j. Northern States filed its request to
use the Traditional Licensing Process on
November 30, 2020. Northern States
provided public notice of its request on
December 11, 2020. In a letter dated
January 21, 2021, the Director of the
Division of Hydropower Licensing
approved Northern States’ request to use
the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Wisconsin State Historic Preservation
Officer as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Northern States as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act,
and consultation pursuant to section
106 of the National Historic
Preservation Act.
m. Northern States filed a PreApplication Document (PAD); including
a proposed process plan and schedule
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD may be viewed
and/or printed on the Commission’s
website (https://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
o. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. 2711.
Pursuant to 18 CFR 16.20, each
application for a subsequent license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
VerDate Sep<11>2014
17:04 Jan 26, 2021
Jkt 253001
for license for this project must be filed
by November 30, 2023.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: January 21, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–01777 Filed 1–26–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Number: PR21–16–000.
Applicants: Gulf Coast Express
Pipeline LLC.
Description: Tariff filing per
284.123(b),(e)+(g): Estimated Fuel
Adjustment to be effective 12/1/2020
under PR21–16.
Filed Date: 1/14/2021.
Accession Number: 202101145036.
Comments Due: 5 p.m. ET 2/4/2021.
284.123(g) Protests Due: 5 p.m. ET 3/
15/2021.
Docket Numbers: RP21–383–000.
Applicants: National Fuel Gas Supply
Corporation.
Description: § 4(d) Rate Filing: NonConforming (Spotlight Amendments) to
be effective 2/15/2021.
Filed Date: 1/14/21.
Accession Number: 20210114–5032.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: RP21–384–000.
Applicants: Portland Natural Gas
Transmission System.
Description: § 4(d) Rate Filing:
Address Update to be effective 2/16/
2021.
Filed Date: 1/15/21.
Accession Number: 20210115–5015.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21–385–000.
Applicants: Boardwalk Storage
Company, LLC.
Description: § 4(d) Rate Filing:
Form(s) of Service Agmt GMS Updates
to be effective 3/1/2021.
Filed Date: 1/15/21.
Accession Number: 20210115–5025.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21–386–000.
Applicants: Texas Gas Transmission,
LLC.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
7285
Description: § 4(d) Rate Filing:
Form(s) of Service Agmt GMS Filing to
be effective 3/1/2021.
Filed Date: 1/15/21.
Accession Number: 20210115–5029.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21–387–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing:
Form(s) of Service Agmt GMS Filing to
be effective 3/1/2021.
Filed Date: 1/15/21.
Accession Number: 20210115–5032.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21–388–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: Create
Bistineau Transportation Service to be
effective 3/1/2021.
Filed Date: 1/15/21.
Accession Number: 20210115–5038.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21–389–000.
Applicants: TransCameron Pipeline,
LLC.
Description: § 4(d) Rate Filing:
Baseline new to be effective 3/16/2021.
Filed Date: 1/15/21.
Accession Number: 20210115–5120.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21–390–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Compliance filing
Cancellation of Rate Schedule X–1—
Docket CP21–10 Compliance Filing to
be effective 2/15/2021.
Filed Date: 1/15/21.
Accession Number: 20210115–5194.
Comments Due: 5 p.m. ET 1/27/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\27JAN1.SGM
27JAN1
7286
Federal Register / Vol. 86, No. 16 / Wednesday, January 27, 2021 / Notices
Dated: January 19, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on March 22, 2021. How
to file protests, motions to intervene,
and comments is explained below.
