Proposed Information Collection Request; Comment Request; 43 Source Categories, 8634-8640 [2021-02520]
Download as PDF
8634
Federal Register / Vol. 86, No. 24 / Monday, February 8, 2021 / Notices
https://www.epa.gov/dockets/
commenting-epa-dockets.
jbell on DSKJLSW7X2PROD with NOTICES
II. Registration Applications
EPA has received applications to
register pesticide products containing
active ingredients not included in any
currently registered pesticide products.
Pursuant to the provisions of FIFRA
section 3(c)(4) (7 U.S.C. 136a(c)(4)), EPA
is hereby providing notice of receipt and
opportunity to comment on these
applications. Notice of receipt of these
applications does not imply a decision
by the Agency on these applications.
For actions being evaluated under EPA’s
public participation process for
registration actions, there will be an
additional opportunity for public
comment on the proposed decisions.
Please see EPA’s public participation
website for additional information on
this process (https://www2.epa.gov/
pesticide-registration/publicparticipation-process-registrationactions).
New Active Ingredients
1. File Symbol: 70051–REI. Docket ID
number: EPA–HQ–OPP–2020–0326.
Applicant: Certis USA LLC, 9145
Guilford Rd., Suite 175, Columbia, MD
21046. Product name: NPV003
Technical. Active Ingredient:
Insecticide—Spodoptera frugiperda
multiple nucleopolyhedrovirus isolate
NPV003 at 100%. Proposed use:
Manufacturing use. Contact: BPPD.
2. File Symbol: 70051–REO. Docket ID
number: EPA–HQ–OPP–2020–0326.
Applicant: Certis USA LLC, 9145
Guilford Rd., Suite 175, Columbia, MD
21046. Product name: NPV003 50%
MUP. Active ingredient: Insecticide—
Spodoptera frugiperda multiple
nucleopolyhedrovirus isolate NPV003 at
50%. Proposed use: Manufacturing use.
Contact: BPPD.
3. File Symbol: 70051–RGN. Docket ID
number: EPA–HQ–OPP–2020–0326.
Applicant: Certis USA LLC, 9145
Guilford Rd., Suite 175, Columbia, MD
21046. Product name: NPV003 WP.
Active ingredient: Insecticide—
Spodoptera frugiperda multiple
nucleopolyhedrovirus isolate NPV003 at
0.71%. Proposed use: To control fall
armyworm (by killing larvae) on or in
berries and small fruit; Brassica head
and stem vegetables; cereal grains;
cucurbit vegetables; forage, fodder, and
straw of cereal grains; fruiting
vegetables; grass forage, fodder, and hay;
hemp; leafy vegetables; legume
vegetables; nongrass animal feeds;
oilseeds; ornamental flowers and plants;
pastures; pome fruit; root and tuber
vegetables; sugarcane; tobacco; and turf
via ground sprayers, aerial sprayers, or
VerDate Sep<11>2014
20:48 Feb 05, 2021
Jkt 253001
overhead sprinkler irrigation
equipment. Contact: BPPD.
4. File Symbol: 70051–RGR. Docket ID
number: EPA–HQ–OPP–2020–0326.
Applicant: Certis USA LLC, 9145
Guilford Rd., Suite 175, Columbia, MD
21046. Product name: NPV003 LC.
Active ingredient: Insecticide—
Spodoptera frugiperda multiple
nucleopolyhedrovirus isolate NPV003 at
25%. Proposed use: To control fall
armyworm (by killing larvae) on or in
berries and small fruit; Brassica head
and stem vegetables; cereal grains;
cucurbit vegetables; forage, fodder, and
straw of cereal grains; fruiting
vegetables; grass forage, fodder, and hay;
hemp; leafy vegetables; legume
vegetables; nongrass animal feeds;
oilseeds; ornamental flowers and plants;
pastures; pome fruit; root and tuber
vegetables; sugarcane; tobacco; and turf
via ground sprayers, aerial sprayers, or
overhead sprinkler irrigation
equipment. Contact: BPPD.
5. File Symbols: 94609–R and 94609–
E. Docket ID number: EPA–HQ–OPP–
2020–0533. Applicant: Meiji Seika
Pharma Co., Ltd, c/o Landis
International, Inc., 3185 Madison
Highway, P.O. Box 5126, Valdosta, GA
31603–5126. Product names: LGlufosinate Free Acid and L-Glufosinate
Liquid Formulation. Active ingredient:
Herbicide—L- Glufosinate Free Acid at
92.3% (L-Glufosinate Free Acid) and
10.26% (L-Glufosinate Liquid
Formulation). Proposed uses: Apple;
Beet, sugar; Bushberry subgroup 13B ;
Canola; Corn, field; Corn, sweet; Cotton;
Fruit, citrus, crop group 10–10; Fruit,
pome, crop group 11–10; Fruit, stone,
crop group 12–12; Grape; Nut, tree, crop
group 14–12; Olive; Potato; Soybean.
Contact: RD.
6. File Symbol: 94713–E. Docket ID
number: EPA–HQ–OPP–2020–0496.
Applicant: AFS32321 Crop Protection,
Inc., P.O. Box 14069, Research Triangle
Park, NC 27709. Product name: Theia
Fungicide. Active ingredient:
Bactericide and Fungicide—Bacillus
subtilis strain AFS032321 at 100.0%.
Proposed use: To control or suppress
foliar and soilborne diseases of plants
(e.g., berries, cucurbit vegetables, hemp,
legume vegetables, pome fruit, or turf)
in fields, forests, greenhouses, nurseries,
post-harvest facilities, residential areas,
or shadehouses via banded spray, bare
root dip, broadcast spray, chemigation,
foliar spray, hydroponics operations, infurrow treatment, seed treatment,
shanked-in treatment, soil drench, soil
injection, transplant water, or tray
drench. Contact: BPPD.
7. File Symbol: 94713–R. Docket ID
number: EPA–HQ–OPP–2020–0496.
Applicant: AFS32321 Crop Protection,
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
Inc., P.O. Box 14069, Research Triangle
Park, NC 27709. Product name:
AFS032321 Technical. Active
ingredient: Bactericide and Fungicide—
Bacillus subtilis strain AFS032321 at
100.0%. Proposed use: Manufacturing
use. Contact: BPPD.
(Authority: 7 U.S.C. 136 et seq.)
Dated: November 6, 2020.
Delores Barber,
Director, Information Technology and
Resources Management Division, Office of
Pesticide Programs.
[FR Doc. 2021–02526 Filed 2–5–21; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–10019–67–OAR]
Proposed Information Collection
Request; Comment Request; 43
Source Categories
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The U.S. Environmental
Protection Agency (EPA) is planning to
submit the below listed Information
Collection Requests (ICR) to the Office
of Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act (PRA).
Before doing so, the EPA is soliciting
public comments on specific aspects of
the proposed information collection as
described below. These are proposed
extensions of the currently approved
ICRs. An agency may not conduct or
sponsor and a person is not required to
respond to a collection of information
unless it displays a currently valid OMB
control number.
DATES: Comments must be submitted on
or before April 9, 2021.
ADDRESSES: Submit your comments,
referencing the Docket ID numbers
provided for each item in the text,
online using https://
www.regulations.gov/ (our preferred
method), by email to a-and-r-docket@
epa.gov, or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW, Washington, DC
20460. The EPA’s policy is that all
comments received will be included in
the public docket without change
including any personal information
provided, unless the comment includes
profanity, threats, information claimed
to be Confidential Business Information
(CBI) or other information whose
disclosure is restricted by statute. Out of
an abundance of caution for members of
SUMMARY:
E:\FR\FM\08FEN1.SGM
08FEN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 86, No. 24 / Monday, February 8, 2021 / Notices
the public and our staff, the EPA Docket
Center and Reading Room are closed to
the public, with limited exceptions, to
reduce the risk of transmitting COVID–
19. Our Docket Center staff will
continue to provide remote customer
service via email, phone, and webform.
We encourage the public to submit
comments via https://
www.regulations.gov/ or email, as there
may be a delay in processing mail and
faxes. Hand deliveries and couriers may
be received by scheduled appointment
only. For further information on the
EPA Docket Center services and the
current status, please visit us online at
https://www.epa.gov/dockets.
FOR FURTHER INFORMATION CONTACT: Mr.
