New England Hydropower Company, LLC Albion Hydro, LLC; Notice of Transfer of Exemption, 10059 [2021-03273]
Download as PDF
Federal Register / Vol. 86, No. 31 / Thursday, February 18, 2021 / Notices
provide a minimum flow in the
bypassed reach of 28 cfs; 2 (3) install
seasonal trashracks with 1-inch spacing;
(4) implement a Trashrack Operations
and Maintenance Plan, a Bat and Eagle
Protection Plan, an Invasive Species
Management Plan, and an
Impoundment Drawdown and
Cofferdam Plan; and (5) implement
several improvements to an existing
fishing platform to make it accessible to
persons with disabilities, including the
addition of an accessible parking space,
an associated access aisle and access
route from the accessible parking space
to the fishing platform, and
modifications to the railing surrounding
the fishing platform.
o. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–4334).
At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter (if necessary)—
March 2021
Request Additional Information—March
2021
Issue Acceptance Letter—June 2021
Issue Scoping Document 1 for
comments—July 2021
Request Additional Information (if
necessary)—September 2021
Issue Scoping Document 2—October
2021
Issue Notice of Ready for Environmental
Analysis—October 2021
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: February 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–03271 Filed 2–17–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14633–0033]
New England Hydropower Company,
LLC Albion Hydro, LLC; Notice of
Transfer of Exemption
1. On December 28, 2020, New
England Hydropower Company, LLC,
exemptee for the Albion Dam
Hydroelectric Project No. 14633, filed a
letter notifying the Commission that the
project was transferred from New
England Hydropower Company, LLC to
Albion Hydro, LLC. The exemption
from licensing was originally issued on
September 24, 2020.1 The project would
be located on the Blackstone River, near
the towns of Cumberland and Lincoln,
Providence County, Rhode Island. The
transfer of an exemption does not
require Commission approval.
2. Albion Hydro, LLC is now the
exemptee of the Albion Dam
Hydroelectric Project No. 14633. All
correspondence must be forwarded to:
Mr. Michael C. Kerr, CEO, Albion
Hydro, LLC, 100 Cummings Center
Drive, Suite 451 C, Beverly, MA 01915,
Phone: (978) 360–2547, Email:
Michael@nehydropower.com.
Dated: February 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
jbell on DSKJLSW7X2PROD with NOTICES
[FR Doc. 2021–03273 Filed 2–17–21; 8:45 am]
2 EONY
determined that the proposed 28-cfs
minimum flow would not result in incremental
losses of generation compared to the current
condition because the field measurement of the
existing minimum flow was approximately 28 cfs,
which accounted for flashboard leakage and was
most likely present during the term of the existing
license.
VerDate Sep<11>2014
17:47 Feb 17, 2021
Jkt 253001
BILLING CODE 6717–01–P
1 New England Hydropower Company, LLC, 172
FERC ¶ 62,167 (2020).
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
10059
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP21–468–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: Third
GMS Filing—Intermediate to be
effective 3/12/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5033.
Comments Due: 5 p.m. ET 2/22/21.
Docket Numbers: RP21–469–000.
Applicants: Chevron U.S.A. Inc.,
Noble Energy, Inc.
Description: Joint Petition For
Temporary Waiver, et al. of Noble
Energy, Inc., et al. under RP21–469.
Filed Date: 2/10/21.
Accession Number: 20210210–5133.
Comments Due: 5 p.m. ET 2/15/21.
Docket Numbers: RP21–470–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate PAL Amendments—
Clearwater & Mercuria to be effective
2/10/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5134.
Comments Due: 5 p.m. ET 2/22/21.
Docket Numbers: RP21–471–000.
Applicants: Tourmaline Oil Corp.,
Tourmaline Oil Marketing Corp.
Description: Joint Petition For
Temporary Waiver, et al. of Tourmaline
Oil Corp., et al. under RP21–471.
Filed Date: 2/10/21.
Accession Number: 20210210–5143.
Comments Due: 5 p.m. ET 2/15/21.
Docket Numbers: RP21–472–000.
Applicants: RH energytrans, LLC.
Description: Request for Waiver of
Requirement to File FL&U Percentage
Adjustment of RH energytrans, LLC
under RP21–472.
Filed Date: 2/10/21.
Accession Number: 20210210–5147.
Comments Due: 5 p.m. ET 2/22/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
E:\FR\FM\18FEN1.SGM
18FEN1
Agencies
[Federal Register Volume 86, Number 31 (Thursday, February 18, 2021)]
[Notices]
[Page 10059]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-03273]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14633-0033]
New England Hydropower Company, LLC Albion Hydro, LLC; Notice of
Transfer of Exemption
1. On December 28, 2020, New England Hydropower Company, LLC,
exemptee for the Albion Dam Hydroelectric Project No. 14633, filed a
letter notifying the Commission that the project was transferred from
New England Hydropower Company, LLC to Albion Hydro, LLC. The exemption
from licensing was originally issued on September 24, 2020.\1\ The
project would be located on the Blackstone River, near the towns of
Cumberland and Lincoln, Providence County, Rhode Island. The transfer
of an exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ New England Hydropower Company, LLC, 172 FERC ] 62,167
(2020).
---------------------------------------------------------------------------
2. Albion Hydro, LLC is now the exemptee of the Albion Dam
Hydroelectric Project No. 14633. All correspondence must be forwarded
to: Mr. Michael C. Kerr, CEO, Albion Hydro, LLC, 100 Cummings Center
Drive, Suite 451 C, Beverly, MA 01915, Phone: (978) 360-2547, Email:
[email protected].
Dated: February 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-03273 Filed 2-17-21; 8:45 am]
BILLING CODE 6717-01-P