Eastern Gas Transmission and Storage, Inc.; Notice of Request for Extension of Time, 7722-7723 [2021-02060]
Download as PDF
7722
Federal Register / Vol. 86, No. 19 / Monday, February 1, 2021 / Notices
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process: Commission staff
will prepare either an environmental
assessment (EA) or an Environmental
Impact Statement (EIS) that describes
and evaluates the probable effects, if
any, of the licensee’s proposed action
and alternatives. The EA or EIS will
consider environmental impacts and
reasonable alternatives to the proposed
action. The Commission’s scoping
process will help determine the
required level of analysis and satisfy the
NEPA scoping requirements,
irrespective of whether the Commission
prepares an EA or an EIS. Due to
restrictions on mass gatherings related
to COVID–19, we do not intend to
conduct a public scoping meeting and
site visit in this case. Instead, we are
soliciting written comments and
suggestions on the preliminary list of
issues and alternatives to be addressed
in the NEPA document, as described in
scoping document 1 (SD1), issued
January 26, 2021.
Copies of the SD1 outlining the
subject areas to be addressed in the
NEPA document were distributed to the
parties on the Commission’s mailing list
and the applicant’s distribution list.
Copies of SD1 may be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
Dated: January 26, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–02062 Filed 1–29–21; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:57 Jan 29, 2021
Jkt 253001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–26–000]
Eastern Gas Transmission and
Storage, Inc.; Notice of Request for
Extension of Time
Take notice that on January 21, 2021,
Eastern Gas Transmission and Storage,
Inc.1 (Eastern GTS) requested that the
Federal Energy Regulatory Commission
(Commission) grant an extension of
time, until August 22, 2021, to abandon,
reconfigure, and relocate storage wells
and related pipelines within its
jurisdictional Bridgeport Storage Field
in Harrison County, West Virginia
(Project),2 as deemed authorized,
effective February 22, 2020. Under the
applicable regulations, the Project was
to be completed and made available for
service by February 22, 2021, i.e.,
within one year of authorization.3
Eastern GTS states that, primarily due
to delays related to the COVID–19
pandemic, as well as weather related
delays, Eastern GTS will be unable to
complete all construction activities
necessary to complete the Project within
the authorized one-year timeframe.
Accordingly, Eastern GTS requests a sixmonth extension of time, until August
22, 2021, to complete construction of
the Project.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on Columbia’s request for an
extension of time may do so. No reply
comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).4
As a matter of practice, the
Commission itself generally acts on
1 As of November 1, 2020, Berkshire Hathaway
Energy Company acquired certain companies of
Dominion Energy, including Dominion Energy
Transmission, Inc. and has changed its name to
Eastern Gas Transmission and Storage, Inc.
2 Prior Notice of Blanket Certificate Activity,
Docket No. CP20–26–000 (filed December 16, 2019).
3 Pursuant to Section 157.205 of the
Commission’s regulations, 18 CFR 157.205, a prior
notice application is deemed to be authorized the
day after the intervention period lapses if no
protests are filed.
4 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC ¶ 61,144, at P 39 (2020).
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,5 the Commission will aim to
issue an order acting on the request
within 45 days.6 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.7 The Commission will not
consider arguments that re-litigate the
issuance of the Certificate Order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.8 At the time
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.9 The OEP Director, or his or
her designee, will act on those extension
requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning COVID–19,
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission. To mail
5 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2020).
6 Algonquin Gas Transmission, LLC, 170 FERC
61,144, at P 40 (2020).
7 Id. P 40.
8 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
9 Algonquin Gas Transmission, LLC, 170 FERC
61,144, at P 40 (2020).
E:\FR\FM\01FEN1.SGM
01FEN1
Federal Register / Vol. 86, No. 19 / Monday, February 1, 2021 / Notices
via USPS, use the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Time on February 11, 2021.
Dated: January 26, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–02060 Filed 1–29–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–47–000.
Applicants: R–WS Antelope Valley
Gen-Tie, LLC, Portal Ridge Solar A,
LLC, OMERS Administration
Corporation.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of R–WS Antelope
Valley Gen-Tie, LLC, et al.
Filed Date: 1/25/21.
Accession Number: 20210125–5231.
Comments Due: 5 p.m. ET 2/16/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2633–039.
Applicants: Birchwood Power
Partners, L.P.