Muntasir Ali, Sector Policies and
Programs Division (D243–05), Office of
Air Quality Planning and Standards,
U.S. Environmental Protection Agency,
Research Triangle Park, North Carolina
27711; telephone number: (919) 541–
0833; email address: ali.muntasir@
epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents which explain in
detail the information that the EPA will
be collecting are available in the public
docket for this ICR. The docket can be
viewed online at https://
www.regulations.gov/ or in person at the
EPA Docket Center, WJC West Building,
Room 3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the EPA Docket Center is (202) 566–
1744. For additional information about
the EPA’s public docket, visit https://
www.epa.gov/dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, the EPA is soliciting comments
and information to enable it to: (1)
Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the Agency, including
whether the information will have
practical utility; (2) evaluate the
accuracy of the Agency’s estimate of the
burden of the proposed collection of
information, including the validity of
the methodology and assumptions used;
(3) enhance the quality, utility, and
clarity of the information to be
collected; and (4) minimize the burden
of the collection of information on those
who are to respond, including through
the use of appropriate automated
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses. Burden is defined at 5 CFR
1320.03(b). The EPA will consider the
comments received and amend the ICR
as appropriate. The final ICR package
will then be submitted to OMB for
VerDate Sep<11>2014
20:48 Feb 05, 2021
Jkt 253001
review and approval. At that time, the
EPA will issue another Federal Register
document to announce the submission
of the ICR to OMB and the opportunity
to submit additional comments to OMB.
General Abstract: For all the listed
ICRs in this document, owners and
operators of affected facilities are
required to comply with reporting and
recordkeeping requirements for the
General Provisions of 40 CFR part 60,
subpart A or 40 CFR part 63, subpart A,
as well as the applicable specific
standards. This includes submitting
initial notifications, performance tests,
and periodic reports and results, and
maintaining records of the occurrence
and duration of any startup, shutdown,
or malfunction in the operation of an
affected facility, or any period during
which the monitoring system is
inoperative. These reports are used by
the EPA to determine compliance with
the standards.
(1) Docket ID Number: EPA–HQ–
OAR–2020–0628; Standards of
Performance for Sulfuric Acid Plants (40
CFR part 60, subpart H) (Renewal); EPA
ICR Number 1057.15; OMB Control
Number 2060–0041; Expiration date
October 31, 2021.
Respondents: Sulfuric acid
manufacturing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart H).
Estimated number of respondents: 53.
Frequency of response: Semiannually.
Estimated annual burden: 13,500
hours.
Estimated annual cost: $1,660,000,
includes $239,000 annualized capital or
operations and maintenance (O&M)
costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(2) Docket ID Number: EPA–HQ–
OAR–2020–0633; Standards of
Performance for Polymeric Coating of
Supporting Substrates Facilities (40 CFR
part 60, subpart VVV) (Renewal); EPA
ICR Number 1284.12; OMB Control
Number 2060–0181; Expiration date
October 31, 2021.
Respondents: Facilities performing
polymeric coating of supporting
substrates.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
VVV).
Estimated number of respondents: 61.
Frequency of response: Initially,
quarterly, and semiannually.
Estimated annual burden: 14,200
hours.
Estimated annual cost: $2,190,000,
includes $700,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
8635
increase in the number of sources
subject to the regulation.
(3) Docket ID Number: EPA–HQ–
OAR–2020–0623; National Emission
Standards for Hazardous Air Pollutants
from Natural Gas Transmission and
Storage Facilities (40 CFR part 63, HHH)
(Renewal); EPA ICR Number 1789.11;
OMB Control Number 2060–0418;
Expiration date October 31, 2021.
Respondents: Natural gas
transmission and storage facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, HHH).
Estimated number of respondents: 55.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 2,910
hours.
Estimated annual cost: $306,000,
includes no annualized capital or O&M
costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(4) Docket ID Number: EPA–HQ–
OAR–2020–0637; National Emission
Standards for Hazardous Air Pollutants
for Source Categories: Carbon Black,
Ethylene, Cyanide, and Spandex (40
CFR part 63, subpart YY) (Renewal);
EPA ICR Number 1983.11; OMB Control
Number 2060–0489; Expiration date
November 30, 2021.
Respondents: Carbon black, ethylene,
cyanide, and spandex manufacturing
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
YY).
Estimated number of respondents: 61.
Frequency of response: Semiannually
and annually.
Estimated annual burden: 41,800
hours.
Estimated annual cost: $4,930,000,
includes $351,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(5) Docket ID Number: EPA–HQ–
OAR–2020–0635; National Emission
Standards for Hazardous Air Pollutants
for Primary Copper Smelting (40 CFR
part 63, subpart QQQ) (Renewal); EPA
ICR Number 1850.09; OMB Control
Number 2060–0476; Expiration date
November 30, 2021.
Respondents: Primary copper
smelting facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
QQQ).
Estimated number of respondents: 3.
Frequency of response: Semiannually
and annually.
E:\FR\FM\08FEN1.SGM
08FEN1
jbell on DSKJLSW7X2PROD with NOTICES
8636
Federal Register / Vol. 86, No. 24 / Monday, February 8, 2021 / Notices
Estimated annual burden: 9,440
hours.
Estimated annual cost: $999,000,
includes $8,220 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(6) Docket ID Number: EPA–HQ–
OAR–2020–0631; Standards of
Performance for Hot Mix Asphalt
Facilities (40 CFR part 60, subpart I)
(Renewal); EPA ICR Number 1127.13;
OMB Control Number 2060–0083;
Expiration date December 31, 2021.
Respondents: Hot mix asphalt
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart I).
Estimated number of respondents:
4,955.
Frequency of response: Initially.
Estimated annual burden: 8,547
hours.
Estimated annual cost: $2,620,000,
includes no annualized capital or O&M
costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(7) Docket ID Number: EPA–HQ–
OAR–2020–0627; Standards of
Performance for Petroleum Refineries
(40 CFR part 60, subpart J) (Renewal);
EPA ICR Number 1054.14; OMB Control
Number 2060–0022; Expiration date
December 31, 2021.
Respondents: Petroleum refineries.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart J).
Estimated number of respondents:
149.
Frequency of response: Semiannually.
Estimated annual burden: 15,800
hours.
Estimated annual cost: $2,500,000,
includes $826,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(8) Docket ID Number: EPA–HQ–
OAR–2020–0629; Standards of
Performance for Primary Emissions from
Basic Oxygen Process Furnaces for
Which Construction is Commenced
After June 11, 1973; and Standards of
Performance for Secondary Emissions
from Basic Oxygen Process Steelmaking
Facilities for Which Construction is
Commenced After January 20, 1983 (40
CFR part 60, subparts N and Na)
(Renewal); EPA ICR Number 1069.13;
OMB Control Number 2060–0029;
Expiration date December 31, 2021.
Respondents: Basic oxygen process
steelmaking facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subparts N
and Na).
VerDate Sep<11>2014
20:48 Feb 05, 2021
Jkt 253001
Estimated number of respondents: 18.
Frequency of response: Semiannually.
Estimated annual burden: 6,280
hours.
Estimated annual cost: $690,000,
includes $29,700 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(9) Docket ID Number: EPA–HQ–
OAR–2020–0632; Standards of
Performance for Lime Manufacturing
Plants (40 CFR part 60, subpart HH)
(Renewal); EPA ICR Number 1167.13;
OMB Control Number 2060–0063;
Expiration date December 31, 2021.
Respondents: Lime manufacturing
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
HH).
Estimated number of respondents: 41.
Frequency of response: Semiannually.
Estimated annual burden: 3,820
hours.
Estimated annual cost: $463,000,
includes $61,500 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(10) Docket ID Number: EPA–HQ–
OAR–2020–0710; Emission Guidelines
and Compliance Times for Other Solid
Waste Incineration Units That
Commenced Construction On or Before
December 9, 2004 (40 CFR part 60,
subpart FFFF) (Renewal); EPA ICR
Number 2164.07; OMB Control Number
2060–0562; Expiration date December
31, 2021.
Respondents: Very small municipal
waste combustion and institutional
waste incineration facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
FFFF).
Estimated number of respondents: 99.
Frequency of response: Initially,
semiannually, and annually.
Estimated annual burden: 70,200
hours.
Estimated annual cost: $8,190,000,
includes $495,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(11) Docket ID Number: EPA–HQ–
OAR–2020–0625; National Emission
Standard for Vinyl Chloride (40 CFR
part 61, subpart F) (Renewal); EPA ICR
Number 0186.15; OMB Control Number
2060–0071; Expiration date December
31, 2021.
Respondents: Facilities that produce
ethylene dichloride, vinyl chloride (VC),
and one or more polymers containing
any fraction of polymerized VC.
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subpart F).
Estimated number of respondents: 16.
Frequency of response: Quarterly and
annually.
Estimated annual burden: 6,540
hours.
Estimated annual cost: $1,410,000,
includes $720,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(12) Docket ID Number: EPA–HQ–
OAR–2020–0630; National Emission
Standards for Inorganic Arsenic
Emissions from Glass Manufacturing
Plants (40 CFR part 61, subpart N)
(Renewal); EPA ICR Number 1081.13;
OMB Control Number 2060–0043;
Expiration date December 31, 2021.
Respondents: Glass manufacturing
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subpart N).
Estimated number of respondents: 16.
Frequency of response: Semiannually.
Estimated annual burden: 3,100
hours.
Estimated annual cost: $382,000,
includes $56,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(13) Docket ID Number: EPA–HQ–
OAR–2020–0634; National Emission
Standards for Hazardous Air Pollutants
From Secondary Lead Smelting (40 CFR
part 63, subpart X) (Renewal); EPA ICR
Number 1686.12; OMB Control Number
2060–0296; Expiration date December
31, 2021.
