Battle Creek Hydroelectric Project; Notice of Existing Licensee's Notice of Intent To Not File a New License Application, and Soliciting Notices of Intent To File a License Application and Pre-Application Documents, 10947-10948 [2021-03675]
Download as PDF
Federal Register / Vol. 86, No. 34 / Tuesday, February 23, 2021 / Notices
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: February 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–03677 Filed 2–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1123–006.
Applicants: Union Electric Company.
Description: Supplement to January
21, 2021 Notice of Change in Status of
Union Electric Company.
Filed Date: 2/16/21.
Accession Number: 20210216–5300.
Comments Due: 5 p.m. ET 3/9/21.
Docket Numbers: ER20–2471–002.
VerDate Sep<11>2014
18:36 Feb 22, 2021
Jkt 253001
Applicants: NedPower Mount Storm,
LLC.
Description: Compliance filing:
Informational Filing Pursuant to Section
2 of the PJM Tariff to be effective 12/31/
9998.
Filed Date: 2/17/21.
Accession Number: 20210217–5049.
Comments Due: 5 p.m. ET 3/10/21.
Docket Numbers: ER21–797–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Request to Defer Action: Revised ISA,
SA No. 5869; Queue No. AE2–126 to be
effective 12/31/9998.
Filed Date: 2/17/21.
Accession Number: 20210217–5093.
Comments Due: 5 p.m. ET 3/10/21.
Docket Numbers: ER21–917–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment to ISA/CSA, SA No. 5290
and 5308; Queue No. AC1–069 to be
effective 1/28/2019.
Filed Date: 2/17/21.
Accession Number: 20210217–5045.
Comments Due: 5 p.m. ET 3/10/21.
Docket Numbers: ER21–1158–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–02–17_SA 3260 MidAmericanHolliday Creek Solar 1st Rev GIA (J524)
to be effective 2/10/2021.
Filed Date: 2/17/21.
Accession Number: 20210217–5010.
Comments Due: 5 p.m. ET 3/10/21.
Docket Numbers: ER21–1159–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–02–17_SA 3243 Deuel Harvest
Wind-OTP 2nd Rev GIA (J526) to be
effective 2/10/2021.
Filed Date: 2/17/21.
Accession Number: 20210217–5014.
Comments Due: 5 p.m. ET 3/10/21.
Docket Numbers: ER21–1160–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Union Electric Company.
Description: § 205(d) Rate Filing:
2021–02–17_SA 2029 Ameren-City of
Perry Missouri WDS to be effective 5/1/
2021.
Filed Date: 2/17/21.
Accession Number: 20210217–5030.
Comments Due: 5 p.m. ET 3/10/21.
Docket Numbers: ER21–1161–000.
Applicants: Ohio Power Company,
American Electric Power Service
Corporation, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: AEP
submits ILDSA SA No. 1419 and Two
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
10947
Facilities Agreements to be effective
4/19/2021.
Filed Date: 2/17/21.
Accession Number: 20210217–5082.
Comments Due: 5 p.m. ET 3/10/21.
Docket Numbers: ER21–1162–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–02–17_SA 3262 MidAmerican
Energy—MidAmerican Energy 1st Rev
GIA (J527) to be effective 2/3/2021.
Filed Date: 2/17/21.
Accession Number: 20210217–5095.
Comments Due: 5 p.m. ET 3/10/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 17, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–03674 Filed 2–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1121–000]
Battle Creek Hydroelectric Project;
Notice of Existing Licensee’s Notice of
Intent To Not File a New License
Application, and Soliciting Notices of
Intent To File a License Application
and Pre-Application Documents
At least five years, but no more than
five and one-half years, before the
expiration of a license for a major water
power project, the licensee must file
with the Commission a letter that
contains an unequivocal statement of
the licensee’s intent to file or not to file
an application for a new license.1
1 18
E:\FR\FM\23FEN1.SGM
CFR 16.6(c) (2020).
23FEN1
10948
Federal Register / Vol. 86, No. 34 / Tuesday, February 23, 2021 / Notices
If such a licensee informs the
Commission that it does not intend to
file an application for a new license,
nonpower license, or exemption for the
project, the licensee may not file an
application for a new license, nonpower
license, or exemption for the project,
either individually or in conjunction
with an entity or entities that are not
currently licensees of the project.2
On October 23, 2020, Pacific Gas &
Electric Company (PG&E), the existing
licensee for the Battle Creek
Hydroelectric Project No. 1121, filed
notice of its intent to not file an
application for a new license. Therefore,
pursuant to section 16.24(a)(1) of the
Commission’s regulations, PG&E may
not file an application for a new license
for the project, either individually or in
conjunction with an entity or entities
that are not currently licensees of the
project.
