Texas Eastern Transmission, LP; Notice of Application and Establishing Intervention Deadline, 8615-8617 [2021-02507]

Download as PDF jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 86, No. 24 / Monday, February 8, 2021 / Notices Docket Numbers: RP21–446–000. Applicants: Gulf South Pipeline Company, LLC. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmt (Constellation 53545 to Exelon 53591) to be effective 2/1/ 2021. Filed Date: 2/1/21. Accession Number: 20210201–5125. Comments Due: 5 p.m. ET 2/16/21. Docket Numbers: RP21–447–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: Rate Schedule S–2 Tracker Filing eff 2–1– 2021 to be effective 2/1/2021. Filed Date: 2/1/21. Accession Number: 20210201–5141. Comments Due: 5 p.m. ET 2/16/21. Docket Numbers: RP21–448–000. Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20210201 Annual PRA to be effective 4/1/2021. Filed Date: 2/1/21. Accession Number: 20210201–5172. Comments Due: 5 p.m. ET 2/16/21. Docket Numbers: RP21–449–000. Applicants: Equitrans, L.P. Description: § 4(d) Rate Filing: Negotiated Rate Capacity Release Agreements—2/1/2021 to be effective 2/1/2021. Filed Date: 2/1/21. Accession Number: 20210201–5191. Comments Due: 5 p.m. ET 2/16/21. Docket Numbers: RP21–450–000. Applicants: White River Hub, LLC. Description: § 4(d) Rate Filing: Nonconforming TSAs V. 4.0.0 to be effective 3/3/2021. Filed Date: 2/1/21. Accession Number: 20210201–5198. Comments Due: 5 p.m. ET 2/16/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Sep<11>2014 20:48 Feb 05, 2021 Jkt 253001 Dated: February 2, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–02501 Filed 2–5–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–31–000] Texas Eastern Transmission, LP; Notice of Waiver Period for Water Quality Certification Application On January 15, 2021, Texas Eastern Transmission, LP submitted to the Federal Energy Regulatory Commission (Commission) a copy of its application for a Clean Water Act section 401(a)(1) water quality certification filed with the Pennsylvania Department of Environmental Protection, in conjunction with the above captioned project. Pursuant to 40 CFR 121.6, we hereby notify the Pennsylvania Department of Environmental Protection of the following: Date of Receipt of the Certification Request: November 16, 2020. Reasonable Period of Time to Act on the Certification Request: One year. Date Waiver Occurs for Failure to Act: November 16, 2021. If the Pennsylvania Department of Environmental Protection fails or refuses to act on the water quality certification request by the above waiver date, then the agency certifying authority is deemed waived pursuant to section 401(a)(1) of the Clean Water Act, 33 U.S.C. 1341(a)(1). Dated: February 2, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–02504 Filed 2–5–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–31–000] Texas Eastern Transmission, LP; Notice of Application and Establishing Intervention Deadline Take notice that on January 15, 2021, Texas Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, TX 77056–5310, filed an application under section 7(b) and 7(c) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 8615 requesting authorization of its Perulack Compressor Units Replacement Project (Project). Texas Eastern seeks authorization to: (1) Abandon and remove four existing compressor units, (2) construct two new compressor units, and (3) construct auxiliary appurtenant facilities at its existing Perulack Compressor Station located in Juniata County, Pennsylvania. The Project is designed to comply with air emission reduction requirements in Pennsylvania and will not create new capacity. Texas Eastern estimates the total cost of the Project to be $135.7 million, all as more fully set forth in the application which is on file with the Commission and open for public inspection. Texas Eastern’s application states that a water quality certificate under section 401 of the Clean Water Act is required for the project from the Pennsylvania Department of Environmental Protection. The request for certification must be submitted to the certifying agency and to the Commission concurrently. Proof of the certifying agency’s receipt date must be filed no later than five (5) days after the request is submitted to the certifying agency. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding the proposed project should be directed to Lisa A. Connolly, Director, Regulatory, Texas Eastern Transmission, LP, P.O. Box 1642, Houston, Texas 77251–1642, by phone at (713) 627–4102, or by email at lisa.connolly@enbridge.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: Complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or 1 18 E:\FR\FM\08FEN1.SGM CFR (Code of Federal Regulations) 157.9. 08FEN1 8616 Federal Register / Vol. 86, No. 24 / Monday, February 8, 2021 / Notices issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. jbell on DSKJLSW7X2PROD with NOTICES Public Participation There are two ways to become involved in the Commission’s review of this project: You can file comments on the project, and you can file a motion to intervene in the proceeding. There is no fee or cost for filing comments or intervening. The deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on February 23, 2021. Comments Any person wishing to comment on the project may do so. Comments may include statements of support or objections to the project as a whole or specific aspects of the project. