Eastern Gas Transmission & Storage, Inc.; Notice of Technical Conference, 83550 [2020-28234]
Download as PDF
83550
Federal Register / Vol. 85, No. 246 / Tuesday, December 22, 2020 / Notices
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the eLibrary link as
described above. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on January 6, 2021.
Dated: December 16, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–28250 Filed 12–21–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP21–144–000]
jbell on DSKJLSW7X2PROD with NOTICES
Eastern Gas Transmission & Storage,
Inc.; Notice of Technical Conference
Take notice that a virtual technical
conference will be held on January 28,
2021, at 10:00 a.m. (EST) to discuss
comments and protests filed in the
proceeding captioned above.
At the technical conference, the
parties to the proceeding should be
prepared to discuss all issues set for
technical conference as established in
9 18
CFR 385.214(b)(3) and (d).
VerDate Sep<11>2014
17:30 Dec 21, 2020
Jkt 253001
the November 30, 2020 Order
(Dominion Energy Transmission, Inc.,
173 FERC 61,188 (2020)).
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
email accessibility@ferc.gov or call toll
free 1–866–208–3372 (voice) or 202–
502–8659 (TTY); or send a fax to 202–
208–2106 with the required
accommodations.
All interested parties are invited to
participate remotely. Staff will use the
WebEx platform to view and present
supporting documents related to this
docket. For more information, please
contact Brandon Henke at
brandon.henke@ferc.gov or call 202–
502–8386 by January 21, 2021, to
register and to receive specific
instructions on how to participate in the
technical conference.
Dated: December 16, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–28234 Filed 12–21–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1892–030]
Great River Hydro, LLC; Notice
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
Take notice that the following
amended hydroelectric application has
been filed with the Commission and is
available for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 1892–030.
c. Date Material Amendments Filed:
December 7, 2020.
d. Applicant: Great River Hydro, LLC
(Great River Hydro).
e. Name of Project: Wilder
Hydroelectric Project.
f. Location: The existing project is
located on the Connecticut River in
Orange and Windsor Counties, Vermont,
and Grafton County, New Hampshire.
There are no federal lands within the
project boundary.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: John Ragonese,
FERC License Manager, Great River
Hydro, LLC, 40 Pleasant Street, Suite
202, Portsmouth, NH 03801; (603) 498–
2851 or jragonese@greatriverhydro.com.
i. FERC Contact: Steve Kartalia, (202)
502–6131 or stephen.kartalia@ferc.gov.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
j. This application is not ready for
environmental analysis at this time.
k. Great River Hydro filed an
application for a new license for the
Wilder Hydroelectric Project No. 1892
on May 1, 2017. In the license
application, Great River Hydro stated
that it could not develop a complete
licensing proposal for the project since
many of the required environmental
studies were not complete as of May 1,
2017. Great River Hydro indicated that
it would amend the license application
after completing additional field work,
consultation, and analyses on the
required studies. Great River Hydro
filed material amendments to the final
license application on December 7,
2020.
l. Project Description: The existing
Wilder Project consists of: (1) A 1,546foot-long, 59-foot-high, concrete dam
that includes: (a) A 400-foot-long nonoverflow, earthen embankment (north
embankment); (b) a 232-foot-long nonoverflow, concrete bulkhead; (c) a 208foot-long concrete forebay; (d) a 526foot-long concrete, gravity spillway that
includes: (i) Six 30-foot-high, 36-footlong tainter gates; (ii) four 17-foot-high,
50-foot-wide stanchion flashboards; (iii)
a 15-foot-high, 20-foot-long skimmer
gate (north gate); and (iv) a 10-foot-high,
10-foot-long skimmer gate (south gate);
and (e) a 180-foot-long non-overflow,
earthen embankment (south
embankment); (2) a 45-mile-long, 3,100acre impoundment with a useable
storage volume of 13,350 acre-feet
between elevations 380 and 385 feet
National Geodetic Vertical Datum of
1929 (NGVD 29); (3) four approximately
25-foot-high, 20-foot-wide trashracks
with 5-inch clear bar spacing and one
approximately 28-foot-high, 20-footwide trashrack with 1.625-inch clear bar
spacing; (4) a 181-foot-long, 50-footwide, 50-foot-high steel frame, brick
powerhouse containing two 16.2megawatt (MW) adjustable-blade Kaplan
turbine-generator units and one 3.2–MW
vertical Francis turbine-generator unit
for a total project capacity of 35.6 MW;
(5) three concrete draft tubes ranging
from 9.5 to 20.5 feet in diameter; (6)
13.8-kilovolt generator leads that
connect the turbine-generator units to
two substation transformers; (7) an
approximately 580-foot-long, 6-footwide fishway; and (8) appurtenant
facilities.
Great River Hydro operates the project
in coordination with its downstream
Bellows Falls Project No. 1855 and
Vernon Project No. 1904 and in a
peaking mode. Average annual
generation is approximately 156,303
MW-hours. Great River Hydro is
proposing changes to project operation
E:\FR\FM\22DEN1.SGM
22DEN1
Agencies
[Federal Register Volume 85, Number 246 (Tuesday, December 22, 2020)]
[Notices]
[Page 83550]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-28234]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP21-144-000]
Eastern Gas Transmission & Storage, Inc.; Notice of Technical
Conference
Take notice that a virtual technical conference will be held on
January 28, 2021, at 10:00 a.m. (EST) to discuss comments and protests
filed in the proceeding captioned above.
At the technical conference, the parties to the proceeding should
be prepared to discuss all issues set for technical conference as
established in the November 30, 2020 Order (Dominion Energy
Transmission, Inc., 173 FERC 61,188 (2020)).
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
email [email protected] or call toll free 1-866-208-3372 (voice)
or 202-502-8659 (TTY); or send a fax to 202-208-2106 with the required
accommodations.
All interested parties are invited to participate remotely. Staff
will use the WebEx platform to view and present supporting documents
related to this docket. For more information, please contact Brandon
Henke at [email protected] or call 202-502-8386 by January 21,
2021, to register and to receive specific instructions on how to
participate in the technical conference.
Dated: December 16, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-28234 Filed 12-21-20; 8:45 am]
BILLING CODE 6717-01-P