Federal Register / Vol. 86, No. 6 / Monday, January 11, 2021 / Notices
9. NCUA Rules and Regulations,
Simplification of Risk Based Capital
Requirements.
PORTIONS CLOSED TO THE PUBLIC:
1. Supervisory Action. Closed
pursuant to Exemptions (7), (8) and
(9)(ii).
2. Supervisory Action. Closed
pursuant to Exemptions (5), (7), (8),
(9)(i)(B) and (9)(ii).
3. Delegation of Authority. Closed
pursuant to Exemption (2).
4. Personnel Action. Closed pursuant
to Exemptions (2) and (6).
5. Personnel Action. Closed pursuant
to Exemptions (2) and (6).
6. Board Briefing. Closed pursuant to
Exemption (8).
CONTACT PERSON FOR MORE INFORMATION:
Melane Conyers-Ausbrooks, Secretary of
the Board, Telephone: 703–518–6304.
Melane Conyers-Ausbrooks,
Secretary of the Board.
[FR Doc. 2021–00473 Filed 1–8–21; 8:45 am]
BILLING CODE 7535–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2021–0001]
Sunshine Act Meetings
Weeks of January 11, 18,
25, February 1, 8, 15, 2021.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public.
TIME AND DATE:
Week of January 11, 2021
There are no meetings scheduled for
the week of January 11, 2021.
Week of January 18, 2021—Tentative
There are no meetings scheduled for
the week of January 18, 2021.
Week of January 25, 2021—Tentative
There are no meetings scheduled for
the week of January 25, 2021.
1119)
Additional Information: Due to
COVID–19, there will be no physical
public attendance. The public is invited
to attend the Commission’s meeting live
by webcast at the Web address—https://
video.nrc.gov/.
CONTACT PERSON FOR MORE INFORMATION:
For more information or to verify the
status of meetings, contact Wesley Held
at 301–287–3591 or via email at
Wesley.Held@nrc.gov. The schedule for
Commission meetings is subject to
change on short notice.
The NRC Commission Meeting
Schedule can be found on the internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.,
braille, large print), please notify Anne
Silk, NRC Disability Program Specialist,
at 301–287–0745, by videophone at
240–428–3217, or by email at
Anne.Silk@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
Members of the public may request to
receive this information electronically.
If you would like to be added to the
distribution, please contact the Nuclear
Regulatory Commission, Office of the
Secretary, Washington, DC 20555, at
301–415–1969, or by email at
Tyesha.Bush@nrc.gov.
The NRC is holding the meetings
under the authority of the Government
in the Sunshine Act, 5 U.S.C. 552b.
Dated: January 7, 2021.
For the Nuclear Regulatory Commission.
Wesley W. Held,
Technical Coordinator, Office of the
Secretary.
[FR Doc. 2021–00414 Filed 1–7–21; 4:15 pm]
BILLING CODE 7590–01–P
Week of February 1, 2021—Tentative
There are no meetings scheduled for
the week of February 1, 2021.
NUCLEAR REGULATORY
COMMISSION
Week of February 8, 2021—Tentative
[Docket Nos. 50–219; 72–15; 50–293, and
72–1044; NRC–2020–0282]
There are no meetings scheduled for
the week of February 8, 2021.
jbell on DSKJLSW7X2PROD with NOTICES
Week of February 15, 2021—Tentative
10:00 a.m. Briefing on Equal
Employment Opportunity,
Affirmative Employment, and Small
Business (Public Meeting)
(Contact: Nadim Khan: 301–415–
22:36 Jan 08, 2021
Jkt 253001
Nuclear Regulatory
Commission.
ACTION: Exemptions; issuance.
AGENCY:
Thursday, February 18, 2021
VerDate Sep<11>2014
Holtec Decommissioning International,
LLC
The U.S. Nuclear Regulatory
Commission (NRC) issued two
exemptions in response to requests from
SUMMARY:
PO 00000
Frm 00087
Fmt 4703
Sfmt 4703
2003
Holtec Decommissioning International,
LLC. The exemptions afford the licensee
temporary relief from a certain
requirement under NRC regulations.
The exemptions are in response to the
licensee’s requests for relief due to the
coronavirus disease 2019 (COVID–19)
public health emergency (PHE). The
NRC is issuing a single notice to
announce the issuance of the
exemptions.