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please submit your comments on or before February 23, 2021. There are three methods you can use to submit your comments to the Commission. In all instances, please reference the Project docket number CP21–31–000 in your submission. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Comment on a Filing’’; or VerDate Sep<11>2014 20:48 Feb 05, 2021 Jkt 253001 (3) You can file a paper copy of your comments by mailing them to the following address below. Your written comments must reference the Project docket number (CP21–31–000). To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of comments (options 1 and 2 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Persons who comment on the environmental review of this project will be placed on the Commission’s environmental mailing list, and will receive notification when the environmental documents (EA or EIS) are issued for this project and will be notified of meetings associated with the Commission’s environmental review process. The Commission considers all comments received about the project in determining the appropriate action to be taken. However, the filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. For instructions on how to intervene, see below. Interventions Any person, which includes individuals, organizations, businesses, municipalities, and other entities,2 has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 3 and the regulations under the NGA 4 by the intervention deadline for the project, which is February 23, 2021. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as the your interest in the proceeding. [For an individual, this could include your status as a landowner, ratepayer, 5 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 6 18 CFR 385.214(c)(1). 2 18 CFR 385.102(d). 3 18 CFR 385.214. 4 18 CFR 157.10. PO 00000 Frm 00039 Fmt 4703 resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene.] For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. There are two ways to submit your motion to intervene. In both instances, please reference the Project docket number CP21–31–000 in your submission. (1) You may file your motion to intervene by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/ document-less-intervention.pdf.; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the address below. Your motion to intervene must reference the Project docket number CP21–31–000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Motions to intervene must be served on the applicant either by mail or email at: P.O. Box 1642, Houston, Texas 77251–1642 or at lisa.connolly@ enbridge.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 5 motions to intervene are automatically granted by operation of Rule 214(c)(1).6 Motions to Sfmt 4703 E:\FR\FM\08FEN1.SGM 08FEN1 Federal Register / Vol. 86, No. 24 / Monday, February 8, 2021 / Notices intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.7 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on February 23, 2021. Dated: February 2, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–02507 Filed 2–5–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15057–000] jbell on DSKJLSW7X2PROD with NOTICES One Drop Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On November 23, 2020, One Drop Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Manville Dam Project (project), on the Blackstone 7 18 CFR 385.214(b)(3) and (d). VerDate Sep<11>2014 20:48 Feb 05, 2021 Jkt 253001 River in Providence County, Rhode Island. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) An existing 246-foot-long, 18foot-high stone masonry, arch-gravity dam with a crest elevation of 105.72 feet North American Vertical Datum of 1988 (NAVD 88); (2) an existing impoundment with a surface area of 2.83 acres and a total storage capacity of 45.45-acre-feet at a surface elevation of 106.22 feet NAVD 88; (3) two new 125kilowatt (kW) Siphon Kaplan turbinegenerator units for a total installed capacity of 250 kW; (4) a new transformer and 528-foot-long, 13kilovolt transmission line connecting the turbine-generator units to the regional grid; and (5) appurtenant facilities. The estimated annual generation of the Manville Dam Project would be 1,839 megawatt-hours. Applicant Contact: Mr. Justin P. Bristol, Manager, One Drop Hydro, LLC, P.O. Box 2033, Kingston, Rhode Island 02881; phone: (401) 793–6041; email: jbristol@onedrophydro.com. FERC Contact: Arash Barsari; phone: (202) 502–6207; email: Arash.JalaliBarsari@ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 8617 must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–15057–000. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Enter the docket number (P–15057) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: February 2, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–02500 Filed 2–5–21; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [FRL–10012–95–Region 5] Proposed Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Administrative Settlement Agreement for Crest Rubber Superfund Site, Alliance, Ohio Environmental Protection Agency (EPA). ACTION: Notice of proposed settlement agreement and request for public comments. AGENCY: The Environmental Protection Agency (EPA) is giving notice of a proposed administrative settlement for recovery of past response costs concerning the Crest Rubber Superfund Site in Alliance, Ohio with the following settling parties: Bridgestone Americas Tire Operations, LLC; Bridgestone Americas, Inc.; Firestone Polymers, LLC; FSPC Holdco, LLC; Firestone Industrial Products Company, LLC; and Bridgestone Bandag, LLC. The SUMMARY: E:\FR\FM\08FEN1.SGM 08FEN1

