Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 7377-7378 [2021-01871]

Download as PDF Federal Register / Vol. 86, No. 17 / Thursday, January 28, 2021 / Notices Comments Due: 5 p.m. ET 2/2/21. Docket Numbers: RP21–395–000. Applicants: Algonquin Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rate—Yankee Gas 510802 Release eff 1–21–2021 to be effective 1/ 21/2021. Filed Date: 1/21/21. Accession Number: 20210121–5003. Comments Due: 5 p.m. ET 2/2/21. Docket Numbers: RP21–396–000. Applicants: Southern LNG Company, L.L.C. Description: § 4(d) Rate Filing: Dredging Surcharge Cost Adjustment— 2021 to be effective 3/1/2021. Filed Date: 1/21/21. Accession Number: 20210121–5044. Comments Due: 5 p.m. ET 2/2/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 22, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–01873 Filed 1–27–21; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:16 Jan 27, 2021 Jkt 253001 Public Participation DEPARTMENT OF ENERGY Docket Numbers: RP21–394–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 1.20.21 Negotiated Rates—Castleton Commodities Merchant Trading L.P. R– 4010–28 to be effective 2/1/2021. Filed Date: 1/21/21. Accession Number: 20210121–5002. Comments Due: 5 p.m. ET 2/2/21. Federal Energy Regulatory Commission [Docket No. CP21–32–000] Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on January 15, 2021, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 State Route 56, Owensboro, Kentucky 42301 filed in the above referenced docket a prior notice pursuant to sections 157.205 and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA) and its blanket certificate issued in Docket No. CP82–479–000 requesting authorization to abandon two injection/withdrawal (I/ W) wells (SW #2 and SW #75) at its South Welda Storage Field in Anderson County, Kansas and one I/W well (Piqua #2) at its Piqua Storage Field in Allen County, Kansas. Southern Star states that the proposed abandonment of the three wells will have no impact on its existing customers or affect the certificated parameters of the South Welda and Piqua Storage Fields. Southern Star estimates the cost of the project to be approximately $150,000, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to Cindy Thompson, Manager Regulatory, Southern Star Central Gas Pipeline, Inc., 4700 State Route 56, Owensboro, Kentucky 42301, by phone at (270) 852– 4655 or by email at cindy.thompson@ southernstar.com. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 7377 There are three ways to become involved in the Commission’s review of this project: You can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on [Date—60 Days]. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is [Date—60 Days]. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is [Date—60 Days]. As described further in Rule 214, your motion to intervene must state, to the extent known, your position 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 3 18 CFR 157.205(e). 4 18 CFR 385.214. 5 18 CFR 157.10. 2 Persons E:\FR\FM\28JAN1.SGM 28JAN1 7378 Federal Register / Vol. 86, No. 17 / Thursday, January 28, 2021 / Notices regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before [Date—60 Days]. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP21–32–000 in your submission. The Commission encourages electronic filing of submissions. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing.’’ The Commission’s eFiling staff are available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. VerDate Sep<11>2014 17:16 Jan 27, 2021 Jkt 253001 (2) You can file a paper copy of your submission. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: cindy.thompson@ southernstar.com, 4700 State Route 56, Owensboro, Kentucky 42301. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: January 22, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–01871 Filed 1–27–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1123–006. Applicants: Union Electric Company. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Description: Notice of Change in Status of Union Electric Company. Filed Date: 1/21/21. Accession Number: 20210121–5319. Comments Due: 5 p.m. ET 2/11/21. Docket Numbers: ER19–1959–004. Applicants: Avista Corporation. Description: Compliance filing: Avista Corp 845/845A Conformed Version LGIP to be effective 1/25/2021. Filed Date: 1/22/21. Accession Number: 20210122–5049. Comments Due: 5 p.m. ET 2/12/21. Docket Numbers: ER20–1839–002. Applicants: VETCO. Description: Compliance filing: Amended Order No. 864 Compliance Filing to be effective 3/26/2020. Filed Date: 1/22/21. Accession Number: 20210122–5058. Comments Due: 5 p.m. ET 2/12/21. Docket Numbers: ER20–1992–001. Applicants: Public Service Company of New Mexico. Description: Compliance filing: PNM Response to December 22, 2020 Deficiency Letter to be effective 1/27/ 2020. Filed Date: 1/21/21. Accession Number: 20210121–5300. Comments Due: 5 p.m. ET 2/11/21. Docket Numbers: ER21–926–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2021–01–21 CCSF First Amendment to Second Amended ROA to be effective 3/ 23/2021. Filed Date: 1/21/21. Accession Number: 20210121–5267. Comments Due: 5 p.m. ET 2/11/21. Docket Numbers: ER21–927–000. Applicants: Cleveland-Cliffs Steel LLC. Description: § 205(d) Rate Filing: Notice of Succession filing to be effective 1/22/2021. Filed Date: 1/21/21. Accession Number: 20210121–5269. Comments Due: 5 p.m. ET 2/11/21. Docket Numbers: ER21–928–000. Applicants: Cleveland-Cliffs Cleveland Works LLC. Description: § 205(d) Rate Filing: Notice of Succession filing to be effective 12/23/2020. Filed Date: 1/21/21. Accession Number: 20210121–5271. Comments Due: 5 p.m. ET 2/11/21. Docket Numbers: ER21–929–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, SA No. 4608; Queue No. AE2–155 (amend) to be effective 4/30/2020. Filed Date: 1/21/21. E:\FR\FM\28JAN1.SGM 28JAN1

