Holtec Decommissioning International, LLC, 2003-2004 [2021-00201]

Download as PDF Federal Register / Vol. 86, No. 6 / Monday, January 11, 2021 / Notices 9. NCUA Rules and Regulations, Simplification of Risk Based Capital Requirements. PORTIONS CLOSED TO THE PUBLIC: 1. Supervisory Action. Closed pursuant to Exemptions (7), (8) and (9)(ii). 2. Supervisory Action. Closed pursuant to Exemptions (5), (7), (8), (9)(i)(B) and (9)(ii). 3. Delegation of Authority. Closed pursuant to Exemption (2). 4. Personnel Action. Closed pursuant to Exemptions (2) and (6). 5. Personnel Action. Closed pursuant to Exemptions (2) and (6). 6. Board Briefing. Closed pursuant to Exemption (8). CONTACT PERSON FOR MORE INFORMATION: Melane Conyers-Ausbrooks, Secretary of the Board, Telephone: 703–518–6304. Melane Conyers-Ausbrooks, Secretary of the Board. [FR Doc. 2021–00473 Filed 1–8–21; 8:45 am] BILLING CODE 7535–01–P NUCLEAR REGULATORY COMMISSION [NRC–2021–0001] Sunshine Act Meetings Weeks of January 11, 18, 25, February 1, 8, 15, 2021. PLACE: Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. STATUS: Public. TIME AND DATE: Week of January 11, 2021 There are no meetings scheduled for the week of January 11, 2021. Week of January 18, 2021—Tentative There are no meetings scheduled for the week of January 18, 2021. Week of January 25, 2021—Tentative There are no meetings scheduled for the week of January 25, 2021. 1119) Additional Information: Due to COVID–19, there will be no physical public attendance. The public is invited to attend the Commission’s meeting live by webcast at the Web address—https:// video.nrc.gov/. CONTACT PERSON FOR MORE INFORMATION: For more information or to verify the status of meetings, contact Wesley Held at 301–287–3591 or via email at Wesley.Held@nrc.gov. The schedule for Commission meetings is subject to change on short notice. The NRC Commission Meeting Schedule can be found on the internet at: https://www.nrc.gov/public-involve/ public-meetings/schedule.html. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in these public meetings or need this meeting notice or the transcript or other information from the public meetings in another format (e.g., braille, large print), please notify Anne Silk, NRC Disability Program Specialist, at 301–287–0745, by videophone at 240–428–3217, or by email at Anne.Silk@nrc.gov. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Members of the public may request to receive this information electronically. If you would like to be added to the distribution, please contact the Nuclear Regulatory Commission, Office of the Secretary, Washington, DC 20555, at 301–415–1969, or by email at Tyesha.Bush@nrc.gov. The NRC is holding the meetings under the authority of the Government in the Sunshine Act, 5 U.S.C. 552b. Dated: January 7, 2021. For the Nuclear Regulatory Commission. Wesley W. Held, Technical Coordinator, Office of the Secretary. [FR Doc. 2021–00414 Filed 1–7–21; 4:15 pm] BILLING CODE 7590–01–P Week of February 1, 2021—Tentative There are no meetings scheduled for the week of February 1, 2021. NUCLEAR REGULATORY COMMISSION Week of February 8, 2021—Tentative [Docket Nos. 50–219; 72–15; 50–293, and 72–1044; NRC–2020–0282] There are no meetings scheduled for the week of February 8, 2021. jbell on DSKJLSW7X2PROD with NOTICES Week of February 15, 2021—Tentative 10:00 a.m. Briefing on Equal Employment Opportunity, Affirmative Employment, and Small Business (Public Meeting) (Contact: Nadim Khan: 301–415– 22:36 Jan 08, 2021 Jkt 253001 Nuclear Regulatory Commission. ACTION: Exemptions; issuance. AGENCY: Thursday, February 18, 2021 VerDate Sep<11>2014 Holtec Decommissioning International, LLC The U.S. Nuclear Regulatory Commission (NRC) issued two exemptions in response to requests from SUMMARY: PO 00000 Frm 00087 Fmt 4703 Sfmt 4703 2003 Holtec Decommissioning International, LLC. The exemptions afford the licensee temporary relief from a certain requirement under NRC regulations. The exemptions are in response to the licensee’s requests for relief due to the coronavirus disease 2019 (COVID–19) public health emergency (PHE). The NRC is issuing a single notice to announce the issuance of the exemptions. DATES: The two exemptions were issued on December 16, 2020, in response to requests submitted by the licensee on November 20, 2020 and supplemented on December 9 and 10, 2020. ADDRESSES: Please refer to Docket ID NRC–2020–0282 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2020–0282. Address questions about Docket IDs in Regulations.gov to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. • Attention: The PDR, where you may examine and order copies of public documents, is currently closed. You may submit your request to the PDR via email at pdr.resource@nrc.gov or call 1– 800–397–4209 or 301–415–4737, between 8:00 a.m. and 4:00 p.m. (EST), Monday through Friday, except Federal holidays. For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the ‘‘Availability of Documents’’ section. FOR FURTHER INFORMATION CONTACT: Bruce Watson, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415–6221, email: Bruce.Watson@ nrc.gov. SUPPLEMENTARY INFORMATION: E:\FR\FM\11JAN1.SGM 11JAN1 2004 Federal Register / Vol. 86, No. 6 / Monday, January 11, 2021 / Notices I. Introduction The NRC issued two exemptions in response to requests from the licensee dated November 20, 2020, and supplemented on December 9 and 10, 2020. The exemptions afford the licensee temporary relief from a certain requirement of part 73 of title 10 of the Code of Federal Regulations (10 CFR), ‘‘Physical Protection of Plants and Materials.’’ The exemptions from 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ section VI, ‘‘Nuclear Power Reactor Training and Qualification Plan for Personnel Performing Security Program Duties,’’ subsection VI.C.3(I)(1) for Holtec Decommissioning International, LLC (for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station), will help to ensure that these regulatory requirements do not unduly limit licensee flexibility in using personnel resources in a manner that most effectively manages the impacts of the COVID–19 PHE on maintaining the required security posture at the facilities, while performing decommissioning activities and the implementation of the licensees’ NRC approved security plans, protective strategy, and implementing procedures. The licensee has committed to certain security measures to ensure response readiness and for their security personnel to maintain performance capability. The NRC is periodically providing this compiled listing of related exemptions using a single Federal Register notice for COVID–19 related exemptions, instead of issuing individual Federal Register notices. The compiled listing provides transparency regarding the number of exemptions the NRC is issuing related to a given regulatory requirement. Additionally, the NRC publishes a list of approved licensing actions related to the COVID– 19 PHE on its public website at https:// www.nrc.gov/about-nrc/covid-19/ materials/storage.html and https:// www.nrc.gov/about-nrc/covid-19/ materials/decommissioning.html. II. Availability of Documents The following table provides the facility name, docket number, document description, and ADAMS accession numbers for documents related to each exemption issued. Additional details on each exemption issued, including the exemption request submitted by the respective licensee and the NRC’s decision, are provided in each exemption approval listed in the tables. For additional directions on accessing information in ADAMS, see the ADDRESSES section of this document. Document description ADAMS accession No. Holtec Decommissioning International, LLC. Oyster Creek Nuclear Generating Station Docket Nos. 50–219 and 72–15 Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID 19 Pandemic. Response to Request for Additional Information on Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID 19 Pandemic, dated December 9, 2020. Oyster Creek Nuclear Generating Station—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ section VI.C.3.(l)(1), dated December 16, 2020. Non-public, withheld under 10 CFR 2.390. ML20345A146. ML20345A291. Holtec Decommissioning International, LLC. Pilgrim Nuclear Power Station Docket Nos. 50–293 and 72–1044 Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID 19 Pandemic. Supplemental Information to Support Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID 19 Pandemic, dated December 10, 2020. Pilgrim Nuclear Power Station—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ section VI.C.3.(l)(1), dated December 16, 2020. Dated: January 5, 2021. For the Nuclear Regulatory Commission. Bruce Watson, Chief, Reactor Decommissioning Branch, Division of Decommissioning, Uranium Recovery and Waste Programs, Office of Nuclear Material Safety and Safeguards. [FR Doc. 2021–00201 Filed 1–8–21; 8:45 am] jbell on DSKJLSW7X2PROD with NOTICES BILLING CODE 7590–01–P OFFICE OF PERSONNEL MANAGEMENT Office of Personnel Management. The Office of Personnel Management (OPM) is announcing an online centralized portal that includes information about our guidance and a searchable, indexed listing of, and links to, our guidance documents. The portal, located on our website, does not displace other listings of or links to our guidance documents in topic-specific sections of our website. SUMMARY: The guidance portal is accessible by the public on the date of publication of this notice. ADDRESSES: Jkt 253001 PO 00000 Frm 00088 Fmt 4703 ML20345A324. FOR FURTHER INFORMATION CONTACT: OPM’s guidance Web Portal is available at www.opm.gov/guidance. AGENCY: 22:36 Jan 08, 2021 Notice. DATES: OPM Guidance Documents Web Portal VerDate Sep<11>2014 ACTION: Non-public, withheld under 10 CFR 2.390. ML20345A199. Sfmt 4703 Alexys Stanley, Regulatory Affairs Analyst, and regulatory.information@ opm.gov or via telephone at (202) 606– 1000. SUPPLEMENTARY INFORMATION: Executive Order 13891, and OMB implementing guidance memorandum M–20–02, require Federal agencies to establish an online, centralized, searchable database of their guidance documents, to include certain identifying information, and to provide information on how to comment on open guidance and how to request revisions to the agency’s guidance. They also require agencies to publish notice in the Federal Register of the new guidance portal. E:\FR\FM\11JAN1.SGM 11JAN1

