LA Storage, LLC; Notice of Applcation and Establishing Intervention Deadline, 9921-9923 [2021-03157]

Download as PDF jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 86, No. 30 / Wednesday, February 17, 2021 / Notices Remove Facilities to be effective 4/12/2021. Filed Date: 2/10/21. Accession Number: 20210210–5041. Comments Due: 5 p.m. ET 3/3/21. Docket Numbers: ER21–1081–000. Applicants: Eagle Creek Racine Hydro, LLC. Description: Baseline eTariff Filing: Market Based Rate Application with Requests for Status, Waivers, and Expedition to be effective 4/11/2021. Filed Date: 2/10/21. Accession Number: 20210210–5042. Comments Due: 5 p.m. ET 3/3/21. Docket Numbers: ER21–1082–000. Applicants: Tucson Electric Power Company. Description: § 205(d) Rate Filing: Service Agreement for Firm Long Term Transmission Service to be effective 1/11/2021. Filed Date: 2/10/21. Accession Number: 20210210–5050. Comments Due: 5 p.m. ET 3/3/21. Docket Numbers: ER21–1083–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Revisions to Clarify that No Project May Be Authorized from 20-Year Assessment to be effective 4/12/2021. Filed Date: 2/10/21. Accession Number: 20210210–5054. Comments Due: 5 p.m. ET 3/3/21. Docket Numbers: ER21–1084–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA 5966; Queue No. AF1– 174 to be effective 1/11/2021. Filed Date: 2/10/21. Accession Number: 20210210–5062. Comments Due: 5 p.m. ET 3/3/21. Docket Numbers: ER21–1085–000. Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2021–02–10_SA 3633 OTP–MDU T–T (Oakes Ellendale) to be effective 1/19/2021. Filed Date: 2/10/21. Accession Number: 20210210–5064. Comments Due: 5 p.m. ET 3/3/21. Docket Numbers: ER21–1086–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, Service Agreement No. 5976; Queue No. AF1–137 to be effective 1/11/2021. Filed Date: 2/10/21. Accession Number: 20210210–5072. Comments Due: 5 p.m. ET 3/3/21. Docket Numbers: ER21–1087–000. Applicants: PJM Interconnection, L.L.C. VerDate Sep<11>2014 20:43 Feb 16, 2021 Jkt 253001 Description: Tariff Cancellation: Notice of Cancellation of WMPA, SA No. 4918; Queue No. AC2–072 to be effective 3/22/2021. Filed Date: 2/10/21. Accession Number: 20210210–5077. Comments Due: 5 p.m. ET 3/3/21. Docket Numbers: ER21–1088–000. Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description: § 205(d) Rate Filing: Joint SGIA among NYISO, NMPC and SunEast Watkins Road Solar (SA2591) to be effective 1/27/2021. Filed Date: 2/10/21. Accession Number: 20210210–5081. Comments Due: 5 p.m. ET 3/3/21. Docket Numbers: ER21–1089–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of WMPA, SA No. 4953; Queue No. AC2–074 to be effective 3/22/2021. Filed Date: 2/10/21. Accession Number: 20210210–5082. Comments Due: 5 p.m. ET 3/3/21. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES21–30–000. Applicants: Northern Maine Independent Administrator. Description: Application under Section 204 of the Federal Power Act for Authorization to Issue Securities for Northern Maine Independent Administrator, Inc. Filed Date: 2/10/21. Accession Number: 20210210–5074. Comments Due: 5 p.m. ET 3/3/21 The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 9921 Dated: February 10, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–03145 Filed 2–16–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–44–000] LA Storage, LLC; Notice of Applcation and Establishing Intervention Deadline Take notice that on January 29, 2021, LA Storage, LLC (LA Storage), 1500 Post Oak Blvd., Suite 1000, Houston, Texas 77056, filed in the above referenced docket an application pursuant to section 7(c) of the Natural Gas Act (NGA) and Parts 157 and 284 of the Commission’s regulations to construct and operate a new natural gas storage and transmission facilities (the Hackberry Storage Project) located in Cameron and Calcasieu Parishes, Louisiana. Specifically, LA Storage request to convert three existing salt dome caverns to natural gas storage service and develop one new salt dome cavern, as well as construct approximately 11.1 miles of 42-inch diameter natural gas pipeline, compression, and appurtenant facilities. LA Storage request the approval of market-based rates for the Hackberry Storage project, all as more fully set forth in the request which is on file with the Commission and open to public inspection. LA Storage’s application states that a water quality certificate under section 401 of the Clean Water Act is required for the project from the Louisiana Department of Environmental Quality. The request for certification must be submitted to the certifying agency and to the Commission concurrently. Proof of the certifying agency’s receipt date must be filed no later than five (5) days after the request is submitted to the certifying agency. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National E:\FR\FM\17FEN1.SGM 17FEN1 9922 Federal Register / Vol. 86, No. 30 / Wednesday, February 17, 2021 / Notices Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to Jerrod L. Harrison, 488 8th Avenue, San Diego, California 92101, by telephone at (619) 696–2987, or by email at jharrison@ sempraglobal.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: Complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are two ways to become involved in the Commission’s review of this project: You can file comments on the project, and you can file a motion to intervene in the proceeding. There is no fee or cost for filing comments or intervening. The deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on March 3, 2021. jbell on DSKJLSW7X2PROD with NOTICES Comments Any person wishing to comment on the project may do so. Comments may include statements of support or objections to the project as a whole or specific aspects of the project. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please submit your comments on or before March 3, 2021. There are three methods you can use to submit your comments to the Commission. In all instances, please 1 18 CFR (Code of Federal Regulations) 157.9. VerDate Sep<11>2014 20:43 Feb 16, 2021 Jkt 253001 reference the Project docket number (CP21–44–000) in your submission. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address below.2 Your written comments must reference the Project docket number (CP21–44–000). Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The Commission encourages electronic filing of comments (options 1 and 2 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Persons who comment on the environmental review of this project will be placed on the Commission’s environmental mailing list, and will receive notification when the environmental documents (EA or EIS) are issued for this project and will be notified of meetings associated with the Commission’s environmental review process. The Commission considers all comments received about the project in determining the appropriate action to be taken. However, the filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. For instructions on how to intervene, see below. Interventions Any person, which includes individuals, organizations, businesses, municipalities, and other entities,3 has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of 2 Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. 3 18 CFR 385.102(d). PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is March 3, 2021. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. There are two ways to submit your motion to intervene. In both instances, please reference the Project docket number (CP21–44–000) in your submission. (1) You may file your motion to intervene by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docsfiling/ efiling/ document-less-intervention.pdf.; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the 4 18 5 18 E:\FR\FM\17FEN1.SGM CFR 385.214. CFR 157.10. 17FEN1 Federal Register / Vol. 86, No. 30 / Wednesday, February 17, 2021 / Notices address below.6 Your motion to intervene must reference the Project docket number (CP21–44–000). Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Motions to intervene must be served on the applicant either by mail or email at: 488 8th Avenue, San Diego, California 92101 or at jharrison@ sempraglobal.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 7 motions to intervene are automatically granted by operation of Rule 214(c)(1).8 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.9 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. jbell on DSKJLSW7X2PROD with NOTICES Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of 6 Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. 7 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 8 18 CFR 385.214(c)(1). 9 18 CFR 385.214(b)(3) and (d). VerDate Sep<11>2014 20:43 Feb 16, 2021 Jkt 253001 time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docsfiling/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on March 3, 2021. Dated: February 10, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–03157 Filed 2–16–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4428–011] Walden Hydro, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: P–4428–011. c. Date filed: May 29, 2020. d. Applicant: Walden Hydro, LLC. e. Name of Project: Walden Hydroelectric Project. f. Location: On the Wallkill River, in the Village of Walden, Orange County, New York. The project does not occupy any federal land. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Tim Carlsen, CEO, Hydroland, Inc.,1 403 Madison Ave. #240, Bainbridge Island, WA 98110; Phone at (844) 493–7612 or email at tim@hydrolandcorp.com. i. FERC Contact: Samantha Pollak at (202) 502–6419, or samantha.pollak@ ferc.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file scoping comments using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. 1 In a February 3, 2021 filing, the Commission was notified that Enel Green Power North America, Inc. transferred all its ownership interests for Walden Hydro, LLC to Hydroland, Inc. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 9923 Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–4428–011. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted and is now ready for environmental analysis. The Council on Environmental Quality (CEQ) issued a final rule on July 15, 2020, revising the regulations under 40 CFR parts 1500–1518 that federal agencies use to implement NEPA (see Update to the Regulations Implementing the Procedural Provisions of the National Environmental Policy Act, 85 FR 43,304). The Final Rule became effective on and applies to any NEPA process begun after September 14, 2020. An agency may also apply the regulations to ongoing activities and environmental documents begun before September 14, 2020, which includes the proposed Walden Project. Commission staff intends to conduct its NEPA review in accordance with CEQ’s new regulations. l. The Walden Project consists of: (1) A 417-foot-long (consisting of 165-footlong east-west and 252-foot-long northsouth portions), V-shaped concrete dam topped with 2-foot-high flashboards; (2) an impoundment with a surface area of 69 acres at the normal pool elevation of 321.3 feet National Geodetic Vertical Datum of 1929 (NGVD29); (3) an intake structure consisting of a 252-foot-long, 56-foot-wide, 18-foot-deep canal E:\FR\FM\17FEN1.SGM 17FEN1

