Download as PDF Federal Register / Vol. 86, No. 48 / Monday, March 15, 2021 / Notices SUPPLEMENTARY INFORMATION: AmeriCorps Seniors has proposed an electronic collection technique of an online survey as a way to minimize the burden of the collection of the information. The survey will be submitted only once per grantee and estimated time for completion is less than 30 minutes, based on staff testing of the survey. The survey will be submitted electronically, can be completed across multiple technical platforms, and questions have been crafted for ease of reporting and efficient collection. The survey will be complemented with an in-depth set of instructions. Staff will also be available to provide individualized assistance, if needed. Comments khammond on DSKJM1Z7X2PROD with NOTICES Title of Collection: AmeriCorps Seniors Alternative Service Plan Reporting. OMB Control Number: 3045–0035 Type of Review: New Information Collection. Respondents/Affected Public: Nonprofit organizations that are grantees of AmeriCorps Seniors. Total Estimated Number of Annual Responses: 1,100. Total Estimated Number of Annual Burden Hours: 550 hours. Abstract: The information provided by the survey will enable AmeriCorps to learn if and how current grantees are engaged in service during the COVID–19 pandemic. Additionally, it provides information to AmeriCorps Seniors about how soon grantees can begin in-person service activities and the likelihood they can do so. This will enable AmeriCorps Seniors to better target training and technical assistance to grantees. Information collected will also influence the decision as to extending the March 31 deadline of the temporary allowance— the small payments made to volunteers who are unable to serve due to COPVID–19—in lieu of their traditional stipend. Dated: March 10, 2021. Atalaya Jones Sergi, Director, AmeriCorps Seniors. [FR Doc. 2021–05313 Filed 3–12–21; 8:45 am] BILLING CODE 6050–28–P VerDate Sep<11>2014 16:36 Mar 12, 2021 Jkt 253001 deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on May 7, 2021. How to file protests, motions to intervene, and comments is explained below. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–60–000] Southern Natural Gas Company, L.L.C.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on February 24, 2021, Southern Natural Gas Company, L.L.C. (SNG), 569 Brookwood Village, Suite 749, Birmingham, Alabama 35209, filed a prior notice request pursuant to sections 157.205, and 157.216 of the Commission’s regulations under the Natural Gas Act, and SNG’s blanket certificate issued in Docket No. CP82– 406. SNG proposes to abandon three 800 horsepower compressor units at its Onward Compressor Station, located in Sharkey County, Mississippi, all as more fully set forth in the application which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to Parker Gargis, Analyst—Rates & Regulatory, Southern Natural Gas Company, L.L.C., 569 Brookwood Village, Suite 749, Birmingham, Alabama 35209, by telephone at (205) 325–7603, or by email at Parker_Gargis@ kindermorgan.com. Public Participation There are three ways to become involved in the Commission’s review of this project: You can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 14319 Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is May 7, 2021. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is May 7, 2021. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 3 18 CFR 157.205(e). 4 18 CFR 385.214. 5 18 CFR 157.10. 2 Persons E:\FR\FM\15MRN1.SGM 15MRN1 14320 Federal Register / Vol. 86, No. 48 / Monday, March 15, 2021 / Notices FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before May 7, 2021. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP21–60–000 in your submission. The Commission encourages electronic filing of submissions. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing.’’ The Commission’s eFiling staff are available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. (2) You can file a paper copy of your submission. Your submission must reference the Project docket number CP21–60–000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: Parker Gargis, Analyst— Rates & Regulatory, Southern Natural Gas Company, L.L.C., 569 Brookwood Village, Suite 749, Birmingham, Alabama 35209, or by email to Parker_ Gargis@kindermorgan.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: March 8, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–05249 Filed 3–12–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD21–10–000] Modernizing Electricity Market Design Supplemental Notice of Technical Conference on Resource Adequacy in the Evolving Electricity Sector As first announced in the Notice of Technical Conference issued in this proceeding on February 18, 2021, the Federal Energy Regulatory Commission (Commission) will convene a Commissioner-led technical conference in the above-referenced proceeding on Tuesday, March 23, 2021, from approximately 9:00 a.m. to 5:00 p.m. Eastern time. The conference will be held remotely. Attached to this Supplemental Notice is an agenda for the technical conference, which includes the final conference program. Commissioners may attend and participate in the staff-led portions of the technical conference. Discussions at the conference may involve issues raised in proceedings that are currently pending before the Commission. These proceedings include, but are not limited to: khammond on DSKJM1Z7X2PROD with NOTICES Docket No. ISO New England Inc ........................................................................................................................................ ISO New England Inc ........................................................................................................................................ Independent Market Monitor for PJM v. PJM Interconnection L.L.C ................................................................ Office of the People’s Counsel for D.C. et al. v. PJM Interconnection ............................................................. Hollow Road Solar, LLC .................................................................................................................................... PJM Interconnection, L.L.C ................................................................................................................................ PJM Interconnection, L.L.C ................................................................................................................................ PJM PJM New New New New Interconnection, L.L.C ................................................................................................................................ Interconnection, L.L.C ................................................................................................................................ York Independent System Operator, Inc ................................................................................................... York State Public Service Commission, et al. v. New York Independent System Operator, Inc ............. York Independent System Operator, Inc ................................................................................................... York Independent System Operator, Inc ................................................................................................... VerDate Sep<11>2014 16:36 Mar 12, 2021 Jkt 253001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM ER21–787–000. ER21–943–000. EL19–47–000. EL19–63–000. EL21–35–000. EL19–100–000. ER21–278–000 and ER21–278– 001. EL19–58–005. ER18–1314–011. ER20–1718–002. EL16–92–004 and ER17–996–004. ER21–1001–000. ER16–1404–005, ER16–1404–006, and ER16–1404–007. 15MRN1

