Take notice that on January 13, 2021,
Northern Natural Gas Company
(Northern), 1111 South 103rd Street
Omaha, NE 68124–1000, filed an
application under section 7(c) of the
Natural Gas Act (NGA), and Part 157 of
the Commission’s regulations requesting
authorization to: (1) Establish a buffer
zone around the storage facility; (2)
designate five geological formations as
gas-containing vertical buffer zones; and
(3) to recognize the inclusion of the
Lower Eau Claire formation into the
geologically continuous Mt. Simon A
zone of the Mt. Simon gas storage
reservoir, all at the Redfield storage
facility located in Dallas County, Iowa.
Northern seeks authorization for the
establishment of a buffer zone
approximately one-half mile around the
mapped gas extent consisting of
approximately 4,847 acres. Northern
also seeks authority to establish five
geological formations that are currently
non-storage formations as buffer
formations: The Prairie Du Chien
formation; the Franconia formation; the
Decorah-Platteville formation; the Fort
Atkinson formation; and the Gower 2
formation. The proposed changes will
not change the certificated physical
parameters, including the certificated
storage capacity, of the Field. No new
aboveground facilities will be required
for the authorities sought herein, all as
more fully set forth in the request which
is on file with the Commission and open
to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
VerDate Sep<11>2014
16:57 Jan 29, 2021
Jkt 253001
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the proposed
project should be directed to Michael T.
Loeffler, Certificates and External
Affairs, Northern Natural Gas Company,
P.O. Box 3330, Omaha, NE 68103–0330,
by phone at (402) 398–7103, or by email
at mike.loeffler@nngco.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
Complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are two ways to become
involved in the Commission’s review of
this project: You can file comments on
the project, and you can file a motion
to intervene in the proceeding. There is
no fee or cost for filing comments or
intervening. The deadline for filing a
motion to intervene is 5:00 p.m. Eastern
Time on [February 16, 2021].
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please submit your comments
on or before [February 16, 2021].
There are three methods you can use
to submit your comments to the
Commission. In all instances, please
reference the Project docket number
CP21–28–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
1 18
PO 00000
CFR (Code of Federal Regulations) 157.9.
Frm 00032
Fmt 4703
Sfmt 4703
7719
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address below.2 Your written
comments must reference the Project
docket number (CP21–28–000).
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,3 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
2 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
3 18 CFR 385.102(d).
E:\FR\FM\01FEN1.SGM
01FEN1
7720
Federal Register / Vol. 86, No. 19 / Monday, February 1, 2021 / Notices
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is [February 16,
2021]. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as the
your interest in the proceeding. [For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene.] For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP21–28–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf.; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below.6 Your motion to
intervene must reference the Project
docket number CP21–28–000.
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Motions to intervene must be served
on the applicant either by mail or email
at: P.O. Box 3330, Omaha, NE 68103–
0330 or mike.loeffler@nngco.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
4 18
CFR 385.214.
CFR 157.10.
6 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
5 18
VerDate Sep<11>2014
16:57 Jan 29, 2021
Jkt 253001
service list at the eService link on FERC
Online. Service can be via email with a
link to the document.
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on [February 16, 2021].
Dated: January 26, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–02098 Filed 1–29–21; 8:45 am]
BILLING CODE 6717–01–P
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
9 18 CFR 385.214(b)(3) and (d).
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–26–000]
Notice of Request for Extension of
Time; Eastern Gas Transmission and
Storage, Inc.
Take notice that on January 21, 2021,
Eastern Gas Transmission and Storage,
Inc.1 (Eastern GTS) requested that the
Federal Energy Regulatory Commission
(Commission) grant an extension of
time, until August 22, 2021, to abandon,
reconfigure, and relocate storage wells
and related pipelines within its
jurisdictional Bridgeport Storage Field
in Harrison County, West Virginia
(Project),2 as deemed authorized,
effective February 22, 2020. Under the
applicable regulations, the Project was
to be completed and made available for
service by February 22, 2021, i.e.,
within one year of authorization.3
Eastern GTS states that, primarily due
to delays related to the COVID–19
pandemic, as well as weather related
delays, Eastern GTS will be unable to
complete all construction activities
necessary to complete the Project within
the authorized one-year timeframe.