The 36.1-megawatt (MW) Battle Creek
Hydroelectric Project is located on the
North and South Forks of Battle Creek,
a tributary to the Sacramento River, in
Shasta and Tehama Counties, California.
The project occupies 93 acres of federal
land managed by the U.S. Forest Service
and the Bureau of Land Management.
The existing license for the project
expires on July 31, 2026.3
The principal project works consist
of: (1) Two small upstream storage
reservoirs; (2) three forebays; (3) twenty
canals and pipelines and associated
diversion dams; (4) penstocks leading to
five powerhouses; (5) five 60-kV
transmission lines with a total length of
50.3 miles; and (6) five substations.
Any party interested in filing a license
application (i.e., potential applicant) for
the Battle Creek Hydroelectric Project
No. 1121 must file a Notice of Intent
(NOI) 4 and pre- application document
(PAD).5 Additionally, while the
integrated licensing process (ILP) is the
default process for preparing an
application for a subsequent license, a
potential applicant may request to use
alternative licensing procedures when it
files its NOI.6
The deadline for potential applicants,
other than the existing licensee, to file
NOIs, PADs, and requests to use an
alternative licensing process is 120 days
from the issuance date of this notice.
Applications for a new license from
potential applicants, other than the
2 18
CFR 16.24 (a)(1).
PG&E filed the notice of intent to not
file an application for a new license more than five
and one-half years before the expiration of the
license, we waive the applicable requirement in 18
CFR 16.6(c)(1).
4 18 CFR 5.5.
5 18 CFR 5.6.
6 18 CFR 5.3(b).
3 Because
VerDate Sep<11>2014
18:36 Feb 22, 2021
Jkt 253001
existing licensee, must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.7
Because the existing license expires on
July 31, 2026, applications for license
for this project must be filed by July 31,
2024.
Questions concerning this notice
should be directed to Rebecca Kipp
(202) 502- 8846 or rebecca.kipp@
ferc.gov.
Dated: February 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–03675 Filed 2–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Number: PR12–20–001.
Applicants: NorthWestern
Corporation.
Description: Tariff filing per
284.123(b)(1)/.: Rate Certification in
Compliance with Docket No. CP11–76–
000 under PR12–20.
Filed Date: 2/16/2021.
Accession Number: 202102165000.
Comments/Protests Due: 5 p.m. ET
3/9/2021.
Docket Numbers: RP21–482–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: REX
2021–02–12 Non-Conforming
Negotiated Rate Amendment to be
effective 2/13/2021.
Filed Date: 2/12/21.
Accession Number: 20210212–5073.
Comments Due: 5 p.m. ET 2/24/21.
Docket Numbers: RP21–483–000.
Applicants: TransCameron Pipeline,
LLC.
Description: § 4(d) Rate Filing:
Changes Normal filing 2021 Mar to be
effective 3/16/2021.
Filed Date: 2/12/21.
Accession Number: 20210212–5075.
Comments Due: 5 p.m. ET 2/24/21.
Docket Numbers: RP21–484–000.
Applicants: TransCameron Pipeline,
LLC.
Description: Petition for Limited
Waiver of TransCameron Pipeline, LLC,
under RP21–484.
Filed Date: 2/12/21.
Accession Number: 20210212–5117.
7 18
PO 00000
CFR 16.9(b)(1).
Frm 00030
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 2/24/21.
Docket Numbers: RP21–485–000.
Applicants: ANR Pipeline Company.
Description: § 4(d) Rate Filing: Short
Notice Start-Up to be effective 3/15/
2021.
Filed Date: 2/12/21.
Accession Number: 20210212–5122.
Comments Due: 5 p.m. ET 2/24/21.
Docket Numbers: RP21–486–000.
Applicants: Empire Pipeline, Inc.
Description: Compliance filing Refund
Report Per Settlement in RP18–940.
Filed Date: 2/12/21.
Accession Number: 20210212–5125.
Comments Due: 5 p.m. ET 2/24/21.
Docket Numbers: RP21–487–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20210212 Negotiated Rate to be effective
2/12/2021.
Filed Date: 2/12/21.
Accession Number: 20210212–5170.
Comments Due: 5 p.m. ET 2/24/21.
Docket Numbers: RP21–488–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate PAL Agreements—Koch
& Citadel to be effective 2/11/2021.
Filed Date: 2/12/21.
Accession Number: 20210212–5239.
Comments Due: 5 p.m. ET 2/24/21.
Docket Numbers: RP21–489–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: REX
2021–02–12 Negotiated Rate Agreement
and Amendment to be effective
2/12/2021.
