Airworthiness Directives; Bell Helicopter Textron Canada Helicopters, 13505-13506 [2021-04508]
Download as PDF
Federal Register / Vol. 86, No. 44 / Tuesday, March 9, 2021 / Proposed Rules
found in 14 CFR 39.19. In accordance with
14 CFR 39.19, send your request to your
principal inspector or local Flight Standards
District Office, as appropriate. If sending
information directly to the manager of the
certification office, send it to the attention of
the person identified in Related Information.
(2) Before using any approved AMOC,
notify your appropriate principal inspector,
or lacking a principal inspector, the manager
of the local flight standards district office/
certificate holding district office.
(j) Related Information
(1) For more information about this AD,
contact Jacob Fitch, Aviation Safety Engineer,
Fort Worth ACO Branch, FAA, 10101
Hillwood Pkwy., Fort Worth, TX 76177;
phone: (817) 222–4130; fax: (817) 222–5245;
email: jacob.fitch@faa.gov.
(2) For service information identified in
this AD, contact Mooney International
Corporation, 165 Al Mooney Road, North
Kerrville, TX 78028; phone: (800) 456–3033;
email: support@mooney.com. You may view
this referenced service information at the
FAA, Airworthiness Products Section,
Operational Safety Branch, 901 Locust,
Kansas City, MO 64106. For information on
the availability of this material at the FAA,
call (816) 329–4148.
Issued on March 1, 2021.
Ross Landes,
Deputy Director for Regulatory Operations,
Compliance & Airworthiness Division,
Aircraft Certification Service.
[FR Doc. 2021–04591 Filed 3–8–21; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA–2011–0449; Project
Identifier AD–2020–01464–R]
RIN 2120–AA64
Airworthiness Directives; Bell
Helicopter Textron Canada Helicopters
Federal Aviation
Administration (FAA), DOT.
ACTION: Proposed rule; withdrawal.
AGENCY:
The FAA is withdrawing a
notice of proposed rulemaking (NPRM)
that proposed to adopt a new
airworthiness directive (AD) that would
have applied to certain Bell Helicopter
Textron Canada Model 206A, 206B, and
206B3 helicopters. The NPRM was
prompted by the need for corresponding
operating limitations prohibiting flight,
including hover, with the litter doorpost
removed when certain litter kits are
installed. The NPRM would have
required revising the Operating
Limitations, Section 1, of the existing
Rotorcraft Flight Manual (RFM) for your
khammond on DSKJM1Z7X2PROD with PROPOSALS
SUMMARY:
VerDate Sep<11>2014
16:42 Mar 08, 2021
Jkt 253001
helicopter to add an operating limitation
when a litter kit is installed to prohibit
flight with the doorpost removed to
prevent loss of structural integrity of the
fuselage. Since issuance of the NPRM,
the FAA has determined that an unsafe
condition no longer exists. Accordingly,
the NPRM is withdrawn.
DATES: The FAA is withdrawing the
proposed rule published May 13, 2011
(76 FR 27958), as of March 9, 2021.
ADDRESSES:
Examining the AD Docket
You may examine the AD docket on
the internet at https://
www.regulations.gov by searching for
and locating Docket No. FAA–2011–
0449; or in person at Docket Operations
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
The AD docket contains this AD action,
any comments received, and other
information. The street address for
Docket Operations is U.S. Department of
Transportation, Docket Operations,
M–30, West Building Ground Floor,
Room W12–140, 1200 New Jersey
Avenue SE, Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT:
Kristi Bradley, Aviation Safety Engineer,
General Aviation & Rotorcraft Section,
International Validation Branch, FAA,
10101 Hillwood Pkwy., Fort Worth, TX
76177; telephone (817) 222–5110; email
kristin.bradley@faa.gov.
SUPPLEMENTARY INFORMATION:
Discussion
The FAA has issued an NPRM that
proposed to amend 14 CFR part 39 by
adding an AD that would apply to the
specified products. The NPRM was
published in the Federal Register on
May 13, 2011 (76 FR 27958). The NPRM
was prompted by the need for
corresponding operating limitations
prohibiting flight, including hover, with
the litter doorpost removed when
certain litter kits are installed.
The NPRM proposed to require
revising the existing RFM for your
helicopter by inserting into the
Operating Limitations, Section 1, of the
existing RFM for your helicopter the
following statement: ‘‘Flight, including
hover, with litter doorpost removed is
prohibited.’’ This revision would have
been made by pen and ink changes,
inserting a copy of this AD into the
existing RFM for your helicopter, or
inserting a copy of the RFM Supplement
(RFMS) dealing with Litter Kits into the
existing RFM for your helicopter as
follows: For Model 206A helicopters—
inserting RFMS BHT–206A–FMS–8,
dated December 30, 2009, into RFM
BHT–206A–FM–1, dated July 2, 2009;
PO 00000
Frm 00012
Fmt 4702
Sfmt 4702
13505
for Model 206B helicopters—inserting
RFMS BHT–206B–FMS–8, dated
December 30, 2009, into RFM BHT–
206B–FM–1, dated July 2, 2009; and for
Model 206B3 helicopters—inserting
RFMS BHT–206B3–FMS–2, dated
December 30, 2009, into RFM BHT–
206B3–FM–1, dated March 24, 2010.
