Sappi North America, Inc., Presumpscot Hydro LLC; Notice of Application for Transfer of License and Lease of Project Lands Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 7723-7724 [2021-02059]

Download as PDF Federal Register / Vol. 86, No. 19 / Monday, February 1, 2021 / Notices via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5:00 p.m. Eastern Time on February 11, 2021. Dated: January 26, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–02060 Filed 1–29–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC21–47–000. Applicants: R–WS Antelope Valley Gen-Tie, LLC, Portal Ridge Solar A, LLC, OMERS Administration Corporation. Description: Application for Authorization Under Section 203 of the Federal Power Act of R–WS Antelope Valley Gen-Tie, LLC, et al. Filed Date: 1/25/21. Accession Number: 20210125–5231. Comments Due: 5 p.m. ET 2/16/21. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2633–039. Applicants: Birchwood Power Partners, L.P. Description: Notice of Change in Status of Birchwood Power Partners, L.P. Filed Date: 1/22/21. Accession Number: 20210122–5128. Comments Due: 5 p.m. ET 2/12/21. Docket Numbers: ER10–2924–015. Applicants: Kleen Energy Systems, LLC. Description: Notice of Non-Material Change in Status of Kleen Energy Systems, LLC. Filed Date: 1/26/21. Accession Number: 20210126–5111. Comments Due: 5 p.m. ET 2/16/21. Docket Numbers: ER19–2757–003. Applicants: California Independent System Operator Corporation. Description: Compliance filing: 2021– 01–26 Petition for Limited Tariff Waiver—Postpone Eff. Date to June 2021 to be effective N/A. VerDate Sep<11>2014 16:57 Jan 29, 2021 Jkt 253001 Filed Date: 1/26/21. Accession Number: 20210126–5104. Comments Due: 5 p.m. ET 2/16/21. Docket Numbers: ER21–639–000. Applicants: Wapello Solar LLC. Description: Supplement to December 14, 2020 Wapello Solar LLC tariff filing. Filed Date: 1/21/21. Accession Number: 20210121–5316. Comments Due: 5 p.m. ET 2/5/21. Docket Numbers: ER21–940–000. Applicants: Hardin Solar Energy LLC. Description: Baseline eTariff Filing: Shared Facilities Agreement to be effective 1/26/2021. Filed Date: 1/25/21. Accession Number: 20210125–5214. Comments Due: 5 p.m. ET 2/16/21. Docket Numbers: ER21–941–000. Applicants: ISO New England Inc., New England Power Pool Participants Committee. Description: Compliance filing: ISO– NE and NEPOOL; Revisions to Schedule 24 to Comply with Order No. 676–I to be effective 12/31/9998. Filed Date: 1/26/21. Accession Number: 20210126–5034. Comments Due: 5 p.m. ET 2/16/21. Docket Numbers: ER21–942–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended GIA Windpower Partner 1993, LLC Renwind Project SA No. 375 to be effective 1/27/2021. Filed Date: 1/26/21. Accession Number: 20210126–5061. Comments Due: 5 p.m. ET 2/16/21. Docket Numbers: ER21–943–000. Applicants: ISO New England Inc. Description: § 205(d) Rate Filing: ISO– NE; Revisions to Obligations of Energy Efficiency Resources Under PFP to be effective 4/1/2021. Filed Date: 1/26/21. Accession Number: 20210126–5084. Comments Due: 5 p.m. ET 2/16/21. Docket Numbers: ER21–944–000. Applicants: Southwestern Electric Power Company. Description: § 205(d) Rate Filing: Bentonville PSA to be effective 3/28/ 2021. Filed Date: 1/26/21. Accession Number: 20210126–5132. Comments Due: 5 p.m. ET 2/16/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 7723 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 26, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–02094 Filed 1–29–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 2897–052, 2931–044, 2932– 051, 2941–047, 2942–054, and 2984–123] Sappi North America, Inc., Presumpscot Hydro LLC; Notice of Application for Transfer of License and Lease of Project Lands Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Transfer of License and Lease of Project Lands. b. Project Nos.: 2897–052, 2931–044, 2932–051, 2941–047, 2942–054, and 2984–123. c. Date Filed: October 20, 2020. d. Applicants: Sappi North America, Inc. (Transferor). Presumpscot Hydro LLC (Transferee). e. Name of Projects: Saccarappa, Gambo, Mallison Falls, Little Falls, Dundee, and Eel Weir. f. Location: The Saccarappa, Gambo, Mallison Falls, Little Falls, Dundee projects are located on the Presumpscot River, in the Towns of Gorham and Windham and the City of Westbrook in Cumberland County, Maine. The Eel Weir Project is located on Sebago Lake near the cities of Standish and Windham in Cumberland County, Maine. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contacts: For Transferor: Ms. Briana O’Regan, Sappi North America, Inc., 179 John Roberts Road, South Portland, ME 04106, phone: (207) 854–7070, Email: briana.oregan@sappi.com. E:\FR\FM\01FEN1.SGM 01FEN1 7724 Federal Register / Vol. 86, No. 19 / Monday, February 1, 2021 / Notices For Transferor and Transferee: Mr. Matthew D. Manahan, Counsel for Transferor and Transferee, Pierce Atwood LLP, 254 Commercial St., Portland, ME 04101, phone: (207) 791– 1189, Email: mmanahan@ pierceatwood.com. i. FERC Contact: Mrs. Anumzziatta Purchiaroni, (202) 502–6191 or Anumzziatta.purchiaroni@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: Within 30 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2897–052, P–2931–044, P– 2932–051, P–2941–047, P–2942–054, and P–2984–123. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a resource agency, it must also serve a copy of the document on that resource agency. k. Description of Transfer and Lease of Project Lands Request: The applicants request that the Commission approve the transfer of the following projects from Sappi North America, Inc. (Sappi or Transferor) to Presumpscot Hydro LLC (Presumpscot or Transferee): Saccarappa Project No. 2897, Gambo Project No. 2931, Mallison Falls Project No. 2932, Little Falls Project No. 2941, Dundee Project No. 2942, and Eel Weir VerDate Sep<11>2014 16:57 Jan 29, 2021 Jkt 253001 Project No. 2984–123. The applicants propose the transfer because of an internal corporate reorganization that resulted in the formation of the Sappi subsidiary, Presumpscot. As part of the proposed transfers, the Transferor would retain ownership of the transmission line properties between the Dundee Project and Transferor’s Westbrook Mill. In addition, the Transferor would retain ownership of the transmission line properties between the Mallison Falls Project and Transferors’ Westbrook Mill (which transmission line connects the Gambo, Little Falls, and Mallison Falls projects to the mill). The applicants request Commission approval to lease the transmission line property to the Transferee. Furthermore, the Transferor requests approval to lease to the Transferee certain lands associated with the Saccarappa Project, including property associated with required fish passage facilities. By an Order issued on April 4, 2019, the Commission approved a surrender of the Saccarappa Project license and related license amendments for the Mallison Falls, Little Falls, Gambo, and Dundee Projects. The license surrender would become effective upon removal of the Saccarappa Dam and other project works, installation of fish passage facilities, and the completion of other requirements. The completed fish passage facilities would become part of the Mallison Falls Project. The applicants also request Commission approval to convey in fee the proposed leased lands occupied by the fish passage facilities to the Transferee once the surrender becomes effective. l. Locations of the Applications: The Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. Agencies may obtain copies of the application directly from the applicants. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 toll free, (866) 208–3676 or TTY, (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: January 26, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–02059 Filed 1–29–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Notice of Closed Meeting Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended, notice is hereby given of the following meeting. The meeting will be closed to the public in accordance with the provisions set forth in sections 552b(c)(4) and 552b(c)(6), Title 5 U.S.C., as amended, and the Determination of E:\FR\FM\01FEN1.SGM 01FEN1