Agencies

[Federal Register Volume 86, Number 30 (Wednesday, February 17, 2021)]
[Notices]
[Pages 9921-9923]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-03157]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP21-44-000]


LA Storage, LLC; Notice of Applcation and Establishing 
Intervention Deadline

    Take notice that on January 29, 2021, LA Storage, LLC (LA Storage), 
1500 Post Oak Blvd., Suite 1000, Houston, Texas 77056, filed in the 
above referenced docket an application pursuant to section 7(c) of the 
Natural Gas Act (NGA) and Parts 157 and 284 of the Commission's 
regulations to construct and operate a new natural gas storage and 
transmission facilities (the Hackberry Storage Project) located in 
Cameron and Calcasieu Parishes, Louisiana. Specifically, LA Storage 
request to convert three existing salt dome caverns to natural gas 
storage service and develop one new salt dome cavern, as well as 
construct approximately 11.1 miles of 42-inch diameter natural gas 
pipeline, compression, and appurtenant facilities. LA Storage request 
the approval of market-based rates for the Hackberry Storage project, 
all as more fully set forth in the request which is on file with the 
Commission and open to public inspection.
    LA Storage's application states that a water quality certificate 
under section 401 of the Clean Water Act is required for the project 
from the Louisiana Department of Environmental Quality. The request for 
certification must be submitted to the certifying agency and to the 
Commission concurrently. Proof of the certifying agency's receipt date 
must be filed no later than five (5) days after the request is 
submitted to the certifying agency.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National

[[Page 9922]]

Emergency concerning the Novel Coronavirus Disease (COVID-19), issued 
by the President on March 13, 2020. For assistance, contact the Federal 
Energy Regulatory Commission at [email protected] or call 
toll-free, (886) 208-3676 or TYY, (202) 502-8659.
    Any questions concerning this application should be directed to 
Jerrod L. Harrison, 488 8th Avenue, San Diego, California 92101, by 
telephone at (619) 696-2987, or by email at [email protected].
    Pursuant to section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: Complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are two ways to become involved in the Commission's review of 
this project: You can file comments on the project, and you can file a 
motion to intervene in the proceeding. There is no fee or cost for 
filing comments or intervening. The deadline for filing a motion to 
intervene is 5:00 p.m. Eastern Time on March 3, 2021.