Respondents: Secondary lead
smelting facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart X).
Estimated number of respondents: 12.
Frequency of response: Semiannually
and annually.
Estimated annual burden: 21,700
hours.
Estimated annual cost: $2,630,000,
includes $251,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(14) Docket ID Number: EPA–HQ–
OAR–2020–0622; National Emission
Standards for Wood Furniture
Manufacturing Operations (40 CFR part
63, subpart JJ) (Renewal); EPA ICR
Number 1716.11; OMB Control Number
2060–0324; Expiration date December
31, 2021.
Respondents: Wood furniture
manufacturing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart JJ)
Estimated number of respondents:
856.
E:\FR\FM\08FEN1.SGM
08FEN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 86, No. 24 / Monday, February 8, 2021 / Notices
Frequency of response: Initially,
quarterly, and semiannually.
Estimated annual burden: 70,800
hours.
Estimated annual cost: $7,780,000,
includes $24,600 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(15) Docket ID Number: EPA–HQ–
OAR–2020–0624; National Emission
Standards for Hazardous Air Pollutants
for Chemical Recovery Combustion
Sources at Kraft, Soda, Sulfite, and
Stand-Alone Semichemical Pulp Mills
(40 CFR part 63, subpart MM)
(Renewal); EPA ICR Number 1805.11;
OMB Control Number 2060–0377;
Expiration date December 31, 2021.
Respondents: Kraft, soda, sulfite, and
stand-alone semichemical pulp mill
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
MM).
Estimated number of respondents:
107.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 122,000
hours.
Estimated annual cost: $14,700,000,
includes $831,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(16) Docket ID Number: EPA–HQ–
OAR–2020–0636; National Emission
Standards for Hazardous Air Pollutants
for Primary Lead Smelting (40 CFR part
63, subpart TTT) (Renewal); EPA ICR
Number 1856.12; OMB Control Number
2060–0414; Expiration date December
31, 2021.
Respondents: Primary lead smelting
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
TTT).
Estimated number of respondents: 1.
Frequency of response: Quarterly and
semiannually.
Estimated annual burden: 6,270
hours.
Estimated annual cost: $855,000,
includes $169,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(17) Docket ID Number: EPA–HQ–
OAR–2020–0640; National Emission
Standards for Hazardous Air Pollutants
for Engine Test Cells/Stands (40 CFR
part 63, subpart PPPPP) (Renewal); EPA
ICR Number 2066.10; OMB Control
Number 2060–0483; Expiration date
December 31, 2021.
VerDate Sep<11>2014
20:48 Feb 05, 2021
Jkt 253001
Respondents: Engine test cells/stand
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
PPPPP).
Estimated number of respondents: 19.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 2,150
hours.
Estimated annual cost: $216,000,
includes $6,200 annualized capital or
O&M costs.
Changes in estimates: There is a
projected decrease in burden due to
anticipated shutdown of existing
sources.
(18) Docket ID Number: EPA–HQ–
OAR–2020–0639; National Emission
Standards for Hazardous Air Pollutants
for Friction Materials Manufacturing
Facilities (40 CFR part 63, subpart
QQQQQ) (Renewal); EPA ICR Number
2025.09; OMB Control Number 2060–
0481; Expiration date December 31,
2021.
Respondents: Friction materials
manufacturing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
QQQQQ).
Estimated number of respondents: 2.
Frequency of response: Semiannually.
Estimated annual burden: 659 hours.
Estimated annual cost: $69,700,
includes $544 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(19) Docket ID Number: EPA–HQ–
OAR–2020–0641; National Emission
Standards for Hazardous Air Pollutants
for Iron and Steel Foundries Area
Sources (40 CFR part 63, subpart
ZZZZZ) (Renewal); EPA ICR Number
2267.08; OMB Control Number 2060–
0605; Expiration date December 31,
2021.
Respondents: Iron and steel foundry
area source facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
ZZZZZ).
Estimated number of respondents:
392.
Frequency of response: Semiannually
and annually.
Estimated annual burden: 9,140
hours.
Estimated annual cost: $1,000,000,
includes no annualized capital or O&M
costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(20) Docket ID Number: EPA–HQ–
OAR–2020–0638; National Emission
Standards for Hazardous Air Pollutants
for Leather Finishing Operations (40
CFR part 63, subpart TTTT) (Renewal);
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
8637
EPA ICR Number 1985.10; OMB Control
Number 2060–0478; Expiration date
February 28, 2022.
Respondents: Leather finishing
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
TTTT).
Estimated number of respondents: 4.
Frequency of response: Annually.
Estimated annual burden: 138 hours.
Estimated annual cost: $12,500,
includes no annualized capital or O&M
costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(21) Docket ID Number: EPA–HQ–
OAR–2020–0643; Standards of
Performance for Municipal Waste
Combustors for Which Construction is
Commenced After December 20, 1989
and On or Before September 20, 1994,
and Standards of Performance for Large
Municipal Waste Combustors for Which
Construction is Commenced After
September 20, 1994 or for Which
Modification or Reconstruction is
Commenced After June 19, 1996 (40
CFR part 60, subparts Ea and Eb)
(Renewal); EPA ICR Number 1506.14;
OMB Control Number 2060–0210;
Expiration date March 31, 2022.
Respondents: Municipal waste
combustor facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subparts Ea
and Eb).
Estimated number of respondents: 23.
Frequency of response: Initially,
quarterly, semiannually, and annually.
Estimated annual burden: 34,900
hours.
Estimated annual cost: $3,440,000,
includes $226,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(22) Docket ID Number: EPA–HQ–
OAR–2020–0657; Standards of
Performance for Kraft Pulp Mills (40
CFR part 60, subpart BB) (Renewal);
EPA ICR Number 1055.13; OMB Control
Number 2060–0021; Expiration date
March 31, 2022.
Respondents: Kraft pulp mill
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart BB).
Estimated number of respondents: 97.
Frequency of response: Semiannually.
Estimated annual burden: 13,900
hours.
Estimated annual cost: $5,020,000,
includes $3,510,000 annualized capital
or O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
E:\FR\FM\08FEN1.SGM
08FEN1
jbell on DSKJLSW7X2PROD with NOTICES
8638
Federal Register / Vol. 86, No. 24 / Monday, February 8, 2021 / Notices
(23) Docket ID Number: EPA–HQ–
OAR–2020–0626; Standards of
Performance for Surface Coating of
Metal Furniture (40 CFR part 60,
subpart EE) (Renewal); EPA ICR Number
0649.14; OMB Control Number 2060–
0106; Expiration date March 31, 2022.
Respondents: Metal furniture surface
coating facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart EE).
Estimated number of respondents:
400.
Frequency of response: Quarterly and
semiannually.
Estimated annual burden: 56,500
hours.
Estimated annual cost: $7,280,000,
includes $840,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(24) Docket ID Number: EPA–HQ–
OAR–2020–0655; Standards of
Performance for Metallic Mineral
Processing Plants (40 CFR part 60,
subpart LL) (Renewal); EPA ICR Number
0982.13; OMB Control Number 2060–
0016; Expiration date March 31, 2022.
Respondents: Metallic mineral
processing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart LL).
Estimated number of respondents: 20.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 2,330
hours.
Estimated annual cost: $268,000,
includes $13,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(25) Docket ID Number: EPA–HQ–
OAR–2020–0654; Standards of
Performance for the Beverage Can
Surface Coating Industry (40 CFR part
60, subpart WW) (Renewal); EPA ICR
Number 0663.14; OMB Control Number
2060–0001; Expiration date March 31,
2022.
Respondents: Beverage can surface
coating facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
WW).
Estimated number of respondents: 48.
Frequency of response: Semiannually.
Estimated annual burden: 5,190
hours.
Estimated annual cost: $669,000,
includes $101,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(26) Docket ID Number: EPA–HQ–
OAR–2020–0660; Standards of
Performance for Nonmetallic Mineral
Processing Plants (40 CFR part 60,
VerDate Sep<11>2014
20:48 Feb 05, 2021
Jkt 253001
subpart OOO) (Renewal); EPA ICR
Number 1084.15; OMB Control Number
2060–0050; Expiration date March 31,
2022.
Respondents: Nonmetallic mineral
processing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
OOO).
Estimated number of respondents:
5,095.
Frequency of response: Initially and
occasionally.
Estimated annual burden: 20,200
hours.
Estimated annual cost: $2,450,000,
includes $228,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(27) Docket ID Number: EPA–HQ–
OAR–2020–0645; Standards of
Performance for Municipal Solid Waste
Landfills That Commenced
Construction, Reconstruction, or
Modification On or After May 30, 1991,
But Before July 18, 2014 (40 CFR part
60, subpart WWW) (Renewal); EPA ICR
Number 1557.11; OMB Control Number
2060–0220; Expiration date March 31,
2022.
