Premium Energy Holdings, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 10046 [2021-03272]
Download as PDF
10046
Federal Register / Vol. 86, No. 31 / Thursday, February 18, 2021 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No.15056–000]
jbell on DSKJLSW7X2PROD with NOTICES
Premium Energy Holdings, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On November 19, 2020, Premium
Energy Holdings, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Ashokan Pumped
Storage Project to be located 14 miles
west of the City of Kingston in Ulster
County, New York. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new 2,618-foot-long,
212-foot-high roller-compacted concrete
dam for the upper reservoir for
alternative 1 (Stony Clove Reservoir)
with a surface area of 245 acres and a
storage capacity 22,496 acre-feet at a
surface elevation of 1,500 feet above
mean sea level (msl); (2) a new 2,736foot-long, 232-foot-high rollercompacted concrete dam for the upper
reservoir for alternative 2 (Woodland
Reservoir) with a surface area of 313
acres and a storage capacity 26,231 acrefeet at a surface elevation of 1,210 feet
msl; (3) a new 2,527-foot-long, 304-foothigh roller-compacted concrete dam for
the upper reservoir for alternative 3
(Wittenberg Reservoir) with a surface
area of 226 acres and a storage capacity
25,558 acre-feet at a surface elevation of
1,180 feet msl; (4) the existing Ashokan
Reservoir for the lower reservoir with a
surface area of 8,300 acres and a storage
capacity of 382,358 acre-feet at a surface
elevation of 585 feet msl; (5) new 13.99mile-long tunnels, shafts, and penstocks
for alternative 1 connecting the upper
and lower reservoirs; (6) new 11.58mile-long tunnels, shafts, and penstocks
for alternative 2 connecting the upper
and lower reservoirs; (7) new 3.81-milelong tunnels, shafts, and penstocks for
alternative 3 connecting the upper and
lower reservoirs; (8) a new 500-footlong, 125-foot-wide, 150-foot-high
underground reinforced-concrete
powerhouse containing five turbinegenerator units with a total rated
VerDate Sep<11>2014
17:47 Feb 17, 2021
Jkt 253001
capacity of 800 megawatts; (9) a 17.3mile-long, 230-kilovolt new
transmission line for alternatives 1 and
2 from the proposed Ashokan
switchyard to the existing Hurley
avenue substation; (10) a 12.9-mile-long,
230-kilovolt new transmission line for
alternative 3 from the proposed
Ashokan switchyard to the existing
Hurley avenue substation; and (11)
appurtenant facilities. The proposed
project would have a maximum annual
generation of 2,700 gigawatt-hours.
Applicant Contact: Victor M. Rojas,
Premium Energy Holdings, LLC, 355
South Lemon Avenue, Suite A, Walnut,
CA 91789; phone: 909–595–5314.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/eFiling.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support. In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–15056–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–15056) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
Dated: February 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–03272 Filed 2–17–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[Case Number 2020–010; EERE–2020–BT–
WAV–0026]
Energy Conservation Program:
Notification of Petition for Waiver of
Hussmann Corporation From the
Department of Energy Walk-In Coolers
and Walk-In Freezers Test Procedure
and Notice of Grant of Interim Waiver
Office of Energy Efficiency and
Renewable Energy, Department of
Energy.
ACTION: Notification of petition for
waiver and grant of an interim waiver;
request for comments.
AGENCY:
This document announces
receipt of and publishes a petition for
waiver and interim waiver from
Hussmann Corporation (‘‘Hussmann’’),
which seeks a waiver for specified
carbon dioxide (‘‘CO2’’) direct
expansion unit cooler basic models from
the U.S. Department of Energy (‘‘DOE’’)
test procedure used to determine the
efficiency of walk-in cooler and walk-in
freezer refrigeration systems. DOE also
gives notice of an Interim Waiver Order
that requires Hussmann to test and rate
the specified CO2 direct expansion unit
cooler basic models in accordance with
the alternate test procedure set forth in
the Interim Waiver Order. DOE solicits
comments, data, and information
concerning Hussmann’s petition and its
suggested alternate test procedure so as
to inform DOE’s final decision on
Hussmann’s waiver request.