Agencies

[Federal Register Volume 86, Number 24 (Monday, February 8, 2021)]
[Notices]
[Pages 8615-8617]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-02507]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP21-31-000]


Texas Eastern Transmission, LP; Notice of Application and 
Establishing Intervention Deadline

    Take notice that on January 15, 2021, Texas Eastern Transmission, 
LP (Texas Eastern), 5400 Westheimer Court, Houston, TX 77056-5310, 
filed an application under section 7(b) and 7(c) of the Natural Gas Act 
(NGA), and Part 157 of the Commission's regulations requesting 
authorization of its Perulack Compressor Units Replacement Project 
(Project). Texas Eastern seeks authorization to: (1) Abandon and remove 
four existing compressor units, (2) construct two new compressor units, 
and (3) construct auxiliary appurtenant facilities at its existing 
Perulack Compressor Station located in Juniata County, Pennsylvania. 
The Project is designed to comply with air emission reduction 
requirements in Pennsylvania and will not create new capacity. Texas 
Eastern estimates the total cost of the Project to be $135.7 million, 
all as more fully set forth in the application which is on file with 
the Commission and open for public inspection.
    Texas Eastern's application states that a water quality certificate 
under section 401 of the Clean Water Act is required for the project 
from the Pennsylvania Department of Environmental Protection. The 
request for certification must be submitted to the certifying agency 
and to the Commission concurrently. Proof of the certifying agency's 
receipt date must be filed no later than five (5) days after the 
request is submitted to the certifying agency.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding the proposed project should be directed to 
Lisa A. Connolly, Director, Regulatory, Texas Eastern Transmission, LP, 
P.O. Box 1642, Houston, Texas 77251-1642, by phone at (713) 627-4102, 
or by email at [email protected].
    Pursuant to section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: Complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or

[[Page 8616]]

issue a Notice of Schedule for Environmental Review. If a Notice of 
Schedule for Environmental Review is issued, it will indicate, among 
other milestones, the anticipated date for the Commission staff's 
issuance of the final environmental impact statement (FEIS) or 
environmental assessment (EA) for this proposal. The filing of an EA in 
the Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are two ways to become involved in the Commission's review of 
this project: You can file comments on the project, and you can file a 
motion to intervene in the proceeding. There is no fee or cost for 
filing comments or intervening. The deadline for filing a motion to 
intervene is 5:00 p.m. Eastern Time on February 23, 2021.