Respondents: Municipal solid waste
landfills.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
WWW).
Estimated number of respondents:
661.
Frequency of response: Annually.
Estimated annual burden: 760 hours.
Estimated annual cost: $86,600,
includes no annualized capital or O&M
costs.
Changes in estimates: There is a
projected decrease in burden due to
anticipated existing sources modifying
and becoming subject to 40 CFR 60,
subpart XXX.
(28) Docket ID Number: EPA–HQ–
OAR–2020–0668; Emission Guidelines
for Compliance Times for Commercial
and Industrial Solid Waste Incineration
Units (40 CFR part 60, subpart DDDD)
(Renewal); EPA ICR Number 2385.08;
OMB Control Number 2060–0664;
Expiration date March 31, 2022.
Respondents: Commercial and
industrial solid waste incineration
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
DDDD).
Estimated number of respondents: 78.
Frequency of response: Semiannually
and annually.
Estimated annual burden: 10,400
hours.
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
Estimated annual cost: $11,200,000,
includes $10,000,000 annualized capital
or O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(29) Docket ID Number: EPA–HQ–
OAR–2020–0665; Standards of
Performance for Other Solid Waste
Incineration Units for Which
Construction is Commenced After
December 9, 2004, or for Which
Modification or Reconstruction is
Commenced On or After June 16, 2006
(40 CFR part 60, subpart EEEE)
(Renewal); EPA ICR Number 2163.08;
OMB Control Number 2060–0563;
Expiration date March 31, 2022.
Respondents: Very small municipal
waste combustion and institutional
waste incineration facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
EEEE).
Estimated number of respondents: 55.
Frequency of response: Initially,
semiannually, and annually.
Estimated annual burden: 80,800
hours.
Estimated annual cost: $11,900,000,
includes $2,720,000 annualized capital
or O&M costs.
Changes in estimates: There is a
projected decrease in burden due to a
decrease in the number of sources
subject to the regulation.
(30) Docket ID Number: EPA–HQ–
OAR–2020–0669; Emissions Guidelines
and Compliance Times for Sewage
Sludge Incineration Units (40 CFR part
60, subpart MMMM) (Renewal); EPA
ICR Number 2403.06; OMB Control
Number 2060–0661; Expiration date
March 31, 2022.
Respondents: Sewage sludge
incinerators.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
MMMM).
Estimated number of respondents: 86.
Frequency of response: Semiannually
and annually.
Estimated annual burden: 32,800
hours.
Estimated annual cost: $4,790,000,
includes $1,350,000 annualized capital
or O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(31) Docket ID Number: EPA–HQ–
OAR–2020–0653; Standards of
Performance for Industrial Surface
Coating: Large Appliances (40 CFR part
60, subpart SS) (Renewal); EPA ICR
Number 0659.15; OMB Control Number
2060–0108; Expiration date April 30,
2022.
Respondents: Facilities conducting
surface coating of large appliance
products.
E:\FR\FM\08FEN1.SGM
08FEN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 86, No. 24 / Monday, February 8, 2021 / Notices
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart SS).
Estimated number of respondents: 72.
Frequency of response: Quarterly and
semiannually.
Estimated annual burden: 7,220
hours.
Estimated annual cost: $830,000,
includes $8,400 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(32) Docket ID Number: EPA–HQ–
OAR–2020–0656; Standards of
Performance for Petroleum Dry Cleaners
(40 CFR part 60, subpart JJJ) (Renewal);
EPA ICR Number 0997.13; OMB Control
Number 2060–0079; Expiration date
April 30, 2022.
Respondents: Petroleum dry cleaning
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart JJJ).
Estimated number of respondents:
1,120.
Frequency of response: Initially.
Estimated annual burden: 1,850
hours.
Estimated annual cost: $202,000,
includes no annualized capital or O&M
costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(33) Docket ID Number: EPA–HQ–
OAR–2020–0670; Standards of
Performance for Crude Oil and Natural
Gas Facilities for Which Construction,
Modification, or Reconstruction
Commenced After August 23, 2011, and
On or Before September 18, 2015 (40
CFR part 60, subpart OOOO) (Renewal);
EPA ICR Number 2437.05; OMB Control
Number 2060–0673; Expiration date
April 30, 2022.
Respondents: Oil and natural gas
production, natural gas processing,
natural gas transmission, and natural
gas distribution facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
OOOO).
Estimated number of respondents:
532.
Frequency of response: Semiannually
and annually.
Estimated annual burden: 69,300
hours.
Estimated annual cost: $9,110,000,
includes $1,220,000 annualized capital
or O&M costs.
Changes in estimates: There is a
projected decrease in burden due to
anticipated shutdown or modification of
existing sources, which would become
subject to 40 CFR 60, subpart OOOO.
(34) Docket ID Number: EPA–HQ–
OAR–2020–0667; Standards of
Performance for Petroleum Refineries
for Which Construction, Reconstruction,
VerDate Sep<11>2014
20:48 Feb 05, 2021
Jkt 253001
or Modification Commenced after May
14, 2007 (40 CFR part 60, subpart Ja)
(Renewal); EPA ICR Number 2263.07;
OMB Control Number 2060–0602;
Expiration date May 31, 2022.
Respondents: Petroleum refineries.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart Ja).
Estimated number of respondents:
150.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 355,000
hours.
Estimated annual cost: $143,000,000,
includes $102,000,000 annualized
capital or O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(35) Docket ID Number: EPA–HQ–
OAR–2020–0662; Standards of
Performance for Secondary Lead
Smelters (40 CFR part 60, subpart L)
(Renewal); EPA ICR Number 1128.13;
OMB Control Number 2060–0080;
Expiration date May 31, 2022.
Respondents: Secondary lead
smelting facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart L).
Estimated number of respondents: 12.
Frequency of response: Initially.
Estimated annual burden: 32 hours.
Estimated annual cost: $3,620,
includes no annualized capital or O&M
costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(36) Docket ID Number: EPA–HQ–
OAR–2020–0658; New Source
Performance Standards for the
Phosphate Fertilizer Industry (40 CFR
part 60, subparts T, U, V, W, and X)
(Renewal); EPA ICR Number 1061.15;
OMB Control Number 2060–0037;
Expiration date May 31, 2022.
Respondents: Phosphate fertilizer
manufacturing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subparts T,
U, V, W, and X).
Estimated number of respondents: 13.
Frequency of response: Semiannually.
Estimated annual burden: 1,390
hours.
Estimated annual cost: $478,000,
includes $320,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(37) Docket ID Number: EPA–HQ–
OAR–2020–0659; Standards of
Performance for Coal Preparation and
Processing Plants (40 CFR part 60,
subpart Y) (Renewal); EPA ICR Number
1062.16; OMB Control Number 2060–
0122; Expiration date May 31, 2022.
Respondents: Coal preparation and
processing facilities.
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
8639
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart Y).
Estimated number of respondents:
757.
Frequency of response: Semiannually.
Estimated annual burden: 35,300
hours.
Estimated annual cost: $4,090,000,
includes $65,600 annualized capital or
O&M costs.
Changes in estimates: There is a
projected decrease in burden due to
anticipated shutdown of existing
sources.
(38) Docket ID Number: EPA–HQ–
OAR–2020–0663; Standards of
Performance for Synthetic Fiber
Production Facilities (40 CFR part 60,
subpart HHH) (Renewal); EPA ICR
Number 1156.14; OMB Control Number
2060–0059; Expiration date May 31,
2022.
Respondents: Synthetic fiber
production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
HHH).
Estimated number of respondents: 22.
Frequency of response: Quarterly and
semiannually.
Estimated annual burden: 1,880
hours.
Estimated annual cost: $380,000,
includes $165,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(39) Docket ID Number: EPA–HQ–
OAR–2020–0661; Standards of
Performance for Industrial Surface
Coating: Surface Coating of Plastic Parts
for Business Machines (40 CFR part 60,
subpart TTT) (Renewal); EPA ICR
Number 1093.13; OMB Control Number
2060–0162; Expiration date May 31,
2022.
Respondents: Facilities conducting
surface coating of plastic parts for
business machines.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
TTT).
Estimated number of respondents: 10.
Frequency of response: Quarterly and
semiannually.
Estimated annual burden: 992 hours.
Estimated annual cost: $113,000,
includes no annualized capital or O&M
costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(40) Docket ID Number: EPA–HQ–
OAR–2020–0664; Emission Guidelines
and Compliance Times for Small
Municipal Waste Combustion Units
Constructed on or before August 30,
1999 (40 CFR part 60, subpart BBBB)
(Renewal); EPA ICR Number 1901.08;
OMB Control Number 2060–0424;
Expiration date May 31, 2022.
E:\FR\FM\08FEN1.SGM
08FEN1
jbell on DSKJLSW7X2PROD with NOTICES
8640
Federal Register / Vol. 86, No. 24 / Monday, February 8, 2021 / Notices
Respondents: Small municipal waste
combustion facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
BBBB).