Agencies

[Federal Register Volume 86, Number 19 (Monday, February 1, 2021)]
[Notices]
[Pages 7723-7724]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-02059]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 2897-052, 2931-044, 2932-051, 2941-047, 2942-054, and 
2984-123]


Sappi North America, Inc., Presumpscot Hydro LLC; Notice of 
Application for Transfer of License and Lease of Project Lands Accepted 
for Filing and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Transfer of License and Lease of Project 
Lands.
    b. Project Nos.: 2897-052, 2931-044, 2932-051, 2941-047, 2942-054, 
and 2984-123.
    c. Date Filed: October 20, 2020.
    d. Applicants: Sappi North America, Inc. (Transferor). Presumpscot 
Hydro LLC (Transferee).
    e. Name of Projects: Saccarappa, Gambo, Mallison Falls, Little 
Falls, Dundee, and Eel Weir.
    f. Location: The Saccarappa, Gambo, Mallison Falls, Little Falls, 
Dundee projects are located on the Presumpscot River, in the Towns of 
Gorham and Windham and the City of Westbrook in Cumberland County, 
Maine. The Eel Weir Project is located on Sebago Lake near the cities 
of Standish and Windham in Cumberland County, Maine.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contacts:
    For Transferor: Ms. Briana O'Regan, Sappi North America, Inc., 179 
John Roberts Road, South Portland, ME 04106, phone: (207) 854-7070, 
Email: [email protected].

[[Page 7724]]

    For Transferor and Transferee: Mr. Matthew D. Manahan, Counsel for 
Transferor and Transferee, Pierce Atwood LLP, 254 Commercial St., 
Portland, ME 04101, phone: (207) 791-1189, Email: 
[email protected].
    i. FERC Contact: Mrs. Anumzziatta Purchiaroni, (202) 502-6191 or 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: Within 30 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any 
filing should include docket number P-2897-052, P-2931-044, P-2932-051, 
P-2941-047, P-2942-054, and P-2984-123. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a resource agency, it must also serve a copy of the 
document on that resource agency.
    k. Description of Transfer and Lease of Project Lands Request: The 
applicants request that the Commission approve the transfer of the 
following projects from Sappi North America, Inc. (Sappi or Transferor) 
to Presumpscot Hydro LLC (Presumpscot or Transferee): Saccarappa 
Project No. 2897, Gambo Project No. 2931, Mallison Falls Project No. 
2932, Little Falls Project No. 2941, Dundee Project No. 2942, and Eel 
Weir Project No. 2984-123. The applicants propose the transfer because 
of an internal corporate reorganization that resulted in the formation 
of the Sappi subsidiary, Presumpscot. As part of the proposed 
transfers, the Transferor would retain ownership of the transmission 
line properties between the Dundee Project and Transferor's Westbrook 
Mill. In addition, the Transferor would retain ownership of the 
transmission line properties between the Mallison Falls Project and 
Transferors' Westbrook Mill (which transmission line connects the 
Gambo, Little Falls, and Mallison Falls projects to the mill). The 
applicants request Commission approval to lease the transmission line 
property to the Transferee. Furthermore, the Transferor requests 
approval to lease to the Transferee certain lands associated with the 
Saccarappa Project, including property associated with required fish 
passage facilities. By an Order issued on April 4, 2019, the Commission 
approved a surrender of the Saccarappa Project license and related 
license amendments for the Mallison Falls, Little Falls, Gambo, and 
Dundee Projects. The license surrender would become effective upon 
removal of the Saccarappa Dam and other project works, installation of 
fish passage facilities, and the completion of other requirements. The 
completed fish passage facilities would become part of the Mallison 
Falls Project. The applicants also request Commission approval to 
convey in fee the proposed leased lands occupied by the fish passage 
facilities to the Transferee once the surrender becomes effective.
    l. Locations of the Applications: The Commission provides all 
interested persons an opportunity to view and/or print the contents of 
this document via the internet through the Commission's website at 
https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and 
issuances related to this or other pending projects. Agencies may 
obtain copies of the application directly from the applicants. At this 
time, the Commission has suspended access to the Commission's Public 
Reference Room due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact FERC at 
[email protected] or call toll free, (866) 208-3676 or TTY, 
(202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: January 26, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-02059 Filed 1-29-21; 8:45 am]
BILLING CODE 6717-01-P