Filed Date: 2/12/21.
Accession Number: 20210212–5253.
Comments Due: 5 p.m. ET 2/24/21.
Docket Numbers: RP21–490–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 2.15.21
Negotiated Rates—Mieco LLC H–7080–
89 to be effective 2/13/2021.
Filed Date: 2/16/21.
Accession Number: 20210216–5009.
Comments Due: 5 p.m. ET 3/1/21.
Docket Numbers: RP21–491–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Negotiated Rate Capacity Release
Agreement—2/15/2021 to be effective
2/15/2021.
Filed Date: 2/16/21.
Accession Number: 20210216–5143.
Comments Due: 5 p.m. ET 3/1/21.
Docket Numbers: RP21–492–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate PAL Agreement—
Morgan Stanley Extension to be
effective 2/12/2021.
E:\FR\FM\23FEN1.SGM
23FEN1
Agencies
[Federal Register Volume 86, Number 34 (Tuesday, February 23, 2021)]
[Notices]
[Pages 10947-10948]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-03675]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1121-000]
Battle Creek Hydroelectric Project; Notice of Existing Licensee's
Notice of Intent To Not File a New License Application, and Soliciting
Notices of Intent To File a License Application and Pre-Application
Documents
At least five years, but no more than five and one-half years,
before the expiration of a license for a major water power project, the
licensee must file with the Commission a letter that contains an
unequivocal statement of the licensee's intent to file or not to file
an application for a new license.\1\
---------------------------------------------------------------------------
\1\ 18 CFR 16.6(c) (2020).
---------------------------------------------------------------------------
[[Page 10948]]
If such a licensee informs the Commission that it does not intend
to file an application for a new license, nonpower license, or
exemption for the project, the licensee may not file an application for
a new license, nonpower license, or exemption for the project, either
individually or in conjunction with an entity or entities that are not
currently licensees of the project.\2\
---------------------------------------------------------------------------
\2\ 18 CFR 16.24 (a)(1).
---------------------------------------------------------------------------
On October 23, 2020, Pacific Gas & Electric Company (PG&E), the
existing licensee for the Battle Creek Hydroelectric Project No. 1121,
filed notice of its intent to not file an application for a new
license. Therefore, pursuant to section 16.24(a)(1) of the Commission's
regulations, PG&E may not file an application for a new license for the
project, either individually or in conjunction with an entity or
entities that are not currently licensees of the project.
The 36.1-megawatt (MW) Battle Creek Hydroelectric Project is
located on the North and South Forks of Battle Creek, a tributary to
the Sacramento River, in Shasta and Tehama Counties, California. The
project occupies 93 acres of federal land managed by the U.S. Forest
Service and the Bureau of Land Management. The existing license for the
project expires on July 31, 2026.\3\
---------------------------------------------------------------------------
\3\ Because PG&E filed the notice of intent to not file an
application for a new license more than five and one-half years
before the expiration of the license, we waive the applicable
requirement in 18 CFR 16.6(c)(1).
---------------------------------------------------------------------------
The principal project works consist of: (1) Two small upstream
storage reservoirs; (2) three forebays; (3) twenty canals and pipelines
and associated diversion dams; (4) penstocks leading to five
powerhouses; (5) five 60-kV transmission lines with a total length of
50.3 miles; and (6) five substations.
Any party interested in filing a license application (i.e.,
potential applicant) for the Battle Creek Hydroelectric Project No.
1121 must file a Notice of Intent (NOI) \4\ and pre- application
document (PAD).\5\ Additionally, while the integrated licensing process
(ILP) is the default process for preparing an application for a
subsequent license, a potential applicant may request to use
alternative licensing procedures when it files its NOI.\6\
---------------------------------------------------------------------------
\4\ 18 CFR 5.5.
\5\ 18 CFR 5.6.
\6\ 18 CFR 5.3(b).
---------------------------------------------------------------------------
The deadline for potential applicants, other than the existing
licensee, to file NOIs, PADs, and requests to use an alternative
licensing process is 120 days from the issuance date of this notice.
Applications for a new license from potential applicants, other
than the existing licensee, must be filed with the Commission at least
24 months prior to the expiration of the existing license.\7\ Because
the existing license expires on July 31, 2026, applications for license
for this project must be filed by July 31, 2024.
---------------------------------------------------------------------------
\7\ 18 CFR 16.9(b)(1).
---------------------------------------------------------------------------
Questions concerning this notice should be directed to Rebecca Kipp
(202) 502- 8846 or [email protected].
Dated: February 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-03675 Filed 2-22-21; 8:45 am]