DATES: The Interim Waiver Order is
effective on February 18, 2021. Written
comments and information will be
accepted on or before March 22, 2021.
ADDRESSES: Interested persons are
encouraged to submit comments using
the Federal eRulemaking Portal at
https://www.regulations.gov.
Alternatively, interested persons may
submit comments, identified by case
number ‘‘2020–010’’, and Docket
number ‘‘EERE–2020–BT–WAV–0026,’’
by any of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the
instructions for submitting comments.
• Email:
HussmannWICF2020WAV0026@
ee.doe.gov. Include Case No. 2020–010
in the subject line of the message.
• Postal Mail: Appliance and
Equipment Standards Program, U.S.
SUMMARY:
E:\FR\FM\18FEN1.SGM
18FEN1
Agencies
[Federal Register Volume 86, Number 31 (Thursday, February 18, 2021)]
[Notices]
[Page 10046]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-03272]
[[Page 10046]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No.15056-000]
Premium Energy Holdings, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On November 19, 2020, Premium Energy Holdings, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Ashokan Pumped Storage Project to be located 14 miles west of the City
of Kingston in Ulster County, New York. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) A new
2,618-foot-long, 212-foot-high roller-compacted concrete dam for the
upper reservoir for alternative 1 (Stony Clove Reservoir) with a
surface area of 245 acres and a storage capacity 22,496 acre-feet at a
surface elevation of 1,500 feet above mean sea level (msl); (2) a new
2,736-foot-long, 232-foot-high roller-compacted concrete dam for the
upper reservoir for alternative 2 (Woodland Reservoir) with a surface
area of 313 acres and a storage capacity 26,231 acre-feet at a surface
elevation of 1,210 feet msl; (3) a new 2,527-foot-long, 304-foot-high
roller-compacted concrete dam for the upper reservoir for alternative 3
(Wittenberg Reservoir) with a surface area of 226 acres and a storage
capacity 25,558 acre-feet at a surface elevation of 1,180 feet msl; (4)
the existing Ashokan Reservoir for the lower reservoir with a surface
area of 8,300 acres and a storage capacity of 382,358 acre-feet at a
surface elevation of 585 feet msl; (5) new 13.99-mile-long tunnels,
shafts, and penstocks for alternative 1 connecting the upper and lower
reservoirs; (6) new 11.58-mile-long tunnels, shafts, and penstocks for
alternative 2 connecting the upper and lower reservoirs; (7) new 3.81-
mile-long tunnels, shafts, and penstocks for alternative 3 connecting
the upper and lower reservoirs; (8) a new 500-foot-long, 125-foot-wide,
150-foot-high underground reinforced-concrete powerhouse containing
five turbine-generator units with a total rated capacity of 800
megawatts; (9) a 17.3-mile-long, 230-kilovolt new transmission line for
alternatives 1 and 2 from the proposed Ashokan switchyard to the
existing Hurley avenue substation; (10) a 12.9-mile-long, 230-kilovolt
new transmission line for alternative 3 from the proposed Ashokan
switchyard to the existing Hurley avenue substation; and (11)
appurtenant facilities. The proposed project would have a maximum
annual generation of 2,700 gigawatt-hours.
Applicant Contact: Victor M. Rojas, Premium Energy Holdings, LLC,
355 South Lemon Avenue, Suite A, Walnut, CA 91789; phone: 909-595-5314.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments
up to 6,000 characters, without prior registration, using the eComment
system at https://ferconline.ferc.gov/QuickComment.aspx. You must
include your name and contact information at the end of your comments.
For assistance, please contact FERC Online Support. In lieu of
electronic filing, you may submit a paper copy. Submissions sent via
the U.S. Postal Service must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Room 1A, Washington, DC 20426. Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
The first page of any filing should include docket number P-15056-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-15056) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: February 11, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-03272 Filed 2-17-21; 8:45 am]
BILLING CODE 6717-01-P