Agencies

[Federal Register Volume 86, Number 6 (Monday, January 11, 2021)]
[Notices]
[Pages 2003-2004]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-00201]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-219; 72-15; 50-293, and 72-1044; NRC-2020-0282]


Holtec Decommissioning International, LLC

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemptions; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) issued two 
exemptions in response to requests from Holtec Decommissioning 
International, LLC. The exemptions afford the licensee temporary relief 
from a certain requirement under NRC regulations. The exemptions are in 
response to the licensee's requests for relief due to the coronavirus 
disease 2019 (COVID-19) public health emergency (PHE). The NRC is 
issuing a single notice to announce the issuance of the exemptions.

DATES: The two exemptions were issued on December 16, 2020, in response 
to requests submitted by the licensee on November 20, 2020 and 
supplemented on December 9 and 10, 2020.

ADDRESSES: Please refer to Docket ID NRC-2020-0282 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0282. Address 
questions about Docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected].
     Attention: The PDR, where you may examine and order copies 
of public documents, is currently closed. You may submit your request 
to the PDR via email at [email protected] or call 1-800-397-4209 or 
301-415-4737, between 8:00 a.m. and 4:00 p.m. (EST), Monday through 
Friday, except Federal holidays.
    For the convenience of the reader, instructions about obtaining 
materials referenced in this document are provided in the 
``Availability of Documents'' section.

FOR FURTHER INFORMATION CONTACT: Bruce Watson, Office of Nuclear 
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001; telephone: 301-415-6221, email: 
[email protected].

SUPPLEMENTARY INFORMATION:

[[Page 2004]]