Agencies

[Federal Register Volume 86, Number 48 (Monday, March 15, 2021)]
[Notices]
[Pages 14319-14320]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05249]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP21-60-000]


Southern Natural Gas Company, L.L.C.; Notice of Request Under 
Blanket Authorization and Establishing Intervention and Protest 
Deadline

    Take notice that on February 24, 2021, Southern Natural Gas 
Company, L.L.C. (SNG), 569 Brookwood Village, Suite 749, Birmingham, 
Alabama 35209, filed a prior notice request pursuant to sections 
157.205, and 157.216 of the Commission's regulations under the Natural 
Gas Act, and SNG's blanket certificate issued in Docket No. CP82-406. 
SNG proposes to abandon three 800 horsepower compressor units at its 
Onward Compressor Station, located in Sharkey County, Mississippi, all 
as more fully set forth in the application which is on file with the 
Commission and open to public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions concerning this application may be directed to Parker 
Gargis, Analyst--Rates & Regulatory, Southern Natural Gas Company, 
L.L.C., 569 Brookwood Village, Suite 749, Birmingham, Alabama 35209, by 
telephone at (205) 325-7603, or by email at 
[email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: You can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on May 7, 2021. How 
to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by 
the protest deadline, which is May 7, 2021. A protest may also serve as 
a motion to intervene so long as the protestor states it also seeks to 
be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is May 7, 2021. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the

[[Page 14320]]

FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before May 7, 2021. The filing of a comment alone will not serve 
to make the filer a party to the proceeding. To become a party, you 
must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP21-60-000 in your submission. The Commission encourages electronic 
filing of submissions.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing.'' The Commission's eFiling 
staff are available to assist you at (202) 502-8258 or 
[email protected]
    (2) You can file a paper copy of your submission. Your submission 
must reference the Project docket number CP21-60-000.
    To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.
    To mail via any other courier, use the following address: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: Parker 
Gargis, Analyst--Rates & Regulatory, Southern Natural Gas Company, 
L.L.C., 569 Brookwood Village, Suite 749, Birmingham, Alabama 35209, or 
by email to [email protected]. Any subsequent submissions 
by an intervenor must be served on the applicant and all other parties 
to the proceeding. Contact information for parties can be downloaded 
from the service list at the eService link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: March 8, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-05249 Filed 3-12-21; 8:45 am]
BILLING CODE 6717-01-P