The proposed actions were intended to
add an operating limitation when a litter
kit is installed to prohibit flight with the
doorpost removed to prevent loss of
structural integrity of the fuselage.
Actions Since the NPRM Was Issued
Since issuance of the NPRM,
reevaluation of current fleet safety data
indicates that there is not an unsafe
condition and AD action is no longer
necessary. There are no recent records
of safety issues related to the unsafe
condition previously described.
Therefore, the FAA has determined that
AD action is not required. Withdrawal
of the NPRM constitutes only such
action and does not preclude the agency
from issuing future rulemaking on this
issue, nor does it commit the agency to
any course of action in the future.
The FAA’s Aircraft Certification
Service has also changed its
organizational structure. The new
structure replaces product directorates
with functional divisions. We have
revised some of the office titles and
nomenclature throughout this proposed
AD to reflect the new organizational
changes. Additional information about
the new structure can be found in the
Notice published on July 25, 2017 (82
FR 34564).
Lastly, the identification of
‘‘Directorate Identifier 2010–SW–021–
AD’’ has been changed to ‘‘Project
Identifier AD 2020–01464–R.’’
Comments
The FAA gave the public the
opportunity to comment on the NPRM.
The FAA received no comments on the
NPRM or on the determination of the
cost to the public.
FAA’s Conclusions
Upon further consideration, the FAA
has determined that the NPRM is
unnecessary. Accordingly, the NPRM is
withdrawn.
Regulatory Findings
Since this action only withdraws an
NPRM, it is neither a proposed nor a
final rule. This action therefore is not
covered under Executive Order 12866,
the Regulatory Flexibility Act, or DOT
Regulatory Policies and Procedures (44
FR 11034, February 26, 1979).
E:\FR\FM\09MRP1.SGM
09MRP1
13506
Federal Register / Vol. 86, No. 44 / Tuesday, March 9, 2021 / Proposed Rules
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation
safety, Incorporation by reference,
Safety.
The Withdrawal
Accordingly, the notice of proposed
rulemaking, Docket No. FAA–2011–
0449, which was published in the
Federal Register on May 13, 2011 (76
FR 27958), is withdrawn.
■
Issued on February 26, 2021.
Gaetano A. Sciortino,
Deputy Director for Strategic Initiatives,
Compliance & Airworthiness Division,
Aircraft Certification Service.
[FR Doc. 2021–04508 Filed 3–8–21; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
18 CFR Parts 4 and 5
[Docket No. RM20–21–000]
Removing Profile Drawing
Requirement for Qualifying Conduit
Notices of Intent and Revising Filing
Requirements for Major Hydroelectric
Projects 10 MW or Less
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of proposed rulemaking.
AGENCY:
The Federal Energy
Regulatory Commission (Commission) is
proposing to revise its regulations
governing the filing requirements for
qualifying conduits and certain major
hydroelectric power projects.
Specifically, the Commission is
proposing to remove the requirement
that a notice of intent to construct a
qualifying conduit include a profile
drawing showing the source of the
hydroelectric potential in instances
where a dam would be constructed in
association with the facility and extend
the licensing requirements that
currently apply to major projects up to
5 MW to major projects 10 MW or less,
consistent with the amended definition
of a small hydroelectric power project in
the Hydropower Regulatory Efficiency
Act of 2013.
DATES: Comments are due May 10, 2021
ADDRESSES: You may send comments,
identified by RM20–21–000, by one of
the following methods:
• Electronic Filing (eFiling) at the
Commission’s website: https://
www.ferc.gov.
• U.S. Postal Service Mail: Persons
unable to file electronically may mail
khammond on DSKJM1Z7X2PROD with PROPOSALS
SUMMARY:
VerDate Sep<11>2014
16:42 Mar 08, 2021
Jkt 253001
similar pleadings to the Federal Energy
Regulatory Commission, Office of the
Secretary, 888 First Street NE,
Washington, DC 20426.
• Delivery of filings other than by
eFiling or the U.S. Postal Service should
be delivered to the Federal Energy
Regulatory Commission, Office of the
Secretary, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Instructions: For detailed instructions
on submitting comments and additional
information on the rulemaking process,
see the Comment Procedures section of
this document.
