Pacific Gas and Electric Company; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 11275 [2021-03798]
Download as PDF
11275
Federal Register / Vol. 86, No. 35 / Wednesday, February 24, 2021 / Notices
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 18, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–03811 Filed 2–23–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1061–103]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene and Protests
khammond on DSKJM1Z7X2PROD with NOTICES
February 18, 2020.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 1061–103.
c. Date filed: August 24, 2020.
d. Applicant: Pacific Gas and Electric
Company.
e. Name of Project: Phoenix
Hydroelectric Project.
f. Location: The existing project is
located on the South Fork Stanislaus
River and in the Tuolumne River Basin,
in Tuolumne County, California. The
project occupies 56.78 acres of federal
land administered by the U.S. Forest
Service and 2.14 acres administered by
the Bureau of Land Management.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Jan Nimick,
Vice President, Power Generation,
Pacific Gas and Electric Company, 245
Market Street, San Francisco, CA 94105,
(415) 973–0629.
i. FERC Contact: Jim Hastreiter, (503)
552–2760 or james.hastreiter@ferc.gov.
j. Deadline for filing motions to
intervene and protests and requests for
cooperating agency status: 60 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
VerDate Sep<11>2014
17:21 Feb 23, 2021
Jkt 253001
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–1061–
103.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
but is not ready for environmental
analysis at this time.
l. The Phoenix Project consists of: (1)
A 535-foot-long and 132-foot-high
concrete arch dam on the South Fork
Stanislaus River; (2) a 172.3 acre
reservoir; (3) a 133.1-foot-long and 20foot-high concrete arch cushion dam; (4)
a 15.38-mile-long Main Tuolumne Canal
(MTC); (5) a Header Box (forebay); (6) a
5,611-foot-long penstock; and (7) a
powerhouse with an impulse turbine
rated at 1.6 megawatts.
m. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
assistance, contact FERC Online
Support.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Issue Scoping Document 1
for comments.
Request Additional Information (if necessary).
Issue Scoping Document 2 ...
Issue notice of ready for environmental analysis.
March 2021.
May 2021.
June 2021.
June 2021.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: February 18, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–03798 Filed 2–23–21; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\24FEN1.SGM
24FEN1
Agencies
[Federal Register Volume 86, Number 35 (Wednesday, February 24, 2021)]
[Notices]
[Page 11275]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-03798]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1061-103]
Pacific Gas and Electric Company; Notice of Application Accepted
for Filing and Soliciting Motions To Intervene and Protests
February 18, 2020.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 1061-103.
c. Date filed: August 24, 2020.
d. Applicant: Pacific Gas and Electric Company.
e. Name of Project: Phoenix Hydroelectric Project.
f. Location: The existing project is located on the South Fork
Stanislaus River and in the Tuolumne River Basin, in Tuolumne County,
California. The project occupies 56.78 acres of federal land
administered by the U.S. Forest Service and 2.14 acres administered by
the Bureau of Land Management.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Jan Nimick, Vice President, Power Generation,
Pacific Gas and Electric Company, 245 Market Street, San Francisco, CA
94105, (415) 973-0629.
i. FERC Contact: Jim Hastreiter, (503) 552-2760 or
[email protected].
j. Deadline for filing motions to intervene and protests and
requests for cooperating agency status: 60 days from the issuance date
of this notice.
The Commission strongly encourages electronic filing. Please file
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://ferconline.ferc.gov/QuickComment.aspx. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-1061-103.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted, but is not ready for
environmental analysis at this time.
l. The Phoenix Project consists of: (1) A 535-foot-long and 132-
foot-high concrete arch dam on the South Fork Stanislaus River; (2) a
172.3 acre reservoir; (3) a 133.1-foot-long and 20-foot-high concrete
arch cushion dam; (4) a 15.38-mile-long Main Tuolumne Canal (MTC); (5)
a Header Box (forebay); (6) a 5,611-foot-long penstock; and (7) a
powerhouse with an impulse turbine rated at 1.6 megawatts.
m. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's website at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC Online
Support.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
------------------------------------------------------------------------
Issue Scoping Document 1 for comments..... March 2021.
Request Additional Information (if May 2021.
necessary).
Issue Scoping Document 2.................. June 2021.
Issue notice of ready for environmental June 2021.
analysis.
------------------------------------------------------------------------
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: February 18, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-03798 Filed 2-23-21; 8:45 am]
BILLING CODE 6717-01-P