Lock 13 Partners, LLC; Notice of Availability of Environmental Assessment, 12440 [2021-04385]

Download as PDF 12440 Federal Register / Vol. 86, No. 40 / Wednesday, March 3, 2021 / Notices TABLE 16—FREEZER UNIT COOLER Unit cooler air entering dry-bulb °F Unit cooler air entering relative humidity, % Off Cycle Fan Power ....................... ¥10 Refrigeration Capacity Suction A .... Saturated suction temp, °F Liquid inlet saturation temp, °F Liquid inlet subcooling temp, °F <50 .................... .................... .................... ¥10 <50 ¥20 38 5 Refrigeration Capacity Suction B .... ¥10 <50 ¥26 38 5 Defrost ............................................. ¥10 Various .................... .................... .................... Test description Success of the application for Waiver and Interim Waiver will: Ensure that manufacturers of CO2 Direct Expansion Unit Coolers in Medium & Low Temperature application can continue to participate in the market. What economic hardship and/or competitive disadvantage is likely to result absent a favorable determination on the Application for Interim Waiver— Economic hardship will be loss of sales due to not meeting the DOE requirements set forth. Conclusion: KeepRite Refrigeration seeks a Waiver and Interim Waiver from DOE’s current requirement to test CO2 direct expansion unit coolers. Request submitted by: /s/ Vince Zolli, P. Eng, Vice President of Engineering, KeepRite Refrigeration. [FR Doc. 2021–04357 Filed 3–2–21; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14799–002] jbell on DSKJLSW7X2PROD with NOTICES Lock 13 Partners, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for an original license for the Evelyn Hydroelectric Project No. 14799, and has prepared an Environmental Assessment (EA) for the project. The proposed project would be located on the Kentucky River in Lee County, Kentucky, at the existing Kentucky River Lock and Dam No. 13, which is owned by the Commonwealth of Kentucky and operated by the Kentucky River Authority. No federal land would be occupied by project VerDate Sep<11>2014 17:29 Mar 02, 2021 Jkt 253001 works or located within the project boundary. The EA contains staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. The Commission provides all interested persons with an opportunity to view and/or print the EA via the internet through the Commission’s Home Page (https://www.ferc.gov/), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), in a Presidential proclamation issued on March 13, 2020. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://ferconline.ferc.gov/ eFiling.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 Compressor capacity Compressor Off. Compressor On. Compressor On. Compressor Off. Test objective Measure fan input power compressor off cycle. Determine Net Refrigeration ity of Unit Cooler. Determine Net Refrigeration ity of Unit Cooler. Test according to Appendix tion C11. during CapacCapacC Sec- sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–14799–002. For further information, contact Sarah Salazar at (202) 502–6863, or by email at sarah.salazar@ferc.gov. Dated: February 25, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–04385 Filed 3–2–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER13–1508–006. Applicants: Entergy Louisiana, LLC, Entergy New Orleans, LLC Description: Informational Compliance Filing of Amended Power Purchase Agreement [Pro Forma Sheets] of Entergy Louisiana, LLC, et al. Filed Date: 2/24/21. Accession Number: 20210224–5196. Comments Due: 5 p.m. ET 3/17/21. Docket Numbers: ER21–1200–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Request for One-Time, Limited Waiver of Tariff Provisions of Midcontinent Independent System Operator, Inc. Filed Date: 2/25/21. Accession Number: 20210225–5084. Comments Due: 5 p.m. ET 2/25/21. Docket Numbers: ER21–1201–000. Applicants: PJM Interconnection, L.L.C. E:\FR\FM\03MRN1.SGM 03MRN1

Agencies

[Federal Register Volume 86, Number 40 (Wednesday, March 3, 2021)]
[Notices]
[Page 12440]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-04385]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14799-002]


Lock 13 Partners, LLC; Notice of Availability of Environmental 
Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380, the Office of Energy Projects has 
reviewed the application for an original license for the Evelyn 
Hydroelectric Project No. 14799, and has prepared an Environmental 
Assessment (EA) for the project. The proposed project would be located 
on the Kentucky River in Lee County, Kentucky, at the existing Kentucky 
River Lock and Dam No. 13, which is owned by the Commonwealth of 
Kentucky and operated by the Kentucky River Authority. No federal land 
would be occupied by project works or located within the project 
boundary.
    The EA contains staff's analysis of the potential environmental 
impacts of the project and concludes that licensing the project, with 
appropriate environmental protective measures, would not constitute a 
major federal action that would significantly affect the quality of the 
human environment.
    The Commission provides all interested persons with an opportunity 
to view and/or print the EA via the internet through the Commission's 
Home Page (https://www.ferc.gov/), using the ``eLibrary'' link. Enter 
the docket number, excluding the last three digits in the docket number 
field, to access the document. At this time, the Commission has 
suspended access to the Commission's Public Reference Room, due to the 
proclamation declaring a National Emergency concerning the Novel 
Coronavirus Disease (COVID-19), in a Presidential proclamation issued 
on March 13, 2020. For assistance, contact FERC Online Support at 
[email protected], or toll-free at (866) 208-3676, or for TTY, 
(202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Any comments should be filed within 30 days from the date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments 
up to 6,000 characters, without prior registration, using the eComment 
system at https://ferconline.ferc.gov/QuickComment.aspx. You must 
include your name and contact information at the end of your comments. 
For assistance, please contact FERC Online Support. In lieu of 
electronic filing, you may submit a paper copy. Submissions sent via 
the U.S. Postal Service must be addressed to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Room 1A, Washington, DC 20426. Submissions sent via any other carrier 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. 
The first page of any filing should include docket number P-14799-002.
    For further information, contact Sarah Salazar at (202) 502-6863, 
or by email at [email protected].

    Dated: February 25, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-04385 Filed 3-2-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.