Agencies

[Federal Register Volume 86, Number 17 (Thursday, January 28, 2021)]
[Notices]
[Pages 7377-7378]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-01871]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP21-32-000]


Southern Star Central Gas Pipeline, Inc.; Notice of Request Under 
Blanket Authorization and Establishing Intervention and Protest 
Deadline

    Take notice that on January 15, 2021, Southern Star Central Gas 
Pipeline, Inc. (Southern Star), 4700 State Route 56, Owensboro, 
Kentucky 42301 filed in the above referenced docket a prior notice 
pursuant to sections 157.205 and 157.216 of the Commission's 
regulations under the Natural Gas Act (NGA) and its blanket certificate 
issued in Docket No. CP82-479-000 requesting authorization to abandon 
two injection/withdrawal (I/W) wells (SW #2 and SW #75) at its South 
Welda Storage Field in Anderson County, Kansas and one I/W well (Piqua 
#2) at its Piqua Storage Field in Allen County, Kansas. Southern Star 
states that the proposed abandonment of the three wells will have no 
impact on its existing customers or affect the certificated parameters 
of the South Welda and Piqua Storage Fields. Southern Star estimates 
the cost of the project to be approximately $150,000, all as more fully 
set forth in the request which is on file with the Commission and open 
to public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions concerning this application should be directed to 
Cindy Thompson, Manager Regulatory, Southern Star Central Gas Pipeline, 
Inc., 4700 State Route 56, Owensboro, Kentucky 42301, by phone at (270) 
852-4655 or by email at [email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: You can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on [Date--60 Days]. 
How to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by 
the protest deadline, which is [Date--60 Days]. A protest may also 
serve as a motion to intervene so long as the protestor states it also 
seeks to be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is [Date--60 Days]. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position

[[Page 7378]]

regarding the proceeding, as well as your interest in the proceeding. 
For an individual, this could include your status as a landowner, 
ratepayer, resident of an impacted community, or recreationist. You do 
not need to have property directly impacted by the project in order to 
intervene. For more information about motions to intervene, refer to 
the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before [Date--60 Days]. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP21-32-000 in your submission. The Commission encourages electronic 
filing of submissions.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing.''
    The Commission's eFiling staff are available to assist you at (202) 
502-8258 or [email protected]
    (2) You can file a paper copy of your submission.
    To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.
    To mail via any other courier, use the following address: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: 
[email protected], 4700 State Route 56, Owensboro, 
Kentucky 42301. Any subsequent submissions by an intervenor must be 
served on the applicant and all other parties to the proceeding. 
Contact information for parties can be downloaded from the service list 
at the eService link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: January 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-01871 Filed 1-27-21; 8:45 am]
BILLING CODE 6717-01-P