Federal Register / Vol. 86, No. 30 / Wednesday, February 17, 2021 / Notices
Remove Facilities to be effective
4/12/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5041.
Comments Due: 5 p.m. ET 3/3/21.
Docket Numbers: ER21–1081–000.
Applicants: Eagle Creek Racine
Hydro, LLC.
Description: Baseline eTariff Filing:
Market Based Rate Application with
Requests for Status, Waivers, and
Expedition to be effective 4/11/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5042.
Comments Due: 5 p.m. ET 3/3/21.
Docket Numbers: ER21–1082–000.
Applicants: Tucson Electric Power
Company.
Description: § 205(d) Rate Filing:
Service Agreement for Firm Long Term
Transmission Service to be effective
1/11/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5050.
Comments Due: 5 p.m. ET 3/3/21.
Docket Numbers: ER21–1083–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Clarify that No Project May
Be Authorized from 20-Year Assessment
to be effective 4/12/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5054.
Comments Due: 5 p.m. ET 3/3/21.
Docket Numbers: ER21–1084–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA 5966; Queue No. AF1–
174 to be effective 1/11/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5062.
Comments Due: 5 p.m. ET 3/3/21.
Docket Numbers: ER21–1085–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
2021–02–10_SA 3633 OTP–MDU T–T
(Oakes Ellendale) to be effective
1/19/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5064.
Comments Due: 5 p.m. ET 3/3/21.
Docket Numbers: ER21–1086–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, Service Agreement No.
5976; Queue No. AF1–137 to be
effective 1/11/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5072.
Comments Due: 5 p.m. ET 3/3/21.
Docket Numbers: ER21–1087–000.
Applicants: PJM Interconnection,
L.L.C.
VerDate Sep<11>2014
20:43 Feb 16, 2021
Jkt 253001
Description: Tariff Cancellation:
Notice of Cancellation of WMPA, SA
No. 4918; Queue No. AC2–072 to be
effective 3/22/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5077.
Comments Due: 5 p.m. ET 3/3/21.
Docket Numbers: ER21–1088–000.
Applicants: New York Independent
System Operator, Inc., Niagara Mohawk
Power Corporation.
Description: § 205(d) Rate Filing: Joint
SGIA among NYISO, NMPC and
SunEast Watkins Road Solar (SA2591)
to be effective 1/27/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5081.
Comments Due: 5 p.m. ET 3/3/21.
Docket Numbers: ER21–1089–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA, SA
No. 4953; Queue No. AC2–074 to be
effective 3/22/2021.
Filed Date: 2/10/21.
Accession Number: 20210210–5082.
Comments Due: 5 p.m. ET 3/3/21.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES21–30–000.
Applicants: Northern Maine
Independent Administrator.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities for
Northern Maine Independent
Administrator, Inc.
Filed Date: 2/10/21.
Accession Number: 20210210–5074.
Comments Due: 5 p.m. ET 3/3/21
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
9921
Dated: February 10, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–03145 Filed 2–16–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–44–000]
LA Storage, LLC; Notice of Applcation
and Establishing Intervention Deadline
Take notice that on January 29, 2021,
LA Storage, LLC (LA Storage), 1500 Post
Oak Blvd., Suite 1000, Houston, Texas
77056, filed in the above referenced
docket an application pursuant to
section 7(c) of the Natural Gas Act
(NGA) and Parts 157 and 284 of the
Commission’s regulations to construct
and operate a new natural gas storage
and transmission facilities (the
Hackberry Storage Project) located in
Cameron and Calcasieu Parishes,
Louisiana. Specifically, LA Storage
request to convert three existing salt
dome caverns to natural gas storage
service and develop one new salt dome
cavern, as well as construct
approximately 11.1 miles of 42-inch
diameter natural gas pipeline,
compression, and appurtenant facilities.
LA Storage request the approval of
market-based rates for the Hackberry
Storage project, all as more fully set
forth in the request which is on file with
the Commission and open to public
inspection.
LA Storage’s application states that a
water quality certificate under section
401 of the Clean Water Act is required
for the project from the Louisiana
Department of Environmental Quality.
The request for certification must be
submitted to the certifying agency and
to the Commission concurrently. Proof
of the certifying agency’s receipt date
must be filed no later than five (5) days
after the request is submitted to the
certifying agency.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
E:\FR\FM\17FEN1.SGM
17FEN1
9922
Federal Register / Vol. 86, No. 30 / Wednesday, February 17, 2021 / Notices
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to Jerrod
L. Harrison, 488 8th Avenue, San Diego,
California 92101, by telephone at (619)
696–2987, or by email at jharrison@
sempraglobal.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
Complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are two ways to become
involved in the Commission’s review of
this project: You can file comments on
the project, and you can file a motion
to intervene in the proceeding. There is
no fee or cost for filing comments or
intervening. The deadline for filing a
motion to intervene is 5:00 p.m. Eastern
Time on March 3, 2021.
jbell on DSKJLSW7X2PROD with NOTICES
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please submit your comments
on or before March 3, 2021.
There are three methods you can use
to submit your comments to the
Commission. In all instances, please
1 18
CFR (Code of Federal Regulations) 157.9.
VerDate Sep<11>2014
20:43 Feb 16, 2021
Jkt 253001
reference the Project docket number
(CP21–44–000) in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address below.2 Your written
comments must reference the Project
docket number (CP21–44–000).
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,3 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
2 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
3 18 CFR 385.102(d).
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is March 3, 2021.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number (CP21–44–000) in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docsfiling/ efiling/
document-less-intervention.pdf.; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
4 18
5 18
E:\FR\FM\17FEN1.SGM
CFR 385.214.
CFR 157.10.
