Download as PDF 1954 Federal Register / Vol. 86, No. 6 / Monday, January 11, 2021 / Notices Total Estimated Number of Annual Responses: 62,000. Total Estimated Number of Annual Burden Hours: 31,000. Abstract: This collection is necessary to certify the identity of individuals requesting information under the Freedom of Information Act (FOIA) and Privacy Act (PA). This certification is required under 5 U.S.C. Section 552a(b). The form is used by Privacy Act requesters to obtain personal records via regular mail, fax, or email. The department will use the information to help identify first-party or third party requesters with same or similar name when requesting retrieval of their own documents. Dated: January 5, 2021. Stephanie Valentine, PRA Coordinator, Strategic Collections and Clearance, Governance and Strategy Division, Office of Chief Data Officer, Office of Planning, Evaluation and Policy Development. [FR Doc. 2021–00205 Filed 1–8–21; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–487–000] jbell on DSKJLSW7X2PROD with NOTICES Northern Natural Gas Company; Notice of Availability of the Environmental Assessment for the Proposed South Sioux City to Sioux Falls A-Line Replacement Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the South Sioux City to Sioux Falls A-line Replacement Project, proposed by Northern Natural Gas Company (Northern) in the above-referenced docket. Northern requests authorization to abandon a portion of its existing pipeline in-place and to construct, operate, and maintain new natural gas facilities in Dakota and Dixon Counties, Nebraska, and Lincoln and Union Counties, South Dakota. The EA assesses the potential environmental effects of the construction and operation of the South Sioux City to Sioux Falls A-line Replacement Project in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. VerDate Sep<11>2014 22:36 Jan 08, 2021 Jkt 253001 The U.S. Army Corps of Engineers participated as a cooperating agency in the preparation of the EA. Cooperating agencies have jurisdiction by law or special expertise with respect to resources potentially affected by the proposal and participate in the NEPA analysis. The proposed Project includes the following: • Construction of 82.2 miles of 12inch-diameter pipeline in Nebraska and South Dakota (A-line); • construction of 3.2 miles of 12-inchdiameter pipeline in South Dakota (SDM97701 Tie-Over); • construction of 1.9 miles of 3-inchdiameter pipeline in Nebraska (Ponca Branch Line); • abandonment in-place of 79.2 miles of 14- and 16-inch-diameter pipeline in Nebraska and South Dakota (A-line); • abandonment in-place of 0.2 mile of 2-inch-diameter pipeline in Nebraska (Ponca Branch Line); • abandonment in-place of 0.1 mile of 2-inch-diameter pipeline in Nebraska (Jackson Branch Line); and • construction and modification of aboveground facilities, including valves, regulators, metering facilities, pig launchers and receivers,1 an odorizer, and town border station sites. The Commission mailed a copy of the Notice of Availability to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the project area. The EA is only available in electronic format. It may be viewed and downloaded from the FERC’s website (www.ferc.gov), on the natural gas environmental documents page (https:// www.ferc.gov/industries-data/naturalgas/environment/environmentaldocuments). In addition, the EA may be accessed by using the eLibrary link on the FERC’s website. Click on the eLibrary link (https://elibrary.ferc.gov/ eLibrary/search), select ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field (i.e. CP20– 487). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The EA is not a decision document. It presents Commission staff’s 1 A pipeline ‘‘pig’’ is a device used to clean or inspect the pipeline. A pig launcher/receiver is an aboveground facility where pigs are inserted or retrieved from the pipeline. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 independent analysis of the environmental issues for the Commission to consider when addressing the merits of all issues in this proceeding. Any person wishing to comment on the EA may do so. Your comments should focus on the EA’s disclosure and discussion of potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before 5:00 p.m. Eastern Time on February 4, 2021. For your convenience, there are three methods you can use to file your comments with the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. This is an easy method for submitting brief, text-only comments on a project; (2) You can also file your comments electronically using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (CP20–487–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Only E:\FR\FM\11JAN1.SGM 11JAN1 Federal Register / Vol. 86, No. 6 / Monday, January 11, 2021 / Notices intervenors have the right to seek rehearing or judicial review of the Commission’s decision. At this point in this proceeding, the timeframe for filing timely intervention requests has expired. Any person seeking to become a party to the proceeding must file a motion to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the Commission’s Rules of Practice and Procedures (18 CFR 385.214(b)(3) and (d)) and show good cause why the time limitation should be waived. Motions to intervene are more fully described at https://www.ferc.gov/ferc-online/ferconline/how-guides. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Dated: January 5, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–00258 Filed 1–8–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2146–256] jbell on DSKJLSW7X2PROD with NOTICES Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Non-Project Use of Project Lands and Waters. b. Project No.: 2146–256. c. Date Filed: November 19, 2020. d. Applicant: Alabama Power Company. e. Name of Project: Coosa River Hydroelectric Project. VerDate Sep<11>2014 22:36 Jan 08, 2021 Jkt 253001 f. Location: The Neely-Henry Development of the Coosa River Hydroelectric Project is in Calhoun, Etowah, and St. Clair counties, Alabama; the non-project use of project lands and waters is in Etowah County. The project does not occupy federal land. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Justin Bearden, Alabama Power Company at (205) 257– 6769 or jbearden@southernco.com. i. FERC Contact: Shana High at (202) 502–8674 or shana.high@ferc.gov. j. Deadline for filing motions to intervene and protests: February 4, 2021. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2146–256. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: Alabama Power Company is requesting Commission approval to permit Godfrey’s Marina, LLC to expand their existing marina on the Neely-Henry PO 00000 Frm 00039 Fmt 4703 Sfmt 9990 1955 Development to accommodate an additional 24 watercraft. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: January 5, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–00255 Filed 1–8–21; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\11JAN1.SGM 11JAN1