Description: Notice of Change in
Status of Birchwood Power Partners,
L.P.
Filed Date: 1/22/21.
Accession Number: 20210122–5128.
Comments Due: 5 p.m. ET 2/12/21.
Docket Numbers: ER10–2924–015.
Applicants: Kleen Energy Systems,
LLC.
Description: Notice of Non-Material
Change in Status of Kleen Energy
Systems, LLC.
Filed Date: 1/26/21.
Accession Number: 20210126–5111.
Comments Due: 5 p.m. ET 2/16/21.
Docket Numbers: ER19–2757–003.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2021–
01–26 Petition for Limited Tariff
Waiver—Postpone Eff. Date to June 2021
to be effective N/A.
VerDate Sep<11>2014
16:57 Jan 29, 2021
Jkt 253001
Filed Date: 1/26/21.
Accession Number: 20210126–5104.
Comments Due: 5 p.m. ET 2/16/21.
Docket Numbers: ER21–639–000.
Applicants: Wapello Solar LLC.
Description: Supplement to December
14, 2020 Wapello Solar LLC tariff filing.
Filed Date: 1/21/21.
Accession Number: 20210121–5316.
Comments Due: 5 p.m. ET 2/5/21.
Docket Numbers: ER21–940–000.
Applicants: Hardin Solar Energy LLC.
Description: Baseline eTariff Filing:
Shared Facilities Agreement to be
effective 1/26/2021.
Filed Date: 1/25/21.
Accession Number: 20210125–5214.
Comments Due: 5 p.m. ET 2/16/21.
Docket Numbers: ER21–941–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: Compliance filing: ISO–
NE and NEPOOL; Revisions to Schedule
24 to Comply with Order No. 676–I to
be effective 12/31/9998.
Filed Date: 1/26/21.
Accession Number: 20210126–5034.
Comments Due: 5 p.m. ET 2/16/21.
Docket Numbers: ER21–942–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended GIA Windpower Partner
1993, LLC Renwind Project SA No. 375
to be effective 1/27/2021.
Filed Date: 1/26/21.
Accession Number: 20210126–5061.
Comments Due: 5 p.m. ET 2/16/21.
Docket Numbers: ER21–943–000.
Applicants: ISO New England Inc.
Description: § 205(d) Rate Filing: ISO–
NE; Revisions to Obligations of Energy
Efficiency Resources Under PFP to be
effective 4/1/2021.
Filed Date: 1/26/21.
Accession Number: 20210126–5084.
Comments Due: 5 p.m. ET 2/16/21.
Docket Numbers: ER21–944–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
Bentonville PSA to be effective 3/28/
2021.
Filed Date: 1/26/21.
Accession Number: 20210126–5132.
Comments Due: 5 p.m. ET 2/16/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
7723
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 26, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–02094 Filed 1–29–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2897–052, 2931–044, 2932–
051, 2941–047, 2942–054, and 2984–123]
Sappi North America, Inc.,
Presumpscot Hydro LLC; Notice of
Application for Transfer of License and
Lease of Project Lands Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Transfer of
License and Lease of Project Lands.
b. Project Nos.: 2897–052, 2931–044,
2932–051, 2941–047, 2942–054, and
2984–123.
c. Date Filed: October 20, 2020.
d. Applicants: Sappi North America,
Inc. (Transferor). Presumpscot Hydro
LLC (Transferee).
e. Name of Projects: Saccarappa,
Gambo, Mallison Falls, Little Falls,
Dundee, and Eel Weir.
f. Location: The Saccarappa, Gambo,
Mallison Falls, Little Falls, Dundee
projects are located on the Presumpscot
River, in the Towns of Gorham and
Windham and the City of Westbrook in
Cumberland County, Maine. The Eel
Weir Project is located on Sebago Lake
near the cities of Standish and
Windham in Cumberland County,
Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contacts:
For Transferor: Ms. Briana O’Regan,
Sappi North America, Inc., 179 John
Roberts Road, South Portland, ME
04106, phone: (207) 854–7070, Email:
briana.oregan@sappi.com.