Accordingly, Eastern GTS requests a sixmonth extension of time, until August
22, 2021, to complete construction of
the Project.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on Columbia’s request for an
extension of time may do so. No reply
comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).4
As a matter of practice, the
Commission itself generally acts on
1 As of November 1, 2020, Berkshire Hathaway
Energy Company acquired certain companies of
Dominion Energy, including Dominion Energy
Transmission, Inc. and has changed its name to
Eastern Gas Transmission and Storage, Inc.
2 Prior Notice of Blanket Certificate Activity,
Docket No. CP20–26–000 (filed December 16, 2019).
3 Pursuant to Section 157.205 of the
Commission’s regulations, 18 CFR 157.205, a prior
notice application is deemed to be authorized the
day after the intervention period lapses if no
protests are filed.
4 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC 61,144, at P 39 (2020).
E:\FR\FM\01FEN1.SGM
01FEN1
Agencies
[Federal Register Volume 86, Number 19 (Monday, February 1, 2021)]
[Notices]
[Pages 7719-7720]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-02098]
[[Page 7719]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-28-000]
Northern Natural Gas Company; Notice of Application and
Establishing Intervention Deadline
Take notice that on January 13, 2021, Northern Natural Gas Company
(Northern), 1111 South 103rd Street Omaha, NE 68124-1000, filed an
application under section 7(c) of the Natural Gas Act (NGA), and Part
157 of the Commission's regulations requesting authorization to: (1)
Establish a buffer zone around the storage facility; (2) designate five
geological formations as gas-containing vertical buffer zones; and (3)
to recognize the inclusion of the Lower Eau Claire formation into the
geologically continuous Mt. Simon A zone of the Mt. Simon gas storage
reservoir, all at the Redfield storage facility located in Dallas
County, Iowa. Northern seeks authorization for the establishment of a
buffer zone approximately one-half mile around the mapped gas extent
consisting of approximately 4,847 acres. Northern also seeks authority
to establish five geological formations that are currently non-storage
formations as buffer formations: The Prairie Du Chien formation; the
Franconia formation; the Decorah-Platteville formation; the Fort
Atkinson formation; and the Gower 2 formation. The proposed changes
will not change the certificated physical parameters, including the
certificated storage capacity, of the Field. No new aboveground
facilities will be required for the authorities sought herein, all as
more fully set forth in the request which is on file with the
Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding the proposed project should be directed to
Michael T. Loeffler, Certificates and External Affairs, Northern
Natural Gas Company, P.O. Box 3330, Omaha, NE 68103-0330, by phone at
(402) 398-7103, or by email at [email protected].
Pursuant to section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: Complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are two ways to become involved in the Commission's review of
this project: You can file comments on the project, and you can file a
motion to intervene in the proceeding. There is no fee or cost for
filing comments or intervening. The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on [February 16, 2021].
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be. To ensure that your comments
are timely and properly recorded, please submit your comments on or
before [February 16, 2021].
There are three methods you can use to submit your comments to the
Commission. In all instances, please reference the Project docket
number CP21-28-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; first select ``General'' and then select ``Comment on a
Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address below.\2\ Your written comments must reference
the Project docket number (CP21-28-000).
---------------------------------------------------------------------------
\2\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\3\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\3\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission
[[Page 7720]]
in accordance with Rule 214 of the Commission's Rules of Practice and
Procedure \4\ and the regulations under the NGA \5\ by the intervention
deadline for the project, which is [February 16, 2021]. As described
further in Rule 214, your motion to intervene must state, to the extent
known, your position regarding the proceeding, as well as the your
interest in the proceeding. [For an individual, this could include your
status as a landowner, ratepayer, resident of an impacted community, or
recreationist. You do not need to have property directly impacted by
the project in order to intervene.] For more information about motions
to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP21-28-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below.\6\
Your motion to intervene must reference the Project docket number CP21-
28-000.
---------------------------------------------------------------------------
\6\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426.
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Motions to intervene must be served on the applicant either by mail
or email at: P.O. Box 3330, Omaha, NE 68103-0330 or
[email protected]. Any subsequent submissions by an intervenor
must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online. Service can be via
email with a link to the document.
All timely, unopposed \7\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that
are filed after the intervention deadline are untimely and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\7\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\8\ 18 CFR 385.214(c)(1).
\9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on [February 16,
2021].
Dated: January 26, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-02098 Filed 1-29-21; 8:45 am]