Walden Hydro, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 9923-9924 [2021-03156]
Download as PDF
Federal Register / Vol. 86, No. 30 / Wednesday, February 17, 2021 / Notices
address below.6 Your motion to
intervene must reference the Project
docket number (CP21–44–000).
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Motions to intervene must be served
on the applicant either by mail or email
at: 488 8th Avenue, San Diego,
California 92101 or at jharrison@
sempraglobal.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online. Service
can be via email with a link to the
document.
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
jbell on DSKJLSW7X2PROD with NOTICES
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
6 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
9 18 CFR 385.214(b)(3) and (d).
VerDate Sep<11>2014
20:43 Feb 16, 2021
Jkt 253001
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docsfiling/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on March 3, 2021.
Dated: February 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–03157 Filed 2–16–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4428–011]
Walden Hydro, LLC; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–4428–011.
c. Date filed: May 29, 2020.
d. Applicant: Walden Hydro, LLC.
e. Name of Project: Walden
Hydroelectric Project.
f. Location: On the Wallkill River, in
the Village of Walden, Orange County,
New York. The project does not occupy
any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Tim Carlsen,
CEO, Hydroland, Inc.,1 403 Madison
Ave. #240, Bainbridge Island, WA
98110; Phone at (844) 493–7612 or
email at tim@hydrolandcorp.com.
i. FERC Contact: Samantha Pollak at
(202) 502–6419, or samantha.pollak@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
1 In a February 3, 2021 filing, the Commission
was notified that Enel Green Power North America,
Inc. transferred all its ownership interests for
Walden Hydro, LLC to Hydroland, Inc.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
9923
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–4428–011.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is now ready for environmental
analysis.
The Council on Environmental
Quality (CEQ) issued a final rule on July
15, 2020, revising the regulations under
40 CFR parts 1500–1518 that federal
agencies use to implement NEPA (see
Update to the Regulations Implementing
the Procedural Provisions of the
National Environmental Policy Act, 85
FR 43,304). The Final Rule became
effective on and applies to any NEPA
process begun after September 14, 2020.
An agency may also apply the
regulations to ongoing activities and
environmental documents begun before
September 14, 2020, which includes the
proposed Walden Project. Commission
staff intends to conduct its NEPA review
in accordance with CEQ’s new
regulations.
l. The Walden Project consists of: (1)
A 417-foot-long (consisting of 165-footlong east-west and 252-foot-long northsouth portions), V-shaped concrete dam
topped with 2-foot-high flashboards; (2)
an impoundment with a surface area of
69 acres at the normal pool elevation of
321.3 feet National Geodetic Vertical
Datum of 1929 (NGVD29); (3) an intake
structure consisting of a 252-foot-long,
56-foot-wide, 18-foot-deep canal
E:\FR\FM\17FEN1.SGM
17FEN1
jbell on DSKJLSW7X2PROD with NOTICES
9924
Federal Register / Vol. 86, No. 30 / Wednesday, February 17, 2021 / Notices
forebay; (4) a 6-foot-wide sluice gate for
a minimum flow of 31 cfs; (5) four 40foot-long steel penstocks; (6) a 60-footlong, 45-foot-wide, 29-foot-high
powerhouse containing three horizontal
double-runner Francis turbine units
with actual ratings of 740 kilowatts
(kW), 540 kW, and 360 kW,
respectively, for a total capacity of 1,640
kW; 2 (7) a 30-foot-long, 37-foot-wide
tailrace; (8) a 230-foot-long bypassed
reach; (9) a 115-foot-long transmission
line from the project generators to a
New York State Electric and Gas
Corporation’s 4.16-kilovolt (kV)
distribution line; (10) a substation with
a single-phase 13.2-kV transformer; and
(11) appurtenant facilities.
Walden Hydro proposes to continue
operating the project in a run-of-river
mode, with no changes to the existing
operation or facilities.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
2 In an October 14, 2020 filing, Walden Hydro
stated that although the total rated capacity of the
project as stated in the license application is 2,110
kW (980 kW, 630 kW, and 500 kW), the maximum
achievable output from each turbine/generator unit
is lower than the stated capacities.
VerDate Sep<11>2014
20:43 Feb 16, 2021
Jkt 253001
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Target date
Deadline for Filing Comments,
Recommendations, and
Agency Terms and Conditions/Prescriptions.
Deadline for Filing Reply Comments.
April 2021.
May 2021.
