Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 7377-7378 [2021-01871]
Download as PDF
Federal Register / Vol. 86, No. 17 / Thursday, January 28, 2021 / Notices
Comments Due: 5 p.m. ET 2/2/21.
Docket Numbers: RP21–395–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Yankee Gas 510802
Release eff 1–21–2021 to be effective 1/
21/2021.
Filed Date: 1/21/21.
Accession Number: 20210121–5003.
Comments Due: 5 p.m. ET 2/2/21.
Docket Numbers: RP21–396–000.
Applicants: Southern LNG Company,
L.L.C.
Description: § 4(d) Rate Filing:
Dredging Surcharge Cost Adjustment—
2021 to be effective 3/1/2021.
Filed Date: 1/21/21.
Accession Number: 20210121–5044.
Comments Due: 5 p.m. ET 2/2/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–01873 Filed 1–27–21; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:16 Jan 27, 2021
Jkt 253001
Public Participation
DEPARTMENT OF ENERGY
Docket Numbers: RP21–394–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 1.20.21
Negotiated Rates—Castleton
Commodities Merchant Trading L.P. R–
4010–28 to be effective 2/1/2021.
Filed Date: 1/21/21.
Accession Number: 20210121–5002.
Comments Due: 5 p.m. ET 2/2/21.
Federal Energy Regulatory
Commission
[Docket No. CP21–32–000]
Southern Star Central Gas Pipeline,
Inc.; Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on January 15, 2021,
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 State Route 56,
Owensboro, Kentucky 42301 filed in the
above referenced docket a prior notice
pursuant to sections 157.205 and
157.216 of the Commission’s regulations
under the Natural Gas Act (NGA) and its
blanket certificate issued in Docket No.
CP82–479–000 requesting authorization
to abandon two injection/withdrawal (I/
W) wells (SW #2 and SW #75) at its
South Welda Storage Field in Anderson
County, Kansas and one I/W well (Piqua
#2) at its Piqua Storage Field in Allen
County, Kansas. Southern Star states
that the proposed abandonment of the
three wells will have no impact on its
existing customers or affect the
certificated parameters of the South
Welda and Piqua Storage Fields.
Southern Star estimates the cost of the
project to be approximately $150,000,
all as more fully set forth in the request
which is on file with the Commission
and open to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to Cindy
Thompson, Manager Regulatory,
Southern Star Central Gas Pipeline, Inc.,
4700 State Route 56, Owensboro,
Kentucky 42301, by phone at (270) 852–
4655 or by email at cindy.thompson@
southernstar.com.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
7377
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on [Date—60 Days]. How
to file protests, motions to intervene,
and comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is [Date—60
Days]. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is [Date—60
Days]. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
4 18 CFR 385.214.
5 18 CFR 157.10.
2 Persons
E:\FR\FM\28JAN1.SGM
28JAN1
7378
Federal Register / Vol. 86, No. 17 / Thursday, January 28, 2021 / Notices
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before [Date—60
Days]. The filing of a comment alone
will not serve to make the filer a party
to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP21–32–000 in your submission. The
Commission encourages electronic filing
of submissions.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing.’’
The Commission’s eFiling staff are
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
VerDate Sep<11>2014
17:16 Jan 27, 2021
Jkt 253001
(2) You can file a paper copy of your
submission.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: cindy.thompson@
southernstar.com, 4700 State Route 56,
Owensboro, Kentucky 42301. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: January 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–01871 Filed 1–27–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1123–006.
Applicants: Union Electric Company.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Description: Notice of Change in
Status of Union Electric Company.
Filed Date: 1/21/21.
Accession Number: 20210121–5319.
Comments Due: 5 p.m. ET 2/11/21.
Docket Numbers: ER19–1959–004.
Applicants: Avista Corporation.
Description: Compliance filing: Avista
Corp 845/845A Conformed Version
LGIP to be effective 1/25/2021.
Filed Date: 1/22/21.
Accession Number: 20210122–5049.
Comments Due: 5 p.m. ET 2/12/21.
Docket Numbers: ER20–1839–002.
Applicants: VETCO.
Description: Compliance filing:
Amended Order No. 864 Compliance
Filing to be effective 3/26/2020.
