New England Hydropower Company, LLC Albion Hydro, LLC; Notice of Transfer of Exemption, 10059 [2021-03273]

Download as PDF Federal Register / Vol. 86, No. 31 / Thursday, February 18, 2021 / Notices provide a minimum flow in the bypassed reach of 28 cfs; 2 (3) install seasonal trashracks with 1-inch spacing; (4) implement a Trashrack Operations and Maintenance Plan, a Bat and Eagle Protection Plan, an Invasive Species Management Plan, and an Impoundment Drawdown and Cofferdam Plan; and (5) implement several improvements to an existing fishing platform to make it accessible to persons with disabilities, including the addition of an accessible parking space, an associated access aisle and access route from the accessible parking space to the fishing platform, and modifications to the railing surrounding the fishing platform. o. In addition to publishing the full text of this notice in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this notice, as well as other documents in the proceeding (e.g., license application) via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document (P–4334). At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19) issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or (202) 502– 8659 (TTY). You may also register online at https://ferconline.ferc.gov/ FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural schedule: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. Issue Deficiency Letter (if necessary)— March 2021 Request Additional Information—March 2021 Issue Acceptance Letter—June 2021 Issue Scoping Document 1 for comments—July 2021 Request Additional Information (if necessary)—September 2021 Issue Scoping Document 2—October 2021 Issue Notice of Ready for Environmental Analysis—October 2021 q. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: February 11, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–03271 Filed 2–17–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14633–0033] New England Hydropower Company, LLC Albion Hydro, LLC; Notice of Transfer of Exemption 1. On December 28, 2020, New England Hydropower Company, LLC, exemptee for the Albion Dam Hydroelectric Project No. 14633, filed a letter notifying the Commission that the project was transferred from New England Hydropower Company, LLC to Albion Hydro, LLC. The exemption from licensing was originally issued on September 24, 2020.1 The project would be located on the Blackstone River, near the towns of Cumberland and Lincoln, Providence County, Rhode Island. The transfer of an exemption does not require Commission approval. 2. Albion Hydro, LLC is now the exemptee of the Albion Dam Hydroelectric Project No. 14633. All correspondence must be forwarded to: Mr. Michael C. Kerr, CEO, Albion Hydro, LLC, 100 Cummings Center Drive, Suite 451 C, Beverly, MA 01915, Phone: (978) 360–2547, Email: Michael@nehydropower.com. Dated: February 11, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. jbell on DSKJLSW7X2PROD with NOTICES [FR Doc. 2021–03273 Filed 2–17–21; 8:45 am] 2 EONY determined that the proposed 28-cfs minimum flow would not result in incremental losses of generation compared to the current condition because the field measurement of the existing minimum flow was approximately 28 cfs, which accounted for flashboard leakage and was most likely present during the term of the existing license. VerDate Sep<11>2014 17:47 Feb 17, 2021 Jkt 253001 BILLING CODE 6717–01–P 1 New England Hydropower Company, LLC, 172 FERC ¶ 62,167 (2020). PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 10059 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP21–468–000. Applicants: Gulf South Pipeline Company, LLC. Description: § 4(d) Rate Filing: Third GMS Filing—Intermediate to be effective 3/12/2021. Filed Date: 2/10/21. Accession Number: 20210210–5033. Comments Due: 5 p.m. ET 2/22/21. Docket Numbers: RP21–469–000. Applicants: Chevron U.S.A. Inc., Noble Energy, Inc. Description: Joint Petition For Temporary Waiver, et al. of Noble Energy, Inc., et al. under RP21–469. Filed Date: 2/10/21. Accession Number: 20210210–5133. Comments Due: 5 p.m. ET 2/15/21. Docket Numbers: RP21–470–000. Applicants: Guardian Pipeline, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate PAL Amendments— Clearwater & Mercuria to be effective 2/10/2021. Filed Date: 2/10/21. Accession Number: 20210210–5134. Comments Due: 5 p.m. ET 2/22/21. Docket Numbers: RP21–471–000. Applicants: Tourmaline Oil Corp., Tourmaline Oil Marketing Corp. Description: Joint Petition For Temporary Waiver, et al. of Tourmaline Oil Corp., et al. under RP21–471. Filed Date: 2/10/21. Accession Number: 20210210–5143. Comments Due: 5 p.m. ET 2/15/21. Docket Numbers: RP21–472–000. Applicants: RH energytrans, LLC. Description: Request for Waiver of Requirement to File FL&U Percentage Adjustment of RH energytrans, LLC under RP21–472. Filed Date: 2/10/21. Accession Number: 20210210–5147. Comments Due: 5 p.m. ET 2/22/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but E:\FR\FM\18FEN1.SGM 18FEN1

Agencies

[Federal Register Volume 86, Number 31 (Thursday, February 18, 2021)]
[Notices]
[Page 10059]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-03273]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14633-0033]


New England Hydropower Company, LLC Albion Hydro, LLC; Notice of 
Transfer of Exemption

    1. On December 28, 2020, New England Hydropower Company, LLC, 
exemptee for the Albion Dam Hydroelectric Project No. 14633, filed a 
letter notifying the Commission that the project was transferred from 
New England Hydropower Company, LLC to Albion Hydro, LLC. The exemption 
from licensing was originally issued on September 24, 2020.\1\ The 
project would be located on the Blackstone River, near the towns of 
Cumberland and Lincoln, Providence County, Rhode Island. The transfer 
of an exemption does not require Commission approval.
---------------------------------------------------------------------------

    \1\ New England Hydropower Company, LLC, 172 FERC ] 62,167 
(2020).
---------------------------------------------------------------------------

    2. Albion Hydro, LLC is now the exemptee of the Albion Dam 
Hydroelectric Project No. 14633. All correspondence must be forwarded 
to: Mr. Michael C. Kerr, CEO, Albion Hydro, LLC, 100 Cummings Center 
Drive, Suite 451 C, Beverly, MA 01915, Phone: (978) 360-2547, Email: 
[email protected].

    Dated: February 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-03273 Filed 2-17-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.