DATES: The two exemptions were issued
on December 16, 2020, in response to
requests submitted by the licensee on
November 20, 2020 and supplemented
on December 9 and 10, 2020.
ADDRESSES: Please refer to Docket ID
NRC–2020–0282 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2020–0282. Address
questions about Docket IDs in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
Jennifer.Borges@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov.
• Attention: The PDR, where you may
examine and order copies of public
documents, is currently closed. You
may submit your request to the PDR via
email at pdr.resource@nrc.gov or call 1–
800–397–4209 or 301–415–4737,
between 8:00 a.m. and 4:00 p.m. (EST),
Monday through Friday, except Federal
holidays.
For the convenience of the reader,
instructions about obtaining materials
referenced in this document are
provided in the ‘‘Availability of
Documents’’ section.
FOR FURTHER INFORMATION CONTACT:
Bruce Watson, Office of Nuclear
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–6221, email: Bruce.Watson@
nrc.gov.
SUPPLEMENTARY INFORMATION:
E:\FR\FM\11JAN1.SGM
11JAN1
2004
Federal Register / Vol. 86, No. 6 / Monday, January 11, 2021 / Notices
I. Introduction
The NRC issued two exemptions in
response to requests from the licensee
dated November 20, 2020, and
supplemented on December 9 and 10,
2020. The exemptions afford the
licensee temporary relief from a certain
requirement of part 73 of title 10 of the
Code of Federal Regulations (10 CFR),
‘‘Physical Protection of Plants and
Materials.’’
The exemptions from 10 CFR part 73,
appendix B, ‘‘General Criteria for
Security Personnel,’’ section VI,
‘‘Nuclear Power Reactor Training and
Qualification Plan for Personnel
Performing Security Program Duties,’’
subsection VI.C.3(I)(1) for Holtec
Decommissioning International, LLC
(for Oyster Creek Nuclear Generating
Station and Pilgrim Nuclear Power
Station), will help to ensure that these
regulatory requirements do not unduly
limit licensee flexibility in using
personnel resources in a manner that
most effectively manages the impacts of
the COVID–19 PHE on maintaining the
required security posture at the
facilities, while performing
decommissioning activities and the
implementation of the licensees’ NRC
approved security plans, protective
strategy, and implementing procedures.
The licensee has committed to certain
security measures to ensure response
readiness and for their security
personnel to maintain performance
capability.
The NRC is periodically providing
this compiled listing of related
exemptions using a single Federal
Register notice for COVID–19 related
exemptions, instead of issuing
individual Federal Register notices. The
compiled listing provides transparency
regarding the number of exemptions the
NRC is issuing related to a given
regulatory requirement. Additionally,
the NRC publishes a list of approved
licensing actions related to the COVID–
19 PHE on its public website at https://
www.nrc.gov/about-nrc/covid-19/
materials/storage.html and https://
www.nrc.gov/about-nrc/covid-19/
materials/decommissioning.html.
II. Availability of Documents
The following table provides the
facility name, docket number, document
description, and ADAMS accession
numbers for documents related to each
exemption issued. Additional details on
each exemption issued, including the
exemption request submitted by the
respective licensee and the NRC’s
decision, are provided in each
exemption approval listed in the tables.
For additional directions on accessing
information in ADAMS, see the
ADDRESSES section of this document.
Document description
ADAMS accession No.
Holtec Decommissioning International, LLC.
Oyster Creek Nuclear Generating Station
Docket Nos. 50–219 and 72–15
Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding
Annual Force-on-Force (FOF) Exercises, Due to COVID 19 Pandemic.
Response to Request for Additional Information on Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID
19 Pandemic, dated December 9, 2020.
Oyster Creek Nuclear Generating Station—Exemption from Annual Force-on-Force Exercise Requirement of 10
CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ section VI.C.3.(l)(1), dated December 16,
2020.
Non-public, withheld under
10 CFR 2.390.
ML20345A146.
ML20345A291.
Holtec Decommissioning International, LLC.
Pilgrim Nuclear Power Station
Docket Nos. 50–293 and 72–1044
Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding
Annual Force-on-Force (FOF) Exercises, Due to COVID 19 Pandemic.
