Federal Register / Vol. 86, No. 34 / Tuesday, February 23, 2021 / Notices
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov, or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 15, 2021.
Dated: February 17, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–03672 Filed 2–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3511–024]
Lower Saranac Hydro, LLC; Notice
Soliciting Scoping Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 3511–024.
c. Date filed: May 29, 2020.
d. Applicant: Lower Saranac Hydro,
LLC.
e. Name of Project: Groveville
Hydroelectric Project.
f. Location: On Fishkill Creek, in the
City of Beacon, Dutchess County, New
York. The project does not occupy any
federal land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
VerDate Sep<11>2014
18:36 Feb 22, 2021
Jkt 253001
h. Applicant Contact: Tim Carlsen,
CEO, Hydroland, Inc.,1 403 Madison
Ave. #240, Bainbridge Island, WA
98110; Phone at (844) 493–7612 or
email at tim@hydrolandcorp.com.
i. FERC Contact: Jeremy Feinberg at
(202) 502–6893 or jeremy.feinberg@
ferc.gov.
j. Deadline for filing scoping
comments: March 19, 2021.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–3511–
024.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
but is not ready for environmental
analysis at this time.
l. The Groveville Hydroelectric
Project consists of: (1) A 167-foot-long,
37-foot-high concrete gravity dam, with
a 140-foot-long spillway having a crest
elevation of 172.4 feet National Geodetic
Vertical Datum of 1929 (NGVD29) and
topped with 3-foot-high wooden
flashboards; (2) an impoundment with a
gross storage capacity of approximately
1 In a February 9, 2021 filing, the Commission
was notified that Enel Green Power North America,
Inc. transferred all its ownership interests for Lower
Saranac Hydro, LLC to Hydroland, Inc.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
10945
43 acre-feet and a surface area of 5 acres
at a normal pool elevation of 175.4 feet
NGVD29; (3) an intake structure with
two gates and a 27-foot-high, 34-footwide trash rack; (4) a 9-foot-diameter,
approximately 140-foot-long riveted
steel underground penstock; (5) a
powerhouse containing three fixedoutput turbine-generator units with a
total rated capacity of 927 kilowatts; (6)
a 4-foot-high submerged stilling basin
weir approximately 60 feet downstream
of the dam spillway; (7) a 20-foot-wide,
90-foot-long tailrace; (8) a 20-foot-long
underground generator lead connecting
to a step-up transformer that connects to
a 13.2-kilovolt, 40-foot-long
underground transmission line that then
connects to a 15-foot-long aerial
transmission line before connecting to
the regional grid; and (9) appurtenant
facilities.
m. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., scoping document)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document (P–3511). At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room due to the proclamation declaring
a National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3673 or (202) 502–
8659 (TTY).
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process: The Commission
staff intends to prepare an
Environmental Assessment (EA) or
Environmental Impact Statement (EIS)
for the Groveville Hydroelectric Project
in accordance with the National
Environmental Policy Act (NEPA). The
NEPA document will consider impacts
and reasonable alternatives to the
proposed action.
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we are soliciting
comments, recommendations, and
information, on the Scoping Document
(SD) issued on February 17, 2021.
E:\FR\FM\23FEN1.SGM
23FEN1
10946
Federal Register / Vol. 86, No. 34 / Tuesday, February 23, 2021 / Notices
Copies of the SD outlining the subject
areas to be addressed in the NEPA
document were distributed to the
parties on the Commission’s mailing list
and the applicant’s distribution list.
Copies of the SD may be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
Dated: February 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–03681 Filed 2–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14803–004]
PacifiCorp, Klamath River Renewal
Corporation, and the States of
California and Oregon; Notice of
Application for Transfer of License,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Transfer of
Project License.
b. Project No: 14803–004.
c. Date Filed: January 13, 2021.
d. Applicant: PacifiCorp, Klamath
River Renewal Corporation, and the
States of California and Oregon.
e. Name of Project: Lower Klamath
Hydroelectric Project.
f. Location: The project is located on
the Klamath River in Klamath County,
Oregon and Siskiyou County, California.
The project includes federal lands
managed by the U.S. Bureau of Land
Management.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: For transferor—
PacifiCorp: Ryan Flynn, Chief Legal
Officer, PacifiCorp, 825 NE Multnomah
Street, Suite 2000, Portland, OR 97232,
ryan.flynn@pacificorp.com, 503–813–
5865.
For transferees—Klamath River
Renewal Corporation: Mark Bransom,
Chief Executive Director, Klamath River
Renewal Corporation, 2001 Addison
Street, Suite 317, Berkeley, CA 94704,
(415) 820–4441, info@
klamathrenewal.org.
State of California: Joshua E. Adrian,
Duncan Weinberg Genzer & Pembroke,
VerDate Sep<11>2014
18:36 Feb 22, 2021
Jkt 253001
P.C., 1667 K Street NW, Suite 700,
Washington, DC 20006, jea@dwgp.com,
202–791–3590.
State of Oregon: Anika E. Marriott, Sr.
Assistant Attorney General, Oregon
Department of Justice, 1162 Court Street
NE, Salem, OR 97301,
Anika.E.Marriott@doj.state.or.us, 503–
947–4520.
i. FERC Contact: Diana Shannon,
(202) 502–6136, diana.shannon@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
March 19, 2021.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
numbers P–14803–004. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: On January
13, 2021, PacifiCorp (transferor) and the
Klamath River Renewal Corporation
(Renewal Corporation) and the States of
California and Oregon (transferees)
jointly filed an application to transfer
the license for the Lower Klamath
Project No. 14803 from PacifiCorp to the
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Renewal Corporation and the States of
California and Oregon as co-licensees.