[FR Doc. 2021–01659 Filed 1–26–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–29–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Gas Transmission Northwest, LLC;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Protests
Take notice that on January 13, 2020,
Gas Transmission Northwest, LLC
(GTN), 700 Louisiana Street, Suite 700,
Houston, Texas 77002–2700, filed in the
above referenced docket, a prior notice
request pursuant to sections 157.205
and 157.208(b) of the Commission’s
regulations under the Natural Gas Act
(NGA) and GTN’s blanket certificate
issued in Docket No. CP82–530–000, for
authorization to construct and operate
one (1) new compressor station, the
Coyote Springs Compressor Station in
Morrow County, Oregon (Coyote
Springs Compressor Station Project), all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this prior
notice request should be directed to
Richard Bralow, Senior Legal Counsel,
Gas Transmission Northwest LLC, 700
Louisiana Street, Suite 700, Houston,
Texas 77002–2700, at (832) 320–5177 or
by email to richard_bralow@
tcenergy.com.
VerDate Sep<11>2014
17:04 Jan 26, 2021
Jkt 253001
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is March 22,
2021. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is March 22, 2021.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
4 18 CFR 385.214.
5 18 CFR 157.10.
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before March 22,
2021. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions,
and Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP21–29–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
2 Persons
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
6 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
E:\FR\FM\27JAN1.SGM
27JAN1
Agencies
[Federal Register Volume 86, Number 16 (Wednesday, January 27, 2021)]
[Notices]
[Pages 7285-7286]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-01659]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Number: PR21-16-000.
Applicants: Gulf Coast Express Pipeline LLC.
Description: Tariff filing per 284.123(b),(e)+(g): Estimated Fuel
Adjustment to be effective 12/1/2020 under PR21-16.
Filed Date: 1/14/2021.
Accession Number: 202101145036.
Comments Due: 5 p.m. ET 2/4/2021.
284.123(g) Protests Due: 5 p.m. ET 3/15/2021.
Docket Numbers: RP21-383-000.
Applicants: National Fuel Gas Supply Corporation.
Description: Sec. 4(d) Rate Filing: Non-Conforming (Spotlight
Amendments) to be effective 2/15/2021.
Filed Date: 1/14/21.
Accession Number: 20210114-5032.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: RP21-384-000.
Applicants: Portland Natural Gas Transmission System.
Description: Sec. 4(d) Rate Filing: Address Update to be effective
2/16/2021.
Filed Date: 1/15/21.
Accession Number: 20210115-5015.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21-385-000.
Applicants: Boardwalk Storage Company, LLC.
Description: Sec. 4(d) Rate Filing: Form(s) of Service Agmt GMS
Updates to be effective 3/1/2021.
Filed Date: 1/15/21.
Accession Number: 20210115-5025.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21-386-000.
Applicants: Texas Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Form(s) of Service Agmt GMS
Filing to be effective 3/1/2021.
Filed Date: 1/15/21.
Accession Number: 20210115-5029.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21-387-000.
Applicants: Gulf South Pipeline Company, LLC.
Description: Sec. 4(d) Rate Filing: Form(s) of Service Agmt GMS
Filing to be effective 3/1/2021.
Filed Date: 1/15/21.
Accession Number: 20210115-5032.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21-388-000.
Applicants: Gulf South Pipeline Company, LLC.
Description: Sec. 4(d) Rate Filing: Create Bistineau
Transportation Service to be effective 3/1/2021.
Filed Date: 1/15/21.
Accession Number: 20210115-5038.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21-389-000.
Applicants: TransCameron Pipeline, LLC.
Description: Sec. 4(d) Rate Filing: Baseline new to be effective
3/16/2021.
Filed Date: 1/15/21.
Accession Number: 20210115-5120.
Comments Due: 5 p.m. ET 1/27/21.
Docket Numbers: RP21-390-000.
Applicants: Algonquin Gas Transmission, LLC.
Description: Compliance filing Cancellation of Rate Schedule X-1--
Docket CP21-10 Compliance Filing to be effective 2/15/2021.
Filed Date: 1/15/21.
Accession Number: 20210115-5194.
Comments Due: 5 p.m. ET 1/27/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified date(s). Protests may be considered,
but intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 7286]]
Dated: January 19, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-01659 Filed 1-26-21; 8:45 am]
BILLING CODE 6717-01-P