Comments

    Any person wishing to comment on the project may do so. Comments 
may include statements of support or objections to the project as a 
whole or specific aspects of the project. The more specific your 
comments, the more useful they will be. To ensure that your comments 
are timely and properly recorded, please submit your comments on or 
before February 23, 2021.
    There are three methods you can use to submit your comments to the 
Commission. In all instances, please reference the Project docket 
number CP21-31-000 in your submission.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's website at www.ferc.gov 
under the link to Documents and Filings. Using eComment is an easy 
method for interested persons to submit brief, text-only comments on a 
project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; first select ``General'' and then select ``Comment on a 
Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address below. Your written comments must reference the 
Project docket number (CP21-31-000).
    To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.
    To mail via any other courier, use the following address: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.
    The Commission encourages electronic filing of comments (options 1 
and 2 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected]
    Persons who comment on the environmental review of this project 
will be placed on the Commission's environmental mailing list, and will 
receive notification when the environmental documents (EA or EIS) are 
issued for this project and will be notified of meetings associated 
with the Commission's environmental review process.
    The Commission considers all comments received about the project in 
determining the appropriate action to be taken. However, the filing of 
a comment alone will not serve to make the filer a party to the 
proceeding. To become a party, you must intervene in the proceeding. 
For instructions on how to intervene, see below.

Interventions

    Any person, which includes individuals, organizations, businesses, 
municipalities, and other entities,\2\ has the option to file a motion 
to intervene in this proceeding. Only intervenors have the right to 
request rehearing of Commission orders issued in this proceeding and to 
subsequently challenge the Commission's orders in the U.S. Circuit 
Courts of Appeal.
---------------------------------------------------------------------------

    \2\ 18 CFR 385.102(d).
---------------------------------------------------------------------------

    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \3\ and the regulations under the NGA \4\ by the 
intervention deadline for the project, which is February 23, 2021. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
the your interest in the proceeding. [For an individual, this could 
include your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene.] For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \3\ 18 CFR 385.214.
    \4\ 18 CFR 157.10.
---------------------------------------------------------------------------

    There are two ways to submit your motion to intervene. In both 
instances, please reference the Project docket number CP21-31-000 in 
your submission.
    (1) You may file your motion to intervene by using the Commission's 
eFiling feature, which is located on the Commission's website 
(www.ferc.gov) under the link to Documents and Filings. New eFiling 
users must first create an account by clicking on ``eRegister.'' You 
will be asked to select the type of filing you are making; first select 
``General'' and then select ``Intervention.'' The eFiling feature 
includes a document-less intervention option; for more information, 
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
    (2) You can file a paper copy of your motion to intervene, along 
with three copies, by mailing the documents to the address below. Your 
motion to intervene must reference the Project docket number CP21-31-
000.
    To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.
    To mail via any other courier, use the following address: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.
    The Commission encourages electronic filing of motions to intervene 
(option 1 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected]
    Motions to intervene must be served on the applicant either by mail 
or email at: P.O. Box 1642, Houston, Texas 77251-1642 or at 
[email protected]. Any subsequent submissions by an intervenor 
must be served on the applicant and all other parties to the 
proceeding. Contact information for parties can be downloaded from the 
service list at the eService link on FERC Online. Service can be via 
email with a link to the document.
    All timely, unopposed \5\ motions to intervene are automatically 
granted by operation of Rule 214(c)(1).\6\ Motions to

[[Page 8617]]

intervene that are filed after the intervention deadline are untimely, 
and may be denied. Any late-filed motion to intervene must show good 
cause for being late and must explain why the time limitation should be 
waived and provide justification by reference to factors set forth in 
Rule 214(d) of the Commission's Rules and Regulations.\7\ A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies (paper or 
electronic) of all documents filed by the applicant and by all other 
parties.
---------------------------------------------------------------------------

    \5\ The applicant has 15 days from the submittal of a motion to 
intervene to file a written objection to the intervention.
    \6\ 18 CFR 385.214(c)(1).
    \7\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Intervention Deadline: 5:00 p.m. Eastern Time on February 23, 2021.

    Dated: February 2, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-02507 Filed 2-5-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.