Filed Date: 1/22/21.
Accession Number: 20210122–5058.
Comments Due: 5 p.m. ET 2/12/21.
Docket Numbers: ER20–1992–001.
Applicants: Public Service Company
of New Mexico.
Description: Compliance filing: PNM
Response to December 22, 2020
Deficiency Letter to be effective 1/27/
2020.
Filed Date: 1/21/21.
Accession Number: 20210121–5300.
Comments Due: 5 p.m. ET 2/11/21.
Docket Numbers: ER21–926–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2021–01–21 CCSF First Amendment to
Second Amended ROA to be effective 3/
23/2021.
Filed Date: 1/21/21.
Accession Number: 20210121–5267.
Comments Due: 5 p.m. ET 2/11/21.
Docket Numbers: ER21–927–000.
Applicants: Cleveland-Cliffs Steel
LLC.
Description: § 205(d) Rate Filing:
Notice of Succession filing to be
effective 1/22/2021.
Filed Date: 1/21/21.
Accession Number: 20210121–5269.
Comments Due: 5 p.m. ET 2/11/21.
Docket Numbers: ER21–928–000.
Applicants: Cleveland-Cliffs
Cleveland Works LLC.
Description: § 205(d) Rate Filing:
Notice of Succession filing to be
effective 12/23/2020.
Filed Date: 1/21/21.
Accession Number: 20210121–5271.
Comments Due: 5 p.m. ET 2/11/21.
Docket Numbers: ER21–929–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, SA No. 4608;
Queue No. AE2–155 (amend) to be
effective 4/30/2020.
Filed Date: 1/21/21.
E:\FR\FM\28JAN1.SGM
28JAN1
Agencies
[Federal Register Volume 86, Number 17 (Thursday, January 28, 2021)]
[Notices]
[Pages 7377-7378]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-01871]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-32-000]
Southern Star Central Gas Pipeline, Inc.; Notice of Request Under
Blanket Authorization and Establishing Intervention and Protest
Deadline
Take notice that on January 15, 2021, Southern Star Central Gas
Pipeline, Inc. (Southern Star), 4700 State Route 56, Owensboro,
Kentucky 42301 filed in the above referenced docket a prior notice
pursuant to sections 157.205 and 157.216 of the Commission's
regulations under the Natural Gas Act (NGA) and its blanket certificate
issued in Docket No. CP82-479-000 requesting authorization to abandon
two injection/withdrawal (I/W) wells (SW #2 and SW #75) at its South
Welda Storage Field in Anderson County, Kansas and one I/W well (Piqua
#2) at its Piqua Storage Field in Allen County, Kansas. Southern Star
states that the proposed abandonment of the three wells will have no
impact on its existing customers or affect the certificated parameters
of the South Welda and Piqua Storage Fields. Southern Star estimates
the cost of the project to be approximately $150,000, all as more fully
set forth in the request which is on file with the Commission and open
to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application should be directed to
Cindy Thompson, Manager Regulatory, Southern Star Central Gas Pipeline,
Inc., 4700 State Route 56, Owensboro, Kentucky 42301, by phone at (270)
852-4655 or by email at [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: You can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on [Date--60 Days].
How to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is [Date--60 Days]. A protest may also
serve as a motion to intervene so long as the protestor states it also
seeks to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is [Date--60 Days]. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position
[[Page 7378]]
regarding the proceeding, as well as your interest in the proceeding.
For an individual, this could include your status as a landowner,
ratepayer, resident of an impacted community, or recreationist. You do
not need to have property directly impacted by the project in order to
intervene. For more information about motions to intervene, refer to
the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before [Date--60 Days]. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP21-32-000 in your submission. The Commission encourages electronic
filing of submissions.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing.''
The Commission's eFiling staff are available to assist you at (202)
502-8258 or [email protected]
(2) You can file a paper copy of your submission.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
To mail via any other courier, use the following address: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at:
[email protected], 4700 State Route 56, Owensboro,
Kentucky 42301. Any subsequent submissions by an intervenor must be
served on the applicant and all other parties to the proceeding.
Contact information for parties can be downloaded from the service list
at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: January 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-01871 Filed 1-27-21; 8:45 am]