FOR FURTHER INFORMATION CONTACT:
Heather Campbell (Technical
Information) Office of Energy Projects,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, (202) 502–
6182, heather.e.campbell@ferc.gov
Kelly Houff (Technical Information)
Office of Energy Projects, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426, (202) 502–6063, kelly.houff@
ferc.gov
John Matkowski (Technical Information)
Office of Energy Projects, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426, (202) 502–8576,
john.matkowski@ferc.gov
Rachael Warden (Legal Information)
Office of the General Counsel, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426, (202) 502–8717,
rachael.warden@ferc.gov
SUPPLEMENTARY INFORMATION:
Table of Contents
Paragraph Numbers
I. Background and Discussion—1.
A. Qualifying Conduits—4.
B. Major Projects Greater Than 5 MW and
up to and Including 10 MW—9.
II. Regulatory Requirements—16.
A. Information Collection Statement—16.
B. Environmental Analysis—29.
C. Regulatory Flexibility Act—30.
D. Comment Procedures—34.
E. Document Availability—38.
I. Background and Discussion
Frm 00013
Fmt 4702
Sfmt 4702
A. Qualifying Conduits
4. The 2013 HREA amended section
30 of the FPA to create a subset of small
conduit facilities that are categorically
excluded from the licensing and
exemption requirements of the FPA. In
September 2014, the Commission issued
Order No. 800, which became effective
February 23, 2015, defining a
‘‘qualifying conduit hydropower
facility’’ at section 4.30(b)(26) of its
regulations.2 Subsequently, section 30
of the FPA was amended by the
America’s Water Infrastructure Act of
2018.3
5. In accordance with section
30(a)(2)(A),4 any person, State, or
municipality proposing to construct a
‘‘qualifying conduit hydropower
facility’’ must file a notice of intent
demonstrating the facility meets the
following ‘‘qualifying criteria’’: 5
• Be located on and use only the
hydroelectric potential of a nonfederally-owned conduit;
• have a proposed installed capacity
that does not exceed 40 Megawatts
(MW); 6 and
• be proposed for construction and,
as of the date of enactment of the 2013
HREA, not be licensed under, or
exempted from, the licensing
requirements of Part I of the FPA.
6. Under the 2013 HREA, as amended
by the America’s Water Infrastructure
Act of 2018,7 the Commission is
required to determine whether proposed
projects meet the criteria to be
considered qualifying conduit
hydropower facilities. Qualifying
conduit hydropower facilities are not
required to be licensed or exempted by
1 Public
Law 113–23, 127 Stat. 493 (2013).
Revisions and Technical Corrections to
Conform the Commission’s Regulations to the
Hydropower Regulatory Efficiency Act of 2013,
Order No. 800, 79 FR 59105 (Oct. 1, 2014), 148
FERC ¶ 61,197 (2014).
3 Public Law 115–270, 132 Stat. 3765 (2018).
4 16 U.S.C. 823a(a)(2)(A).
5 Id. 823a(a)(3)(C). The qualifying conduit
hydropower facility must also meet the
requirements for a small conduit facility as defined
in section 30(a)(3)(A) of the FPA. Id. 823a(a)(3)(A).
6 The 2013 HREA required that qualifying conduit
hydropower facilities not exceed 5 MW. This limit
was revised to 40 MW at section 3002(2) in the
America’s Water Infrastructure Act of 2018
(codified at 16 U.S.C. 823a(a)(3)(C)(ii)).
7 Public Law 115–270, 132 Stat. 3765.
2 See
1. By this Notice of Proposed
Rulemaking, the Federal Energy
Regulatory Commission (Commission or
FERC) proposes to amend Parts 4 and 5
of its regulations governing the filing
requirements for qualifying conduits
and certain major hydroelectric power
projects.
2. The Commission, under Part I of
the Federal Power Act (FPA), licenses
hydropower projects that are developed
by non-Federal entities including
individuals, private entities, states,
PO 00000
municipalities, electric cooperatives,
and others.
3. The Hydropower Regulatory
Efficiency Act of 2013 (2013 HREA) 1
was signed into law on August 9, 2013.
As explained below, changes
implemented in response to the 2013
HREA form the basis for these proposed
revisions to the Commission’s
regulations.
E:\FR\FM\09MRP1.SGM
09MRP1
Agencies
[Federal Register Volume 86, Number 44 (Tuesday, March 9, 2021)]
[Proposed Rules]
[Pages 13505-13506]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-04508]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2011-0449; Project Identifier AD-2020-01464-R]
RIN 2120-AA64
Airworthiness Directives; Bell Helicopter Textron Canada
Helicopters
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Proposed rule; withdrawal.