PacifiCorp and the transferees jointly
propose to transfer the license to
Renewal Corporation and the States of
California and Oregon for the purpose of
surrendering, decommissioning, and
removing the project dams, if approved
separately by the Commission. The
project includes four developments: J.C.
Boyle, Copco No. 1, Copco No. 2, and
Iron Gate.
On July 16, 2020, the Commission
issued an order approving a partial
transfer of the license for the project
from PacifiCorp to PacifiCorp and the
Renewal Corporation as co-licensees.
PacifiCorp, 172 FERC ¶ 61,062 (2020).
The order was contingent on PacifiCorp
remaining on the license as a colicensee and required compliance with
certain conditions before it would take
effect. In the January 13 filing,
PacifiCorp and the Renewal Corporation
state that they do not accept their status
as co-licensees under the July 16 order.
On November 17, 2020, in a separate
proceeding, PacifiCorp and the Renewal
Corporation filed an amended
application to surrender the license and
decommission the Lower Klamath
Project. Decommissioning activities
would include the full removal of the
four developments. The Commission
issued notice of that application on
December 16, 2020, soliciting
comments, motions to intervene, and
protests in the surrender proceeding.
In the January 13 filing, the applicants
request that, in any order approving the
transfer, the Commission establish an
extended period of time—until 30 days
following any Commission order
approving the surrender application—
for the transferees to accept the license
transfer and their co-licensee status. As
a result, PacifiCorp would remain as the
sole licensee for the Lower Klamath
Project while the Commission considers
what action to take on the surrender
application.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
E:\FR\FM\23FEN1.SGM
23FEN1
Agencies
[Federal Register Volume 86, Number 34 (Tuesday, February 23, 2021)]
[Notices]
[Pages 10945-10946]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-03681]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3511-024]
Lower Saranac Hydro, LLC; Notice Soliciting Scoping Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 3511-024.
c. Date filed: May 29, 2020.
d. Applicant: Lower Saranac Hydro, LLC.
e. Name of Project: Groveville Hydroelectric Project.
f. Location: On Fishkill Creek, in the City of Beacon, Dutchess
County, New York. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Tim Carlsen, CEO, Hydroland, Inc.,\1\ 403
Madison Ave. #240, Bainbridge Island, WA 98110; Phone at (844) 493-7612
or email at [email protected].
---------------------------------------------------------------------------
\1\ In a February 9, 2021 filing, the Commission was notified
that Enel Green Power North America, Inc. transferred all its
ownership interests for Lower Saranac Hydro, LLC to Hydroland, Inc.
---------------------------------------------------------------------------
i. FERC Contact: Jeremy Feinberg at (202) 502-6893 or
[email protected].
j. Deadline for filing scoping comments: March 19, 2021.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-3511-024.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted but is not ready for
environmental analysis at this time.
l. The Groveville Hydroelectric Project consists of: (1) A 167-
foot-long, 37-foot-high concrete gravity dam, with a 140-foot-long
spillway having a crest elevation of 172.4 feet National Geodetic
Vertical Datum of 1929 (NGVD29) and topped with 3-foot-high wooden
flashboards; (2) an impoundment with a gross storage capacity of
approximately 43 acre-feet and a surface area of 5 acres at a normal
pool elevation of 175.4 feet NGVD29; (3) an intake structure with two
gates and a 27-foot-high, 34-foot-wide trash rack; (4) a 9-foot-
diameter, approximately 140-foot-long riveted steel underground
penstock; (5) a powerhouse containing three fixed-output turbine-
generator units with a total rated capacity of 927 kilowatts; (6) a 4-
foot-high submerged stilling basin weir approximately 60 feet
downstream of the dam spillway; (7) a 20-foot-wide, 90-foot-long
tailrace; (8) a 20-foot-long underground generator lead connecting to a
step-up transformer that connects to a 13.2-kilovolt, 40-foot-long
underground transmission line that then connects to a 15-foot-long
aerial transmission line before connecting to the regional grid; and
(9) appurtenant facilities.
m. In addition to publishing the full text of this notice in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., scoping document) via the
internet through the Commission's Home Page (https://www.ferc.gov),
using the ``eLibrary'' link. Enter the docket number, excluding the
last three digits in the docket number field to access the document (P-
3511). At this time, the Commission has suspended access to the
Commission's Public Reference Room due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact FERC
at [email protected] or call toll-free, (886) 208-3673 or
(202) 502-8659 (TTY).
n. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. Scoping Process: The Commission staff intends to prepare an
Environmental Assessment (EA) or Environmental Impact Statement (EIS)
for the Groveville Hydroelectric Project in accordance with the
National Environmental Policy Act (NEPA). The NEPA document will
consider impacts and reasonable alternatives to the proposed action.
Commission staff does not propose to conduct any on-site scoping
meetings at this time. Instead, we are soliciting comments,
recommendations, and information, on the Scoping Document (SD) issued
on February 17, 2021.
[[Page 10946]]
Copies of the SD outlining the subject areas to be addressed in the
NEPA document were distributed to the parties on the Commission's
mailing list and the applicant's distribution list. Copies of the SD
may be viewed on the web at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, call 1-866-
208-3676 or for TTY, (202) 502-8659.
Dated: February 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-03681 Filed 2-22-21; 8:45 am]