E:\FR\FM\01FEN1.SGM
01FEN1
Agencies
[Federal Register Volume 86, Number 19 (Monday, February 1, 2021)]
[Notices]
[Pages 7722-7723]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-02060]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-26-000]
Eastern Gas Transmission and Storage, Inc.; Notice of Request for
Extension of Time
Take notice that on January 21, 2021, Eastern Gas Transmission and
Storage, Inc.\1\ (Eastern GTS) requested that the Federal Energy
Regulatory Commission (Commission) grant an extension of time, until
August 22, 2021, to abandon, reconfigure, and relocate storage wells
and related pipelines within its jurisdictional Bridgeport Storage
Field in Harrison County, West Virginia (Project),\2\ as deemed
authorized, effective February 22, 2020. Under the applicable
regulations, the Project was to be completed and made available for
service by February 22, 2021, i.e., within one year of
authorization.\3\
---------------------------------------------------------------------------
\1\ As of November 1, 2020, Berkshire Hathaway Energy Company
acquired certain companies of Dominion Energy, including Dominion
Energy Transmission, Inc. and has changed its name to Eastern Gas
Transmission and Storage, Inc.
\2\ Prior Notice of Blanket Certificate Activity, Docket No.
CP20-26-000 (filed December 16, 2019).
\3\ Pursuant to Section 157.205 of the Commission's regulations,
18 CFR 157.205, a prior notice application is deemed to be
authorized the day after the intervention period lapses if no
protests are filed.
---------------------------------------------------------------------------
Eastern GTS states that, primarily due to delays related to the
COVID-19 pandemic, as well as weather related delays, Eastern GTS will
be unable to complete all construction activities necessary to complete
the Project within the authorized one-year timeframe. Accordingly,
Eastern GTS requests a six-month extension of time, until August 22,
2021, to complete construction of the Project.
This notice establishes a 15-calendar day intervention and comment
period deadline. Any person wishing to comment on Columbia's request
for an extension of time may do so. No reply comments or answers will
be considered. If you wish to obtain legal status by becoming a party
to the proceedings for this request, you should, on or before the
comment date stated below, file a motion to intervene in accordance
with the requirements of the Commission's Rules of Practice and
Procedure (18 CFR 385.214 or 385.211) and the Regulations under the
Natural Gas Act (18 CFR 157.10).\4\
---------------------------------------------------------------------------
\4\ Only motions to intervene from entities that were party to
the underlying proceeding will be accepted. Algonquin Gas
Transmission, LLC, 170 FERC ] 61,144, at P 39 (2020).
---------------------------------------------------------------------------
As a matter of practice, the Commission itself generally acts on
requests for extensions of time to complete construction for Natural
Gas Act facilities when such requests are contested before order
issuance. For those extension requests that are contested,\5\ the
Commission will aim to issue an order acting on the request within 45
days.\6\ The Commission will address all arguments relating to whether
the applicant has demonstrated there is good cause to grant the
extension.\7\ The Commission will not consider arguments that re-
litigate the issuance of the Certificate Order, including whether the
Commission properly found the project to be in the public convenience
and necessity and whether the Commission's environmental analysis for
the certificate complied with the National Environmental Policy Act.\8\
At the time a pipeline requests an extension of time, orders on
certificates of public convenience and necessity are final and the
Commission will not re-litigate their issuance.\9\ The OEP Director, or
his or her designee, will act on those extension requests that are
uncontested.
---------------------------------------------------------------------------
\5\ Contested proceedings are those where an intervenor disputes
any material issue of the filing. 18 CFR 385.2201(c)(1) (2020).
\6\ Algonquin Gas Transmission, LLC, 170 FERC 61,144, at P 40
(2020).
\7\ Id. P 40.
\8\ Similarly, the Commission will not re-litigate the issuance
of an NGA section 3 authorization, including whether a proposed
project is not inconsistent with the public interest and whether the
Commission's environmental analysis for the permit order complied
with NEPA.
\9\ Algonquin Gas Transmission, LLC, 170 FERC 61,144, at P 40
(2020).
---------------------------------------------------------------------------
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning COVID-19, issued by the President on March 13, 2020. For
assistance, contact FERC at [email protected] or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFile'' link at
https://www.ferc.gov. Persons unable to file electronically may mail
similar pleadings to the Federal Energy Regulatory Commission. To mail
[[Page 7723]]
via USPS, use the following address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426. To mail via any other courier, use the following address:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern Time on February 11, 2021.
Dated: January 26, 2021.
Kimberly D. Bose,
Secretary.