17FEN1
Federal Register / Vol. 86, No. 30 / Wednesday, February 17, 2021 / Notices
address below.6 Your motion to
intervene must reference the Project
docket number (CP21–44–000).
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Motions to intervene must be served
on the applicant either by mail or email
at: 488 8th Avenue, San Diego,
California 92101 or at jharrison@
sempraglobal.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online. Service
can be via email with a link to the
document.
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
jbell on DSKJLSW7X2PROD with NOTICES
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
6 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
9 18 CFR 385.214(b)(3) and (d).
VerDate Sep<11>2014
20:43 Feb 16, 2021
Jkt 253001
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docsfiling/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on March 3, 2021.
Dated: February 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–03157 Filed 2–16–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4428–011]
Walden Hydro, LLC; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–4428–011.
c. Date filed: May 29, 2020.
d. Applicant: Walden Hydro, LLC.
e. Name of Project: Walden
Hydroelectric Project.
f. Location: On the Wallkill River, in
the Village of Walden, Orange County,
New York. The project does not occupy
any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Tim Carlsen,
CEO, Hydroland, Inc.,1 403 Madison
Ave. #240, Bainbridge Island, WA
98110; Phone at (844) 493–7612 or
email at tim@hydrolandcorp.com.
i. FERC Contact: Samantha Pollak at
(202) 502–6419, or samantha.pollak@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
1 In a February 3, 2021 filing, the Commission
was notified that Enel Green Power North America,
Inc. transferred all its ownership interests for
Walden Hydro, LLC to Hydroland, Inc.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
9923
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–4428–011.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is now ready for environmental
analysis.
The Council on Environmental
Quality (CEQ) issued a final rule on July
15, 2020, revising the regulations under
40 CFR parts 1500–1518 that federal
agencies use to implement NEPA (see
Update to the Regulations Implementing
the Procedural Provisions of the
National Environmental Policy Act, 85
FR 43,304). The Final Rule became
effective on and applies to any NEPA
process begun after September 14, 2020.
An agency may also apply the
regulations to ongoing activities and
environmental documents begun before
September 14, 2020, which includes the
proposed Walden Project. Commission
staff intends to conduct its NEPA review
in accordance with CEQ’s new
regulations.
l. The Walden Project consists of: (1)
A 417-foot-long (consisting of 165-footlong east-west and 252-foot-long northsouth portions), V-shaped concrete dam
topped with 2-foot-high flashboards; (2)
an impoundment with a surface area of
69 acres at the normal pool elevation of
321.3 feet National Geodetic Vertical
Datum of 1929 (NGVD29); (3) an intake
structure consisting of a 252-foot-long,
56-foot-wide, 18-foot-deep canal
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 86, Number 30 (Wednesday, February 17, 2021)]
[Notices]
[Pages 9921-9923]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-03157]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-44-000]
LA Storage, LLC; Notice of Applcation and Establishing
Intervention Deadline
Take notice that on January 29, 2021, LA Storage, LLC (LA Storage),
1500 Post Oak Blvd., Suite 1000, Houston, Texas 77056, filed in the
above referenced docket an application pursuant to section 7(c) of the
Natural Gas Act (NGA) and Parts 157 and 284 of the Commission's
regulations to construct and operate a new natural gas storage and
transmission facilities (the Hackberry Storage Project) located in
Cameron and Calcasieu Parishes, Louisiana. Specifically, LA Storage
request to convert three existing salt dome caverns to natural gas
storage service and develop one new salt dome cavern, as well as
construct approximately 11.1 miles of 42-inch diameter natural gas
pipeline, compression, and appurtenant facilities. LA Storage request
the approval of market-based rates for the Hackberry Storage project,
all as more fully set forth in the request which is on file with the
Commission and open to public inspection.
LA Storage's application states that a water quality certificate
under section 401 of the Clean Water Act is required for the project
from the Louisiana Department of Environmental Quality. The request for
certification must be submitted to the certifying agency and to the
Commission concurrently. Proof of the certifying agency's receipt date
must be filed no later than five (5) days after the request is
submitted to the certifying agency.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National
[[Page 9922]]
Emergency concerning the Novel Coronavirus Disease (COVID-19), issued
by the President on March 13, 2020. For assistance, contact the Federal
Energy Regulatory Commission at [email protected] or call
toll-free, (886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application should be directed to
Jerrod L. Harrison, 488 8th Avenue, San Diego, California 92101, by
telephone at (619) 696-2987, or by email at [email protected].
Pursuant to section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: Complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are two ways to become involved in the Commission's review of
this project: You can file comments on the project, and you can file a
motion to intervene in the proceeding. There is no fee or cost for
filing comments or intervening. The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on March 3, 2021.
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be. To ensure that your comments
are timely and properly recorded, please submit your comments on or
before March 3, 2021.
There are three methods you can use to submit your comments to the
Commission. In all instances, please reference the Project docket
number (CP21-44-000) in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; first select ``General'' and then select ``Comment on a
Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address below.\2\ Your written comments must reference
the Project docket number (CP21-44-000).
---------------------------------------------------------------------------
\2\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\3\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\3\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is March 3, 2021. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number (CP21-44-000) in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docsfiling/ efiling/document-less-
intervention.pdf.; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the
[[Page 9923]]
address below.\6\ Your motion to intervene must reference the Project
docket number (CP21-44-000).
---------------------------------------------------------------------------
\6\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426.
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Motions to intervene must be served on the applicant either by mail
or email at: 488 8th Avenue, San Diego, California 92101 or at
[email protected]. Any subsequent submissions by an intervenor
must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online. Service can be via
email with a link to the document.
All timely, unopposed \7\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\7\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\8\ 18 CFR 385.214(c)(1).
\9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docsfiling/ esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on March 3, 2021.
Dated: February 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-03157 Filed 2-16-21; 8:45 am]