-----------------------------------------------------------------------
SUMMARY: The FAA is withdrawing a notice of proposed rulemaking (NPRM)
that proposed to adopt a new airworthiness directive (AD) that would
have applied to certain Bell Helicopter Textron Canada Model 206A,
206B, and 206B3 helicopters. The NPRM was prompted by the need for
corresponding operating limitations prohibiting flight, including
hover, with the litter doorpost removed when certain litter kits are
installed. The NPRM would have required revising the Operating
Limitations, Section 1, of the existing Rotorcraft Flight Manual (RFM)
for your helicopter to add an operating limitation when a litter kit is
installed to prohibit flight with the doorpost removed to prevent loss
of structural integrity of the fuselage. Since issuance of the NPRM,
the FAA has determined that an unsafe condition no longer exists.
Accordingly, the NPRM is withdrawn.
DATES: The FAA is withdrawing the proposed rule published May 13, 2011
(76 FR 27958), as of March 9, 2021.
ADDRESSES:
Examining the AD Docket
You may examine the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2011-
0449; or in person at Docket Operations between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal holidays. The AD docket contains
this AD action, any comments received, and other information. The
street address for Docket Operations is U.S. Department of
Transportation, Docket Operations, M-30, West Building Ground Floor,
Room W12-140, 1200 New Jersey Avenue SE, Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Kristi Bradley, Aviation Safety
Engineer, General Aviation & Rotorcraft Section, International
Validation Branch, FAA, 10101 Hillwood Pkwy., Fort Worth, TX 76177;
telephone (817) 222-5110; email [email protected].
SUPPLEMENTARY INFORMATION:
Discussion
The FAA has issued an NPRM that proposed to amend 14 CFR part 39 by
adding an AD that would apply to the specified products. The NPRM was
published in the Federal Register on May 13, 2011 (76 FR 27958). The
NPRM was prompted by the need for corresponding operating limitations
prohibiting flight, including hover, with the litter doorpost removed
when certain litter kits are installed.
The NPRM proposed to require revising the existing RFM for your
helicopter by inserting into the Operating Limitations, Section 1, of
the existing RFM for your helicopter the following statement: ``Flight,
including hover, with litter doorpost removed is prohibited.'' This
revision would have been made by pen and ink changes, inserting a copy
of this AD into the existing RFM for your helicopter, or inserting a
copy of the RFM Supplement (RFMS) dealing with Litter Kits into the
existing RFM for your helicopter as follows: For Model 206A
helicopters--inserting RFMS BHT-206A-FMS-8, dated December 30, 2009,
into RFM BHT-206A-FM-1, dated July 2, 2009; for Model 206B
helicopters--inserting RFMS BHT-206B-FMS-8, dated December 30, 2009,
into RFM BHT-206B-FM-1, dated July 2, 2009; and for Model 206B3
helicopters--inserting RFMS BHT-206B3-FMS-2, dated December 30, 2009,
into RFM BHT-206B3-FM-1, dated March 24, 2010. The proposed actions
were intended to add an operating limitation when a litter kit is
installed to prohibit flight with the doorpost removed to prevent loss
of structural integrity of the fuselage.
Actions Since the NPRM Was Issued
Since issuance of the NPRM, reevaluation of current fleet safety
data indicates that there is not an unsafe condition and AD action is
no longer necessary. There are no recent records of safety issues
related to the unsafe condition previously described. Therefore, the
FAA has determined that AD action is not required. Withdrawal of the
NPRM constitutes only such action and does not preclude the agency from
issuing future rulemaking on this issue, nor does it commit the agency
to any course of action in the future.
The FAA's Aircraft Certification Service has also changed its
organizational structure. The new structure replaces product
directorates with functional divisions. We have revised some of the
office titles and nomenclature throughout this proposed AD to reflect
the new organizational changes. Additional information about the new
structure can be found in the Notice published on July 25, 2017 (82 FR
34564).
Lastly, the identification of ``Directorate Identifier 2010-SW-021-
AD'' has been changed to ``Project Identifier AD 2020-01464-R.''
Comments
The FAA gave the public the opportunity to comment on the NPRM. The
FAA received no comments on the NPRM or on the determination of the
cost to the public.
FAA's Conclusions
Upon further consideration, the FAA has determined that the NPRM is
unnecessary. Accordingly, the NPRM is withdrawn.
Regulatory Findings
Since this action only withdraws an NPRM, it is neither a proposed
nor a final rule. This action therefore is not covered under Executive
Order 12866, the Regulatory Flexibility Act, or DOT Regulatory Policies
and Procedures (44 FR 11034, February 26, 1979).
[[Page 13506]]
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
The Withdrawal
0
Accordingly, the notice of proposed rulemaking, Docket No. FAA-2011-
0449, which was published in the Federal Register on May 13, 2011 (76
FR 27958), is withdrawn.
Issued on February 26, 2021.
Gaetano A. Sciortino,
Deputy Director for Strategic Initiatives, Compliance & Airworthiness
Division, Aircraft Certification Service.
[FR Doc. 2021-04508 Filed 3-8-21; 8:45 am]
BILLING CODE 4910-13-P