Supplemental Information to Support Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID 19 Pandemic,
dated December 10, 2020.
Pilgrim Nuclear Power Station—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73,
appendix B, ‘‘General Criteria for Security Personnel,’’ section VI.C.3.(l)(1), dated December 16, 2020.
Dated: January 5, 2021.
For the Nuclear Regulatory Commission.
Bruce Watson,
Chief, Reactor Decommissioning Branch,
Division of Decommissioning, Uranium
Recovery and Waste Programs, Office of
Nuclear Material Safety and Safeguards.
[FR Doc. 2021–00201 Filed 1–8–21; 8:45 am]
jbell on DSKJLSW7X2PROD with NOTICES
BILLING CODE 7590–01–P
OFFICE OF PERSONNEL
MANAGEMENT
Office of Personnel
Management.
The Office of Personnel
Management (OPM) is announcing an
online centralized portal that includes
information about our guidance and a
searchable, indexed listing of, and links
to, our guidance documents. The portal,
located on our website, does not
displace other listings of or links to our
guidance documents in topic-specific
sections of our website.
SUMMARY:
The guidance portal is accessible
by the public on the date of publication
of this notice.
ADDRESSES:
Jkt 253001
PO 00000
Frm 00088
Fmt 4703
ML20345A324.
FOR FURTHER INFORMATION CONTACT:
OPM’s guidance Web Portal
is available at www.opm.gov/guidance.
AGENCY:
22:36 Jan 08, 2021
Notice.
DATES:
OPM Guidance Documents Web Portal
VerDate Sep<11>2014
ACTION:
Non-public, withheld under
10 CFR 2.390.
ML20345A199.
Sfmt 4703
Alexys Stanley, Regulatory Affairs
Analyst, and regulatory.information@
opm.gov or via telephone at (202) 606–
1000.
SUPPLEMENTARY INFORMATION: Executive
Order 13891, and OMB implementing
guidance memorandum M–20–02,
require Federal agencies to establish an
online, centralized, searchable database
of their guidance documents, to include
certain identifying information, and to
provide information on how to
comment on open guidance and how to
request revisions to the agency’s
guidance. They also require agencies to
publish notice in the Federal Register of
the new guidance portal.
E:\FR\FM\11JAN1.SGM
11JAN1
Agencies
[Federal Register Volume 86, Number 6 (Monday, January 11, 2021)]
[Notices]
[Pages 2003-2004]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-00201]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-219; 72-15; 50-293, and 72-1044; NRC-2020-0282]
Holtec Decommissioning International, LLC
AGENCY: Nuclear Regulatory Commission.
ACTION: Exemptions; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) issued two
exemptions in response to requests from Holtec Decommissioning
International, LLC. The exemptions afford the licensee temporary relief
from a certain requirement under NRC regulations. The exemptions are in
response to the licensee's requests for relief due to the coronavirus
disease 2019 (COVID-19) public health emergency (PHE). The NRC is
issuing a single notice to announce the issuance of the exemptions.
DATES: The two exemptions were issued on December 16, 2020, in response
to requests submitted by the licensee on November 20, 2020 and
supplemented on December 9 and 10, 2020.
ADDRESSES: Please refer to Docket ID NRC-2020-0282 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0282. Address
questions about Docket IDs in Regulations.gov to Jennifer Borges;
telephone: 301-287-9127; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected].
Attention: The PDR, where you may examine and order copies
of public documents, is currently closed. You may submit your request
to the PDR via email at [email protected] or call 1-800-397-4209 or
301-415-4737, between 8:00 a.m. and 4:00 p.m. (EST), Monday through
Friday, except Federal holidays.
For the convenience of the reader, instructions about obtaining
materials referenced in this document are provided in the
``Availability of Documents'' section.
FOR FURTHER INFORMATION CONTACT: Bruce Watson, Office of Nuclear
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001; telephone: 301-415-6221, email:
[email protected].
SUPPLEMENTARY INFORMATION:
[[Page 2004]]
I. Introduction
The NRC issued two exemptions in response to requests from the
licensee dated November 20, 2020, and supplemented on December 9 and
10, 2020. The exemptions afford the licensee temporary relief from a
certain requirement of part 73 of title 10 of the Code of Federal
Regulations (10 CFR), ``Physical Protection of Plants and Materials.''