Dated: February 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–03156 Filed 2–16–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4451–024]
Green Mountain Power Corporation,
City of Somersworth, New Hampshire;
Notice of Application Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 4451–024.
c. Date filed: April 30, 2020.
d. Applicants: Green Mountain Power
and the City of Somersworth, New
Hampshire.
e. Name of Project: Lower Great Falls
Hydroelectric Project.
f. Location: On the Salmon Falls River
in Strafford County, New Hampshire,
and York County, Maine. The project
does not occupy federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. John
Greenan, Green Mountain Power
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Corporation, 1252 Post Road, Rutland,
VT 05701; Phone at (802) 770–2195, or
email at john.greenan@
greenmountainpower.com.
i. FERC Contact: Amanda Gill, (202)
502–6773 or amanda.gill@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–4451–
024.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is ready for environmental analysis
at this time.
The Council on Environmental
Quality (CEQ) issued a final rule on July
15, 2020, revising the regulations under
40 CFR parts 1500–1518 that federal
agencies use to implement the National
Environmental Policy Act (NEPA) (see
Update to the Regulations Implementing
the Procedural Provisions of the
National Environmental Policy Act, 85
FR 43,304). The Final Rule became
effective on and applies to any NEPA
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 86, Number 30 (Wednesday, February 17, 2021)]
[Notices]
[Pages 9923-9924]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-03156]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4428-011]
Walden Hydro, LLC; Notice of Application Ready for Environmental
Analysis and Soliciting Comments, Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P-4428-011.
c. Date filed: May 29, 2020.
d. Applicant: Walden Hydro, LLC.
e. Name of Project: Walden Hydroelectric Project.
f. Location: On the Wallkill River, in the Village of Walden,
Orange County, New York. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Tim Carlsen, CEO, Hydroland, Inc.,\1\ 403
Madison Ave. #240, Bainbridge Island, WA 98110; Phone at (844) 493-7612
or email at [email protected].
---------------------------------------------------------------------------
\1\ In a February 3, 2021 filing, the Commission was notified
that Enel Green Power North America, Inc. transferred all its
ownership interests for Walden Hydro, LLC to Hydroland, Inc.
---------------------------------------------------------------------------
i. FERC Contact: Samantha Pollak at (202) 502-6419, or
[email protected].
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. Submissions sent via any other
carrier must be addressed to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing should include docket number P-
4428-011.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted and is now ready for
environmental analysis.
The Council on Environmental Quality (CEQ) issued a final rule on
July 15, 2020, revising the regulations under 40 CFR parts 1500-1518
that federal agencies use to implement NEPA (see Update to the
Regulations Implementing the Procedural Provisions of the National
Environmental Policy Act, 85 FR 43,304). The Final Rule became
effective on and applies to any NEPA process begun after September 14,
2020. An agency may also apply the regulations to ongoing activities
and environmental documents begun before September 14, 2020, which
includes the proposed Walden Project. Commission staff intends to
conduct its NEPA review in accordance with CEQ's new regulations.
l. The Walden Project consists of: (1) A 417-foot-long (consisting
of 165-foot-long east-west and 252-foot-long north-south portions), V-
shaped concrete dam topped with 2-foot-high flashboards; (2) an
impoundment with a surface area of 69 acres at the normal pool
elevation of 321.3 feet National Geodetic Vertical Datum of 1929
(NGVD29); (3) an intake structure consisting of a 252-foot-long, 56-
foot-wide, 18-foot-deep canal
[[Page 9924]]
forebay; (4) a 6-foot-wide sluice gate for a minimum flow of 31 cfs;
(5) four 40-foot-long steel penstocks; (6) a 60-foot-long, 45-foot-
wide, 29-foot-high powerhouse containing three horizontal double-runner
Francis turbine units with actual ratings of 740 kilowatts (kW), 540
kW, and 360 kW, respectively, for a total capacity of 1,640 kW; \2\ (7)
a 30-foot-long, 37-foot-wide tailrace; (8) a 230-foot-long bypassed
reach; (9) a 115-foot-long transmission line from the project
generators to a New York State Electric and Gas Corporation's 4.16-
kilovolt (kV) distribution line; (10) a substation with a single-phase
13.2-kV transformer; and (11) appurtenant facilities.
---------------------------------------------------------------------------
\2\ In an October 14, 2020 filing, Walden Hydro stated that
although the total rated capacity of the project as stated in the
license application is 2,110 kW (980 kW, 630 kW, and 500 kW), the
maximum achievable output from each turbine/generator unit is lower
than the stated capacities.
---------------------------------------------------------------------------
Walden Hydro proposes to continue operating the project in a run-
of-river mode, with no changes to the existing operation or facilities.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Deadline for Filing Comments, April 2021.
Recommendations, and Agency Terms and
Conditions/Prescriptions.
Deadline for Filing Reply Comments........ May 2021.
------------------------------------------------------------------------
Dated: February 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-03156 Filed 2-16-21; 8:45 am]
BILLING CODE 6717-01-P