I. Introduction

    The NRC issued two exemptions in response to requests from the 
licensee dated November 20, 2020, and supplemented on December 9 and 
10, 2020. The exemptions afford the licensee temporary relief from a 
certain requirement of part 73 of title 10 of the Code of Federal 
Regulations (10 CFR), ``Physical Protection of Plants and Materials.''
    The exemptions from 10 CFR part 73, appendix B, ``General Criteria 
for Security Personnel,'' section VI, ``Nuclear Power Reactor Training 
and Qualification Plan for Personnel Performing Security Program 
Duties,'' subsection VI.C.3(I)(1) for Holtec Decommissioning 
International, LLC (for Oyster Creek Nuclear Generating Station and 
Pilgrim Nuclear Power Station), will help to ensure that these 
regulatory requirements do not unduly limit licensee flexibility in 
using personnel resources in a manner that most effectively manages the 
impacts of the COVID-19 PHE on maintaining the required security 
posture at the facilities, while performing decommissioning activities 
and the implementation of the licensees' NRC approved security plans, 
protective strategy, and implementing procedures. The licensee has 
committed to certain security measures to ensure response readiness and 
for their security personnel to maintain performance capability.
    The NRC is periodically providing this compiled listing of related 
exemptions using a single Federal Register notice for COVID-19 related 
exemptions, instead of issuing individual Federal Register notices. The 
compiled listing provides transparency regarding the number of 
exemptions the NRC is issuing related to a given regulatory 
requirement. Additionally, the NRC publishes a list of approved 
licensing actions related to the COVID-19 PHE on its public website at 
https://www.nrc.gov/about-nrc/covid-19/materials/storage.html and 
https://www.nrc.gov/about-nrc/covid-19/materials/decommissioning.html.

II. Availability of Documents

    The following table provides the facility name, docket number, 
document description, and ADAMS accession numbers for documents related 
to each exemption issued. Additional details on each exemption issued, 
including the exemption request submitted by the respective licensee 
and the NRC's decision, are provided in each exemption approval listed 
in the tables. For additional directions on accessing information in 
ADAMS, see the ADDRESSES section of this document.

------------------------------------------------------------------------
              Document description                  ADAMS accession No.
------------------------------------------------------------------------
               Holtec Decommissioning International, LLC.
                 Oyster Creek Nuclear Generating Station
                      Docket Nos. 50-219 and 72-15
------------------------------------------------------------------------
Request for a One-Time Exemption from 10 CFR      Non-public, withheld
 part 73, appendix B, section VI, subsection       under 10 CFR 2.390.
 C.3.(I)(1) Regarding Annual Force-on-Force
 (FOF) Exercises, Due to COVID 19 Pandemic.
Response to Request for Additional Information    ML20345A146.
 on Request for a One-Time Exemption from 10 CFR
 part 73, appendix B, section VI, subsection
 C.3.(I)(1) Regarding Annual Force-on-Force
 (FOF) Exercises, Due to COVID 19 Pandemic,
 dated December 9, 2020.
Oyster Creek Nuclear Generating Station--         ML20345A291.
 Exemption from Annual Force-on-Force Exercise
 Requirement of 10 CFR part 73, appendix B,
 ``General Criteria for Security Personnel,''
 section VI.C.3.(l)(1), dated December 16, 2020.
------------------------------------------------------------------------
               Holtec Decommissioning International, LLC.
                      Pilgrim Nuclear Power Station
                     Docket Nos. 50-293 and 72-1044
------------------------------------------------------------------------
Request for a One-Time Exemption from 10 CFR      Non-public, withheld
 part 73, appendix B, section VI, subsection       under 10 CFR 2.390.
 C.3.(I)(1) Regarding Annual Force-on-Force
 (FOF) Exercises, Due to COVID 19 Pandemic.
Supplemental Information to Support Request for   ML20345A199.
 a One-Time Exemption from 10 CFR part 73,
 appendix B, section VI, subsection C.3.(I)(1)
 Regarding Annual Force-on-Force (FOF)
 Exercises, Due to COVID 19 Pandemic, dated
 December 10, 2020.
Pilgrim Nuclear Power Station--Exemption from     ML20345A324.
 Annual Force-on-Force Exercise Requirement of
 10 CFR part 73, appendix B, ``General Criteria
 for Security Personnel,'' section
 VI.C.3.(l)(1), dated December 16, 2020.
------------------------------------------------------------------------


    Dated: January 5, 2021.

    For the Nuclear Regulatory Commission.
Bruce Watson,
Chief, Reactor Decommissioning Branch, Division of Decommissioning, 
Uranium Recovery and Waste Programs, Office of Nuclear Material Safety 
and Safeguards.
[FR Doc. 2021-00201 Filed 1-8-21; 8:45 am]
BILLING CODE 7590-01-P