, 2021.
Atalaya Jones Sergi,
Director, AmeriCorps Seniors.
[FR Doc. 2021–05313 Filed 3–12–21; 8:45 am]
BILLING CODE 6050–28–P
VerDate Sep<11>2014
16:36 Mar 12, 2021
Jkt 253001
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on May 7, 2021. How to
file protests, motions to intervene, and
comments is explained below.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–60–000]
Southern Natural Gas Company,
L.L.C.; Notice of Request Under
Blanket Authorization and Establishing
Intervention and Protest Deadline
Take notice that on February 24, 2021,
Southern Natural Gas Company, L.L.C.
(SNG), 569 Brookwood Village, Suite
749, Birmingham, Alabama 35209, filed
a prior notice request pursuant to
sections 157.205, and 157.216 of the
Commission’s regulations under the
Natural Gas Act, and SNG’s blanket
certificate issued in Docket No. CP82–
406. SNG proposes to abandon three 800
horsepower compressor units at its
Onward Compressor Station, located in
Sharkey County, Mississippi, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Parker
Gargis, Analyst—Rates & Regulatory,
Southern Natural Gas Company, L.L.C.,
569 Brookwood Village, Suite 749,
Birmingham, Alabama 35209, by
telephone at (205) 325–7603, or by
email at Parker_Gargis@
kindermorgan.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
14319
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is May 7,
2021. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is May 7, 2021. As
described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
4 18 CFR 385.214.
5 18 CFR 157.10.
2 Persons
E:\FR\FM\15MRN1.SGM
15MRN1
14320
Federal Register / Vol. 86, No. 48 / Monday, March 15, 2021 / Notices
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before May 7,
2021. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP21–60–000 in your submission. The
Commission encourages electronic filing
of submissions.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing.’’ The
Commission’s eFiling staff are available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
(2) You can file a paper copy of your
submission. Your submission must
reference the Project docket number
CP21–60–000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: Parker Gargis, Analyst—
Rates & Regulatory, Southern Natural
Gas Company, L.L.C., 569 Brookwood
Village, Suite 749, Birmingham,
Alabama 35209, or by email to Parker_
Gargis@kindermorgan.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: March 8, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–05249 Filed 3–12–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD21–10–000]
Modernizing Electricity Market Design
Supplemental Notice of Technical
Conference on Resource Adequacy in
the Evolving Electricity Sector
As first announced in the Notice of
Technical Conference issued in this
proceeding on February 18, 2021, the
Federal Energy Regulatory Commission
(Commission) will convene a
Commissioner-led technical conference
in the above-referenced proceeding on
Tuesday, March 23, 2021, from
approximately 9:00 a.m. to 5:00 p.m.
Eastern time. The conference will be
held remotely. Attached to this
Supplemental Notice is an agenda for
the technical conference, which
includes the final conference program.
Commissioners may attend and
participate in the staff-led portions of
the technical conference.
Discussions at the conference may
involve issues raised in proceedings that
are currently pending before the
Commission. These proceedings
include, but are not limited to:
khammond on DSKJM1Z7X2PROD with NOTICES
Docket No.
ISO New England Inc ........................................................................................................................................
ISO New England Inc ........................................................................................................................................
Independent Market Monitor for PJM v. PJM Interconnection L.L.C ................................................................
Office of the People’s Counsel for D.C. et al. v. PJM Interconnection .............................................................
Hollow Road Solar, LLC ....................................................................................................................................
PJM Interconnection, L.L.C ................................................................................................................................
PJM Interconnection, L.L.C ................................................................................................................................
PJM
PJM
New
New
New
New
Interconnection, L.L.C ................................................................................................................................
Interconnection, L.L.C ................................................................................................................................
York Independent System Operator, Inc ...................................................................................................
York State Public Service Commission, et al. v. New York Independent System Operator, Inc .............
York Independent System Operator, Inc ...................................................................................................
York Independent System Operator, Inc ...................................................................................................
VerDate Sep<11>2014
16:36 Mar 12, 2021
Jkt 253001
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
E:\FR\FM\15MRN1.SGM
ER21–787–000.
ER21–943–000.
EL19–47–000.
EL19–63–000.
EL21–35–000.
EL19–100–000.
ER21–278–000 and ER21–278–
001.
EL19–58–005.
ER18–1314–011.
ER20–1718–002.
EL16–92–004 and ER17–996–004.
ER21–1001–000.
ER16–1404–005, ER16–1404–006,
and ER16–1404–007.
15MRN1
Agencies
[Federal Register Volume 86, Number 48 (Monday, March 15, 2021)]
[Notices]
[Pages 14319-14320]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05249]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-60-000]
Southern Natural Gas Company, L.L.C.; Notice of Request Under
Blanket Authorization and Establishing Intervention and Protest
Deadline
Take notice that on February 24, 2021, Southern Natural Gas
Company, L.L.C. (SNG), 569 Brookwood Village, Suite 749, Birmingham,
Alabama 35209, filed a prior notice request pursuant to sections
157.205, and 157.216 of the Commission's regulations under the Natural
Gas Act, and SNG's blanket certificate issued in Docket No. CP82-406.
SNG proposes to abandon three 800 horsepower compressor units at its
Onward Compressor Station, located in Sharkey County, Mississippi, all
as more fully set forth in the application which is on file with the
Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application may be directed to Parker
Gargis, Analyst--Rates & Regulatory, Southern Natural Gas Company,
L.L.C., 569 Brookwood Village, Suite 749, Birmingham, Alabama 35209, by
telephone at (205) 325-7603, or by email at
[email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: You can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on May 7, 2021. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is May 7, 2021. A protest may also serve as
a motion to intervene so long as the protestor states it also seeks to
be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is May 7, 2021. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the
[[Page 14320]]
FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before May 7, 2021. The filing of a comment alone will not serve
to make the filer a party to the proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP21-60-000 in your submission. The Commission encourages electronic
filing of submissions.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing.'' The Commission's eFiling
staff are available to assist you at (202) 502-8258 or
[email protected]
(2) You can file a paper copy of your submission. Your submission
must reference the Project docket number CP21-60-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
To mail via any other courier, use the following address: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: Parker
Gargis, Analyst--Rates & Regulatory, Southern Natural Gas Company,
L.L.C., 569 Brookwood Village, Suite 749, Birmingham, Alabama 35209, or
by email to [email protected]. Any subsequent submissions
by an intervenor must be served on the applicant and all other parties
to the proceeding. Contact information for parties can be downloaded
from the service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: March 8, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-05249 Filed 3-12-21; 8:45 am]
BILLING CODE 6717-01-P