Brainerd Public Utilities; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 13893 [2021-05064]
Download as PDF
13893
Federal Register / Vol. 86, No. 46 / Thursday, March 11, 2021 / Notices
any changes in timing or logistics.
Information will also be posted on the
Calendar of Events on the Commission’s
website, www.ferc.gov, prior to the
event. The conference will be
transcribed. Transcripts will be
available for a fee from Ace Reporting,
(202) 347–3700.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov,
call toll-free (866) 208–3372 (voice) or
(202) 208–8659 (TTY), or send a fax to
(202) 208–2106 with the required
accommodations.
Individuals interested in participating
as panelists should self-nominate
through the WebEx registration form by
5:00 p.m. Eastern Time on Wednesday,
April 7, 2021 at: https://ferc.webex.com/
ferc/onstage/
g.php?MTID=eff91ed43b5be08b
7808828631394b5c5.
For more information about this
technical conference, please contact
Rahim Amerkhail, 202–502–8266,
rahim.amerkhail@ferc.gov for technical
questions or Sarah McKinley, 202–502–
8368, sarah.mckinley@ferc.gov for
logistical issues.
Dated: March 5, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05067 Filed 3–10–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2533–062]
khammond on DSKJM1Z7X2PROD with NOTICES
Brainerd Public Utilities; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2533–062.
c. Date Filed: March 1, 2021.
d. Applicant: Brainerd Public
Utilities.
e. Name of Project: Brainerd
Hydroelectric Project (Brainerd Project).
f. Location: The Brainerd Project is
located on the Mississippi River, in the
City of Brainerd, in Crow Wing County,
Minnesota. The project does not occupy
federal land.
VerDate Sep<11>2014
16:53 Mar 10, 2021
Jkt 253001
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Scott
Magnuson, Superintendent, Brainerd
Public Utilities, 8027 Highland Scenic
Road, P.O. Box 273, Brainerd, MN
56401. Phone (218) 825–3213 or email
at smagnuson@bpu.org.
i. FERC Contact: Patrick Ely at (202)
502–8570 or email at patrick.ely@
ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Brainerd Project consists of: (1)
A short left embankment; (2) a 256-footlong powerhouse containing five turbine
generators with a totaled installed
capacity of 2.9425 megawatts (MW); (3)
a 78-foot-long slide gate section; (4) a
207-foot-long bascule (crest) gate
section; (5) a single 20-foot-wide steel
Tainter gate; (6) a 200-foot-long right
embankment; (7) a 236-foot-long, 2.4kilovolt overhead transmission line; (8)
a 25-foot-high dam; and (9) 2,500-acre
impoundment.
The Brainerd Project is operated in a
run-of-river mode with an estimated
annual energy production of
approximately 19,392 megawatt hours.
Brainerd Public Utilities proposes to
continue operating the project as a runof-river facility and does not propose
any new construction to the project. A
license amendment allows for a sixth
turbine generator unit, which would
increase the total installed capacity to
3.5425 MW. The sixth turbine generator
unit has not yet been installed. See 156
FERC ¶ 62,045 (2016).
l. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19)
issued on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Milestone
Issue Deficiency Letter (if
necessary).
Request Additional Information.
Notice of Acceptance/Notice
of Ready for Environmental
Analysis.
Target date
April 2021.
April 2021.
August 2021.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: March 5, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05064 Filed 3–10–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD21–9–000]
The Office of Public Participation;
Notice of Virtual Listening Sessions
and a Public Comment Period
Take notice that the Federal Energy
Regulatory Commission (Commission)
staff will convene, in the abovereferenced proceeding, virtual listening
sessions from March 17, 2021 to March
25, 2021, to solicit public input on how
the Commission should establish and
operate the Office of Public
Participation (OPP) pursuant to section
319 of the Federal Power Act (FPA) (16
U.S.C. 825q–1). The public may also
submit written comments by April 23,
2021. The listening sessions will be led
by Commission staff, and may be
attended by one or more
Commissioners.
In December 2020, Congress directed
the Commission to provide a report, by
June 25, 2021, detailing its progress
towards establishing the OPP. Section
319 of the FPA directs the Commission
to establish the OPP to ‘‘coordinate
assistance to the public with respect to
authorities exercised by the
Commission,’’ including assistance to
those seeking to intervene in
Commission proceedings. (16 U.S.C.
825q–1). A February 22, 2021 notice
announced a Commissioner-led
workshop to be held on April 16, 2021,
from 9:00 a.m. to 5:00 p.m. Eastern time,
and requested speaker nominations by
March 10, 2021. The February 22, 2021
notice can be found on the
Commission’s website and eLibrary.
Commission staff plan to hold
listening sessions to hear from several
E:\FR\FM\11MRN1.SGM
11MRN1
Agencies
[Federal Register Volume 86, Number 46 (Thursday, March 11, 2021)]
[Notices]
[Page 13893]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05064]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2533-062]
Brainerd Public Utilities; Notice of Application Tendered for
Filing With the Commission and Establishing Procedural Schedule for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2533-062.
c. Date Filed: March 1, 2021.
d. Applicant: Brainerd Public Utilities.
e. Name of Project: Brainerd Hydroelectric Project (Brainerd
Project).
f. Location: The Brainerd Project is located on the Mississippi
River, in the City of Brainerd, in Crow Wing County, Minnesota. The
project does not occupy federal land.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Scott Magnuson, Superintendent, Brainerd
Public Utilities, 8027 Highland Scenic Road, P.O. Box 273, Brainerd, MN
56401. Phone (218) 825-3213 or email at [email protected].
i. FERC Contact: Patrick Ely at (202) 502-8570 or email at
[email protected].
j. This application is not ready for environmental analysis at this
time.
k. The Brainerd Project consists of: (1) A short left embankment;
(2) a 256-foot-long powerhouse containing five turbine generators with
a totaled installed capacity of 2.9425 megawatts (MW); (3) a 78-foot-
long slide gate section; (4) a 207-foot-long bascule (crest) gate
section; (5) a single 20-foot-wide steel Tainter gate; (6) a 200-foot-
long right embankment; (7) a 236-foot-long, 2.4-kilovolt overhead
transmission line; (8) a 25-foot-high dam; and (9) 2,500-acre
impoundment.
The Brainerd Project is operated in a run-of-river mode with an
estimated annual energy production of approximately 19,392 megawatt
hours. Brainerd Public Utilities proposes to continue operating the
project as a run-of-river facility and does not propose any new
construction to the project. A license amendment allows for a sixth
turbine generator unit, which would increase the total installed
capacity to 3.5425 MW. The sixth turbine generator unit has not yet
been installed. See 156 FERC ] 62,045 (2016).
l. A copy of the application can be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. At this time, the Commission has
suspended access to the Commission's Public Reference Room due to the
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19) issued on March 13, 2020. For
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or (202) 502-8659 (TTY).
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural schedule: The application will be processed according
to the following preliminary schedule. Revisions to the schedule will
be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary).... April 2021.
Request Additional Information............ April 2021.
Notice of Acceptance/Notice of Ready for August 2021.
Environmental Analysis.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: March 5, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-05064 Filed 3-10-21; 8:45 am]
BILLING CODE 6717-01-P