Green Mountain Power Corporation, Hydro Power, LLC; Notice of Transfer of Exemption, 12188 [2021-04259]
Download as PDF
12188
Federal Register / Vol. 86, No. 39 / Tuesday, March 2, 2021 / Notices
Docket Numbers: ER21–1199–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits tariff filing per
35.13(a)(2)(iii: Amendment to ISA/CSA,
Service Agreement Nos. 5604 and 5614;
Queue No. AC1–164 to be effective 2/
24/2020.
Filed Date: 02/24/2021.
Accession Number: 20210224–5104.
Comment Date: 5 p.m. ET 3/17/21.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM21–6–000.
Applicants: Indiana Municipal Power
Agency.
Description: Application of Indiana
Municipal Power Agency to Terminate
Its Mandatory Purchase Obligation
under the Public Utility Regulatory
Policies Act of 1978.
Filed Date: 02/24/2021.
Accession Number: 20210224–5102.
Comment Date: 5 p.m. ET 3/24/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 24, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–04262 Filed 3–1–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
jbell on DSKJLSW7X2PROD with NOTICES
Federal Energy Regulatory
Commission
[Project No. 5307–004]
Green Mountain Power Corporation,
Hydro Power, LLC; Notice of Transfer
of Exemption
1. On February 1, 2021, Green
Mountain Power Corporation, exemptee
VerDate Sep<11>2014
17:11 Mar 01, 2021
Jkt 253001
for the Woodsville Hydroelectric Project
No. 5307, filed a letter notifying the
Commission that the project was
transferred from Green Mountain Power
Corporation to Hydro Power, LLC. The
exemption from licensing was originally
issued on February 5, 1982.1 The project
is located on the Ammonoosuc River,
Grafton County, New Hampshire. The
transfer of an exemption does not
require Commission approval.
2. Hydro Power, LLC is now the
exemptee of the Woodsville
Hydroelectric Project No. 5307. All
correspondence must be forwarded to:
Mr. Brandon L. Boudreau, 87 Factory
Street, St. Johnsbury, VT 05819, Email:
Brandon@FairBanksMill.com.
Dated: February 24, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–04259 Filed 3–1–21; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[CERCLA 01–2021–0006; FRL–10018–25–
Region 1]
Proposed CERCLA Administrative
Cost Recovery Settlement: Jones and
Lamson Site, Springfield, Vermont
Environmental Protection
Agency (EPA).
ACTION: Notice of proposed settlement;
request for public comments.
AGENCY:
Notice is hereby given of a
proposed administrative cost settlement
for recovery of response costs
concerning the Jones and Lamson Site,
located in Springfield, Windsor County,
Vermont, with the Settling Party,
Textron Inc. The proposed settlement
requires the Settling Party to pay EPA
$662,500 plus interest to settle EPA’s
claim for recovery of past response
costs, which amount to approximately
$830,000. In exchange, EPA will
provide the Settling Party with a
covenant not to sue for past costs. The
settlement has been approved by the
Environmental and Natural Resources
Division of the United States
Department of Justice. For 30 days
following the date of publication of this
notice, the Agency will receive written
comments relating to the settlement for
recovery of response costs. The Agency
will consider all comments received and
may modify or withdraw its consent to
this cost recovery settlement if
SUMMARY:
1 New England Hydro, Inc., and Woodsville Fire
District, 18 FERC 62,158 (1982). On June 27, 2017,
the project was transferred to Green Mountain
Power Corporation.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
comments received disclose facts or
considerations which indicate that the
settlement is inappropriate, improper,
or inadequate. The Agency’s response to
any comments received will be available
for public inspection at the
Environmental Protection Agency—
Region I, 5 Post Office Square, Suite
100, Boston, MA 02109–3912.
DATES: Comments must be submitted by
April 1, 2021.
ADDRESSES: Comments should be
addressed to Joy Sun, Senior
Enforcement Counsel, Office of Regional
Counsel, U.S. Environmental Protection
Agency, 5 Post Office Square, Suite 100
(04–2), Boston, MA 02109–3912, (617)
918–1018, sun.joy@epa.gov, and should
reference the Jones and Lamson Site,
U.S. EPA Docket No: CERCLA 01–2021–
0006.
FOR FURTHER INFORMATION CONTACT: A
copy of the proposed settlement may be
obtained from Stacy Greendlinger,
Superfund and Emergency Management
Division, U.S. Environmental Protection
Agency, Region I, 5 Post Office Square,
Suite 100 (02–2), Boston, MA 02109–
3912, telephone number: (617) 918–
1403, email address:
greendlinger.stacy@epa.gov. Direct
technical questions to Stacy
Greendlinger and legal questions to Joy
Sun, Office of Regional Counsel, U.S.
Environmental Protection Agency,
Region I, 5 Post Office Square, Suite 100
(04–2), Boston, MA 02109–3912,
telephone number: (617) 918–1018,
email address: sun.joy@epa.gov.
SUPPLEMENTARY INFORMATION: This
proposed administrative settlement for
recovery of past response costs
concerning the Jones and Lamson Site,
located in Springfield, Windsor County,
Vermont, is made in accordance with
Section 122(h)(l) of the Comprehensive
Environmental Response,
Compensation, and Liability Act
(CERCLA). EPA covenants not to sue or
take administrative action against the
Settling Party, Textron Inc., pursuant to
Section 107(a) of CERCLA, 42 U.S.C.
9607(a), for Past Response Costs. In
exchange, the Settling Party agrees to
pay EPA $662,500, plus interest on that
amount calculated from the Effective
Date through the date of payment.
Payment of such amount shall be due
within 30 days after the Effective Date.
For 30 days following the date of
publication of this notice, the Agency
will receive written comments relating
to the settlement for recovery of
response costs. The Effective Date of the
Agreement is the date upon which EPA
notifies Textron Inc. that the public
comment period has closed and that
such comments, if any, do not require
E:\FR\FM\02MRN1.SGM
02MRN1
Agencies
[Federal Register Volume 86, Number 39 (Tuesday, March 2, 2021)]
[Notices]
[Page 12188]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-04259]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5307-004]
Green Mountain Power Corporation, Hydro Power, LLC; Notice of
Transfer of Exemption
1. On February 1, 2021, Green Mountain Power Corporation, exemptee
for the Woodsville Hydroelectric Project No. 5307, filed a letter
notifying the Commission that the project was transferred from Green
Mountain Power Corporation to Hydro Power, LLC. The exemption from
licensing was originally issued on February 5, 1982.\1\ The project is
located on the Ammonoosuc River, Grafton County, New Hampshire. The
transfer of an exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ New England Hydro, Inc., and Woodsville Fire District, 18
FERC 62,158 (1982). On June 27, 2017, the project was transferred to
Green Mountain Power Corporation.
---------------------------------------------------------------------------
2. Hydro Power, LLC is now the exemptee of the Woodsville
Hydroelectric Project No. 5307. All correspondence must be forwarded
to: Mr. Brandon L. Boudreau, 87 Factory Street, St. Johnsbury, VT
05819, Email: [email protected].
Dated: February 24, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-04259 Filed 3-1-21; 8:45 am]
BILLING CODE 6717-01-P