Estimated number of respondents: 23.
Frequency of response: Semiannually
and annually.
Estimated annual burden: 102,000
hours.
Estimated annual cost: $11,500,000,
includes $1,040,000 annualized capital
or O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(41) Docket ID Number: EPA–HQ–
OAR–2020–0666; Standards of
Performance for Stationary Compression
Ignition Internal Combustion Engines
(40 CFR part 60, subpart IIII) (Renewal);
EPA ICR Number 2196.07; OMB Control
Number 2060–0590; Expiration date
May 31, 2022.
Respondents: Stationary compression
ignition internal combustion engine
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart IIII).
Estimated number of respondents:
206,885.
Frequency of response: Annually.
Estimated annual burden: 408,000
hours.
Estimated annual cost: $46,700,000,
includes $167,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(42) Docket ID Number: EPA–HQ–
OAR–2020–0671; Standards of
Performance for New Residential
Hydronic Heaters and Forced-Air
Furnaces (40 CFR part 60, subpart
QQQQ) (Renewal); EPA ICR Number
2442.04; OMB Control Number 2060–
0693; Expiration date May 31, 2022.
Respondents: Residential hydronic
heater and forced-air furnace
manufacturers, EPA-approved testing
laboratories, and third-party certifiers.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
QQQQ).
Estimated number of respondents: 50.
Frequency of response: Annually.
Estimated annual burden: 4,270
hours.
Estimated annual cost: $4,770,000,
includes $4,280,000 annualized capital
or O&M costs.
Changes in estimates: There is no
change in burden from the previous ICR.
(43) Docket ID Number: EPA–HQ–
OAR–2020–0647; Standards of
Performance for Storage Vessels for
Petroleum Liquids for which
Construction, Reconstruction, or
VerDate Sep<11>2014
20:48 Feb 05, 2021
Jkt 253001
Modification Commenced After June 11,
1973, and Prior to May 19, 1978 (40 CFR
part 60, subpart K) (Renewal); EPA ICR
Number 1797.09; OMB Control Number
2060–0442; Expiration date June 30,
2022.
Respondents: Facilities that store
petroleum liquids in storage vessels
with a storage capacity greater than
151,416 liters (40,000 gallons) but not
exceeding 246,052 liters (65,000
gallons).
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart K).
Estimated number of respondents: 69.
Frequency of response: Annually.
Estimated annual burden: 321 hours.
Estimated annual cost: $36,500,
includes no annualized capital or O&M
costs.
Changes in estimates: There is no
change in burden from the previous ICR.
Dated: January 20, 2021.
Penny Lassiter,
Director, Sector Policies and Programs
Division.
[FR Doc. 2021–02520 Filed 2–5–21; 8:45 am]
BILLING CODE 6560–50–P
EXPORT-IMPORT BANK
[Public Notice: 2021–6003]
Agency Information Collection
Activities: Comment Request
Export-Import Bank of the
United States.
ACTION: Submission for OMB review and
comments request.
AGENCY:
The Export-Import Bank of
the United States (EXIM), as a part of its
continuing effort to reduce paperwork
and respondent burden, invites the
general public and other Federal
Agencies to comment on the proposed
information collection, as required by
the Paperwork Reduction Act of 1995.
The collection provides EXIM staff with
the information necessary to monitor
the borrower’s payments for exported
goods covered under its short and
medium-term export credit insurance
policies. It also alerts EXIM staff of
defaults, so they can manage the
portfolio in an informed manner.
DATES: Comments must be received on
or before April 9, 2021 to be assured of
consideration.
ADDRESSES: Comments may be
submitted electronically on
WWW.REGULATIONS.GOV or by mail
to Mia Johnson, Export-Import Bank of
the United States, 811 Vermont Ave.
NW Washington, DC 20571. Form can
be viewed at https://www.exim.gov/
sites/default/files/forms/eib10-05.pdf.
SUMMARY:
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
SUPPLEMENTARY INFORMATION:
Title and Form Number: EIB 92–29
Export-Import Bank Report of Premiums
Payable for Exporters Only.
OMB Number: 3048–0017.
Type of Review: Regular.
Need and Use: The ‘‘Report of
Premiums Payable for Exporters Only’’
form is used by exporters to report and
pay premiums on insured shipments to
various foreign buyers under the terms
of the policy and to certify that
premiums have been correctly
computed and remitted. Individual
transactions that an exporter may have
with the same foreign borrower can be
sub-totaled and entered as a single line
item for the specific month provided the
length of payment term is identical. The
use of sub-totals reduces the
administrative burden on the exporter.
The ‘Report of Premiums Payable for
Exporters Only’ is used by the Bank to
determine the eligibility of the
shipment(s) and to calculate the
premium due to Ex-Im Bank for its
support of the shipment(s) under its
insurance program.
Affected Public: This form affects
entities involved in the export of U.S.
goods and services.
Annual Number of Respondents:
2600.
Estimated Time per Respondent: 15
minutes.
Annual Burden Hours: 650 hours.
Frequency of Reporting or Use:
Monthly.
Government Expenses:
Reviewing Time per Year: 1,950
hours.
Average Wages per Hour: $42.50.
Average Cost per Year: $82,875.
Benefits and Overhead: 20%.
Total Government Cost: $99,450.
Bassam Doughman,
IT Specialist.
[FR Doc. 2021–02541 Filed 2–5–21; 8:45 am]
BILLING CODE 6690–01–P
FEDERAL TRADE COMMISSION
Agency Information Collection
Activities; Proposed Collection;
Comment Request; Extension
Federal Trade Commission.
Notice.
AGENCY:
ACTION:
In accordance with the
Paperwork Reduction Act of 1995
(PRA), the Federal Trade Commission
(FTC or Commission) is seeking public
comment on its proposal to extend for
an additional three years the Office of
Management and Budget (OMB)
clearance for information collection
SUMMARY:
E:\FR\FM\08FEN1.SGM
08FEN1
Agencies
[Federal Register Volume 86, Number 24 (Monday, February 8, 2021)]
[Notices]
[Pages 8634-8640]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-02520]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL-10019-67-OAR]
Proposed Information Collection Request; Comment Request; 43
Source Categories
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The U.S. Environmental Protection Agency (EPA) is planning to
submit the below listed Information Collection Requests (ICR) to the
Office of Management and Budget (OMB) for review and approval in
accordance with the Paperwork Reduction Act (PRA). Before doing so, the
EPA is soliciting public comments on specific aspects of the proposed
information collection as described below. These are proposed
extensions of the currently approved ICRs. An agency may not conduct or
sponsor and a person is not required to respond to a collection of
information unless it displays a currently valid OMB control number.
DATES: Comments must be submitted on or before April 9, 2021.
ADDRESSES: Submit your comments, referencing the Docket ID numbers
provided for each item in the text, online using https://www.regulations.gov/ (our preferred method), by email to [email protected], or by mail to: EPA Docket Center, Environmental
Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW,
Washington, DC 20460. The EPA's policy is that all comments received
will be included in the public docket without change including any
personal information provided, unless the comment includes profanity,
threats, information claimed to be Confidential Business Information
(CBI) or other information whose disclosure is restricted by statute.
Out of an abundance of caution for members of
[[Page 8635]]
the public and our staff, the EPA Docket Center and Reading Room are
closed to the public, with limited exceptions, to reduce the risk of
transmitting COVID-19. Our Docket Center staff will continue to provide
remote customer service via email, phone, and webform. We encourage the
public to submit comments via https://www.regulations.gov/ or email, as
there may be a delay in processing mail and faxes. Hand deliveries and
couriers may be received by scheduled appointment only. For further
information on the EPA Docket Center services and the current status,
please visit us online at https://www.epa.gov/dockets.
FOR FURTHER INFORMATION CONTACT: Mr. Muntasir Ali, Sector Policies and
Programs Division (D243-05), Office of Air Quality Planning and
Standards, U.S. Environmental Protection Agency, Research Triangle
Park, North Carolina 27711; telephone number: (919) 541-0833; email
address: [email protected].
SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail
the information that the EPA will be collecting are available in the
public docket for this ICR. The docket can be viewed online at https://www.regulations.gov/ or in person at the EPA Docket Center, WJC West
Building, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The
telephone number for the EPA Docket Center is (202) 566-1744. For
additional information about the EPA's public docket, visit https://www.epa.gov/dockets.
Pursuant to section 3506(c)(2)(A) of the PRA, the EPA is soliciting
comments and information to enable it to: (1) Evaluate whether the
proposed collection of information is necessary for the proper
performance of the functions of the Agency, including whether the
information will have practical utility; (2) evaluate the accuracy of
the Agency's estimate of the burden of the proposed collection of
information, including the validity of the methodology and assumptions
used; (3) enhance the quality, utility, and clarity of the information
to be collected; and (4) minimize the burden of the collection of
information on those who are to respond, including through the use of
appropriate automated electronic, mechanical, or other technological
collection techniques or other forms of information technology, e.g.,
permitting electronic submission of responses. Burden is defined at 5
CFR 1320.03(b). The EPA will consider the comments received and amend
the ICR as appropriate. The final ICR package will then be submitted to
OMB for review and approval. At that time, the EPA will issue another
Federal Register document to announce the submission of the ICR to OMB
and the opportunity to submit additional comments to OMB.