Comments

    Any person wishing to comment on the project may do so. Comments 
may include statements of support or objections to the project as a 
whole or specific aspects of the project. The more specific your 
comments, the more useful they will be. To ensure that your comments 
are timely and properly recorded, please submit your comments on or 
before March 3, 2021.
    There are three methods you can use to submit your comments to the 
Commission. In all instances, please reference the Project docket 
number (CP21-44-000) in your submission.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's website at www.ferc.gov 
under the link to Documents and Filings. Using eComment is an easy 
method for interested persons to submit brief, text-only comments on a 
project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; first select ``General'' and then select ``Comment on a 
Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address below.\2\ Your written comments must reference 
the Project docket number (CP21-44-000).
---------------------------------------------------------------------------

    \2\ Hand delivered submissions in docketed proceedings should be 
delivered to Health and Human Services, 12225 Wilkins Avenue, 
Rockville, Maryland 20852.
---------------------------------------------------------------------------

    Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426.
    The Commission encourages electronic filing of comments (options 1 
and 2 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected]
    Persons who comment on the environmental review of this project 
will be placed on the Commission's environmental mailing list, and will 
receive notification when the environmental documents (EA or EIS) are 
issued for this project and will be notified of meetings associated 
with the Commission's environmental review process.
    The Commission considers all comments received about the project in 
determining the appropriate action to be taken. However, the filing of 
a comment alone will not serve to make the filer a party to the 
proceeding. To become a party, you must intervene in the proceeding. 
For instructions on how to intervene, see below.

Interventions

    Any person, which includes individuals, organizations, businesses, 
municipalities, and other entities,\3\ has the option to file a motion 
to intervene in this proceeding. Only intervenors have the right to 
request rehearing of Commission orders issued in this proceeding and to 
subsequently challenge the Commission's orders in the U.S. Circuit 
Courts of Appeal.
---------------------------------------------------------------------------

    \3\ 18 CFR 385.102(d).
---------------------------------------------------------------------------

    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is March 3, 2021. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.
    There are two ways to submit your motion to intervene. In both 
instances, please reference the Project docket number (CP21-44-000) in 
your submission.
    (1) You may file your motion to intervene by using the Commission's 
eFiling feature, which is located on the Commission's website 
(www.ferc.gov) under the link to Documents and Filings. New eFiling 
users must first create an account by clicking on ``eRegister.'' You 
will be asked to select the type of filing you are making; first select 
``General'' and then select ``Intervention.'' The eFiling feature 
includes a document-less intervention option; for more information, 
visit https://www.ferc.gov/docsfiling/ efiling/document-less-
intervention.pdf.; or
    (2) You can file a paper copy of your motion to intervene, along 
with three copies, by mailing the documents to the

[[Page 9923]]

address below.\6\ Your motion to intervene must reference the Project 
docket number (CP21-44-000).
---------------------------------------------------------------------------

    \6\ Hand delivered submissions in docketed proceedings should be 
delivered to Health and Human Services, 12225 Wilkins Avenue, 
Rockville, Maryland 20852.
---------------------------------------------------------------------------

    Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426.
    The Commission encourages electronic filing of motions to intervene 
(option 1 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected]
    Motions to intervene must be served on the applicant either by mail 
or email at: 488 8th Avenue, San Diego, California 92101 or at 
[email protected]. Any subsequent submissions by an intervenor 
must be served on the applicant and all other parties to the 
proceeding. Contact information for parties can be downloaded from the 
service list at the eService link on FERC Online. Service can be via 
email with a link to the document.
    All timely, unopposed \7\ motions to intervene are automatically 
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that 
are filed after the intervention deadline are untimely, and may be 
denied. Any late-filed motion to intervene must show good cause for 
being late and must explain why the time limitation should be waived 
and provide justification by reference to factors set forth in Rule 
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining 
party status will be placed on the service list maintained by the 
Secretary of the Commission and will receive copies (paper or 
electronic) of all documents filed by the applicant and by all other 
parties.
---------------------------------------------------------------------------

    \7\ The applicant has 15 days from the submittal of a motion to 
intervene to file a written objection to the intervention.
    \8\ 18 CFR 385.214(c)(1).
    \9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docsfiling/ esubscription.asp.
    Intervention Deadline: 5:00 p.m. Eastern Time on March 3, 2021.

    Dated: February 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-03157 Filed 2-16-21; 8:45 am]
BILLING CODE 6717-01-P