Agencies

[Federal Register Volume 86, Number 6 (Monday, January 11, 2021)]
[Notices]
[Pages 1954-1955]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-00258]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP20-487-000]


Northern Natural Gas Company; Notice of Availability of the 
Environmental Assessment for the Proposed South Sioux City to Sioux 
Falls A-Line Replacement Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the South 
Sioux City to Sioux Falls A-line Replacement Project, proposed by 
Northern Natural Gas Company (Northern) in the above-referenced docket. 
Northern requests authorization to abandon a portion of its existing 
pipeline in-place and to construct, operate, and maintain new natural 
gas facilities in Dakota and Dixon Counties, Nebraska, and Lincoln and 
Union Counties, South Dakota.
    The EA assesses the potential environmental effects of the 
construction and operation of the South Sioux City to Sioux Falls A-
line Replacement Project in accordance with the requirements of the 
National Environmental Policy Act (NEPA). The FERC staff concludes that 
approval of the proposed project, with appropriate mitigating measures, 
would not constitute a major federal action significantly affecting the 
quality of the human environment.
    The U.S. Army Corps of Engineers participated as a cooperating 
agency in the preparation of the EA. Cooperating agencies have 
jurisdiction by law or special expertise with respect to resources 
potentially affected by the proposal and participate in the NEPA 
analysis.
    The proposed Project includes the following:
     Construction of 82.2 miles of 12-inch-diameter pipeline in 
Nebraska and South Dakota (A-line);
     construction of 3.2 miles of 12-inch-diameter pipeline in 
South Dakota (SDM97701 Tie-Over);
     construction of 1.9 miles of 3-inch-diameter pipeline in 
Nebraska (Ponca Branch Line);
     abandonment in-place of 79.2 miles of 14- and 16-inch-
diameter pipeline in Nebraska and South Dakota (A-line);
     abandonment in-place of 0.2 mile of 2-inch-diameter 
pipeline in Nebraska (Ponca Branch Line);
     abandonment in-place of 0.1 mile of 2-inch-diameter 
pipeline in Nebraska (Jackson Branch Line); and
     construction and modification of aboveground facilities, 
including valves, regulators, metering facilities, pig launchers and 
receivers,\1\ an odorizer, and town border station sites.
---------------------------------------------------------------------------

    \1\ A pipeline ``pig'' is a device used to clean or inspect the 
pipeline. A pig launcher/receiver is an aboveground facility where 
pigs are inserted or retrieved from the pipeline.
---------------------------------------------------------------------------

    The Commission mailed a copy of the Notice of Availability to 
federal, state, and local government representatives and agencies; 
elected officials; environmental and public interest groups; Native 
American tribes; potentially affected landowners and other interested 
individuals and groups; and newspapers and libraries in the project 
area. The EA is only available in electronic format. It may be viewed 
and downloaded from the FERC's website (www.ferc.gov), on the natural 
gas environmental documents page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). In addition, the EA 
may be accessed by using the eLibrary link on the FERC's website. Click 
on the eLibrary link (https://elibrary.ferc.gov/eLibrary/search), 
select ``General Search'' and enter the docket number in the ``Docket 
Number'' field (i.e. CP20-487). Be sure you have selected an 
appropriate date range. For assistance, please contact FERC Online 
Support at [email protected] or toll free at (866) 208-3676, 
or for TTY, contact (202) 502-8659.
    The EA is not a decision document. It presents Commission staff's 
independent analysis of the environmental issues for the Commission to 
consider when addressing the merits of all issues in this proceeding. 
Any person wishing to comment on the EA may do so. Your comments should 
focus on the EA's disclosure and discussion of potential environmental 
effects, reasonable alternatives, and measures to avoid or lessen 
environmental impacts. The more specific your comments, the more useful 
they will be. To ensure that the Commission has the opportunity to 
consider your comments prior to making its decision on this project, it 
is important that we receive your comments in Washington, DC on or 
before 5:00 p.m. Eastern Time on February 4, 2021.
    For your convenience, there are three methods you can use to file 
your comments with the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
FERC Online. This is an easy method for submitting brief, text-only 
comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's website (www.ferc.gov) under the 
link to FERC Online. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the project docket number (CP20-
487-000) on your letter. Submissions sent via the U.S. Postal Service 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852.
    Filing environmental comments will not give you intervenor status, 
but you do not need intervenor status to have your comments considered. 
Only

[[Page 1955]]

intervenors have the right to seek rehearing or judicial review of the 
Commission's decision. At this point in this proceeding, the timeframe 
for filing timely intervention requests has expired. Any person seeking 
to become a party to the proceeding must file a motion to intervene 
out-of-time pursuant to Rule 214(b)(3) and (d) of the Commission's 
Rules of Practice and Procedures (18 CFR 385.214(b)(3) and (d)) and 
show good cause why the time limitation should be waived. Motions to 
intervene are more fully described at https://www.ferc.gov/ferc-online/ferc-online/how-guides.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link 
also provides access to the texts of all formal documents issued by the 
Commission, such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to https://www.ferc.gov/ferc-online/overview to 
register for eSubscription.

    Dated: January 5, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-00258 Filed 1-8-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.