General Abstract: For all the listed ICRs in this document, owners
and operators of affected facilities are required to comply with
reporting and recordkeeping requirements for the General Provisions of
40 CFR part 60, subpart A or 40 CFR part 63, subpart A, as well as the
applicable specific standards. This includes submitting initial
notifications, performance tests, and periodic reports and results, and
maintaining records of the occurrence and duration of any startup,
shutdown, or malfunction in the operation of an affected facility, or
any period during which the monitoring system is inoperative. These
reports are used by the EPA to determine compliance with the standards.
(1) Docket ID Number: EPA-HQ-OAR-2020-0628; Standards of
Performance for Sulfuric Acid Plants (40 CFR part 60, subpart H)
(Renewal); EPA ICR Number 1057.15; OMB Control Number 2060-0041;
Expiration date October 31, 2021.
Respondents: Sulfuric acid manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart H).
Estimated number of respondents: 53.
Frequency of response: Semiannually.
Estimated annual burden: 13,500 hours.
Estimated annual cost: $1,660,000, includes $239,000 annualized
capital or operations and maintenance (O&M) costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(2) Docket ID Number: EPA-HQ-OAR-2020-0633; Standards of
Performance for Polymeric Coating of Supporting Substrates Facilities
(40 CFR part 60, subpart VVV) (Renewal); EPA ICR Number 1284.12; OMB
Control Number 2060-0181; Expiration date October 31, 2021.
Respondents: Facilities performing polymeric coating of supporting
substrates.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart VVV).
Estimated number of respondents: 61.
Frequency of response: Initially, quarterly, and semiannually.
Estimated annual burden: 14,200 hours.
Estimated annual cost: $2,190,000, includes $700,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(3) Docket ID Number: EPA-HQ-OAR-2020-0623; National Emission
Standards for Hazardous Air Pollutants from Natural Gas Transmission
and Storage Facilities (40 CFR part 63, HHH) (Renewal); EPA ICR Number
1789.11; OMB Control Number 2060-0418; Expiration date October 31,
2021.
Respondents: Natural gas transmission and storage facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
HHH).
Estimated number of respondents: 55.
Frequency of response: Initially and semiannually.
Estimated annual burden: 2,910 hours.
Estimated annual cost: $306,000, includes no annualized capital or
O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(4) Docket ID Number: EPA-HQ-OAR-2020-0637; National Emission
Standards for Hazardous Air Pollutants for Source Categories: Carbon
Black, Ethylene, Cyanide, and Spandex (40 CFR part 63, subpart YY)
(Renewal); EPA ICR Number 1983.11; OMB Control Number 2060-0489;
Expiration date November 30, 2021.
Respondents: Carbon black, ethylene, cyanide, and spandex
manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart YY).
Estimated number of respondents: 61.
Frequency of response: Semiannually and annually.
Estimated annual burden: 41,800 hours.
Estimated annual cost: $4,930,000, includes $351,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(5) Docket ID Number: EPA-HQ-OAR-2020-0635; National Emission
Standards for Hazardous Air Pollutants for Primary Copper Smelting (40
CFR part 63, subpart QQQ) (Renewal); EPA ICR Number 1850.09; OMB
Control Number 2060-0476; Expiration date November 30, 2021.
Respondents: Primary copper smelting facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart QQQ).
Estimated number of respondents: 3.
Frequency of response: Semiannually and annually.
[[Page 8636]]
Estimated annual burden: 9,440 hours.
Estimated annual cost: $999,000, includes $8,220 annualized capital
or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(6) Docket ID Number: EPA-HQ-OAR-2020-0631; Standards of
Performance for Hot Mix Asphalt Facilities (40 CFR part 60, subpart I)
(Renewal); EPA ICR Number 1127.13; OMB Control Number 2060-0083;
Expiration date December 31, 2021.
Respondents: Hot mix asphalt facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart I).
Estimated number of respondents: 4,955.
Frequency of response: Initially.
Estimated annual burden: 8,547 hours.
Estimated annual cost: $2,620,000, includes no annualized capital
or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(7) Docket ID Number: EPA-HQ-OAR-2020-0627; Standards of
Performance for Petroleum Refineries (40 CFR part 60, subpart J)
(Renewal); EPA ICR Number 1054.14; OMB Control Number 2060-0022;
Expiration date December 31, 2021.
Respondents: Petroleum refineries.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart J).
Estimated number of respondents: 149.
Frequency of response: Semiannually.
Estimated annual burden: 15,800 hours.
Estimated annual cost: $2,500,000, includes $826,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(8) Docket ID Number: EPA-HQ-OAR-2020-0629; Standards of
Performance for Primary Emissions from Basic Oxygen Process Furnaces
for Which Construction is Commenced After June 11, 1973; and Standards
of Performance for Secondary Emissions from Basic Oxygen Process
Steelmaking Facilities for Which Construction is Commenced After
January 20, 1983 (40 CFR part 60, subparts N and Na) (Renewal); EPA ICR
Number 1069.13; OMB Control Number 2060-0029; Expiration date December
31, 2021.
Respondents: Basic oxygen process steelmaking facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts N and Na).
Estimated number of respondents: 18.
Frequency of response: Semiannually.
Estimated annual burden: 6,280 hours.
Estimated annual cost: $690,000, includes $29,700 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(9) Docket ID Number: EPA-HQ-OAR-2020-0632; Standards of
Performance for Lime Manufacturing Plants (40 CFR part 60, subpart HH)
(Renewal); EPA ICR Number 1167.13; OMB Control Number 2060-0063;
Expiration date December 31, 2021.
Respondents: Lime manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart HH).
Estimated number of respondents: 41.
Frequency of response: Semiannually.
Estimated annual burden: 3,820 hours.
Estimated annual cost: $463,000, includes $61,500 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(10) Docket ID Number: EPA-HQ-OAR-2020-0710; Emission Guidelines
and Compliance Times for Other Solid Waste Incineration Units That
Commenced Construction On or Before December 9, 2004 (40 CFR part 60,
subpart FFFF) (Renewal); EPA ICR Number 2164.07; OMB Control Number
2060-0562; Expiration date December 31, 2021.
Respondents: Very small municipal waste combustion and
institutional waste incineration facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart FFFF).
Estimated number of respondents: 99.
Frequency of response: Initially, semiannually, and annually.
Estimated annual burden: 70,200 hours.
Estimated annual cost: $8,190,000, includes $495,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(11) Docket ID Number: EPA-HQ-OAR-2020-0625; National Emission
Standard for Vinyl Chloride (40 CFR part 61, subpart F) (Renewal); EPA
ICR Number 0186.15; OMB Control Number 2060-0071; Expiration date
December 31, 2021.
Respondents: Facilities that produce ethylene dichloride, vinyl
chloride (VC), and one or more polymers containing any fraction of
polymerized VC.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart F).
Estimated number of respondents: 16.
Frequency of response: Quarterly and annually.
Estimated annual burden: 6,540 hours.
Estimated annual cost: $1,410,000, includes $720,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(12) Docket ID Number: EPA-HQ-OAR-2020-0630; National Emission
Standards for Inorganic Arsenic Emissions from Glass Manufacturing
Plants (40 CFR part 61, subpart N) (Renewal); EPA ICR Number 1081.13;
OMB Control Number 2060-0043; Expiration date December 31, 2021.
Respondents: Glass manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart N).
Estimated number of respondents: 16.
Frequency of response: Semiannually.
Estimated annual burden: 3,100 hours.
Estimated annual cost: $382,000, includes $56,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(13) Docket ID Number: EPA-HQ-OAR-2020-0634; National Emission
Standards for Hazardous Air Pollutants From Secondary Lead Smelting (40
CFR part 63, subpart X) (Renewal); EPA ICR Number 1686.12; OMB Control
Number 2060-0296; Expiration date December 31, 2021.
Respondents: Secondary lead smelting facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart X).
Estimated number of respondents: 12.
Frequency of response: Semiannually and annually.
Estimated annual burden: 21,700 hours.
Estimated annual cost: $2,630,000, includes $251,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(14) Docket ID Number: EPA-HQ-OAR-2020-0622; National Emission
Standards for Wood Furniture Manufacturing Operations (40 CFR part 63,
subpart JJ) (Renewal); EPA ICR Number 1716.11; OMB Control Number 2060-
0324; Expiration date December 31, 2021.
Respondents: Wood furniture manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart JJ)
Estimated number of respondents: 856.
[[Page 8637]]
Frequency of response: Initially, quarterly, and semiannually.
Estimated annual burden: 70,800 hours.