The exemptions from 10 CFR part 73, appendix B, ``General Criteria
for Security Personnel,'' section VI, ``Nuclear Power Reactor Training
and Qualification Plan for Personnel Performing Security Program
Duties,'' subsection VI.C.3(I)(1) for Holtec Decommissioning
International, LLC (for Oyster Creek Nuclear Generating Station and
Pilgrim Nuclear Power Station), will help to ensure that these
regulatory requirements do not unduly limit licensee flexibility in
using personnel resources in a manner that most effectively manages the
impacts of the COVID-19 PHE on maintaining the required security
posture at the facilities, while performing decommissioning activities
and the implementation of the licensees' NRC approved security plans,
protective strategy, and implementing procedures. The licensee has
committed to certain security measures to ensure response readiness and
for their security personnel to maintain performance capability.
The NRC is periodically providing this compiled listing of related
exemptions using a single Federal Register notice for COVID-19 related
exemptions, instead of issuing individual Federal Register notices. The
compiled listing provides transparency regarding the number of
exemptions the NRC is issuing related to a given regulatory
requirement. Additionally, the NRC publishes a list of approved
licensing actions related to the COVID-19 PHE on its public website at
https://www.nrc.gov/about-nrc/covid-19/materials/storage.html and
https://www.nrc.gov/about-nrc/covid-19/materials/decommissioning.html.
II. Availability of Documents
The following table provides the facility name, docket number,
document description, and ADAMS accession numbers for documents related
to each exemption issued. Additional details on each exemption issued,
including the exemption request submitted by the respective licensee
and the NRC's decision, are provided in each exemption approval listed
in the tables. For additional directions on accessing information in
ADAMS, see the ADDRESSES section of this document.
------------------------------------------------------------------------
Document description ADAMS accession No.
------------------------------------------------------------------------
Holtec Decommissioning International, LLC.
Oyster Creek Nuclear Generating Station
Docket Nos. 50-219 and 72-15
------------------------------------------------------------------------
Request for a One-Time Exemption from 10 CFR Non-public, withheld
part 73, appendix B, section VI, subsection under 10 CFR 2.390.
C.3.(I)(1) Regarding Annual Force-on-Force
(FOF) Exercises, Due to COVID 19 Pandemic.
Response to Request for Additional Information ML20345A146.
on Request for a One-Time Exemption from 10 CFR
part 73, appendix B, section VI, subsection
C.3.(I)(1) Regarding Annual Force-on-Force
(FOF) Exercises, Due to COVID 19 Pandemic,
dated December 9, 2020.
Oyster Creek Nuclear Generating Station-- ML20345A291.
Exemption from Annual Force-on-Force Exercise
Requirement of 10 CFR part 73, appendix B,
``General Criteria for Security Personnel,''
section VI.C.3.(l)(1), dated December 16, 2020.
------------------------------------------------------------------------
Holtec Decommissioning International, LLC.
Pilgrim Nuclear Power Station
Docket Nos. 50-293 and 72-1044
------------------------------------------------------------------------
Request for a One-Time Exemption from 10 CFR Non-public, withheld
part 73, appendix B, section VI, subsection under 10 CFR 2.390.
C.3.(I)(1) Regarding Annual Force-on-Force
(FOF) Exercises, Due to COVID 19 Pandemic.
Supplemental Information to Support Request for ML20345A199.
a One-Time Exemption from 10 CFR part 73,
appendix B, section VI, subsection C.3.(I)(1)
Regarding Annual Force-on-Force (FOF)
Exercises, Due to COVID 19 Pandemic, dated
December 10, 2020.
Pilgrim Nuclear Power Station--Exemption from ML20345A324.
Annual Force-on-Force Exercise Requirement of
10 CFR part 73, appendix B, ``General Criteria
for Security Personnel,'' section
VI.C.3.(l)(1), dated December 16, 2020.
------------------------------------------------------------------------
Dated: January 5, 2021.
For the Nuclear Regulatory Commission.
Bruce Watson,
Chief, Reactor Decommissioning Branch, Division of Decommissioning,
Uranium Recovery and Waste Programs, Office of Nuclear Material Safety
and Safeguards.
[FR Doc. 2021-00201 Filed 1-8-21; 8:45 am]