Estimated annual cost: $7,780,000, includes $24,600 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(15) Docket ID Number: EPA-HQ-OAR-2020-0624; National Emission
Standards for Hazardous Air Pollutants for Chemical Recovery Combustion
Sources at Kraft, Soda, Sulfite, and Stand-Alone Semichemical Pulp
Mills (40 CFR part 63, subpart MM) (Renewal); EPA ICR Number 1805.11;
OMB Control Number 2060-0377; Expiration date December 31, 2021.
Respondents: Kraft, soda, sulfite, and stand-alone semichemical
pulp mill facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart MM).
Estimated number of respondents: 107.
Frequency of response: Initially and semiannually.
Estimated annual burden: 122,000 hours.
Estimated annual cost: $14,700,000, includes $831,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(16) Docket ID Number: EPA-HQ-OAR-2020-0636; National Emission
Standards for Hazardous Air Pollutants for Primary Lead Smelting (40
CFR part 63, subpart TTT) (Renewal); EPA ICR Number 1856.12; OMB
Control Number 2060-0414; Expiration date December 31, 2021.
Respondents: Primary lead smelting facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart TTT).
Estimated number of respondents: 1.
Frequency of response: Quarterly and semiannually.
Estimated annual burden: 6,270 hours.
Estimated annual cost: $855,000, includes $169,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(17) Docket ID Number: EPA-HQ-OAR-2020-0640; National Emission
Standards for Hazardous Air Pollutants for Engine Test Cells/Stands (40
CFR part 63, subpart PPPPP) (Renewal); EPA ICR Number 2066.10; OMB
Control Number 2060-0483; Expiration date December 31, 2021.
Respondents: Engine test cells/stand facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart PPPPP).
Estimated number of respondents: 19.
Frequency of response: Initially and semiannually.
Estimated annual burden: 2,150 hours.
Estimated annual cost: $216,000, includes $6,200 annualized capital
or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to anticipated shutdown of existing sources.
(18) Docket ID Number: EPA-HQ-OAR-2020-0639; National Emission
Standards for Hazardous Air Pollutants for Friction Materials
Manufacturing Facilities (40 CFR part 63, subpart QQQQQ) (Renewal); EPA
ICR Number 2025.09; OMB Control Number 2060-0481; Expiration date
December 31, 2021.
Respondents: Friction materials manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart QQQQQ).
Estimated number of respondents: 2.
Frequency of response: Semiannually.
Estimated annual burden: 659 hours.
Estimated annual cost: $69,700, includes $544 annualized capital or
O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(19) Docket ID Number: EPA-HQ-OAR-2020-0641; National Emission
Standards for Hazardous Air Pollutants for Iron and Steel Foundries
Area Sources (40 CFR part 63, subpart ZZZZZ) (Renewal); EPA ICR Number
2267.08; OMB Control Number 2060-0605; Expiration date December 31,
2021.
Respondents: Iron and steel foundry area source facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart ZZZZZ).
Estimated number of respondents: 392.
Frequency of response: Semiannually and annually.
Estimated annual burden: 9,140 hours.
Estimated annual cost: $1,000,000, includes no annualized capital
or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(20) Docket ID Number: EPA-HQ-OAR-2020-0638; National Emission
Standards for Hazardous Air Pollutants for Leather Finishing Operations
(40 CFR part 63, subpart TTTT) (Renewal); EPA ICR Number 1985.10; OMB
Control Number 2060-0478; Expiration date February 28, 2022.
Respondents: Leather finishing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart TTTT).
Estimated number of respondents: 4.
Frequency of response: Annually.
Estimated annual burden: 138 hours.
Estimated annual cost: $12,500, includes no annualized capital or
O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(21) Docket ID Number: EPA-HQ-OAR-2020-0643; Standards of
Performance for Municipal Waste Combustors for Which Construction is
Commenced After December 20, 1989 and On or Before September 20, 1994,
and Standards of Performance for Large Municipal Waste Combustors for
Which Construction is Commenced After September 20, 1994 or for Which
Modification or Reconstruction is Commenced After June 19, 1996 (40 CFR
part 60, subparts Ea and Eb) (Renewal); EPA ICR Number 1506.14; OMB
Control Number 2060-0210; Expiration date March 31, 2022.
Respondents: Municipal waste combustor facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts Ea and Eb).
Estimated number of respondents: 23.
Frequency of response: Initially, quarterly, semiannually, and
annually.
Estimated annual burden: 34,900 hours.
Estimated annual cost: $3,440,000, includes $226,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(22) Docket ID Number: EPA-HQ-OAR-2020-0657; Standards of
Performance for Kraft Pulp Mills (40 CFR part 60, subpart BB)
(Renewal); EPA ICR Number 1055.13; OMB Control Number 2060-0021;
Expiration date March 31, 2022.
Respondents: Kraft pulp mill facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart BB).
Estimated number of respondents: 97.
Frequency of response: Semiannually.
Estimated annual burden: 13,900 hours.
Estimated annual cost: $5,020,000, includes $3,510,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
[[Page 8638]]
(23) Docket ID Number: EPA-HQ-OAR-2020-0626; Standards of
Performance for Surface Coating of Metal Furniture (40 CFR part 60,
subpart EE) (Renewal); EPA ICR Number 0649.14; OMB Control Number 2060-
0106; Expiration date March 31, 2022.
Respondents: Metal furniture surface coating facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart EE).
Estimated number of respondents: 400.
Frequency of response: Quarterly and semiannually.
Estimated annual burden: 56,500 hours.
Estimated annual cost: $7,280,000, includes $840,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(24) Docket ID Number: EPA-HQ-OAR-2020-0655; Standards of
Performance for Metallic Mineral Processing Plants (40 CFR part 60,
subpart LL) (Renewal); EPA ICR Number 0982.13; OMB Control Number 2060-
0016; Expiration date March 31, 2022.
Respondents: Metallic mineral processing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart LL).
Estimated number of respondents: 20.
Frequency of response: Initially and semiannually.
Estimated annual burden: 2,330 hours.
Estimated annual cost: $268,000, includes $13,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(25) Docket ID Number: EPA-HQ-OAR-2020-0654; Standards of
Performance for the Beverage Can Surface Coating Industry (40 CFR part
60, subpart WW) (Renewal); EPA ICR Number 0663.14; OMB Control Number
2060-0001; Expiration date March 31, 2022.
Respondents: Beverage can surface coating facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart WW).
Estimated number of respondents: 48.
Frequency of response: Semiannually.
Estimated annual burden: 5,190 hours.
Estimated annual cost: $669,000, includes $101,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(26) Docket ID Number: EPA-HQ-OAR-2020-0660; Standards of
Performance for Nonmetallic Mineral Processing Plants (40 CFR part 60,
subpart OOO) (Renewal); EPA ICR Number 1084.15; OMB Control Number
2060-0050; Expiration date March 31, 2022.
Respondents: Nonmetallic mineral processing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart OOO).
Estimated number of respondents: 5,095.
Frequency of response: Initially and occasionally.
Estimated annual burden: 20,200 hours.
Estimated annual cost: $2,450,000, includes $228,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(27) Docket ID Number: EPA-HQ-OAR-2020-0645; Standards of
Performance for Municipal Solid Waste Landfills That Commenced
Construction, Reconstruction, or Modification On or After May 30, 1991,
But Before July 18, 2014 (40 CFR part 60, subpart WWW) (Renewal); EPA
ICR Number 1557.11; OMB Control Number 2060-0220; Expiration date March
31, 2022.
Respondents: Municipal solid waste landfills.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart WWW).
Estimated number of respondents: 661.
Frequency of response: Annually.
Estimated annual burden: 760 hours.
Estimated annual cost: $86,600, includes no annualized capital or
O&M costs.
Changes in estimates: There is a projected decrease in burden due
to anticipated existing sources modifying and becoming subject to 40
CFR 60, subpart XXX.
(28) Docket ID Number: EPA-HQ-OAR-2020-0668; Emission Guidelines
for Compliance Times for Commercial and Industrial Solid Waste
Incineration Units (40 CFR part 60, subpart DDDD) (Renewal); EPA ICR
Number 2385.08; OMB Control Number 2060-0664; Expiration date March 31,
2022.
Respondents: Commercial and industrial solid waste incineration
facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart DDDD).
Estimated number of respondents: 78.
Frequency of response: Semiannually and annually.
Estimated annual burden: 10,400 hours.
Estimated annual cost: $11,200,000, includes $10,000,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(29) Docket ID Number: EPA-HQ-OAR-2020-0665; Standards of
Performance for Other Solid Waste Incineration Units for Which
Construction is Commenced After December 9, 2004, or for Which
Modification or Reconstruction is Commenced On or After June 16, 2006
(40 CFR part 60, subpart EEEE) (Renewal); EPA ICR Number 2163.08; OMB
Control Number 2060-0563; Expiration date March 31, 2022.
Respondents: Very small municipal waste combustion and
institutional waste incineration facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart EEEE).
Estimated number of respondents: 55.
Frequency of response: Initially, semiannually, and annually.
Estimated annual burden: 80,800 hours.
Estimated annual cost: $11,900,000, includes $2,720,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to a decrease in the number of sources subject to the regulation.
(30) Docket ID Number: EPA-HQ-OAR-2020-0669; Emissions Guidelines
and Compliance Times for Sewage Sludge Incineration Units (40 CFR part
60, subpart MMMM) (Renewal); EPA ICR Number 2403.06; OMB Control Number
2060-0661; Expiration date March 31, 2022.
Respondents: Sewage sludge incinerators.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart MMMM).
Estimated number of respondents: 86.
Frequency of response: Semiannually and annually.
Estimated annual burden: 32,800 hours.
Estimated annual cost: $4,790,000, includes $1,350,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(31) Docket ID Number: EPA-HQ-OAR-2020-0653; Standards of
Performance for Industrial Surface Coating: Large Appliances (40 CFR
part 60, subpart SS) (Renewal); EPA ICR Number 0659.15; OMB Control
Number 2060-0108; Expiration date April 30, 2022.
Respondents: Facilities conducting surface coating of large
appliance products.
[[Page 8639]]
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart SS).
Estimated number of respondents: 72.
Frequency of response: Quarterly and semiannually.
Estimated annual burden: 7,220 hours.
Estimated annual cost: $830,000, includes $8,400 annualized capital
or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(32) Docket ID Number: EPA-HQ-OAR-2020-0656; Standards of
Performance for Petroleum Dry Cleaners (40 CFR part 60, subpart JJJ)
(Renewal); EPA ICR Number 0997.13; OMB Control Number 2060-0079;
Expiration date April 30, 2022.
Respondents: Petroleum dry cleaning facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart JJJ).
Estimated number of respondents: 1,120.
Frequency of response: Initially.
Estimated annual burden: 1,850 hours.
Estimated annual cost: $202,000, includes no annualized capital or
O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(33) Docket ID Number: EPA-HQ-OAR-2020-0670; Standards of
Performance for Crude Oil and Natural Gas Facilities for Which
Construction, Modification, or Reconstruction Commenced After August
23, 2011, and On or Before September 18, 2015 (40 CFR part 60, subpart
OOOO) (Renewal); EPA ICR Number 2437.05; OMB Control Number 2060-0673;
Expiration date April 30, 2022.
Respondents: Oil and natural gas production, natural gas
processing, natural gas transmission, and natural gas distribution
facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart OOOO).
Estimated number of respondents: 532.
Frequency of response: Semiannually and annually.
Estimated annual burden: 69,300 hours.
Estimated annual cost: $9,110,000, includes $1,220,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to anticipated shutdown or modification of existing sources, which
would become subject to 40 CFR 60, subpart OOOO.
(34) Docket ID Number: EPA-HQ-OAR-2020-0667; Standards of
Performance for Petroleum Refineries for Which Construction,
Reconstruction, or Modification Commenced after May 14, 2007 (40 CFR
part 60, subpart Ja) (Renewal); EPA ICR Number 2263.07; OMB Control
Number 2060-0602; Expiration date May 31, 2022.
Respondents: Petroleum refineries.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart Ja).
Estimated number of respondents: 150.
Frequency of response: Initially and semiannually.
Estimated annual burden: 355,000 hours.
Estimated annual cost: $143,000,000, includes $102,000,000
annualized capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(35) Docket ID Number: EPA-HQ-OAR-2020-0662; Standards of
Performance for Secondary Lead Smelters (40 CFR part 60, subpart L)
(Renewal); EPA ICR Number 1128.13; OMB Control Number 2060-0080;
Expiration date May 31, 2022.
Respondents: Secondary lead smelting facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart L).
Estimated number of respondents: 12.
Frequency of response: Initially.
Estimated annual burden: 32 hours.
Estimated annual cost: $3,620, includes no annualized capital or
O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(36) Docket ID Number: EPA-HQ-OAR-2020-0658; New Source Performance
Standards for the Phosphate Fertilizer Industry (40 CFR part 60,
subparts T, U, V, W, and X) (Renewal); EPA ICR Number 1061.15; OMB
Control Number 2060-0037; Expiration date May 31, 2022.
Respondents: Phosphate fertilizer manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts T, U, V, W, and X).
Estimated number of respondents: 13.
Frequency of response: Semiannually.
Estimated annual burden: 1,390 hours.
Estimated annual cost: $478,000, includes $320,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(37) Docket ID Number: EPA-HQ-OAR-2020-0659; Standards of
Performance for Coal Preparation and Processing Plants (40 CFR part 60,
subpart Y) (Renewal); EPA ICR Number 1062.16; OMB Control Number 2060-
0122; Expiration date May 31, 2022.
Respondents: Coal preparation and processing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart Y).
Estimated number of respondents: 757.
Frequency of response: Semiannually.
Estimated annual burden: 35,300 hours.
Estimated annual cost: $4,090,000, includes $65,600 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to anticipated shutdown of existing sources.
(38) Docket ID Number: EPA-HQ-OAR-2020-0663; Standards of
Performance for Synthetic Fiber Production Facilities (40 CFR part 60,
subpart HHH) (Renewal); EPA ICR Number 1156.14; OMB Control Number
2060-0059; Expiration date May 31, 2022.
Respondents: Synthetic fiber production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart HHH).
Estimated number of respondents: 22.
Frequency of response: Quarterly and semiannually.
Estimated annual burden: 1,880 hours.
Estimated annual cost: $380,000, includes $165,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(39) Docket ID Number: EPA-HQ-OAR-2020-0661; Standards of
Performance for Industrial Surface Coating: Surface Coating of Plastic
Parts for Business Machines (40 CFR part 60, subpart TTT) (Renewal);
EPA ICR Number 1093.13; OMB Control Number 2060-0162; Expiration date
May 31, 2022.
Respondents: Facilities conducting surface coating of plastic parts
for business machines.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart TTT).
Estimated number of respondents: 10.
Frequency of response: Quarterly and semiannually.
Estimated annual burden: 992 hours.
Estimated annual cost: $113,000, includes no annualized capital or
O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(40) Docket ID Number: EPA-HQ-OAR-2020-0664; Emission Guidelines
and Compliance Times for Small Municipal Waste Combustion Units
Constructed on or before August 30, 1999 (40 CFR part 60, subpart BBBB)
(Renewal); EPA ICR Number 1901.08; OMB Control Number 2060-0424;
Expiration date May 31, 2022.
[[Page 8640]]
Respondents: Small municipal waste combustion facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart BBBB).
Estimated number of respondents: 23.
Frequency of response: Semiannually and annually.
Estimated annual burden: 102,000 hours.
Estimated annual cost: $11,500,000, includes $1,040,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(41) Docket ID Number: EPA-HQ-OAR-2020-0666; Standards of
Performance for Stationary Compression Ignition Internal Combustion
Engines (40 CFR part 60, subpart IIII) (Renewal); EPA ICR Number
2196.07; OMB Control Number 2060-0590; Expiration date May 31, 2022.
Respondents: Stationary compression ignition internal combustion
engine facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart IIII).
Estimated number of respondents: 206,885.
Frequency of response: Annually.
Estimated annual burden: 408,000 hours.
Estimated annual cost: $46,700,000, includes $167,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(42) Docket ID Number: EPA-HQ-OAR-2020-0671; Standards of
Performance for New Residential Hydronic Heaters and Forced-Air
Furnaces (40 CFR part 60, subpart QQQQ) (Renewal); EPA ICR Number
2442.04; OMB Control Number 2060-0693; Expiration date May 31, 2022.
Respondents: Residential hydronic heater and forced-air furnace
manufacturers, EPA-approved testing laboratories, and third-party
certifiers.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart QQQQ).
Estimated number of respondents: 50.
Frequency of response: Annually.
Estimated annual burden: 4,270 hours.
Estimated annual cost: $4,770,000, includes $4,280,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
(43) Docket ID Number: EPA-HQ-OAR-2020-0647; Standards of
Performance for Storage Vessels for Petroleum Liquids for which
Construction, Reconstruction, or Modification Commenced After June 11,
1973, and Prior to May 19, 1978 (40 CFR part 60, subpart K) (Renewal);
EPA ICR Number 1797.09; OMB Control Number 2060-0442; Expiration date
June 30, 2022.
Respondents: Facilities that store petroleum liquids in storage
vessels with a storage capacity greater than 151,416 liters (40,000
gallons) but not exceeding 246,052 liters (65,000 gallons).
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart K).
Estimated number of respondents: 69.
Frequency of response: Annually.
Estimated annual burden: 321 hours.
Estimated annual cost: $36,500, includes no annualized capital or
O&M costs.
Changes in estimates: There is no change in burden from the
previous ICR.
Dated: January 20, 2021.
Penny Lassiter,
Director, Sector Policies and Programs Division.
[FR Doc. 2021-02520 Filed 2-5-21; 8:45 am]
BILLING CODE 6560-50-P